HomeMy WebLinkAboutAQ_F_4200201_20220810_CMPL_CompRptAugust 5, 2022
Regional Supervisor
North Carolina Division of Air Quality
Raleigh Regional Office
3800 Barrett Drive Raleigh, NC 27609
919-791-4200
RE: Notification of Initial Startup EU0 I 5
Binderholz Enfield LLC
Facility ID Number 4200201
Air Permit Number 10231R03
binderholz ■
NC Dept ofEnvironmcntaJ Quality
AUG 10 2022
.Raleigh Regional Office
In accordance with section 2.1.A.8.o.ii of Title V Air Permit nu mber I 023 1 R03, Binderholz
Enfield is providing written notification that we have performed the initial startup of Natural
Gas Boiler EU015.
Natural Gas Boiler# I, ID number EU0 15 initial startup was performed on July 26, 2022.
Sincerely,
Christian Rindler
Plant Manager -Binderholz Enfi eld LLC
I -770-722-1065
christian .rindler@binderholz.com
cc: Don Keisling, Binderholz Enfield LLC
Jon Gamer, Binderholz Enfield LLC
Aimee Benoist, Trinity Consultants
Bhdemolz Enfield LLC -260 Piper !..Me · Enfield, Na1h Carolila 27823, USA· enfietl@bndemolz.am · www.bi1delhotz.am