Loading...
HomeMy WebLinkAboutAQ_F_1900015_20210728_CMPL_CompRpt_SEMI 0 0 0 1 7 985 Corinth Road Moncure, NC 27559 Tel: 919.542.2828 Fax: 919.642.6600 r co www.arauco-na.com Certified Mail July 28, 2021 Return Receipt Requested NC Dept of Environmental Quality Mr. Ray Stewart AUG 10 2021 Regional Supervisor Zu-z-i 3800 Barrett Drive Raleigh regional Office Raleigh, NC 27609 Subject: Semi-Annual Title V Summary Report, PSD Avoidance Report, and MACT Summary Report Title V Permit No. 03449T54 Facility ID: 1900015 Arauco North America, Inc. Moncure, Chatham County, North Carolina Mr. Stewart: Arauco-NA is submitting these semi-annual reports for our Moncure, North Carolina facility in accordance with the stipulations of Title V Permit 03449T53. Included with this submission are the supporting calculations and certification forms for reporting period January 1, 2021 to June 30, 2021. Also included is a copy of the semi-annual PSD avoidance calculations. If you have any questions, please contact Savannah Carroll (919-545-5848) or (843-544-3025). Sincerely, f Jeff M A �_ cMillian Plant Manager Attachments: 1. The Title V Semi-Annual Summary Report for V Half of 2021; and 2. The Semi-Annual PSD Avoidance Calculations. ATTACHMENT 1: TITLE V SEMI-ANNUAL SUMMARY REPORT- 15t HALF 2021 NC beet ofFnv;ronme ntal V ualad�, leigb Regio,�a j North Carolina Department of Environment au�ai oy£Environmental Quality Division of Air Quality Title V Semi-Annual Summary Report AUG 10 701 for Monitoring and Recordkeeping ActivitiesRaleigh Regional Office Facility Name: Arauco North America, Inc. (formerly Uniboard USA LLC) Facility Location: 985 Corinth Rd., Moncure, NC 27559, Chatham County Facility ID Number: 1900015 Title V Permit Number: 03449T54 Start of Reporting Period: January 1, 2021 End of Reporting Period: June 30, 2021 Compliance Statement: (Check one of the following options) During the reporting period specified above, the facility was in compliance with the terms and conditions identified in the above referenced Title V Operating Permit. As such, there were no deviations, excess emissions events, or other reportable incidents including those attributable to equipment malfunctions, breakdown, or upset conditions. _X_During the reporting period specified above, the facility was in compliance with all the terms and conditions identified in the above referenced Title V Operating Permit except for those identified in the Attached Deviation/SSM Summary Report. This report is being submitted to fulfill the semi-annual reporting requirements included in the above noted Title V Permit. Certification By Responsible Official Based on information and belief formed after reasonable inquiry, the undersigned certifies under penalty of law (federal rule 40 CFR 70.5(d)that all information and statements provided in this form (including any attachments) are true, accurate, and complete to the best of my knowledge. Signature of Responsible Official Date Name: Jeff McMillian, Plant Manager Table of Contents Section 1—Compliance Summary Report Section 2—Deviation Summary Report Section 3—Detailed Summary of Shutdown, Startup,and Malfunction Events(PCWP MACT) Section 4—Summary of Shutdown, Startup, and Malfunction Events (PCWP MACT) Section 5—PCWP MACT Compliance Report T � i J a ^ y � G O U w � U O A U Section 1 — Compliance Summary Report North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number I issue? Yes Shall perform monthly external Monthlyextemal checks and annual MDF wood working Sources listed in inspection of ductwork,cyclones and 2.S.B.i.b. N Y structural iintegrity are sdhetlultVl anil operations Table 2.1.B bagfilters and an annual inspection of comPletediinaccordance with permit. structural inter rit MDF wood working Results of inspections and maintenance Results of inspections and maintenance operations Table 2.1.B 2.1.B.l.c. shall be maintained N y are maintained. Summary report of monitoring an MDF wood working Table 2.1.6 2.1.B.1.e. recordkeeping to be submitted by N r Summary reports are submitted by3uly operations January 30&July 30 for the preceding 6- 30 and January 30. month period MDF wood working Permittee shall observe visual emissions Table 2.1.B 2.1.B.2.c. weekly to ensure visual emissions are N v Once per week emission points are operations normal. observed after normals were established MDF wood working Table 2.1.B 2.S.B.2.d. N y Results are maintained operations Results of monitoring shall be maintained MDF wood working Summary report of obervations to be Summary reports are submitted'by)uly operations Table 2.1.B 2.1.B.2.e. submitted by January 30&July 30 for the N y 30 and January 30. preceding 6-month period Permittee shall demonstrate compliance with the emission limits on an annual basis by testing emission point EP18. If Energy System,Refiner, the emissions are 80 percent of the Dryers,Press Table 2.1.0 2.1.C.l.c. emission limit,then the Permittee shall N Devicete_aed and passed July 25,201g. (Next test(due July 25,2023 only be required to stack test once every five years following the previous stack test. Energy System,Refiner, Permittee shall perfom inspections and Dryers,Press Table 2.1.0 2.1.C.l.e. maintenance as recommended by the N Y Maintenance records maintained in SAP. The permittee shall maintain three hour Energy System,Refiner, block averages as described in table Table 2.1.0 2.1.C.l.f. N v Data is being logged and stored. Dryers,Press 2.1.C.l.f for continuous operation of Venturi scrubbers. Results of inspections,maintenance,and Energy System,Refiner, Results of inspections,maintenance,and Dryers,Press Table 2.1.0 2.1.C.l.g. 3-hour block averages shall be N v 3-hour!block averages are maintained. maintained Summary report of recor eeping an Energy System,Refiner, Table 2.1.0 2.1.C.l.h. monitoring to be submitted by January N Dryers,Press 30&July 30 for the preceding 6-month SummaryrepOYtsare submitted by July eriod 30 and January 30. Permittee shall observe visual emissions Energy System,Refiner, Table 2.1.0 2.1.C.2.c weekly on EP18 to ensure visual N Observations are being completed on Dryers,Press weekly basis. emissions are normal. Page 1 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Terms and Conditions Records Was Deviation Emission Source Source or Permit Deviations? a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number issue? Yes Energy System,Refiner, Table 2.1.0 2.1.C.2.d Results of monitoring shall be maintained N v Results are maintained Dryers,Press Summary report o7—recordkeeping an Energy System,Refiner, Table 2.1.0 2.1.C.2.e monitoring to be submitted by January N s Summary reports are submitted by July Dryers,Press 30&July 30 for the preceding 6-month 30 and January 30. period Permittee shall comply with the Data is being maintained and excursions conditions for Pollutant Specific Emission Energy System,Refiner, tracked. QiP developed for instances of Table 2.1.0 2.1.C.4.a-c. Units controlled by the Venturi N Y Dryers,Press six or more excursions in a reporting Scrubbers.Key elements defined in table 2.1.C.4.c. period. Energy System,Refiner, Records are maintained and data is Dryers,Press Table 2.1.0 2.1.C.4.d Results of maintenance,monitoring, N y being logged and stored. excursions and QIP shall be maintained Summary report of recordkeeping an Energy System,Refiner, Table ZLC Z.1.C4.e monitoring to be submitted by January Summary reports are submitted by July Dryers,Press 30&July 30 for the preceding 6-month 30 and January 30. eriod Permittee shall be deemed in Energy System,Refiner, noncompliance with 15A NCAC 02D.0530 Maintain the 24hr block biofilter bed 24-hr timeblock averages maintained Table 2.1.0 2.1.C.5.c if the biofilter bed minimum and v y following issuance of TV Permit Dryers,Press temperature within range maximum temperatures are outside the 03449TS4 on May 19,2021. indicator range found at Section 2.2.A.l.h Energy System,Refiner, Permittee shall meet the recordkeeping Recording keeping requirements to Dryers,Press Table 2.1.0 2.1.C.S.d and reporting requirements found in N Y comply with PCWP MALT Section 2.2.A.l.aa through ii Permittee shall maintain records of the actual emissions of PM10,PM2.5,NOx, and CO from the sources indicated in the Dryers ES-02-B 2.1.C.6.c permitted section list in Section 1 as the N y Emissions are being tracked and logged Reports submitted in a timely manner as MDF Facilities in tons per year on a specified. calendar year basis for ten years following the resumption of regular operations The reported actual(post-construction emissions)of the dryer for each of the Reports submitted in a timely manner as Dryers ES-02-B 2.1.C.6.d ten calendar years will be compared to N Y Emissions are being tracked and logged the projected actual emissions(pre- specified. construction projection)for the dryer Page 2 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records was Deviation Emission Source Permit Deviations? anon- Method(s)of Determining Compliance Control Device Maintained? Comments ID Numbers Description Condition Condition Summary (Yes/No) compliance Status () Number (Yes/NO/NA) issue? Yes Permittee shall submit a report of the actual emissions of the pollutants identified in Section 2.1.C.6.c from the Submit dryer actual emissions compared Reports submitted in a timely manner as Dryers ES-02-B 2.1.C.6.e dryer to the Director within 60 calendar N y to projected emissions at the end of the specified, days afer the end of each calendar year year p during which the records in Section 2.1.C.6.c must be generated Natural Gas Fired FS-18,FS19, Permittee shall maintain records of the Heaters ES20 2.1.D.4.b. amount of fuel combusted during each N v Monthly gas records are being recorded. calendar month. Permittee shall submit notification of the Natural Gas Fired ES-18,ES19, Burner started March 1,2019; Heaters E520 2.1.D.4.c. actual startup for each source within 15 N Submit startup notificati� notification submitted March 7,2019 days after such date Permittee shall submit an Initial Natural Gas Fired ES-18,ES19, Notification to the DAQ not later than 15 Burner started March 1,2019; Heaters ES20 2.1.D.5.e. days after the actual date of startup of N y Submit startup notification notification submitted March 7,2019 each affected source Permittee shall conduct a tune-up once Natural Gas Fired ES-18,ES19, Last tune up and burner inspection was Heaters ES20 2.1.D.5.f. every five years for each source as N N/A Tune-Up is being conducted completed March 1st,2019. specified in f.i.-f.v. Each five year tune-up shall be conducted no more than 61 months after the Natural Gas Fired ES-18,ES19, previous tune-up.The initial tune-up Tune-up is conducted within 61 months Last tune up and burner inspection was Heaters ES20 2.1.D.S.f.ii. shall be conducted no later than 61 N N/A of previous tune-up completed March 1st,2019. months after the initial startup of the source A copy of each notification and report submitted to comply with this subpart, Natural Gas Fired ES-18,ES19, including all documentation supporting Heaters ES20 2.1.D.S.g. any Initial Notificaion or Notification of N Notification records are maintained Compliance Status,or 5-year compliance report that has been submitted Permittee shall submit compliance reports to the DAQ on an annual basis. The first report shall cover the period Summary reports were submitted by December 31st of the first respective Natural Gas Fired ES-18,ES19, 2.1.D.S.h.i. beginning on the compliance date N compliance year and by January 30th 2020 Compliance report submitted on Heaters ES20 specified in Section 2.1.D.5.d(i.e.,start December 21st,2020. up)and ending on the earliest December every year following the First respective 31st less than one year from the year of compliance. compliance date Comp lance report must also be Natural Gas Fired ES-18,E519, submitted electronically via the Submit compliance report through 2020 Compliance report submitted on Heaters ES20 2.1.D.S.h.ii. Compliance and Emissions Data } CEDRI December 21st,2020. Reporting Interface CEDRI Page 3 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number issue? Yes Shall perform monthly external inspection of ductwork,cyclones and Monthly external checks and annual bagfilters and an annual inspection of N Y completed integrity are scheduled and structural inter nt completed in accordance with permit. Old PB Operations CD-3501,CD-SC 2.1.E.2.c. g Y Results of inspections and maintenance N Y Results of inspections and maintenance shall be maintained are maintained. Old PB Operations CD-3501,CD-SC 2.1.E.2.d. Summary report of monitoring and recordkeeping to be submitted by N y Summary reports are submitted by July January 30&July 30 for the preceding 6- 30 and January 30. Old PB Operations CD-3501,CD-SC 2.1.E.2.e. month period Permittee shall observe visual emissions weekly to ensure visual emissions are N Y Once per week emission points are Unit did not run I1-12O21. Old PB Operations CD-3501,CD-SC 2.1.E.5.c. normal. observed after normals were established N Y Results are maintained Old PB Operations CD-3501,CD-SC 2.1.E.S.d. Results of monitoring shall be maintained Summary report of obervations to be submitted by January 30&July 30 for the N y Summary reports are submitted by July preceding 6-month period 30 and January 30. Old PB Operations CD-3501,CD-SC 2.1.E.S.e. P g P Shall perform monthly inspections of Unit did not run 11,12O21. cyclones,ductwork and material Monthly and annual inspections are Old PB Operations CD-3501,CD-SC 2.1.E.6.e. collection and annual internal inspection N Y scheduled and performed N Y Results are maintained Old PB Operations CD-3501,CD-SC 2.1.E.6.i. Results of monitoring shall be maintained Summary report of obervations to be submitted by January 30&July 30 for the N y Summary reports are submitted by July preceding 6-month period 30 and January 30. Old PB Operations CD-3501,CD-SC 2.1.E.6.n. P g P 3593,3594,CD- Particulate emissions shall be controlled Emissions are controlled as required by Laminating mill did not operate in 2020 Laminating Mill 3593 2.1.F.2.c. I using the reverse flow bagfilter N Y the permit or IH2O21. Shall perform monthly inspections of cyclones,ductwork and material Monthly and annual Inspections are laminating mill did not operate in 2020 Laminating Mill Laminating Mill 2.1.F.2.c. collection and annual internal inspection N Y scheduled and performed or I1-12O21. Results of inspections shall be maintained Laminating mill did not operate In 2020 Laminating Mill Laminating Mill 2.1.F.2.d. N Y Results of Inspections are maintained or 11,12021. Summary report of-monitoring an recordkeeping to be submitted by January 30 and July 30 for the preceding Summary reports are submitted by July Laminating mill did not operate in 2020 Laminating Mill Laminating Mill 2.1.F.2.f. 6-month period N Y 30 and January 30. or 11-12O21. 3593,3594,CD- Shall perform weekly visible emissions Inspections are scheduled and Laminating Mill 1 3593 1 2.1.F.4.c. N I y performed in accordance with permit I Laminating mill did not operate In 2020, Page 4 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? anon- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (yes/No/NA) compliance Status Number issue? Yes 3593,3594,CD- Results of inspections shall be Laminating mill did not operate in 2020 Laminatin Mill 3593 2.1.F.4.d. maintained N Y Results of inspections are maintained or I1-12O21. Summary report of monitoring an recordkeeping to be submitted by Summary report was submitted by July 3593,3594,CD- January 30 and July 30 for the preceding 30 and January 30. Laminating mill did not operate in 2020 Laminating Mill 3593 2.1.F.4.e. 6-month period N Y or I1-12O21. Permittee shall comply with all applicable provisions of 40 CFR Part 63 Subpart Complying with Boiler MALT. Laminating mill did not operate in 2020 Laminating Mill Pr-Heatl 2.1.F.6.a DDDDD Boiler MACT. N N/A or 11-12O21. Permittee shall conduct a one time Laminating mill did not operate in 2020 energy assessment no later than May 20, Initial Energy Assessment completed or 11-12O21. Laminating Mill Pr-Heatl 2.1.F.6.a 2019. N Y Permittee shall conduct a tune-up once Laminating mill did not operate in 2020 every five years for each source as 5 year Tune-ups completed. or I1-12O21. Laminating Mill Pr-Heatl 2.1.F.6. . specified in g.i.-g.v. N Y Each five year tune-up shall be conducted no more than 61 months after the previous tune-up.The initial tune-up Laminating mill did not operate in 2020 shall be conducted no later than 61 or 11-12O21. months after the initial startup of the Laminating Mill Pr-Heatl 2.1.F.6.h. source N Y 5 year Tune-ups completed. Permittee shall conduct a onetime energy assessment by a qualified energy Laminating mill did not operate in 2020 assessor and must address requirement Initial Energy Assessment completed or 11-12O21. Laminating Mill Pr-Heatl 2.1.F.6.k. in the applicable DDDDD subpart Table 3. N Y Permittee shall maintain applicable Boiler Tune-up and notification records Laminating mill did not operate in 2020 MACT records,inclduing NOCS and sem- maintained or I1-12O21. Laminating Mill Pr-Heatl 2.1.F.6.1. annual reports. N Y Compliance report to be submitted on a Initial compliance report to be Laminating mill did not operate In 2020 5-yr basis with reports submitted by submitted in January 2027 or 11-12O21. Laminating Mill Pr-Heatl 2.1.F.6.n. Janua 31 for the recedin 5 ears. N Y Comp lance report must a so e submitted electronically via the Submit compliance report through Compliance and Emissions Data N Y CEDRI Laminating Mill Pr-Heatl 2.1.F.6.n.i. Reporting Interface CEDRI Shall perform monthly inspections of cyclones,ductwork and material Results of Inspections are maintained Moulding Line CD-2006,CD- collection and annual internal inspection Operations 3570-,CD-3575 2.1.G.l.c. N Y Moulding Line CD-2006,CD- Results of inspections shall be N Y Results of inspections are maintained Operations 3570-,CD-3575 2.1.G.l.e maintained Summary report of monitoring an recordkeeping to be submitted by N Y Summary reports submitted. Previous report submitted in January Moulding Line January 30 and July 30 for the preceding 2021 for 21-12O20. Operations ES-MlA ES-M1B 2.1.G.l.f I 6-month period Page 5 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Terms and Conditions Was Deviation Emission Source Source v Permit Deviations? Records a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number issue? Yes Permittee shall observe visual emissions Moulding Line weekly on these sources to ensure visual N Y Weekly visual observations. Records maintained. Operations ES-MIA,ES-M1B 2.1.G.4.c emissions are normal. Results of observations and inspections. N Y Results of inspections are maintained Moulding Line CD-2006,CD- shall be maintained Operations 3570-,CD-3575 2.1.G.l.d Summary report of monitoring an recordkeeping to be submitted by Previous report submitted in January Moulding Line January 30 and July 30 for the preceding N Y Summary reports submitted. 2021 for 2H2O20. Operations ES-MIA,ES-M1B 2.1.G.1.e 6-month period Permittee shall notify the Regional Office Notification submitted July 23,2021 for in wiring of the date of tahe beginning of N y Notification of start up. Moulding Line 2. Moulding Line operation of the Moulding Line no later Operations ES-MIA,ES-M1B 2.1.G.5 than 30 days after such date. Permittee shall comply with the work practice standards and maintenance requirements and associated Complying with work practice standards recordkeeping and reporting as required and maintenance requirements by 40 CFR Part 63 Subpart ZZZZ and 40 MDF Mill Operations ES-21 2.1.1.3. CFR Part 60 Subpart[III N y Permittee sFa-ff comply with As indicated in requirements of 40 CFR,63,Subpart A for Complying with 40 CFR 63 Subpart A Sources subject to the equipment sources identified in Table 10 to 40 CFR General Provisions MACT Subpart DDDD list 2.2.A.l.c. Part 63,Subpart DDDD. N Y As indicated in Permittee shall use non-HAP coatings in Using non-HAP spray paints Sources subject to the equipment its Group 1 miscellaneous coating MACT Subpart DDDD list 2.2.A.1.e. operations N Y ES-01,ES-02-A, HAP emissions trom the sources in I able ES-02-13,ES-02- 2.2.A.1.shall be controlled to meet one Source testing results show Sources subject to C,ES-02-1),ES- of the following compliane options in g.i. formaldehyde reduced by 90% MACT Subpart DDDD 16 2.2.A.1. . vi. N y ES-01,ES-02-A, 24 hr block averages maintained ES-02-8,ES-02- Permittee shall maintain the 24hr block Operating within biofilter bed following Issuance of TV Permit Sources subject to C,ES-02-1),ES- biofilter bed temperature within the temperature range 03449T54 on May 19,2021 and in MACT Subpart DDDD 16 2.2.A.l.h. range N y accordance with SOC 2020-002, ES-01,ES-02-A, ES-02-B,ES-02- Permittee shall operate the MDF press in Sources subject to C,ES-02-D,ES- an enclosure that meets the definition of Wood products enclosure evaluation Evaluation was performed July 24,2018. MACT Subpart DDDD 16 2.2.A.l.i a wood products enclosure N y If emissions testing is required,the testing shall be performed in accordance General JJ performance testing Sources subject to Nos.1420 and requirements. MALT Subpart DDDD 1430 2.2.A.1.' with General Condition 11. N Y Page 6 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number issue? Yes Permittee shall conduct performance Source test results have been submitted tests no later than 180 calendar days in accordance with Title V permit and after initial startup or no later than 180 Perform source testing within 180 days NESHAP,further source testing to be days after issuance of T54.An application following initial startup of the biofilter completed within 180 days of issuance Sources subject to to revise the monitoring parameters shall of TV Permit 03449TS4,on May 19, MACT Subpart DDDD CD-18 2.2.A.l.m.i. be submitted in a report at this time. N y 2021. Permittee shall conduct a repeat Source test results have been submitted performance test using the applicable in accordance with Title V permit and method(s)within 2 years of previous test Perform subsequent source tests NESHAP,further source testing to be or within 180 days within replaces of 50% completed within 180 days of issuance Sources subject to or more of of the biofilter bed media. of TV Permit 03449T54,on May 19, MALT Subpart DDDD CD-18 2.2.A.l.m.ii. I N N/A 2021. As indicated in Sources subject to the equipment Permitte must develop a written SSM SSMP Developed MACT Subpart DDDD list 2.2.A.1.n. plan N y Emissions limitations in section 2.2.A.l.g do not apply during times when control device maintenance covered under RCDME request records. No RCDME performed during reporting As indicated in period. Sources subject to the equipment approved RCDME is performed. MACT Subpart DDDD list 2.2.A.l.o. N y Permitte shall monitor and record the CPMS has been installed to monitor Biofilter is currently under SOC 2020- Sources subject to MDF Plant Biofilter bed temperature with biofilter bed temperature and PB dryer 002.Temperature monitored following MALT Subpart DDDD CD-18 2.2.A.l.p CPMS. N y inlet temperature issuance of T54. Permitte shall determine the 24hr block average of all recorded readings, Biofilter is currently under SOC 2020- calculated after every 24hr of operation Records of 24-hour block averages 002 Temperature monitored following as the average of the evenly spaced maintained recorded readings in the previous 24 issuance of T54. Sources subject to operations hours MACT Subpart DDDD CD-18 2.2.A.l.q y Y N Fermircee snail eep a copy of each As indicated in notification and report submitted to Sources subject to the equipment comply with this subpart Copies of Notifications are maintained MACT Subpart DDDD list 2.2.A.l.r. N Y suitable and available;Permittee shall keep records for 5 years following date of each occurrence,measurement, maintanence,corrective action,report or record;Permittee must keep record on Records are maintained site for 2 years and may keep 3 years off As indicated in site Sources subject to the equipment MACT Subpart DDDD list 2.2.A.S.s N y Page 7 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? anon- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number issue? Yes Permittee shall submit a compliance As indicated in report semiannually postmarked by Reports are submitted by January 30 Sources subject to the equipment and July 30. JJanuary 30 and July 30 of each year MACT Subpart DDDD list 2.2.A.l.0 N Y Compliance report must also include the following information for each instance of noncompliance from the compliance option or operating requirements where Report is submitted on time with all you are using a CMS to comply with the requirements As indicated in compliance options and operating Sources subject to the equipment requirements MACT Subpart DDDD list 2.2.A.i.v N y Compliance report must also include the following information for each instance of noncompliance from the compliance No noncompliance events from a Report is submitted on time with all option or operating requirements where compliance option or operating As indicated in you are not using a CMS to comply with equirements requirement where a CMS is not used Sources subject to the equipment the compliance options and operation MALT Subpart DDDD list 2.2.A.l.w. requirements N Y Submit a report if a startup,shutdown,or As indicated in malfunction during the reporting period Reports are submitted If events occur Sources subject to the equipment occurred that is not consistent with the outside the written SSMP No events occurred outside of SSMP MACT Subpart DDDD list 2.2.A.l.x SSMP N y Permittee shall submit all notifications of 40 CFR 63.7(b)and(c),63.8(e),(f)(4)and As indicated in (f)(6),63.9(b)through(e)and(g)and(h) Notification of Compliance Status for operating units has been submitted Sources subject to the equipment by specified dates;and NOCS for Biofilter MACT Subpart DODO list 2.2.A.l.z and Press N Y Facility cannot exceed 111.9 TPY PM-2.5, MDF Mill Operations MDF Plant 2.2.B.1.a. and 116.9 TPY PM-10. N Y 12-month emission limits not exceeded Test the biofilter to establish emission factors,testing shall be completed within Testing was performed July 25,2018. 180 days after the start-up of the Perform source testing within 180 of Source testing to be completed within MDF Mill Operations MDF Plant 2.2.B.1.b. biofilter.A written report of the test N y biofilter start up 180 days of issuance of TV Permit T54. results shall be submitted to the Regional Biofiilter operating under SOC 2020-002 Supervisor,DAQ within 60 days of until completion of source testing. completion of the test Facility shall maintain logs of 12-month Records maintained to ensure MDF mill MDF Mill Operations I MDF Plant 1 2.2.B.1.c. I rolling sums for PM-2.5 and PM-10. N r does not exceed permitted limits, Page 8 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Number(s) Condition Condition Summary (Yes/No) (Yes/No/NA) compliance Status Number issue? Yes Facility shall keep records in a logbook containing monthly and rolling 12-month total for PM10 and PM2.5;and process rates of the dryers in ODMT/hr,process Records are maintained and data is being logged and stored. rates of the press in MSF/hr,and heat inputs for the combustion sources in MDF Mill Operations MDF Plant 2.2.B.l.d. MMBtu/hr N y Semi-annual summary report of monitoring and recordkeeping of rolling Summary reports are submitted by July and monthly PM2.5 and PM10 averages 30 and January 30. are to be submitted by January 30 and MDF Mill Operations MDF Plant 2.2.B.l.i I July 30 for the preceding 6-month period y Perform testing on biofilter;establish a Testing was performed July 25,2018. minimum and maximum biofilter bed Performance testing completed within Source testing to be completed within temp;the energy dryer system should be 180 days of issuance of TV Permit operatind during test;testing should be 180 days after issuance of T50,emission 03449T54.Biofilter operating under SOC completed within 180 days after the limits in Table 2.2.6.2 met 2020-002 until completion of source issuance of permit no.T50 testing. MDF Mill Operations MDF Plant 2.2.B.2.b. N N/A Record maintenance and monthly throughput for each emission source in either ODMT or MSF;results of any Monthly maintenance throughput for maintenance activities performed on the each emission source being recorded MDF Mill Operations MDF Plant 2.2.B.2.c.i. emission sources N y oni oring and recorOKeeping requirements in Section 2.I.D.5.f through I,as applicable,shall be sufficient to Inspections and maintanence being ensure compliance with 15A NCAC 021) done in accordance with manufacturer. .0530 for the natural gas-fired hot oil Results are being recorded and logged. MDF Mill Operations MDF Plant 2.2.B.2.c.ii. heaters N Fermittee s1nall comply with the work practice standards and maintenance requirements and associated Complying with work practice standards recordkeeping and reporting as required and maintenance requirements by 40 CFR Part 63 Subpart ZZZZ and 40 MDF Mill Operations MDF Plant 2.2.9.2.c.iii. CFR Part 60 Subpart IIII N Y Record the monthly throughput for each emission source in either ODMT or MSF; install and operate a continuous temp ei 002,r is currently under temps monitoring system on the biofilter, Retord5 and monitoring maintained 24-hr block average te maintain the 24-hour block temp of the maintained ained after permit 03449754 biofilter within the min and max bed issued May 19,2021. MDF Mill Operations I MDF Plant I 2.2.B.2.c.v. temp N Y Page 9 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Reporting Period:January 1,2021 to July 31,2021 Source or Terms and Conditions Records Was Deviation Emission Source Permit Deviations? a non- Method(s)of Determining Compliance Control Device Maintained? Comments Description ID Numbers Condition Condition Summary (Yes/No) compliance Status ( ) Number (Yes/No/NA) issue? Yes Summary report o monitoring an recordkeeping to be submitted by Summary reports are submitted by July January 30 and July 30 for the preceding 30 and January 30. MDF Mill Operations MDF Plant 2.2.B.2.d. 6-month period N Y The combined Nox emissions from sources indicated in Table 2.2.6.3 shall Records are maintained and data is Maintained after permit 03449TS4 not exceed 308 tons per consecutive 12- being logged and stored. issued May 19,2021. MDF Mill Operations MDF Plant 2.2.B.3.a. month period. N Y Test the biofilter to establish emission factors,testing shall be completed within 180 days after the start-up of the biofilter Source testing to be completed within after issuance of T54.Testing shall reflect Perform source testing within 180 of 180 days of issuance of TV Permit T54. MDF Mill Operations MDF Plant worst case scenario NOx emissions.A N Y written report of the test results shall be biofilter startup Biofntil operating under SOCsource 2sting. 2 submitted to the Regional Supervisor, until completion of source testing. DAQ within 60 days of completion of the 2.2.B.3.b.i i. test Permittee shall source test these units at Source testing to be completed within least once every 5 years to confirm or Perform source testing within 180 of 180 days of issuance of TV Permit T54. MDF Mill Operations MDF Plant reestablish emission factors and N y bloflter start up Biofilter operating under SOC 2020-002 2.2.B.3.b.iii. monitoring parameters. until completion of source testing. When the urea/water injection system is in operation,the permittee shall MDF Mill Operations MDF Plant maintain the minimum 3-hr block N Y Records maintained while in operation. Urea Injection system use ceased upon average injection rate indicated in Table issuance of TS4. 2.2.B.3.c.i A 2.2.13.3. When the urea/water injection system is MDF Mill Operations MDF Plant not in operation,the permittee shall use N Y Operational records maintained. Urea injection system use ceased upon uncontrolled emissions factors indicated Issuance of T54. 2.2.B.3.c.i B in Table 2.2.13.3. Record the monthly and 12 month rolling MDF Mill Operations MDF Plant average total of Nox emissions from MDF N y Operational records maintained. Calculations completed on monthly basis. 2.2.8.3.c.i i. sources. Facility shall keep records in a logbook containing monthly and rolling 12-month total for Nox emissions for MDF sources, Records are maintained and data is hours of operation,and urea/water injection rates in units of gpm(3 hr-block being logged and stored. averages),and heat inputs for the MDF Mill Operations I MDF Plant I 2.2.B.3.d. I combustion sources in MMBtu/hr N I Y Summary report o monitoring an recordkeeping to be submitted by Summary reports are submitted by July January 30 and July 30 for the preceding 30 and January 30. MDF Mill Operations MDF Plant 2.2.B.3.e. 6-month period N y Page 10 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021 to July 31,2021 Terms and Conditions Deviations? Records Was Deviation a non- Permit Condition Maintained? compliance issue? (Yes Methods of Determining Number Condition Summary Yes/No (Yes/No/NA) /No) Compliance Status Comments 3.A General Provisions No Yes 3.8 Permit available at facility No Yes Permit is on site 3.0 Severability Clause No NA Except as otherwise specified,Two copies of 3.D submissions shall be sent to regional office No Yes Two Copies always mailed 3.E Duty to Comply No Yes All deviations noted in deviation summary report. 3.F Circumvention No Yes Facility operated as permitted. Per SOC. Permittee has submitted in 3.G Permit modifications and applications No Yes accordance with requirements when required ADS project completed 3.H Changes Not Requiring Permit Modifications No NA No changes made with input from NCDAQ on non-applicability of permit modification. Reporting requirements for excess emissions 3.I.A,3.1.B and permit deviations and other requirements No Yes P accordteeance has submitted notices a under NCAC rule section cited in condition in accordance with requirements 3J Emergency Provisions No NA No emergencies have occurred as specified by this condition Previous permit renewal Permit due to expire until submitted In a timely 3.K Permit renewal due every five years No Yes 6/30/2021 manner.Permit renewal submitted Dec.22nd, 0 31 Need to halt or Reduce Activity not a Defense No NA Duty to submit any information requested by Requests for information 3.M director No NA submitted to agency when requested 3.N Duty to supplement No NA Supplemental information will be submitted promptly if necessary 3.0 Retention of records No Yes Records maintained per requirement of five years ACC submitted by March 1st-2 3.P Annual compliance certification No Yes copies sent to Regional office and one copy to US EPA 3.Q Certification by responsible official No Yes Certified by a responsible official 3.11 Permit shield for applicable requirements No NA No permit shield was in effect 3.S Termination,Modification,and Revocation or No NA No modifications or revocations Permit were conducted on this permit. Insignificant activities records available at 3.T No Yes Records maintained facility 3.0 Property Rights No NA DAQ personnel will be allowed for DAQ visited site 3.V Inspection and Entry No Yes 12/18/2020 for an inspection and entry inspection. Page 1 of 2 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021 to July 31,2021 Terms and Conditions Deviations? Records Was Deviation a non- Permit Condition Maintained? compliance Issue? (Yes Methods of Determining Number Condition Summary Yes/No (Yes/No/NA) /No) Compliance Status Comments 3.W Annual fee payment No NA Fees have and will be paid in accordance with requirement Emissions Inventory required by 3.X Annual emission inventory requirement No Yes permit have been submitted by June 30th of each year 3.Y. Confidential Information No NA Will comply with requirements if confidentiality is claimed 31 Construction and operation permits No Yes Permits have been obtained prior to construction Standard Application Form and required Applications submitted in 3.AA information No Yes accordance with 15A NCAC 24.0505 and.0507 3.138 Financial responsibility and compliance history No NA Not requested during second half of 2020. Permittee complies with 3.CC Refrigerant requirements No Yes requirements of condition for equipment sub ect to rules Prevention of accidental releases—Section 3.DD 112 r No NA Not subject to 112r Prevention of accidental releases"General 3.EE Duty Clause"-Section 112 r1 No Yes Maintain&inspect storage vessels 3.FF Title IV Allowances No NA 3.GG Air Pollution Emergency Episode No NA 3.HH Registration of Air Pollution Sources No NA 3.11 Ambient Air Quality Standards No NA 3.JJ Emission testing and reporting requirements Yes Have complied with requirements of condition 3.KK Reopening for Cause No NA No reopening for cause was required. 3.LL Reporting requirements for non-operating No Yes Have maintained records of equipment operation/non-operation 3.MM Fugitive Dust Control Requirement No Yes No complaints were received beyond the property boundard. Permittee shall file permit PSD Permit modification 3.NN. Specific Permit Modifications No Yes applications in accordance with submitted for state permit condition and regulations determination in July 2020, received May 19,2021. The time period available to (1> 3.00. Third Party Participation and EPA Review No Yes submit a public petition begins at e�t,.1 Of Environm al�C the end of a the 45-day EPA C Dept review period. q JWCigh xegl°nal Offic Page 2 of 2 to (D r-r O' N I 0 CD r+ O U) c 3 3 fD O r+ NC Dept of F.mfironmental 1Lalci& Kogional Uffice North Carolina Department of Environmental Quality Division of Air Quality DEVIATION SUMMARY REPORT For Reporting Period January 1,2021 to July 31,2021 Page 1 of 1 Source or Control Estimate of Emission Source Device ID Deviation Suspected Cause of Excess Excess Description Numbers Pollutant Deviation Description Deviation Dates Duration Deviation Corrective Action Taken Emission Emission N/A No deviations noted in No NA semi-annual period 11C Dept of F.nvironniental Quality AUG ?Q21 sleigh Kcgional Office Section 3 — Detailed Summary of Shutdown, Startup, and Malfunction Events (PCWP MACT) a o � � o o w � � A � s REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs( Process Area device malfunction? brief description. Were procedures in plan followed? if procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 1/1/2114:29 1/1/2114:29 0.216666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/1/2115:03 11112115:03 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/5/215:59 1/5/215:59 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/5/2119:20 1/5/2119:20 0.25 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/5/21 21:35 1/5/21 21:35 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/5/2122:21 1/5/21 22:21 0.616666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/6/2116:33 1/6/2116:33 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/6/2118:07 1/6/2118:07 0.366666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/6/2119:59 1/6/2119:59 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/7/2110:37 1[712110:37 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 11712110:51 1/7/2110:51 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2111:14 1/7/2111:14 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/7/2112:03 1/7/2112:03 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2112:29 1/7/2112:29 0.066666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1[712116:22 1/7/2116:22 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2116:24 1[7/2116:24 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/7/2116:27 1/7/2116:27 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2116:30 1/7/2116:30 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2116:34 1/7/2116:34 0.016566667 MDF Refiner fugitive emissions. Quality Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2116:56 1/7/2116:56 0.133333333 MDF Refiner nme fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2118:31 1/7/2118:31 0.183333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2118:37 1/7/2118:37 0.016666667 MDF Refiner _ fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/7/2118:46 1[7/2118:46 0.11 MDF Refiner fugitive emissions. ' office ffice Yes,time spent in refiner abort minimized to reduce Shutdown 1/7/2121:43 1/7/21 21:43 0.033333333 MDF Refiner v n J fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1181211:00 1/8/211:00 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/9/21 21:51 1/9/2121:51 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/9/21 22:05 1/9/2122:05 1 0.083333333 1 MDF Refiner I Ifugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/10/21 1:35 1/101211:35 1 0.316666667 MDF Refiner I fugitive emissions. Page 1 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures in plan followed? if procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 1/10/211:52 1/10/211:52 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/10/215:15 1/10/215:15 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/10/216:51 1/10/216:51 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/10/21 8:09 11101218:09 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/11/21 3:08 1/11/21 3:08 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/11/214:36 1/11/214:36 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/11/2116:46 1/11/2116:46 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/11/2121:13 111112121:13 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/11/21 21:36 1/11/2121:36 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/12/21 0:41 1/12/210:41 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/12/2119:48 1/12/2119:48 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2114:10 1/13/2114:10 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2115:04 1/13/2115:04 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2116:05 1113/2116:05 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2116:25 1/13/2116:25 0.066666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2117:43 1/13/2117:43 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2119:37 1/13/2119:37 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/2119:49 1/13/2119:49 0,016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/21 20:06 1/13/2120:06 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/13/21 20:26 1/13/2120:26 0,016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1/13/21 21:23 1/13/21 21:23 0.016666667 MDF Refiner fugitive emissions. C Dept of Fnviron en Yes,time spent in refinerabort minimized to reduce Startup 1/14/2110:39 1/14/2110:39 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1/14/2110:49 1/14/2110:49 0.016666667 MDF Refiner fugitive emissions. UMINi ?� Yes,time spent in refiner abort minimized to reduce Startup 1/14/2110:59 1/14/2110:59 0.016666667 MDF Refiner A fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/2/216:10 2/2/216:10 0.2 MDF Refiner - gitive emissions. es,time spent in refiner abort minimized to reduce Shutdown 2/2/2116:41 2/2/2116:41 0.183333333 MDF Refiner Raleigh (rp] na fugitive emissions. Yes,time spent in refinerabort minimized to reduce Shutdown 2/2/2117:49 2/2/2117:49 0.283333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/2/2118:48 2/2/2118:48 0.1 MDF Refiner fugitive emissions. Page 2 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures in plan followed? if procedures In plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 2/4/21740 2/4/217:40 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/4/218:16 2/4/218:16 0.183333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/4/2114:26 2/4/2114:26 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/4/2114.33 2/4/2114:33 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/8/2116:16 2/8/2116:16 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/8/2116:18 2/8/2116:18 0.0166666671 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/9/219:56 2/9/219:56 0.683333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/9/2110:30 2/9/2110:30 0.433333333 MDF Refiner fugitive emissions. Yes,time spent in refinerabort minimized to reduce Startup 2/9/2111:18 2/9/2111:18 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/12/219:01 2/12/219:01 0.383333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/12/219:29 2/12/219:29 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/13/218:24 2/13/218:24 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/13/2112:32 2/13/2112:32 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/13/2112:46 2/13/2112:46 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/13/2112:53 2/13/2112:53 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/14/218:22 2/14/218:22 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/14/218:59 2/14/21 8:59 0,016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/14/21 23:19 2/14/21 23:19 0.316666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/14/21 23:55 2/14/21 23:55 0.266666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/15/214:05 2/15/214:05 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/15/215:01 2/15/215:01 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 211512112:13 2/15/2112:13 0.216666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/16/21 6:52 2/16/21 6:52 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/16/21 7:25 2/16/21 7:25 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/16/21 21:51 2/16/21 21:51 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/16/2122:32 2/16/2122:32 0.55 MDF Refiner Ifugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/16/21 23:21 2/16/2123:21 0.183333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/17/214:55 2/17/214:55 0.033333333 MDF Refiner fugitive emissions. Page 3 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If matfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs( Process Area device malfunction? brief description. Were procedures in plan followed? If procedures In plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 2/17/2112:32 2/17/2112:32 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/17/2114:38 2/17/2114:38 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/17/2115:04 2/17/2115:04 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/18/2114:41 2/18/2114:41 0,233333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/19/2114:20 2/19/2114:20 0.283333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/19/2115:00 2/19/2115:00 0.283333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/19/2115:17 2/19/2115:17 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/212:06 2/20/212:06 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/215:33 2/20/215:33 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/219:44 2/20/219:" 0.066666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/219:59 2/20/219:59 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2110:16 2/20/2110:16 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2110:49 2/20/2110:49 0.466666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2111:52 2/20/2111:52 0.316666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2112:06 2/20/2112:06 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2112:17 2/20/2112:17 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2112:29 2/20/2112:29 0.183333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2112:52 2/20/2112:52 0.366666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce 2/20/2113:00 2/20/2113:00 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/20/2119:18 2/20/2118:18 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2118:54 2/20/2118:54 0.566666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/20/2119:10 2/20/2119:10 0.25 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/20/2120:44 2120121 20:44 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 2/21/2110:42 2/21/2110:42 0.35 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 2/21/2111:27 2/21/2111:27 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/1/214:08 3/1/214:08 0.283333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/7/219:57 3/7/219:57 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/7/2110:29 3/7/2110:29 0.133333333 MDF Refiner fugitive emissions. Page 4 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures in plan followed? If procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Startup 3[7/2111:28 3/7/2111:28 0.316666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/8/2116:50 3/8/2116:50 O.OS MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/9/211:36 3/9/211:36 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/9/215:46 3/9/215:46 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/9/216:52 3/9/216:52 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/9/217:07 3/9/217:07 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/9/218:41 3/9/218:41 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/9/2113:36 3/9/2113:36 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/9/2118:24 3/9/2118:24 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/10/2118:27 3/10/2118:27 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/10/2120:44 3/10/21 20:44 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/10/2121:05 3/10/2121:05 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/12/216:33 3/12/21 6:33 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/12/216:45 3/12/21 6:45 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/12/2111:56 3/12/2111:56 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/12/2112:25 3/12/2112:25 0,133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3113/2121:09 3/13/2121:09 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/14/211:33 3/14/211:33 0.066666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/14/21 3:48 3/14/213:48 0.233333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/15/2111:08 3/15/2111:08 0.166666667 MDF Refiner fugitive emissions. NCpt of Environm Yes,time spent in refiner abort minimized to reduce Shutdown 3/18/212:51 3/18/212:51 0.15 MDF RefinEf fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/18/219:39 3/18/219:39 0.183333333 MDF Refiner fugitive emissions. fi Yes,time spent in refiner abort minimized to reduce Shutdown 3/18/2114:36 3/18/2114:36 0.366666667 MDF Refiner fugitive emissions. a Yes,time spent in refiner abort minimized to reduce Startup 3/19/2119:29 3/19/2119:29 0.2 MDF Refiner- fugitive emissions. Taleigh RegionYes,time spent in refiner abort minimized to reduce Shutdown 3/19/2123:22 3/19/2123:22 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/20/212:07 3/20/212:07 0.233333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1 3/20/212:30 3/20/21 2:30 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/20/2112:14 3/20/2112:24 0.1 MDF Refiner fugitive emissions. Page 5 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures in plan followed? If procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 3/20/2112:17 3/20/2112:17 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/20/2118:45 3/20/2118:45 0.216666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/20/2119:44 3/20/2119:44 0.266666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1 3/22/2111:46 3/22/2111:46 0.15 MDF Refiner fugitive emissions. Yes,time spent in refinerabort minimized to reduce Startup 3/22/2113:12 3/22/2113:12 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/22/2114:22 3/22/2114:22 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/22/2114:27 3/22/2114:27 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 3/26/21 6:05 3/26/216:05 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/26/21 6:24 3/26/21 6:24 0.216666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 3/26/217:19 3/26/217:19 0.183333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 4/1/2115:06 4/1/2115:06 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/1/2116:33 4/1/2116:33 0.25 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/2/2120:14 4/2/2120:14 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 4/2/21 20:54 4/2/21 20:54 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/2/21 21:47 4/2/21 21:47 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 4/3/21 3:19 4/3/213:19 0.033333333 1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/3/214:23 4/3/214:23 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/3/216:28 4/3/216:28 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 4/6/215:02 4/6/215:02 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/7/21 3:08 4/7/21 3:08 0.3 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/7/214:44 4/7/214:44 0.493333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/9/2115:53 4/9/2115:53 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 4/9/2115:55 4/9/2115:55 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/9/2119:28 4/9/2119:28 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/9/21 21:01 4/9/2121:01 0.466666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/10/218:08 4/10/218:08 0.233333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/10/2110:55 4/10/2110:55 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 4/10/2113:24 4/10/2113:24 0.133333333 MDF Refiner fugitive emissions. Page 6 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures in plan followed? if procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 4/12/210:44 4/12/210:44 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/12/211:11 4/12/211:11 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 4/12/2112:53 4/12/2112:53 0.183333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/1/216:36 5111216:36 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/3/2121:09 5/3/21 21:09 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/6/217:54 5/6/217:54 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/6/2111:34 5/6/2111:34 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/6/2111:56 5/6/2111:56 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/6/2115:38 S/6/2115:38 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/7/2119:08 5[7/2119:08 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/7/2119:15 5/7/2119:15 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/9/213:47 5/9/213:47 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/10/215:24 5/10/215:24 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/11/215:21 5/11/215:21 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/11/2115:05 5/11/2115:05 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/11/2122:59 5/11/2122:59 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/12/210:46 5/12/210:46 0.2 MDF Refiner fugitive emissions. Yes,time spent in refinerabort minimized to reduce Startup 1 5/13/214:44 5/13/214:44 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/13/2114:58 5/13/2114:58 0,166666667 MDF Refiner fugitive emissions. eptofEnviron Ti enta Quality Yes,time spent in refiner abort minimized to reduce Shutdown 5/15/2113:32 5/15/2113:32 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/15/2117:26 5/15/2117:26 0.25 MDF Refiner fugitive emissions. ` } Vi Yes,time spent in refiner abort minimized to reduce Startup 5/16/21 0:51 5/16/210:51 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/16/21 2:57 5/16/21 2:57 0.05 MDF Refiner fugitive emissions. a ►g cgjojjaj Qffljee Yes,time spent in refiner abort minimized to reduce Shutdown 5/16/21 8:40 5/16/218:40 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/16/21 10:15 _ 5/16/2110:15 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/18/2114:00 5/18/2114:00 1 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 1 5/19/2118:41 5/19/2118:41 0.266666667 IMDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/19/2118:56 5/19/2118:56 0.083333333 MDF Refiner fugitive emissions. Page 7 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures in plan followed? If procedures In plan were not followed? Yes,time spent in refiner abort minimized to reduce Startup 5/20/2110:59 5/20/2110:59 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/21/211:11 5/21/211:11 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/22/217:19 5/22/21 7:19 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/23/215:08 5/23/21 5:08 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/23/21 22:20 5/23/21 22:20 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/24/215:01 5/24/215:01 0,016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/24/2111:52 5/24/2111:52 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/25/21 6:10 5/25/216:10 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/25/2118:20 5/25/2118:20 0.466666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/27/218:18 5/27/218:18 0.216666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/28/2120:54 5/28/2120:54 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/29/21 23:31 5/29/2123:31 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 5/30/21 2:52 5/30/212:52 0.383333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/30/21 3:28 5/30/213:28 0.266666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/1/21 3:51 6/1/21 3:51 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/4/2112:40 6/4/2112:40 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/5/214:29 6/5/214:29 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/5/215:15 6/5/215:15 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 5/5/21 6:54 6/5/216:54 1.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/6/216:37 6/6/216:37 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/7/214:22 6[7/214:22 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/7/215:37 6/7/215:37 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/7/216:43 6/7/21 6:43 0.25 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/7/2111:49 617/2111:49 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/8/21 8:32 6/8/218:32 0.6 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/8/2112:21 6/8/2112:21 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/8/2112:23 6/8/2112:23 0.016666667 MDF Refiner Ifugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/8/2116:15 6/8/2116:15 0.033333333 MDF Refiner fugitive emissions. Page 8 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures In plan followed? If procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 6/9/218:06 6/9/218:06 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/9/219:33 6/9/219:33 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/9/2110:09 6/9/2110:09 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/9/2110:46 6/9/2110:46 0.066666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/12/215:14 6/12/215:14 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/13/213:59 6/13/213:59 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/14/21 21:55 6/14/21 21:55 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/15/211:39 6/15/211:39 0.05 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/15/2110:33 6/15/2110:33 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/15/2110:51 6/15/2110:51 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/15/2116:50 6/15/2116:50 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/15/21 20:44 6/15/21 20:44 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/15/21 21:19 6/15/21 21:19 0.216666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/16/215:23 6/16/215:23 0.366666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/16/216:58 6/16/216:58 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/16/2112:00 6/16/2112:00 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/16/2112:28 6/16/2112:28 0.2 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/21 3:55 6/18/21 3:55 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/214:53 6/18/214:53 0.25 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/216:01 6/18/216:01 0.116666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/216:49 6/18/216:49 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/217:24 6/18/217:24 0.1 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/217:46 6/18/21 7:46 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/18/2110:00 6/18/2110:00 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 6/18/21 21:06 6/18/21 21:06 0.233333333 MDF Refiner fugitive emissions. Yes,time spent in refinerabort minimized to reduce Shutdown 6/18/2121:46 6/18/21 21:46 0.083333333 MDF Refiner Itugitrve emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/18/21 21:49 6/18/21 21:49 0.016666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/21/211:53 6/21/211:53 0.033333333 MDF Refiner fugitive emissions. Page 9 of 10 REFINER ABORT LOG Janua 1,2021-June 30,2021 If malfunction,was this a control If malfunction,provide a Describe actions taken to minimize emissions Type of Event Start Date&Time Stop Date&Time Duration(hrs) Process Area device malfunction? brief description. Were procedures In plan followed? If procedures in plan were not followed? Yes,time spent in refiner abort minimized to reduce Shutdown 6/21/211:59 6/21/211:59 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/21/2111:48 6/21/2111:48 0.033333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/21/2112:00 6/21/2112:00 0.166666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/21/2112:11 6/21/2112:11 0.15 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/21/2112:34 6/21/2112:34 0.133333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/22/213:58 6/22/213:58 0.066666667 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/22/216:07 6/22/21 6:07 0.25 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/22/2117:51 6/22/2117:51 0.083333333 MDF Refiner fugitive emissions. Yes,time spent in refiner abort minimized to reduce Startup 1 6/22/2118:45 6/22/2118:45 0.3 MDF Refiner Ifugitive emissions. Yes,time spent in refiner abort minimized to reduce Shutdown 6/22/2119:42 6/22/2119:42 0.516666667 1 MDF Refiner fugitive emissions. 03WO IeuOT a� q�l�Ig� TILriZj 1'34U0 LI0JIAUA,,4o ldaU Z)H 44 Page 10 of 10 Section 4—Summary of Shutdown, Startup, and Malfunction Events (PCW P MACT) For Reporting Period: North Carolina Department of Environmental Quality Page 1 of 2 January 1, 2021 to June 30, 2021 Division of Air Quality Summary of Shutdown, Startup, and Malfunction Events MDF Pressurized Refiner total operating time during the reporting period 3801.70 Duration as Duration(hrs) Percentage of Total Refiner Deviation Associated with: Operation Startup 10.60 0.28% Shutdown 26.53 0.70% Control Device Malfunctions 0.00 0.00% Process Malfunctions 0.00 0.00% Other Known Causes 0.00 0.00% Other Unknown Causes 0.00 0.00% Total Deviations 37.13 0.98% CMS Downtime 0.00 0.00% MDF Dryer total operating time during the reporting period 3801.70 Duration as Duration(hrs) Percentage of Total Dryer Deviation Associated with: Operation Startup 0.00 0.00% Shutdown 0.00 0.00% Control Device Malfunctions 0.00 0.00% Process Malfunctions 0.00 0.00% Other Known Causes 0.00 0.00% Other Unknown Causes 0.00 0.00% Total Deviations 0.00 0.00% CMS Downtime 0.00 0.00% MDF Press total operating time during the reporting period 3801.70 Duration as Duration(hrs) Percentage of Total Press Deviation Associated with: Operation Startup 0.00 0.00% Shutdown 0.00 0.00% Control Device Malfunctions 0.00 0.00% Process Malfunctions 0.00 0.00% Other Known Causes 0.00 0.00% Other Unknown Causes 0.00 0.00% Total Deviations 0.00 0.00% CMS Downtime 0.00 0.00% Section 5 — PCWP MACT Compliance Report Plywood and Composite Wood Products Maximum Achievable Control Technology (MACT) Compliance Report REQUIRED BY§63.2281: Facility Operating Permit No. TV Permit No. 03449T54 Company Name: Arauco North America, Inc. 985 Corinth Road (c)(1) Facility Address: Moncure, NC 27559 Date of Report: July 28,2021 (c)(3) Reporting Period: January 1 —June 30,2021 (c)(3) Yes. Information required by§63.10(d)(5)(i)is provided in the Summary of Were there any SSM events during the reporting period? Shutdown, Startup, and Malfunction Events log. These events indicate (c)(4) instances when emissions vented through the refiner abort cyclone. No control device maintenance was performed during the reporting period Control Device Maintenance Description: while a control device was off-line and while the process units controlled by (c)(5) the control device were operating. Were there any performance tests conducted during the No performance tests conducted during the reporting period (c)(6) reporting period? Were there any deviations from any applicable compliance Yes. There were deviations from applicable compliance options or operating options,operating requirements,or work practice requirements requirements,or work practice requirements during this reporting period; (c)(7) during the reporting period? these instances are identified in the attached Deviation Report. Were there any periods during which a CMS was out-of-control No. There were no periods during which the CMS was out-of-control. (c)(8) as specified in§63.8(c)(7)?: Plywood and Composite Wood Products Maximum Achievable Control Technology (MACT) Compliance Report REQUIRED BY§63.2281: Were there any deviations from any applicable compliance option,operating requirement or work practice requirement (e) during the reporting period where a CMS is used to demonstrate (e)(1) compliance? (e)(2) If Yes,provide the date and time that each malfunction started (e)(3) and stopped,each CMS was inoperative,each CMS was out-of- control,each instance of noncompliance started and stopped (e)(4) and whether each instance occurred during a SSM period,a (e)(5) summary of the total duration of the instance of noncompliance No.There were no deviations during the reporting period where a CMS is (e)(6) during the reporting period and the total duration as a percent of used to demonstrate compliance. the total source operating time during that reporting period,a (e)(7) breakdown of the total duration of the instances of (e)(8) noncompliance during the reporting period into those that are (e)(g) due to SSM,a summary of the total duration of CMS downtime (e)(10) and total duration of CMS downtime as a percent of the total source operation time,a brief description of the process unit (e)(11) and CMS, latest CMS certification,a description of any changes in CMS. Were there any deviations from any applicable compliance option,operating requirement or work practice requirement during the reporting period where a CMS is not used to demonstrate compliance? (d) If Yes,provide the total operating time of each affected source No. There were no deviations during the reporting period where a CMS is (d)(1) not used to demonstrate compliance. during the reporting period that experienced such deviation and (d)(2) information on the number,duration,and cause of deviations (including unknown cause,if applicable),as applicable,and any corrective actions taken. ATTACHMENT 2: SEMI-ANNUAL PSD AVOIDANCE CALCULATIONS Please note: Uncontrolled emission factors for NOx were added for May and June 2021calculations, as a major permit modification allowing for the cease of the urea injection system at MDF was received May 19, 2021. For calculation simplicity, all of May 2021 NOx emissions used an uncontrolled emission factor, rather than a partial month with controlled and partial with uncontrolled. IvCDept ofPnvironm enta1 Quality AUG go 21 -Raleigh Regional free Moncure MDF Permit Number 03449T54 MDF Plant CO Emissions Summary Monthly CO Current 12-Month Teaford Abort Ness Burners Dryers HDF Dryers MDF Month Emissions (tons) Rolling Sum Total Emission ID ES-02A ES-18/19/20 ES-02HW ES-02SW CO CO Jul-19 1.09 0.00 21.50 4.00 26.6 234.5 Aug-19 1.10 0.00 14.68 3.39 19.2 231.9 Sep-19 0.52 0.00 14.14 4.32 19.0 232.5 Oct-19 1.03 0.00 12.50 2.03 15.6 228.2 Nov-19 0.90 0.00 15.54 3.16 19.6 232.2 Dec-19 1.20 0.00 13.11 4.98 19.3 238.7 Jan-20 0.60 0.00 16.09 3.42 20.1 238.8 Feb-20 1.02 0.00 13.26 4.25 18.5 238.1 Mar-20 1.16 0.00 12.07 4.78 18.0 234.8 Apr-20 1.82 0.00 4.84 5.54 12.2 226.5 May-20 1.83 0.00 7.62 7.19 16.6 223.6 Jun-20 0.69 0.00 11.58 8.25 20.5 225.2 Jul-20 0.76 0.00 11.48 8.04 20.3 218.9 Aug-20 0.55 0.00 12.98 6.67 20.2 219.9 Sep-20 0.67 0.00 11.64 8.33 20.6 221.6 Oct-20 0.87 0.00 12.08 7.73 20.7 226.7 Nov-20 0.78 0.00 11.34 7.60 19.7 226.8 Dec-20 1.14 0.00 10.31 8.88 20.3 227.8 Jan-21 1.21 0.00 8.29 10.17 19.7 227.4 Feb-21 1.04 0.00 8.68 9.51 19.2 228.1 Mar-21 0.48 0.00 7.67 8.44 16.6 226.7 Apr-21 0.73 0.00 8.68 10.26 19.7 234.1 May-21 0.40 0.00 10.58 9.86 20.8 238.3 Jun-21 0.68 0.00 8.49 11.72 20.9 238.7 Limits CO 251.0 tpy NC Dept of h:nvironmental Quality AUG 10 2021 Raleigh Regional Office 7/28/2021 Moncure MDF Permit Number 03449T54 MDF Plant NOx Emissions Summary Current Monthly NOxton Teaford Abort Ness Burners Dryers HDF Dryers MDF Month Month Emissions(tons) Rolling Sum Total Emission ID ES-02A ES-18/19/20 ES-02HW ES-02SW NOx NOx Jan-20 0.33 1.01 8.85 1.88 12.1 143.6 Feb-20 0.56 1.39 7.29 2.34 11.6 143.7 Mar-20 0.64 1.20 6.64 2.63 11.1 141.9 Apr-20 1.00 0.51 2.66 3.05 7.2 135.4 May-20 1.01 0.77 4.19 3.95 9.9 133.6 Jun-20 0.38 0.96 6.37 4.54 12.2 134.5 Jul-20 0.42 0.97 6.31 4.42 12.1 131.2 Aug-20 0.30 0.76 7.14 3.67 11.9 131.7 Sep-20 0.37 0.81 6.40 4.58 12.2 132.7 Oct-20 0.48 0.91 6.65 4.25 12.3 135.6 Nov-20 0.43 0.94 6.24 4.18 11.8 135.9 Dec-20 0.63 1.08 5.67 4.88 12.3 136.6 Jan-21 0.66 0.98 4.56 5.59 11.8 136.4 Feb-21 0.57 1.83 4.77 5.23 12.4 137.2 Mar-21 0.26 0.99 4.22 4.64 10.1 136.2 Apr-21 0.40 0.94 4.77 5.64 11.8 140.7 May-21 0.53 7.35 13.94 13.00 34.8 165.6 Jun-21 0.89 6.27 11.19 15.45 33.8 187.2 Limits NO. 308.0 tpy 7/28/2021 § ) , }\ ) ) ( ) ) ) ( § ) ) ) ) ())) ) ) LZ _ 6 _ „ O , O 6 6 6 6 6 ! kk ) ) § ) § § § ) ) ) \ ) \ §§§ § § a }\ ) ) ( ( ) ) ) ) ) ) ) ) )§6d66 §2 � . |f )k �k } § § 5 § 55 ! § 5 § 5555555 § ; ; ; ; mean ; ƒ§ § ! ; q # a ; -i -ig4 q@ ! * q - - - - „ - , . 9 , , ,, , � , $ mqa ; @ ; k ;nq @!@ , ! @ ! , , . - „ � , , , , , , - , , , I § § § § § ! § § ! § § § | 6o666 ; : 6 6 d d 6 l �c;6 6 6 � ) ! § ! ! l555 ! ! ! 66666o5 ! g [ � -2 )\ ) ilk ) )/\})/}k \ § ! � !