Loading...
HomeMy WebLinkAboutAQ_F_1900009_20220124_CMPL_CompRpt C73)4 0010 General Shale Building The American Dream* Via Certified Mail P c, January 17, 2022 �v n4 Ms.Taylor Hartsfield Regional Supervisor q .� NCDEQ Division of Air Quality V 3800 Barrett Drive x Raleigh, NC 27609 Re: 4th Quarter(October- December) 2021 General Shale Brick, Inc.-Moncure Facility Plant Nos. 24&25 Permit No. 4384T40, Facility ID: 05/19/00009, Chatham County Dear Ms. Hartsfield: In accordance with Specific ConditionsA.11.b.i and A.13.d.ii.A of the above referenced permit, General Shale Brick submits the following quarterly report for the Moncure facility.The report contains the average hourly combined feed rate for ES-K1K, ES-K2K, ES-K3K and ES-K4K during each day of the reporting quarter and facility-wide PM10,hydrogen chloride and hydrogen fluoride emissions. Please feel free to contact Warren Paschal at (919) 774-6533 (Ext. 221) or at warred.pachaIPgeneralsliale.conl should you have any questions concerning the information provided. Sincerely, At A�l� Kevin Ham Vice President cc Larry Cockerill Warren Paschal P.O.Box 3547 3015 Bristol Highway Johnson City,Tennessee 37602 ,t:-i 1-800-414-4661 FN( 423-952-4104 www.GeneralShale.com Moncure Facility K3 and K4 Production Raw Material Kiln Feed Rate Date (Tons/Day) (Pounds/Hour) 10/01/11 0 0 10/02/11 0 0 10/03/11 0 0 10/04/11 0 0 10/05/11 0 0 10/06/11 0 0 10/07/11 0 0 10/08/11 0 0 10/09/11 0 0 10/10/11 0 0 10/11/11 0 0 10/12/11 0 0 10/13/11 0 0 10/14/11 0 0 10/15/11 0 0 10/16/11 0 0 10/17/11 0 0 10/18/11 0 0 10/19/11 0 0 10/20/11 0 0 10/21/1 1 0 0 10/22/11 0 0 0, 10/23/11 0 0 w 10/24/11 0 0 10/25/11 0 0 0 0 10/26/11 0 0 'a c%I 0 10/27/11 0 0 10/28/11 0 0 10/29/11 0 0 10/30/11 0 0 CA 3 10/31/11 0 0 z z 11/01/11 0 0 11/02/11 0 0 11/03/11 0 0 11/04/11 0 0 11/05/11 0 0 11/06/11 0 0 11/07/11 0 0 11/08/11 0 0 11/09/11 0 0 11/10/11 0 0 Moncure Facility K3 and K4 Production Raw Material Kiln Feed Rate Date (Tons/Day) (Pounds/Hour) 11/11/11 0 0 11/12/11 0 0 11/13/11 0 0 11/14/11 0 0 11/15/11 0 0 11/16/11 0 0 11/17/11 0 0 11/18/11 0 0 11/19/11 0 0 11/20/11 0 0 11/21/11 0 0 11/22/11 0 0 11/23/11 0 0 11/24/11 0 0 11/25/11 0 0 11/26/11 0 0 11/27/11 0 0 11/28/11 0 0 11/29/11 0 0 11/30/11 0 0 i 12/01/11 0 0 12/02/11 0 0 p- 12/03/11 0 0 p 12/04/11 0 0 v -�4 12/05/11 0 0 0 0 12/06/11 0 0 > N OA 12/07/11 0 0 12/08/11 0 0 0 12/09/11 0 0 v 12/10/11 0 0 A 12/11/11 0 0 z 12/12/11 0 0 12/13/11 0 0 12/14/11 0 0 12/15/11 0 0 12/16/11 0 0 12/17/11 0 0 12/18/11 0 0 12/19/11 0 0 12/20/11 0 0 12/21/11 0 0 Moncure Facility K3 and K4 Production Raw Material Kiln Feed Rate Date (Tons/Day) (Pounds/Hour) 12/22/11 0 0 12/23/11 0 0 12/24/11 0 0 12/25/11 0 0 12/26/11 0 0 12/27/11 0 0 12/28/11 0 0 12/29/11 0 0 12/30/11 0 0 Max Quarterly Feed Rate 0 Pounds/Hour 12/31/11 0 1 0 Year to Date 69,785 Tons of Brick u a� o Q � Q.' Month HF Emissions tons HF Emissions tons HF Emissions tons This Month Previous 11 Months 12 Month Total Oct-21 0.04 0.36 0.40 Nov-21 0.03 0.37 0.40 Dec-21 0.03 0.38 0.41 Month HCL Emissions tons HCI Emissions tons HCI Emissions tons This Month Previous 11 Months 12 Month Total Oct-21 0.18 1.66 1.84 Nov-21 0.15 1.70 1.85 Dec-21 0.13 1.75 1.88 Month PM Emissions tons PM Emissions tons PM Emissions (tons) This Month Previous 11 Months 12 Month Total Oct-21 0.68 6.30 6.98 Nov-21 0.59 6.60 7.19 Dec-21 0.52 6.80 7.32