Loading...
HomeMy WebLinkAboutAQ_F_1900009_20210722_CMPL_CompRpt 0010 General Shale . Building The American Dream c2ua�'t� NC Dept ofEnviM^ Via Certified Mail Raleigh K�glo►ial vll►ce July 14, 2021 1 Ms.Taylor Hartsfield Acting Regional Supervisor NCDEQ, Division of Air Quality 3800 Barrett Drive Raleigh, NC 27609 Re: General Shale Brick, Inc. - Moncure Facility Plant Nos. 24&25 Permit No. 4384T39, Facility ID: 05/19/00009, Chatham County Dear Ms. Hartsfield: In accordance with the above referenced permit please find the compliance summary report for the General Shale Brick, Inc. Moncure facility. The compliance report is for the reporting period January 1, 2021 -June 30, 2021. Based on information and belief formed after reasonable inquiry, the undersigned certifies under penalty of law that all information and statements provided in this letter (including any attachments) are true, accurate, and complete. If you have any questions concerning the information provided please feel free to contact Warren Paschal at(919) 774-6533 (ext. 221)or by email at warren.paschal ,general shale.com. Sincerel "O;� //,", Kevin Ham Vice President cc Larry Cockerill Warren Paschal P.O.Box 3547 3015 Bristol Highway Johnson City,Tennessee 37602 Ta 1-800-414-4661 FAX 423-952-4104 www.GeneralShale.com North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device iD Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number Two wood/natural gas-fired brick ES-Kl,ES-K2&ES- 2.1.A.L(c)-(d) Every six months,perform a visual inspection of the No Yes NA Inspections scheduled and NA tunnel kilns&associated sawdust WDI,2 brick tunnel kiln emissions ductwork systems for completed. Documented in rotary dryer leaks,holes,or disrepair;and every six months, logbook. perform a visual inspection of the tummel brick kiln fuel combustion system. Logbook of inspection& Two wood/natural gas-fired brick ES-KI,ES-K2&ES- 2.1.A.L(e) A summary report of monitoring and record keeping No Yes NA Summary report submitted NA tunnel kilns&associated sawdust WDI,2 activities by January 30 of each calendar year for the on or before January 30 and rotary dryer preceding six-month period between July and July 30 December and July 30 of each calendar year for the preceding six-month period between January and One natural gas/propane/coal-fired ES-K3K,CD-K3DLA,ES 2.1.A.L(c)-(d) Every six months,perform a visual inspection of the No Yes NA Inspections scheduled and NA brick tunnel kiln and associated dry K3D1,ES-K3D2&ES- brick tunnel kiln emissions ductwork systems for completed. Documented in limestone adsorber and three K3D3 leaks,holes,or disrepair;and every six months, logbook. natural gas/propane-fired brick perform a visual inspection of the tunnel brick kiln dryers, fuel combustion system. Logbook of inspection& One natural gas/propane/coal-fired ES-K3K,CD-K3DLA,ES 2.1.A.L(e) A summary report of monitoring and record keeping No Yes NA Summary report submitted NA brick tunnel kiln and associated dry K3D1,ES-K3D2&ES- activities by January 30 of each calendar year for the on or before January 30 and limestone adsorber and three K3D3 preceding six-month period between July and July 30 natural gas/propane-fired brick December and July 30 of each calendar year for the dryers. preceding six-month period between January and J nor One natural gas/propane/coal-fired ES-K4K,CD-K4DLA', 2.1.A.L(c)-(d) Every six months,perform a visual inspection of the No Yes NA Inspections scheduled and NA brick tunnel kiln and associated dry ES-K4Dl,ES-K4D2& brick tummel kiln emissions ductwork systems for completed. Documented in limestone adsorber and three ES-K4D3 leaks,holes,or disrepair;and every six months, logbook. natural gas/propane-fired brick perform a visual inspection of the tunnel brick kiln dryers. fuel combustion system. Logbook of inspection& maintenance maintamned, One natural gas/propane/coal-fired ES-K4K,CD-K4DLA,ES 2.1.A.L(e) A summary report of monitoring and record keeping No Yes NA Summary report submitted NA brick tunnel kiln and associated dry K4D1,ES-K4D2&ES- activities by January 30 of each calendar year for the on or before January 30 and limestone adsorber and three K4D3' preceding six-month period between July and July 30 natural gas/propane-fired brick December and July 30 of each calendar year for the dryers. preceding six-month period between January and One natural gas/propane/coal-fired ES-K3K,CD-K3DLA ES 2.1.A.2(c)-(e) The maximum sulfur content of any coal received and No Yes NA Did not operate. NA brick tunnel kiln and associated dry K3Dl,ES-K3D2&ES- burned shall not exceed 1.0 percent by weight. The limestone adsorber and three K3D3 Permittee shall monitor the sulfur content of the coal natural gas/propane-fired brick by using coal supplier certification per total shipment dryers. received. The coal supplier certification shall be recorded in a logbook. Page 1 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number One natural gas/propane/coal-fired ES-K3K,CD-K3DLA,ES 2.1.A.2(f) A summary report of the coal supplier certifications No Yes No Did not operate. NA brick tunnel kiln and associated dry K3131,ES-K3D2&ES- postmarked on or before January 30 or each calendar limestone adsorber and three K3133 year for the preceding six-month period between July natural gas/propane-fired brick and December and July 30 of each calendar year for dryers. the preceding six-month period between January and June a certified statement signed by responsible official that the records of coal supplier certification submitted represent all the coal feed during the reporting period. One natural gas/propane/coal-fired ES-K4K,CD-K4DLA,ES 2.1.A.2(c)-(e) The maximum sulfur content of any coal received and No Yes NA Firing with natural gas no NA brick tunnel kiln and associated dry K4Dl,ES-K4D2&ES- burned shall not exceed 1.0 percent by weight. The coal received limestone adsorber and three K4133 Permittee shall monitor the sulfur content of the coal natural gas/proparre-feed brick by using coal supplier certification per total shipment dryers. received. The coal supplier certification shall be recorded in a logbook. One natural gas/propane/coal-fired ES-K4K,CD-K4DLA,ES 2.1.A.2(f) A summary report of the coal supplier certifications No Yes No Firing with natural gas no NA brick tunnel kiln and associated dry K4DI,ES-K4D2&ES- postmarked on or before January 30 or each calendar coal received limestone adsorber and three K4D3 year for the preceding six-month period between July natural gas/propane-fired brick and December and July 30 of each calendar year for dryers. the preceding six-month period between January and June a certified statement signed by responsible official that the records of coal supplier certification submitted represent all the coal fired during the ieporting period. One natural gas/propane/coal-fired ES-K3K,ES-K3D 1,ES- 2.1.A.3(g) The Permittee shall submit a summary report of the No Yes NA Did not operate. NA brick tunnel kiln and associated dry K31)2&ES-K3D3 observations postmarked on or before January 30 of limestone adsorber and three each calendar year for the preceding six-month period natural gas/propane-fired brick between July and December and July 30 of each dryers. calendar year for the preceding six-month period between January and June. One natural gas/propane/coal-fired ES-K4K,CD-K4DLA,ES 2.1.A.3(g) The Permittee shall submit a summary report of the No Yes NA Firing with natural gas. No NA brick tunnel kiln and associated dry K4D1,ES-K4D2&ES- observations postmarked on or before January 30 of testing,monitoring, limestone adsorber and three K4D3 each calendar year for the preceding six-month period recordkeeping,reporting natural gas/propane-fired brick between July and December and July 30 of each required. dryers. calendar year for the preceding six-month period between January and June. Page 2 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number Two wood/natural gas-fired brick ES-Kl,ES-K2&ES- 2.1.A.4.a 2D.1109:CAA§1120);Case-by-Case MACT for No Yes NA Initial compliance test date NA tunnel kilns and two natural K3K,CD-K3DLA, Brick Manufacturers emission standards,work must be within 180 days of gas/propane/coal-fired brick tunnel ESK4K&ES-K4DLA practice standards,and associated monitoring, July 29,2015.Testing kilns and associated dry limestone recordkeeping and reporting. completed September 24, adsorbers 2015. Two wood/natural gas-fired brick ES-K1&ES-K2 2.1.A.4.e. Work practice standards 2Q.0508(f)the Permittee No Yes NA KS-Ki and ES-K2 did not NA tunnel kilns shall preform annual inspection and maintenance of operate. tunnel kilns ES-KI and K-2 and as a minimum include(i)a visual inspection of the ductwork and system for each kiln for leaks,holes,or disrepair and (ii)inspect each burner,and clean and replace any components of the burner as necessary and(iii) inspect the system controlling the air-to-fuel ratio and ensure that it is correctly calibrated and functioning Two natural gas/propane/coal-fired ES-K3K,CD-K3DLA, 2.1.A.4.f. Monitoring 2Q.0508(f)the Permittee shall(i)install, No Yes No Pressure drop measurement NA brick tunnel kilns and associated ESK4K&ES-K413LA operate and maintain a pressure measurement device device installed,operated dry limestone adsorbers at the DLAs and(ii)record the pressure drop across and maintained.Results the DLAs once per day and the results shall be documented and maintained maintained in a logbook. in logbook. Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.g. Monitoring 2Q.0508(f)the Permittee shall maintain No Yes NA Results documented NA brick tunnel kilns and associated K4DLA an adequate amount of limestone in the limestone recorded and maintained in dry limestone adsorbers hopper storage bin and(i)once per day verify the logbook. limestone hopper and storage bin at the DLAs contain adequate limestone and(ii)record the results in a Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.h. Monitoring 2Q.0508(f)the Permittee shall use the No Yes NA Same grade limestone used NA brick tunnel kilns and associated K4DLA same grade of limestone at the DLAs from the same since September 24,2015 dry limestone adsorbers source as was used during the performance test.The compliance test. Permittee shall maintain records of the source and grade of limestone used and record in logbook. Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.i. Monitoring 2Q.0508(f)the Permittee shall maintain No Yes NA Limstone feeder rate setting NA brick tunnel kilns and associated K4DLA the limestone feeder setting at the DLAs at or above checked and maintained in dry limestone adsorbers the level established during the performance test.(i) logbook. The Permittee shall check once per day and record the limestone feeder setting to verify that it is being maintained at or above the level in the performance test and(ii)maintain in a logbook. Page 3 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/NO/NA) issue?(Yes/No) Permit Condition Summary Condition Number Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.j.(A) Monitoring 2Q.0508(f)the Permittee shall maintain No Yes No Daily VE observed for a NA brick tunnel kilns and associated K4DLA no visible emissions fort the DLAs.The Permittee least 15 minutes documented dry limestone adsorbers shall conduct a daily Method 22 test for a least 15 in logbook. minutes and if VE are observed promptly initiate and complete corrective actions according to OM&M nlan Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.j.(B) Monitoring 2Q.0508(f)If no VE are observed for 30 No Yes No Daily VE observed for a NA brick tunnel kilns and associated K4DLA consecutive daily Method 22 tests for any kiln stack, least 15 minutes documented dry limestone adsorbers the Permittee may decrease the frequency from daily in logbook. to weekly.If VE are observed during any weekly test,promptly initiate corrective actions,resume daily testing and maintain until no VE are observed in 30 consecutive days at which time the Permittee may decrease frequency of testing to a weekly basis. Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.41. Monitoring 2Q.0508(f)Once per month the No Yes NA Results documented NA brick tumtel kilns and associated K4DLA Permittee shall ensure that the limestone feed system recorded and maintained in dry limestone adsorbers on a DLA replaces limestone at least at the frequency logbook. as the schedule during the performance test.Create and maintain a record of the monthly check in a Two wood/natural gas-fired brick ES-Kl,ES-K2,ES-K3K 2.1.A.4.1. Monitoring 2Q.0508(f)The Permittee shall maintain No Yes NA Production rates maintained NA tunnel kilns and two natural &ESK4K records of production rates on fired-product basis for and recorded in logbook, gas/propane/coal-fired brick tunnel each affected tunnel kilns. kilns and associated dry limestone adsorbers Two wood/natural gas-fired brick ES-K1&ES-K2 2.I.A.4.m. Monitoring 2Q.0508(f)The results of inspection and No Yes NA Inspections scheduled and NA tunnel kilns maintenance shall be maintained in a logbook,made completed. Documented in available upon request and include the(i)date of logbook.Ki and K2 did not each recorded action,(ii)the results of each operate. inspection and the(iii)results of any maintenance performed- Two natural gas/propane/coal-fired CD-K3&ES-K4 2.I.A.4.n. Monitoring 2Q.0508(f)The results of the VE No Yes NA VE observations scheduled NA brick tunnel kilns and associated observations shall be maintained in logbook and and completed. Documented dry limestone adsorbers include the(i)date and time of each recorded action, in logbook. (ii)the results of each observation and/or test noting emissions the in noncompliance along with any corrective actions taken to reduce emissions and(iii) the results of any corrective action performed. Page 4 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.o. Monitoring 2Q.0508(f)The Permittee shall maintain No Yes NA Bypass records maintained NA brick tunnel kilns and associated K4DLA a record of each period when operating while and description of dry limestone adsorbers bypassing the DLAs in order to perform maintenance. maintenance documented The results shall be maintained in a logbook and and recorded in logbook. include the(i)start date and time of routine The percentage of time the maintenance,(ii)the stop date and time of routine kilns operated did not exceed maintenance,(iii)a description of maintenance 4%of the annual operating activities and(iii)the total time the kiln has operated time. in by-pass,and(iv)the total percentage of the time the kilns have been operated in by-pass for the previous 12-month period. Two wood/natural gas-fired brick ES-KI,ES-K2&ES- 2.1.A.4.p. Monitoring 2Q.0508(0 The Permittee must submit a No NA NA Initial compliance test date NA tunnel kilns and two natural K3K,CD-K3DLA, Notification of Compliance Status within 60 days must be within 180 days of gas/propane/coal-fined brick tunnel ESK4K&ES-K4DLA following the completion of the final require July 29,2015.Testing kilns and associated dry limestone performance test. completed September 24, adsorbers 2015.Notification of Compliance Status submitted November 13,2015. Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.i.A.4.q. Monitoring 2Q.0508(f)The Permittee shall submit a No Yes NA Summary report submitted NA brick tunnel kihts and associated K4DLA semi-annual report of monitoring and recordkeeping on or before January 30 and dry limestone adsorbers activities on or before January 30 of each calendar July 30 year for the preceding six-month period between July and December,and July 30 of each calendar year for the preceding six-month period between January and June Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.q.i. Monitoring 2Q.0508(f)The report shall contain the No Yes NA Summary report submitted NA brick tunnel kilns and associated K4DLA Company name,facility ID number and address. on or before January 30 and dry limestone adsorbers July 30 Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.I.A.4.q.ii. Monitoring 2Q.0508(f)The report shall contain a No Yes NA Summary report submitted NA brick tunnel kilns and associated K4DLA statement by the Responsible official with the on or before January 30 and dry limestone adsorbers official's name,title and signature certifying the July 30 statements and information are true,accurate and Page 5 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.I.A.4.q.iii. Monitoring 2Q.0508(f)The report shall contain a No Yes NA No routine maintenance NA brick tunnel kilns and associated K4DLA description of routine maintenance performed while performed offline. dry limestone adsorbers the DLAs were offline and the tunnel kilns were operating including(A)date and time when the DLAs were shutdown and restarted,(B)the number of hours the kilns operated while the DLAs was offline and(C)the total amount of time that the associated kiln operated during the semiannual compliance and during the previous semiannual compliance period. Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.1.A.4.q.iv. Monitoring 2Q.0508(f)For each deviation from a No Yes NA No deviation from a NA brick tunnel kilns and associated K4DLA limitation include(A)the total operating time of each limitation(emission limit, dry limestone adsorbers affected source during the reporting period and(B) operating limit or work the information on the number,duration and cause of practice standard)since July deviations and the corrective action taken. 29,2015 compliance date. Two natural gas/propane/coal-fired CD-K3DLA&ES- 2.LA.5. Alternative Operating Scenarios 2Q.0508(p)The No Yes NA No AOS during reporting NA brick tunnel kilns and associated K4DLA Permittee,contemporaneously with making a change period. dry limestone adsorbers from one alternative operating scenario or another, shall record in a logbook the scenario under which it is r One wood fuel/sawdust system ES-WFS-SD-SC I,ES- 2.1.13.1(c)&(d) The Permittee shall perform inspections and No Yes NA Inspections scheduled and NA consisting of two 8x8 screens, WFS-SC2,ES-WFS-SD- maintenance as recommended by the control device completed. Documented in cyclone,hammetmill,sawdust silo, CYC,ES-WFS-SD-HM, manufacturer. As a minimum,the inspection and logbook. surge hopper,transfer screw ES-WFS-SD-SDS,ES- maintenance shall include a monthly visual inspection conveyor,screen feed conveyor WFS-SD-SH,ES-WFS- of the system ductwork and material collection unit and enclosed conveyor controlled SD-CV I,ES-WFS-CV2, for leaks and annual inspection of the cyclone by two dust collectors,one ES-WFS-SD-CV3,CD- structural integrity. The results of the inspection and cyclone,and two bin vent filters. SD-DC1,CD-SD-DC2, maintenance shall be maintained in a logbook and ES-WFS-SD-CYC,DC- made available upon request. One wood fuel/sawdust system ES-WFS-SD-SCI,ES- 2.f.B.I(e) The Pemvttee shall submit a summary report of the No Yes NA Summary report submitted NA consisting of two 8x8 screens, WFS-SC2,ES-WFS-SD- observations postmarked on or before January 30 of on or before January 30 and cyclone,hammermill,sawdust silo, CYC,ES-WFS-SD-HM, each calendar year for the preceding six-month period July 30 surge hopper,transfer screw ES-WFS-SD-SDS,ES- between July and December and July 30 of each conveyor,screen feed conveyor WFS-SD-SH,ES-WFS- calendar year for the preceding six-month period and enclosed conveyor controlled SD-CV I,ES-WFS-CV2, between January and June. by two dust collectors,one ES-WFS-SD-CV3,CD- cyclone,and two bin vent filters. SD-DCl,CD-SD-DC2, ES-WFS-SD-CYC,DC- Page 6 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number Natural gas-fired coatings dryer ES-CD-8,CD-CD8BF 2.1.C.1(c)(d) The Pemuttee shall perform inspections and No Yes NA Inspections scheduled and NA maintenance as recommended by the control device completed. Documented in manufacturer. As a minimum,the inspection and logbook. maintenance shall include a monthly visual inspection of the system ductwork and material collection unit for leaks and annual inspection of the bagfilter structural integrity. The results of the inspection and maintenance shall be maintained in a logbook and made available upon request. Natural gas-fired coatings dryer ES-CD-8,CD-CD8BF 2.1.C.1(e) The Permittee shall submit the results of any No NA NA Not requested by the DAQ. NA maintenance performed on the bagfilter within 30 days of a written request by the DA . Natural gas-fired coatings dryer ES-CD-8,CD-CD8BF 2.1.C.I(f) The Permittee shall submit a summary report of the No Yes NA Summary report submitted NA observations postmarked on or before January 30 of on or before January 30 and each calendar year for the preceding six-month period July 30 between July and December and July 30 of each calendar year for the preceding six-month period between January and June. Natural gas-fired coatings dryer ES-CD-8 2.1.C.2(a)-(c) Sulfur dioxide emissions shall not exceed 2.3 pounds No NA NA No testing,monitoring, NA per million Btu heat input 2D.0516(a) recordkeeping reporting reauired. Natural gas-fired coatings dryer ES-CD-8 2.1.C.3(a)&c(b) Visible emissions shall not exceed 20 percent opacity No NA NA No testing required. NA 2D.0521. If required,testing shall be performed in accordance with 2D.0501 c 8. Natural gas-fired coatings dryer ES-CD-8 2.1.C.3(e) The Permittee shall submit a summary report of the No Yes NA Summary report submitted NA observations postmarked on or before January 30 of on or before January 30 and each calendar year for the preceding six-month period July 30 between July and December and July 30 of each calendar year for the preceding six-month period between January and June. Two texturizing operations ES-CR5,ES-CR6,CD- 2.1.D.1(c)&(d) The Permittee shall perform inspections and No Yes NA Inspections scheduled and NA controlled by bagfilter,one CR6BF,ES-CR7,ES- maintenance as recommended by the control device completed. Documented in texturizing operation controlled by CR8,CD-CR7BF,CD- manufacturer. As a minimum,the inspection and logbook. three bagfilters and sand silo CR7BF2,CD-CR7BF3, maintenance shall include a monthly visual inspection system controlled by on bin vent ES-SS&CD-SS-BV3 of the system ductwork and material collection unit filter. for leaks and annual inspection of the bagfilter structural integrity. The results of the inspection and maintenance shall be maintained in a logbook and made available upon request. Page 7 of 10 i 1 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device iD Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number Two texturizing operations ES-CR5,ES-CR6,CD- 2.1.D.1(e) The Penmittee shall submit the results of any No NA NA Not requested by the DAQ. NA controlled by bagfilter,one CR6BF,ES-CR7,ES- maintenance performed on the bagfilter within 30 texturizing operation controlled by CR8,CD-CR7BF,CD- days of a written request by the DAQ. three bagfilters and sand silo CR7BF2,CD-CR713173, system controlled by on bin vent ES-SS&CD-SS-BV3 Two texturizing operations ES-CR5,ES-CR6,CD- 2.1.D.1(f) The Permittee shall submit a summary report of the No Yes NA Summary report submitted NA controlled by bagfilter,one CR6BF,ES-CR7,ES- observations postmarked on or before January 30 of on or before January 30 and textudzing operation controlled by CR8,CD-CR713F,CD- each calendar year for the preceding six-month period July 30 three bagfilters and sand silo CR7BF2,CD-CR7BF3, between July and December and July 30 of each system controlled by on bin vent ES-SS&CD-SS-BV3 calendar year for the preceding six-month period filter. between January and June. Two texturizing operations ES-CR5,ES-CR6,CD- 2.1.13.2(a)-(c) Visible emissions shall not exceed 20 percent opacity No NA NA No testing,monitoring, NA controlled by bagfilter,one CR6BF,ES-CR7,ES- 2D.0521. VE from ES-CR5&ES-CR6 shall not recordkeeping or reporting texturizing operation controlled by CR8,CD-CR713F,CD- exceed 40 percent when averaged over a six-minute required. three bagfilters and sand silo CR7BF2,CD-CR7BF3, period. VE from ES-CR7 and ES-SS shall not system controlled by on bin vent ES-SS&CD-SS-BV3 exceed 20 percent when averaged over a six-minute filter DCri0d Clay crushing,grinding,and F-SSI,F-SS2,F-FC4&F 2.1.E.2(e) Recordkeeping for Condition 2.I.E.2(d) No Yes NA Inspections scheduled and NA screening operations including one FC5 and F-C-CFBH completed. Documented in NSPS-affected primary crusher, logbook. two NSPS-affected scalping screens,one NSPS-affected hammermill,two single deck finishing screens,one bank of six finishing screens,two NSPS- affected finishing conveyors#4 and #5 and one NSPS affected intersite conveyor Clay crushing,grinding,and F-SSI,F-SS2,F-FC4&F.2.1.E.2(f)(ii)-(iii) Affected facility reporting requirements 2Q.0508(f)- No Yes NA Summary report submitted NA screening operations including one FC5 and F-C-CFBH Summary report of monitoring and record keeping by on or before January 30 and NSPS-affected primary crusher, January 30 and July 30 of each calendar year for the July 30 two NSPS-affected scalping preceding six month period of any noncomplying screens,one NSPS-affected emissions hammermill,two single deck finishing screens,one bank of six finishing screens,two NSPS- affected finishing conveyors#4 and #5 and one NSPS affected intersite conveyor Page 8 of 10 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes(No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number One Concrete Block Plant ES-BP-FAS,CD-BP- 2.1.G.1(d)&(f) Monthly visual inspection of the system ductwork No Yes NA Did not operate. NA consisting of: one flyash silo BV 1,ES-BP-CS,CD-BP- and material collection units for leaks and an annual controlled by one bin vent filter, BV2,ES-BP-BM&CD- internal inspection of the bagfilters structural integrity one cement silo controlled by one BP-BH1 in accordance with 2Q.0508(f). Results of bin vent filter and one batch mixer inspection and maintenance shall be maintained in a controlled by one bagfilter logbook and made available upon request. One Concrete Block Plant ES-BP-FAS,CD-BP- 2.I.G.I(g)&(h) The Pemtittee shall submit results of any maintenance No Yes NA Did not operate. NA consisting of: one flyash silo BVI,ES-BP-CS,CD-BP- performed on the bagfilters within 30 days of a controlled by one bin vent filter, BV2,ES-BP-BM&CD- written request and submit a summary report of one cement silo controlled by one BP-BH1 monitoring and recordkeeping activities postmarked bin vent filter and one batch mixer on or before January 30 and July 30 for the preceding controlled by one baefilter 6 month neriod. One coal processing system and ES-Coal-CC,CD-Coal- 2.1.H.l(c)&(d) The Permittee shall perform inspections and No Yes NA Did not operate. NA one coal crusher controlled by one CC,ES-Rumble&CD- maintenance as recommended by the control device bagfilter and one rumbler system Rumble manufacturer. As a minimum,the inspection and controlled by a bagfilter. maintenance shall include a monthly visual inspection of the system ductwork and material collection unit for leaks and annual internal inspection of the bagfilter's structural integrity. The results of the inspection and maintenance shall be maintained in a logbook and made available upon request. One coal processing system and ES-Coal-CC,CD-Coal- 2.l.H.l(e)&(f) The Pernuttee shall submit results of any maintenance No Yes NA Did not operate. NA one coal crusher controlled by one CC,ES-Rumble&CD- performed on the bagfdters within 30 days of a bagfilter and one rumbler system Rumble written request and submit a summary report of controlled by a bagfilter. monitoring and recordkeeping activities postmarked on or before January 30 and July 30 for the preceding One coal processing system and ES-Coal-CC,CD-Coal- 2.1.H.2(c)&(d) The Pennittee shall observe the emission points of No Yes NA Did not operate. NA one coal crusher controlled by one CC,ES-Rumble&CD- this source for any VE above normal and the date and bagfilter and one nimbler system Rumble time,results of observation and any corrective actions controfled by a bagfilter. shall be maintained in a logbook on-site and made available upon request, One coal processing system and ES-Coal-CC,CD-Coal- 2.1.H.2(e) The Permitee shall submit a summary report of the No Yes NA Did not operate. NA one coal crusher controlled by one CC,ES-Rumble&CD- observations postmarked on or before January 30 of bagfilter and one rumbler system Rumble each calendar year for the preceding six-month period controlled by a bagfilter. between July and December and July 30 of each calendar year for the preceding six-month period between January and June. Page 9 of 10 I J North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT January 1,2021-June 30,2021 Emission Source Description Source or Control Terms and Conditions Deviations? Records Was Deviation a Method(s)of Determining Comments Device ID Number(s) (Yes/No) Maintained? non-compliance Compliance Status (Yes/No/NA) issue?(Yes/No) Permit Condition Summary Condition Number TAP Emissions Limitations& 2.2.2.b.i For compliance purposes within 30 days after each No Yes NA Report submitted within 30 NA Requirements calendar quarter the maximum hourly combined feed days after each calendar rates for ES-Kl,ES-K2,ES-K3 and ES-K4 shall be quarter. submitted to the DAQ Regional Supervisor. Page 10 of 10