Loading...
HomeMy WebLinkAboutAQ_F_0400056_20220128_CMPL_CompRpt --le/s1 O 1131 2o2z Piedmont Natural Gas January 19,2022 Heather Carter,Regional Supervisor NC Division of Air Quality RECEIVED Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville,NC 28301 JAN 28 2022 Re: Title V Semi Annual Permit Report—Permit No. 10097T Piedmont Natural Gas—Wadesboro Compressor Station Reporting Period July 2021 through December 2021 DEQ-FAYETTEVILLE RECtONAL OFFICE Facilh),ID: 0400056 Dear Ms.Carter: In accordance with Permit No. 10097T,Piedmont Natural Gas is submitting a semi-annual report for the Wadesboro Compressor Station located at 379 Pleasant Grove Church Road in Wadesboro,Anson County, North Carolina.As stated in permit condition 2.I.A.3(k)and 2.1.13 3(l),the facility is required to submit a semi- annual summary report of monitoring and recordkeeping activities by January 30 for the preceding six months for the internal combustion engines(COMPOI through COMP08)and the emergency generator(EG-01).This letter serves as the summary report for the period of July 1,2021 through December 31,2021. Four of the eight permitted natural-gas fired internal combustion engines(COMP05 COMP08)have not yet been installed at the Wadesboro Compressor Station. The hours of operation for the four internal combustion engines in service(COMP01 --COMP04)and the emergency generator(EG-01)are recorded using non-resettable hour meters. A summary of engine hours of operation during the reporting period is shown in Table 1. Recordkeeping is conducted in accordance with permit conditions 2.l.A.3(h),2.1.A.4(d),and 2.1.B.3(i). No malfunctions or instances of noncompliance occurred for any unit during this reporting period. If you have any questions regarding the information contained in this report,please contact Kristen Belisario at (919)5464005 or by email at Kristen.Belisario4 duke-eneray.com. Certification by Responsible Official Based on information and belief formed after reasonable inquiry,the statements and information in the document are true,accurate,and complete. Sincerely, 6- Adam B.Long,P.E. VP,Gas Pipeline Operations cc: Kristen Belisario Cynthia Winston Tyler Barbare P.O.Box 33068 - Charlotte,North Carolina 28233 pledmontng.com Semi-Annual Report-Wadesboro Compressor Station January 19, 2022 Page 2,Table 1 Table 1. Wadesboro Compressor Station: Number of Hours of Operation July- December 2021 Month COMPOl COMP02 COMP03 COMP04 EGO1 July 165.1 147.6 144.8 147.9 2.0 August 175.1 191.8 180.0 157.3 1.0 September 139.9 142.8 168.4 8.1 1.0 October 44.1 33.6 22.0 264.0 1.0 November 118.5 158.7 153.5 97.1 1.0 December 211.4 153.4 164.0 168.9 1.0 Total 854.1 827.9 832.7 843.3 7.0 hours P.O. Box 33068 • Charlotte,North Carolina 28233 piedmontng.corn