Loading...
HomeMy WebLinkAboutAQ_F_0400056_20210726_CMPL_CompRpt i V"'S Piedmont Natural Gas July 20,2021 Heather Carter, Regional Supervisor NC Division of Air Quality Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville,NC 28301 Re: Title V Semi Annual Permit Report—Permit No. 10097T Piedmont Natural Gas—Wadesboro Compressor Station Reporting Period January 2021 through June 2021 Facility ID: 0400056 Dear Ms.Carter: In accordance with Permit No. 10097T, Piedmont Natural Gas is submitting a semi-annual report for the Wadesboro Compressor Station located at 379 Pleasant Grove Church Road in Wadesboro,Anson County,North Carolina. As stated in permit condition 2.1.A.3(k)and 2.1.13 3(1),the facility is required to submit a semi-annual summary report of monitoring and recordkeeping activities by July 30 for the preceding six months for the internal combustion engines(COMPOI through COMP08) and the emergency generator(EG-01).This letter serves as the summary report for the period of January 1,2021 through June 30,2021. Four of the eight permitted natural-gas fired internal combustion engines(COMP05--COMP08)have not yet been installed at the Wadesboro Compressor Station. The hours of operation for the four internal combustion engines in service(COMPO 1 —COMP04)and the emergency generator(EG-01)are recorded using non-resettable hour meters. A summary of engine hours of operation during the reporting period is shown in Table 1. Recordkeeping is conducted in accordance with permit conditions 2.1.A.3(h),2.1.A.4(d),and 2.l.B.3(i).This correspondence also includes notification of a permit deviation. In January 2021, Unit 4 began "back-firing"during normal operation. The engine was removed from service and the equipment manufacturer was brought to the site for troubleshooting purposes. In order to diagnose the problem and to ensure that the catalyst would not be fouled during the process,the engine ran for 2.7 hours without the catalyst installed on January 13 and 14,2021. Technicians determined that a fuel shut off valve was faulty. Repairs were completed on January 14,2021 and the engine was returned to service. As a precautionary measure,emissions were verified following repairs using a handheld monitor and were determined to be within the compliance limits. If you have any questions regarding the information contained in this report,please contact Kristen Belisario at(440)668-8785 or via email at Kristen.Bel isario cr duke-eneEgv.com. Certification by Responsible Official Based on information and belief formed after reasonable inquiry,the statements and information in the document are true,accurate,and complete. P.O.Box 33068 - Charlotte.North Carolina 28233 piedmontng.com Sincerely, )?�s Adam B. Long, P.E. VP,Gas Pipeline Operations cc: Kristen Belisario Cynthia Winston 1 Y Semi-Annual Report-Wadesboro Compressor Station July 20, 2021 Page 3,Table 1 Table 1. Wadesboro Compressor Station: Number of Hours of Operation January-June 2021 Month COMP01 COMP02 COMP03 COMM4 EG01 Jan" 254.8 238.0 184.2 193.2 2.0 Feb ru 179.0 223.0 197.0 185.0 2.0 :Larch 147.0 119.0 143.0 154.0 2.0 April 162.0 153.0 174.0 157.0 3.0 Ma _ 70.0 74.0 74.0 100.0 2.0 Jane 92.0 98.0 98.0 67.0 2.0 Total 904.8 905.0 870.2 856.2 13.0 ours P.O.Box 33068 - Charlotte,North Carolina 28233 piedmontng.com