Loading...
HomeMy WebLinkAboutAQ_F_0400052_20210104_CMPL_CompRpt REVIEW OF TITLE V 2020 ANNUAL COMPLIANCE CERTIFICATION Reviewer Assigned: Jeffrey Cole FACILITY Anson County Waste Management Facility FACILITY 0400052 NAME: ID: 1. Is the Certification sheet signed by the authorized/responsible official? Y a N ❑ 2. Print the"Summary of Violations for a Facility"report from IBEAM and attach. F7 3. Are all NOD/NOV/NREs accounted for in the Deviation Summary Report? Y V N❑ N/A❑ 4. If deviations are noted, did FRO address them all?(i.e. send letter)? Check paper file for any issues that may not be recorded in IBEAM Violations. Y� N F N/A❑ 5. Discuss deviations details with Compliance Coordinator. Y❑ N/AF,(] 6. If there was more than one permit applicable during the year, have all the permits been addressed in this ACC? Permit Numbers 09835T04 Y 1:1 N F,/] N/A❑ 7. Do reported sources and conditions match those in the permit(s)? Y❑� N F 8. Is the Compliance Summary Report for Specific Conditions complete and accurate? Y I—V] N ❑ 9. Is the Compliance Summary Report for General Conditions complete and accurate? Y F,(] N ❑ 10. Is compliance with the ACC requirements indicated? Y 7 N ❑ 11. Record in IBEAM Actions/Reporting(date received, date reviewed,compliance status,comments). Completed on 04/08/2021 (date) REMEMBER—Compliance determination here refers to the ACC submitting requirements(late, not submitted, incomplete, etc). Talk to the Compliance Coordinator before you code a facility in violation. 12. Initial and date the top of the ACC Certification Sheet(not this cover sheet). W] 13. File FRO copy in a"Reports" or an"ACC"folder in facility file after Compliance Coordinator review. 14. Comments: Reviewed by: joe Date: 0410812021 (initials) Coordinator Review: gwir? Date 0410812021 (initials) 04/08/2021 Page 1 of 1 Summary of Violations Violator: Facility ID: Letter Date(s): Violation(s): County: Letter Type: Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: Fra kiln Engineers&Consultants, LLC. Franklin b 2734 Sunrise Blvd,Suite 308 JAN Pearland,TX 77584 Engineers&Consultants,LLC. 9 20t Phone: (281)205-8410 C.-rAYETTTVILLE REGIONAL Orr!CE January 28,2021 Division of Air Quality Air and EPCRA Enforcement Branch North Carolina Department of Environment US EPA—Region 4 and Natural Resources 61 Forsyth Street Fayetteville Regional Office Atlanta, GA 30303 225 Green Street, Suite 714 Fayetteville,North Carolina 28301 RE: 2020 Title V Annual Compliance Certification/2nd Half 2020 Semi-Annual Report Anson County Waste Management Facility,Polkton,North Carolina Facility Title V Permit No. 9835T04 Facility ID: 0400052 To Whom It May Concern: This letter and the attached documentation represent the Title V Annual Compliance Certification for the Anson County Solid Waste Management Facility(ACWMF)located in Polkton,NC. This report has been prepared to satisfy the requirements of Title V Permit Condition 3.P. If you have any questions concerning this information,please feel free to call Lana Brown at(901)500- 1812 or me at(281)205-8415. Sincerely, Franklin Engineers& Consultants,LLC. f r'1 _J Juene Franklin President Enclosure: ACWMF 2020 Title V Annual Compliance Certification and 211 Half 2020 Semi-Annual Report cc: w/attachment Matt Crockett—WCN Eastern Region Engineering Manager(Electronic) Lana Brown—WCN Eastern Region Environmental Compliance Specialist(Electronic) Tyler Fitzgerald—WCN District Manager Anson County Waste Management Facility North Carolina Department of Environmental Quality Division of Air Quality DA Q tY( Q) Title V Annual Compliance Certification Forms(1) FacilityName: Anson Count Waste Management Facility Y 9 Y Facility Location: Polkton, North Carolina Facility ID Number: 400052 Title V Permit Number: 09835T04 (Refer to first page of Title V Permit) Start of Reporting Period: January 1,2020 (Month, Day,Year) End of Reporting Period: December 31,2020 (Month, Day, Year) Compliance Statement (Check only one of the following options) X During the reporting period specified above,this facility was in compliance with all terms and conditions identified in the above referenced Title V Operating Permit. As such, there were no deviations(2), excesE emissions events, or other reportable incidents including those attributable to equipment malfunctions, breakdown, or upset conditions(please fill out the Compliance Summary Report). During the reporting period specified above,this facility was in compliance with ALL terms and conditions identified in the above referenced Title V Operating Permit, EXCEPT for the deviations(2) identified in the Deviation Summary Report(please fill out both the Compliance Summary Report and Deviation Summary Report). Does the above compliance statement differ from what is indicated on your most recent Title V Report(i.e. last Semi-Annual Monitoring Report, Annual Emissions Inventory, etc)? Yes ©o Are you submitting this Annual Compliance Certification form to also fulfill a Titl V Semi-Annual Monitoring reporting requirement? If so,this certification must be submitted by January 30. No Certification By Responsible Official Based on information and belief formed after reasonable inquiry,the undersigned certifies under penalty of law (federal rule 40 CFR 70.5(d))that all information and statements provided in this form (including any attachments) are true, accurate, and co lete. ig re of Responsible Official) (Date) Naive: ). \y LE(L r lT 2G t�Ln (Type or Print) Number of Pages Attached20 0508 a*1 220,.05OS ?;.ani Sectvn3-Geneym Ca d=n P,f6m 3'itw V Ope raby Feymit A czp, vrrr ACE'it w be �chriitWtrrbbxt tip Nor&Caralza DAQajtdtu US EPA Mk andFPCIA E4ftrcrm extRramc,EPA, at 47 61 Fora AAamn; G4 3039-1- 77m mdm hW d=rjW toACC's Yw"fl?d z Sec>cn�-CknF-a C-,-)dnw P fioLr T"- Vpeymi l=crthe pwrpv=stafthis fxm tlha Corm(deviation" nstrny actian ar crcu,msrvncv not.in arccrdaanciv wiMtha tornasand rm d itions o,f the TAW V Oporating Porn*i melts ain g th ow a rb—A au&vbAv to equ iyamant unrban by a kda wn,tr a pwt cand'.bmsanWnraxoam arnisrlouts a won= Tha vdrnvi 4adtganmnt qf do viwtis fr sperifir purnrjit mquimr nix ys nat rI 60-CVM47raty tan 0&n as 9.73FA '%n t cif 9 v.9 i U tian Ho NV 10.F;f 7.dUT9 rD ropGn IM y and 4V k1 da vuttWnS n_►try eon sbtu to tr v}okFt►an of tlh a r&W V Opv.rating%r*rvt and tha un adb rlym g a m.w.icn st;c.n arc rd ra io r W the DAQ mwrnarm dum ow d ini ng tha di t Aim taf davw6aq f txr T dv V.nW rtangt an the D4Q web site i httar+rfdaa.n e.ta�v�ts3ta�t:�d.rv:►�ans�asa�truolrtv?ai�-tra.c.Ci°ttt-anf�an�ntfa.roass,o+ness.��a'�v.►at�s-rrtrtfa�nc-t.�tan- North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 2of33 Was Deviation a Source or Records Method(s)of Emission Source Terms and Conditions Deviations? uon-compliance liance Description (Yes/NO) es/No/NA issue. Control Device Maintained? e? Determining Comments ID Number(s) permit Condition Number Condition Summary ) Yes/No Compliance Status Emissions of sulfur dioxide from the flare(ID No. CD-1)shall not exceed 2.3 pounds per million Btu Candle Stick Flare CD-1 2.1.A.1(a) heat input.Sulfur dioxide formed by the combustion No NA No Operations of sulfur in fuels,wastes,ores,and other substances shall be included when determining compliance with this standard. If emission testing is required,the testing shall be performed in accordance with General Condition JJ. Candle Stick Flare CD-1 2,I.A.1(b) If the results of this test are above the limit given in No NA No Testing Section 2.1 A La.above,the Permittee shall be deemed in noncompliance with 15A NCAC 2D .0516. No monitoring,recordkeeping,or reporting is Combust/Fire LFG in Candle Stick Flare CD-1 2.LA.l(c) required for sulfur dioxide emissions from the firing No NA No the flare of landfill gas in the flare ID No.CI.I. Visible emissions from the flare(ID No.CO-1)shall not be more than 20 percent opacity each when averaged over a six-minute period.However,six- Candle Stick Flare CD-1 2.I.A.2(a) minute averaging periods may exceed 20 percent not N o NA No Monitoring, Recordkeeping more than once in any hour and not more than four times in any 24-hour period.In no event shall the six- minute average exceed 87 percent opacity. If emission testing is required,the testing shall be performed in accordance with General Condition JJ. Candle Stick Flare CD-1 2.I.A.2(b) If the results of this test are above the limit given in No NA No Testing Section 2.1 A.2.a.above,the Permittee shall be deemed in noncompliance with 15A NCAC 2D .0521. No monitoring,recordkeeping,or reporting is e Comb LFG in flare Candle Stick Flare CD-1 2.l.A.2(c) required for visible emissions from the firing of No NA No th landfill gas in the flare(ID No.CO-1). the flar Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 3 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Yes/No Maintained? issue? Determining Comments Description ID Number(s) ( ) (Yes/No/NA) Compliance Status Permit Condition Number Condition SummaryYes/No The Permittee shall comply with all applicable provisions,including the notification,testing,record keeping,and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 02D.0524"New Source Performance Notification/ Protocol submitted to the DAQ One municipal solid ES-1 2.l.A.3(a) Standards(NSPS)"as promulgated in 40 CFR Part 60 No Yes No Recordkeeping/ for approval prior to Tier 2 waste landfill SubpartXXX,including Subpart A"General Testing/Monitoring Testing on 10/5/18. Provisions."Compliance with the NSPS Subpart XXX regulations referenced in Section 2.1.A.3.of this permit will be required when applicable.[ISA NCAC 02D.0524] If the calculated NMOC emission rate is equal to or Tier 2 Testing performed on greater than 34 megagrams per year,the Permittee Monitoring/Record 12/27/18 and 1/31/19.Based on One municipal solid ES-1 2.1.A.3(b)(i) shall submit a collection and control system design No Yes No Keeping/Reporting/ the test results either Annual waste landfill plan prepared by a professional engineer who is NMOC Reports or one 5-Year registered in the State of North Carolina within one Testing Report will be submitted to the year. NCDEQ in the future. One municipal solid The collection and control system as described in the waste landfill ES-1 2.1.A.3(b)(i)(A) plan shall meet the design requirements of b.ii.(B)of No NA NA NA this section. The collection and control system design plan shall Gas Collection and include any alternatives to the operational standards, Control System GCCS-1 2.1.A.3(b)(i)(B) test methods,procedures,compliance measures, No NA NA NA monitoring,recordkeeping or reporting provisions of §§60.763 through 60.768 proposed by the Permittee. The collection and control system design plan shall Gas Collection and either conform with specifications for active GCCS-1 2.1.A.3(b)(i)(C) collection systems in§60.769 or include a No NA NA NA Control System demonstration to the DAQ's satisfaction of the sufficiency of the alternative provisions to§60.769. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 4of33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments Compliance Status ID Number(s) permit Condition Number Condition Summary (Yes/No/NA) Yes/No Com p Install a collection and control system that captures the gas generated'Within the landfill as required by paragraphs(b)(2)(ii)(C)or(D)and(b)(2)(iii)of §60.762'Within 30 months after the first report in which the NMOC emission rate equals or exceeds 34 megagrams per year,unless Tier 2 or Tier 3 sampling Gas Collection and demonstrates that the emission rate is less than 34 Control System C7CCS-1 2.1.A.3(b)(ii) megagrams per year,as specified in§§60.767(c)(4) No NA NA NA or the most recent NMOC emission rate report in which the NMOC emission rate equals or exceeds 34 megagrams per year based on Tier 2,if the Tier 4 surface emissions monitoring shows a surface methane emission concentration of500 parts per million methane or greater as specified in §60.767(c)(4)(iii). An active collection system shall be designed to Gas Collection and handle the maximum expected gas flow rate from the Control System GCCS-1 2.1.A.3(b)(ii)(A)(a) entire area of the landfill that warrants control over No Yes N A N A the intended use period of the gas control or treatment system equipment. An active collection system shall collect gas from Gas Collection and each area,cell,or group of cells in the landfill in Control System GCCS-1 2.I.A.3(b)(ii)(A)(b) which the initial solid waste has been placed for a No NA NA NA period of 5 years or more if active or 2 years or more if closed or at final grade. Gas Collection and GCCS-1 2.1.A.3(b)(ii)(A)(c) An active collection system shall collect gas at a No NA N;1 NA Control System sufficient extraction rate. Gas Collection and An active collection system shall be designed to Control System GCCS-1 2.1.A.3(b)(ii)(A)(d) minimize off-site migration of subsurface as. No NA N.� NA A passive collection system shall comply with the provisions specified in paragraphs(Axl),(2)and(4) Gas Collection and GCCS-1 2.I.A.3(b)(ii)(B) above;and be installed with liners on the bottom and No NA NA N,\ Control System all sides in all areas in which gas is to be collected. The liners shall be installed as required under §258.40. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 5 of 33 Source or Records Was Deviation aMetbod(s)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Comments Description (Yes/No) es/No/NA issue? Com Hance Status ID Number(s) Permit Condition Number Condition Summary ) Yes/No) p Gas Collection and Route all the collected gas to a control system that Control System GCCS-1 2.1.A.3(b)(iii)(A) complies with an open flare designed and operated in No NA NA NA accordance'With§60.18 except as noted in§60.764€. Route all the collected gas to a control system designed and operated to reduce NMOC by 98 weight percent or reduce the outlet NMOC concentration to less than 20 parts per million by volume,dry basis as Gas Collection and GCCS-1 2.1.A.3(b)(iii)(B) hexane at 3 percent oxygen.The reduction efficiency No NA NA NA Control System or parts per million by volume shall be established by an initial performance test to be completed no later than 180 days after the initial startup of the approved control system using the test method specified in §60.764(d). Gas Collection and If a boiler or process heater is used as the control Control System GCCS-1 2.I.A.3(b)(iii)(B)(1) device,the landfill gas stream shall be introduced into No NA NA NA the flame zone. The control device shall be operated within the Gas Collection and parameter ranges established during the initial or Control System GCCS-1 2.1.A.3(b)(iii)(B)(2) most recent performance test.The operating No NA NA NA parameters to be monitored are specified in§60.766. Route the collected gas to a treatment system that Gas Collection and processes the collected gas for subsequent sale or use. Control System (iccs-1 2.1.A.3(b)(iii)(C) All emissions from any atmospheric vent from the No NA NA NA gas treatment system shall be subject to the Requirements of paragraphs(A)and(B)above. Gas Collection and Operate the collection and control device installed to Control System GCCS-1 2.I.A.3(b)(i)(C)(iv) comply With this subpart in accordance with the No NA Nil NA provisions of§§60.763,60.765 and 60.766. Operate the collection system such that gas is Gas Collection and collected from each area,cell,or group of cells in the Control System GCCS-1 2.1.A.3(c)(i) MSW landfill in which solid waste has been in place No NA NA NA for 5 years or more if active,or 2 years or more if closed or at final grade. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 6 of 33 Source or Records N`'as Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Comments Description es/No) Yes/No/NA issue? Compliance Status ID Number(s) O permit Condition Number Condition Summary ( ) Yes/No) p Operate the collection system with negative pressure at each wellhead except under the following conditions:(A)A fire or increased well temperature. The Permittee shall record instances when positive pressure occurs in efforts to avoid a fire.These Gas Collection and records shall be submitted with the annual reports as Control System GCCS-1 2.1.A.3(c)(ii) provided in A.3.x.i of this section;(B)Use of a No NA NA NA geomembrane or synthetic cover.The Permittee shall develop acceptable pressure limits in the design plan; (C)A decommissioned well.A well may experience a static positive pressure after shutdown to accommodate for declining flows.All design changes shall be approved by DAQ. Operate each interior wellhead in the collection system with a landfill gas temperature less than 55 *C.The Permittee may establish a higher operating temperature value at a particular well via a Gas Collection and demonstration submitted to the DAQ Regional Office Control System GCCS-1 2.1.A.3(c)(iii) for approval.A higher operating value demonstration No NA NA NA shall include supporting data showing that the elevated parameter does not cause fires or significantly inhibit anaerobic decomposition by killing methanogens. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 7 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? � Determining Comments Description (Yes/No) )es/No/NA issue. Com Lance Status ID Number(s) hermit Condition Number Condition SummaryYes/No) p Operate the collection system so that the methane concentration is less than 500 parts per million above background al the surface of the landfill using an organic vapor analyzer,flame ionization detector or other portable monitor meeting the specifications of A.3.g.To determine if this level is exceeded,the facility shall conduct surface testing around the perimeter of the collection area and along a pattern that traverses the landfill at 30-meter intervals and Gas Collection and where visual observations indicate elevated Control System GCCS-1 2.1.A.3(c)(iv) concentrations of landfill gas,such as distressed No NA N,A N 1 vegetation and cracks or seeps in the cover and all cover penetrations.The owner or operator may establish an alternative traversing pattern that ensures equivalent coverage.A surface monitoring design plan shall be developed that includes a topographical map with the monitoring route and the rationale for any site specific deviations from the 30-meter intervals.Areas with steep slope—or other dangerous areas may be excluded from the surface testing. Operate the system such that all collected gases are vented to a control system designed and operated in compliance with A.3.b of this section.In the event the Gas Collection and GCCS-1 2.1.A.3(c)(v) collection or control system is inoperable,the gas No NA NA NA Control System mover system shall be shut down and all valves in the collection and control system contributing to venting of the gas to the atmosphere shall be closed within 1 hour. Gas Collection and Operate the control or treatment system at all times Control System GCCS-1 2.1.A.3(c)(vi) when the collected as is routed to the system. N" N;A N1 NA If monitoring demonstrates that the operational requirements in paragraphs ii,iii or iv above are not met,corrective action shall be taken as specified in Gas Collection and A.3.d.iii and A.3.d.iv or A.3.f of this section.If Control System GCCS-1 2.1.A.3(c)(vii) corrective actions are taken as specified in the No NA NA NA compliance provisions specified in A.3.d through h, the monitored exceedance is not a violation of the operational requirements in this section. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 8 of 33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations. non-compliance Control Device Maintained. ? Determining Comments Description ID Number(s) (Yes/No) (Yes/No/NA) issue. Compliance Status Permit Condition Number Condition Summary Yes/No For the purposes of calculating the maximum expected gas generation flow rate from the landfill to determine compliance with A.3.b.ii of this section, the following equation shall be used.The k and LO kinetic factors should be those published in the most recent Compilation of Air Pollutant Emission Factors (AP-42)or other site-specific values demonstrated to Gas Collection and GCCS-1 2.1.A.3(d)(i) be appropriate and approved by the DAQ.If k has No NA NA NA Control System been determined by Tier 3 testing as specified in §60.764(a)(4),the value of k determined from the test shall be used.A value of no more than IS years shall be used for the intended use period of the gas mover equipment.The active life of the landfill is the age of the landfill plus the estimated number of years until closure. For sites with known year-to year solid waste acceptance rate: Qm=L 2 kl,i)Mj(il Ml) f-1 where,QM=maximum expected gas generation flow Gas Collection and rate,cubic meters per year No NA NA NA Control System GCCS-1 2.1.A.3(d)(i)(A) k=methane generation rate constant,year-1 Lo=methane generation potential,cubic meters per megagram solid waste M;=mass of solid waste in the ith section, megagrams t;=age of the ith section,years The Permittee may use actual flow data to project the maximum expected gas generation flow rate instead of,or in conjunction with the above equation.If the landfill is still accepting waste,the actual measured Gas Collection and GCCS-1 2.1.A.3(d)(i)(B) flow data will not equal the maximum expected gas No NA NA NA Control System generation rate,so calculations using the equation above or other methods shall be used to predict the maximum expected gas generation rate over the intended period of use of the gas control system equipment. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 9 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Description (Yes/No) issue? Control Device Maintained? Determining Comments ID Number(s) permit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status For the purposes of determining sufficient density of gas collectors for compliance with A.3.b.ii of this section,the Permittee shall design a system of vertical Gas Collection and GCCS-1 2.1.A.3(d)(ii) Fells,horizontal collectors,or other collection No NA NA NA Control System devices,satisfactory to the DAQ,capable of controlling and extracting gas from all portions of the landfill sufficient to meet all operational and performance standards. For the purpose of demonstrating whether the gas collection system flow rate is sufficient to determine compliance with A.3.b.ii.(A)(3),the Permittee shall measure gauge pressure in the gas collection header at Gas Collection and each individual well,monthly.If a positive pressure Control System GCCS-1 2.1.A.3(d)(iii) exists,action shall be initiated to correct the No NA NA NA exceedance within 5 calendar days,except for the three conditions allowed under A.3.c.ii of this section. Any attempted corrective action shall not cause exceedances of other operational or performance standards. If negative pressure cannot be achieved without excess air infiltration within 15 calendar days of the Gas Collection and GCCS-1 2.1.A.3(d)( )(m A) first measurement of positive pressure,the Permittee No NA NA NA Control System shall conduct a root cause analysis and correct the exceedance as soon as practicable,but no later than 60 days after positive pressure was first measured. If corrective actions cannot be fully implemented within 60 days,the Permittee shall conduct a Gas Collection and GCCS-1 2.1.A.3(d)(iii)(B) corrective action plan analysis,and develop an No NA NA NA Control System implementation schedule to complete the corrective actions as soon as practicable,but no more than 120 days following the positive pressure measurement. If corrective action is expected to take longer than 120 days to complete after the initial exceedance,the Gas Collection and GCCS-1 2.1.A.3(d)(iii)(C) Permittee shall submit the root cause analysis, No NA NA NA Control System corrective action analysis,and corresponding implementation timeline to the DAQ according to A.3.cc. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 10 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Continents Description (Yes/No) issue? ID Number(s) permit Condition Number- Condition Summa (Yes/No/NA) Yes/No Compliance Status For the purpose of identifying whether excess air infiltration into the landfill is occurring,the Permittee shall monitor each well monthly for temperature as Gas Collection and provided in A.3.c.iii of this section.If a well exceeds Control System G CS-1 2.1.A.3(d)(iv) the operating parameter for temperature,action shall No NA NA NA be initiated to correct the exceedance within 5 calendar days.Any attempted corrective action shall not cause exceedances of other operational or performance standards. If correction of the temperature exceedance cannot be achieved within 15 calendar days of the first Gas Collection and GCCS-1 2.1.A.3(d)(iv)(A) measurement,the Permittee shall conduct a root No N^ N A NA Control System cause analysis and correct the exceedance as soon as practicable,but no later than 60 days after the temperature exceedance was first measured. If corrective actions cannot be fully implemented within 60 days,the Permittee shall conduct a Gas Collection and corrective action plan analysis,and develop an Control System GCCS-1 2.1.A.3(d)(ivxB) implementation schedule to complete the corrective No NA NA NA actions as soon as practicable,but no more than 120 days following the measurement of the temperature exceedance. If corrective action is expected to take longer than 120 days to complete after the initial exceedance,the Gas Collection and Permittee shall submit the root cause analysis, Control System GCCS-1 2.1.A.3(d)(iv)(C) corrective action analysis,and corresponding No NA N,A NA implementation timeline to the DAQ according to A.3.cc. The Permittee may establish a higher operating temperature value at a particular well provided that the elevated parameter does not cause fires or Gas Collection and (;CCS-1 2.1.A.3(d)( ) significantly inhibit anaerobic decomposition by No NA NA NA Control System v killing methanogens as described in A.3.c.iii of this section.An alternative operating value,a parameter, and the well ID(s)along with supporting data shall be submitted to the DAQ Regional Office for approval. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 11 of 33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations9 non-compliance Compliance Status Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) Permit Condition Number Condition Summary (Yes/No/NA) (Yes/No (tom p The Permittee seeking to demonstrate compliance with A.3.b.ii.(A)(4)of this section through the use of Gas Collection and a collection system not conforming to the Control System GCCS-1 2.1.A.3(d)(vi) specification provided in§60.769 shall provide No NA NA NA information satisfactory to the DAQ as specified in §60.767(c)(3)demonstrating that off-site migration is being controlled. For purposes of compliance with A.3.c.i of this section,the Permittee shall place each well or design component as specified in the approved design plan Gas Collection and as provided in§60.767(c).Each well shall be installed Control System GCCS-1 2.l.A.3(e) no later than 60 days after the date on which the N" N'^ N`� NA initial solid waste has been in place for a period of: i.5 years or more if active;or ii.2 years or more if closed or at final grade. The Permittee shall monitor surface concentrations of methane along the entire perimeter of the collection area and along a pattern that traverses the landfill at Gas Collection and GCCS-1 2.1.A.3(f)(i) 30-meter intervals(or a site specific established Nc NA NA N 1 Control System spacing)for each collection area on a quarterly basis using an organic vapor analyzer,flame ionization detector,or other portable monitor meeting the specifications provided in A.3.g of this section. The background concentration shall be determined by Gas Collection and GCCS-1 2.1.A.3 ii(flO moving the probe inlet upwind and downwind outside No NA NA NA Control System the boundary of the landfill at a distance of at least 30 meters from the perimeter wells. Surface emission monitoring shall be performed in accordance with section 8.3.1 of Method 21 of Gas Collection and GCCS-1 2.1.A.3(f)(iii) appendix A of this part,except that the probe inlet No NA NA NA Control System shall be placed within 5 to 10 centimeters of the ground.Monitoring shall be performed during typical meteorological conditions. Revision 3.0 1 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 12 of 33 Records Was Deviation a Methods of Source or () r Terms and Conditions Deviations. non-compliance Emission Source Maintained? Determining Comments Description Control Device Yes ID Number(s) ( /No) issue? g (Yes/No/NA) Compliance Status Permit Condition Number Condition SummaryYes/No Any reading of 500 parts per million or more above background at any location shall be recorded as a Gas Collection and monitored exceedance and the actions specified in the Control System GCCS-1 2.1.A.3(f)(iv) following paragraphs,(A)through(E),shall be taken. No NA NA NA As long as the specified actions are taken,the exceedance is not a violation of the operational requirements ofA.3.c.iv. Gas Collection and The location of each monitored exceedance shall be Control System GCCS-1 2.1.A.3(f)(iv)(A) marked,and the location recorded. No NA NA NA Cover maintenance or adjustments to the vacuum of Gas Collection and the adjacent wells to increase the gas collection in the Control System GCCS-1 2.1.A.3(f)(iv)(B) vicinity of each exceedance shall be made and the No NA NA NA location shall be re-monitored within 10 calendar days of detecting the exceedance. If the re-monitoring of the location shows a second exceedance,additional corrective action shall be taken,and the location shall be monitored again Gas Collection and within 10 days of the second exceedance.If the re- ControlGCCS-1 2.1.A.3(f)(iv)(C) monitoring shows a third exceedance for the same No NA NA NA System location,the action specified in paragraph(E)below shall be taken,and no further monitoring of that location is required until the action specified in paragraph(E)below has been taken. Any location that initially showed an exceedance but has a methane concentration less than 500 ppm methane above background at the 10-day re- monitoring specified in paragraph(B)or(C)above shall be remonitored 1 month from the initial Gas Collection and GCCS-1 2.1.A.3(f)(iv)(D) exceedance.If the I-month re-monitoring shows a No NA NA NA Control System concentration less than 500 parts per million above background,no further monitoring of that location is required until the next quarterly monitoring period.If the 1-month re-monitoring shows an exceedance,the actions specified in paragraph(C)or(E)of this section shall be taken. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 13 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) I'ermit Condition Number Condition Sunnnar y (Yes/No/NA) Yes/No Compliance Status For any location where monitored methane concentration equals or exceeds 500 parts per million above background three times within a quarterly Gas Collection and period,a new well or other collection device shall be Control System GCCS-1 2.1.A.3(f)(iv)(E) installed within 120 calendar days of the initial No NA NA NA exceedance.An alternative remedy to the exceedance, such as upgrading the blower,header pipes or control device,and a corresponding timeline for installation shall be submitted to the DAQ for approval. Gas Collection and The Permittee shall implement a program to monitor GCCS-1 2.1.A.3(f)(v) for cover integrity and implement cover repairs as No N;A N:1 NA Control System necessary on a monthly basis. The Permittee shall comply with the following One municipal solid FS-1 2.1.A.3(g) instrumentation specifications and procedures for No NA NA N,\ waste landfill surface emission monitoring devices: The portable analyzer shall meet the instrument One municipal solid ES-1 2.1.A.3(g)()i specifications provided in section 6 of Method 21 of No NA NA NA waste landfill appendix A of this part,except that"methane"shall replace all references to VOC. One municipal solid The calibration gas shall be methane,diluted to a waste landfill FS-1 2.1.A.3(g)(ii) nominal concentration of 500 parts per million in air. No NA NA NA To meet the performance evaluation requirements in One municipal solid I:S-1 2.1.A.3(g)(iii) section 8.1 of Method 21 of appendix A of this part, No N A N A N A waste landfill the instrument evaluation procedures of section 8.1 of Method 21 of appendix A of this part shall be used. The calibration procedures provided in sections 8 and One municipal solid 10 of Method 21 of appendix A of this part shall be waste landfill ES-1 2.1.A.3(g)(iv) followed immediately before commencing a surface No NA NA NA monitoring survey. The provisions of this subpart apply at all times, except during periods of start-up,shutdown,or malfunction.During periods of startup,shutdown, One municipal solid waste landfill ES-1 2.1.A.3(h) and malfunction,the Permittee shall comply with the No NA N;\ NA work practice specified in A.3.c.v in lieu of the compliance provisions in A.3.d through g of this section. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 14 of 33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Comments Description ID Number(s) (Yes/No) (Yes/No/NA) issue? Compliance Status Permit Condition Number Condition Summary (Yes/No When testing is required,the testing shall be performed in accordance with§60.764 and General Condition JJ located in Section 3 of this permit.The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0524 if these requirements are not Tier 2 Testing performed on met. 12/27/18 and 1/31/19.Based on One municipal solid ES-I 2.1.A.3(i) No Yes No Testing/Monitoring Unless the facility's collection and control system the test results either Annual waste landfill design include any alternatives to the monitoring NMOC Reports or one 5-Year provisions approved by the DAQ as provided in Report will be submitted to the §60.767(c)(2),the facility must meet the monitoring NCDEQ in the future. requirements as described in paragraphs j through p below.The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0524 if these monitoring requirements are not met. The Permittee shall measure the gauge pressure in the One municipal solid ES-1 2.1.A.30)(i) gas collection header on a monthly basis as provided No NA NA NA waste landfill in A.3.d.iii of this section at each wellhead. One municipal solid ES-1 2.1.A.3 'U)( )ii Monitor nitrogen or oxygen concentration in the No NA NA NA waste landfill landfill gas on a monthly basis. One municipal solid The nitrogen level shall be determined using Method waste landfill ES-I 2.1.A.30)(ii)(A) 3C,unless an alternative test method is established by No NA NA NA DAQ under§60.767(c)(2). Unless an alternative test method is approved by DAQ under§60.767(c)(2),the oxygen level shall be determined by an oxygen meter using Method 3A,3C or ASTM D6522-11(if sample location is prior to combustion)except that: One municipal solid (1)The span shall be set between 10 and 12 percent waste landfill ES-1 2.1.A.30)(ii)(B) oxygen; No NA NA NA (2)A data recorder is not required; (3)Only two calibration gases are required,a zero and span; (4)A calibration error check is not required; (5)The allowable sample bias,zero drift,and calibration drift are f10 percent. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 15of33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) hermit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status A portable gas composition analyzer may be used to monitor oxygen levels provided: One municipal solid 1 S-1 2.LA.30)(ii)(C) (I)The analyzer is calibrated;and No NA NA N A waste landfill (2)The analyzer meets all quality assurance and quality control requirements for Method 3A or ASTM D6522-11. Monitor temperature of the landfill gas on a monthly basis as provided in A.3.d.iv,using a temperature One municipal solid waste landfill ES-1 2.1.A.30)(iii) measuring device that has been calibrated annually No NA NA NA using the procedure in section 10.3 of Method 2 of appendix A-1 of this part. Monitor surface concentrations of methane along the One municipal solid entire perimeter of the collection area(or site-specific waste landfill ES-1 2.1.A.3(j)(iv) established spacing)for each collection area on a No NA N':1 N quarterly basis. The Permittee shall install,calibrate,maintain,and One municipal solid 3(k) operate according to the manufacture's specifications No NA NA NA waste landfill ES-1 2.1.A. the following equipment when using an enclosed combustor: A temperature monitoring device equipped with a continuous recorder having a minimum accuracy off 1 percent of the temperature being measured in One municipal solid waste landfill ES-1 2.LA.3(k)(i) degrees Celsius orf 5°C,whichever is greater. No NA NA NA (A)A temperature monitoring device is not required for boilers or process heaters with design heat input capacity equal to or greater than 44 megawatts. A device that records flow to and bypass of the control device.The Permittee shall: (A)Install,calibrate,and maintain a gas flow rate measuring device that shall record the flow to the control device at least every 15 minutes;and One municipal solid hS-1 2.1.A.3(k)(ii) (B)Secure the bypass line valve in the closed No NA Nib NA waste landfill position with a car-seal or a lock and-key type configuration.A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 16 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) permit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status The Permittee shall install,calibrate,maintain,and operate according to the manufacture's specifications Candle Stick Flare CD-1 2.1.A.3(1)(i) the following equipment when using an open flare:A No NA NA NA heat sensing device,such as an ultraviolet beam sensor or thermocouple,at the pilot light or the flame itself to indicate the continuous presence of a flame. The Permittee shall install,calibrate,maintain,and operate according to the manufacture's specifications the following equipment when using an open flare: A device that records flow to and bypass of the flare. The Permittee shall: (A)Install,calibrate,and maintain a gas flow rate measuring device that shall record the flow to the Candle Stick Flare CD-1 2.1.A.3(1)(ii) control device at least every 15 minutes;and No NA NA NA (B)Secure the bypass line valve in the closed position with a car-seal or a lock and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line. The Permittee shall maintain and operate all monitoring systems associated with the treatment system according to the site-specific monitoring plan Gas Collection and GCCS-1 2.1.A.3(m) required in A.3.niii.(B)of this section,and shall No NA NA NA Control System install,calibrate,maintain,and operate according to the manufacture's specifications the following equipment when using a landfill gas treatment system: Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 17 of 33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations. non-compliance Description Control Device (Yes/N°) Maintained. issue? Determining Comments Compliance Status ID Number(s) hermit Condition Number Condition Summary (Yes/No/NA) Yes/No Com p A device that records flow to or bypass of the treatment system.The Permittee shall: (A)Install,calibrate,and maintain a gas flow rate measuring device that shall record the flow to the control device at least every 15 minutes;and Gas Collection and GCCS-1 2.1.A.3(m)(i) (B)Secure the bypass line valve in the closed position No NA NA NA Control System with a car-seal or a lock and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line. Each owner or operator seeking to install a collection system that does not meet the active collection system specifications in 40 CFR§60.769,or seeking to monitor alternative parameters to those required by§ Gas Collection and GCCS-I §60.763 through 60.766,shall provide information No NA NA NA Control System 2.l.A.3(n) satisfactory to DAQ as provided in§60.767(c)(2)and (3)describing the design and operation of the collection system,the operating parameters that would indicate proper performance,and appropriate monitoring procedures. The Permittee shall monitor surface concentrations of methane according to the procedures in A.3.fand instrument specifications and procedure provided in A.3.g of this section.Any closed landfill that has no One municipal solid monitored exceedances of the operational standard in waste landfill ES-1 2.1.A.3(o) three consecutive quarterly monitoring periods may No NA NA NA skip to annual monitoring.Any methane reading of 500 ppm or more above background detected during the annual monitoring returns the frequency for that landfill to quarterly monitoring. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 18 of 33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations:' non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) permit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status The monitoring requirements of A.3.k through A.3.m of this section apply at all times the affected source is One municipal solid ES-1 2.1.A.3(p) operating,except for periods of monitoring system N o NA N A N A waste landfill malfunctions,repairs associated with monitoring system malfunctions,and required monitoring system quality assurance or quality control activities. A monitoring system malfunction shall be defined as any sudden,infrequent,not reasonably preventable One municipal solid failure of the monitoring system to provide valid data. ES-1 2.1.A.3(p)(i) No NA NA NA waste landfill Monitoring system failures caused in part by poor maintenance or careless operation are not malfunctions. The Permittee shall complete monitoring system One municipal solid ES-1 2.1.A.3(p)( )ii repairs in response to monitoring system No NA NA NA waste landfill malfunctions and return the monitoring system to operation as expeditiously as practicable. The Permittee shall keep for at least 5 years up-to- date,readily accessible,on-site records of the design capacity report which triggered the standard of 2.5 million megagrams and 2.5 million cubic meters,the One municipal solid FS-1 I :V 3W) current amount of solid waste in-place,and the year- No Yes No Monitoring/Record Keeping waste landfill Keeping by-year waste acceptance rate.Off-site records may be maintained if they are retrievable within 4 hours. Either paper copy or electronic formats are acceptable. The Permittee shall keep up-to-date,readily accessible records for the life of the control system equipment of the data listed below in this section as measured during the initial performance test or One municipal solid waste landfill I D S-1 2.1.A.3(r) compliance determination.Records of subsequent No NA N A NA tests or monitoring shall be maintained for a minimum of 5 years.Records of the control device vendor specifications shall be maintained until removal. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 19 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance DescriptionControl Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) Permit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status In order to demonstrate compliance with paragraph A.3.b through use of a gas collection and control Gas Collection and system,the maximum expected gas generation flow Control System GC.CS-1 2.1.A.3(r)(i)(A) rate as calculated in A.3.d.i of this section.The No NA N.1 NA Permittee may use another method to determine the maximum gas generation flow rate,if the method has been approved by the DAQ. In order to demonstrate compliance with paragraph A.3.b through use of a gas collection and control system,the density of wells,horizontal collectors, Gas Collection and GCCS-1 2.1.A.3(r)(i)(B) surface collectors,or other gas extraction devices No NA NA NA Control System determined using the procedures specified in §60.769(a)(1). (A)The maximum expected gas generation flow rate as calculated in A.3.d.i of this section. In order to demonstrate compliance with paragraph A.3.b.iii through use of an open flare,the flare type (i.e.,steam-assisted,air-assisted,or nonassisted),all visible emission readings,heat content determination, Gas Collection and GCCS-1 2.1.A.3 r i► flow rate or bypass flow rate measurements,and exit No NA NA NA Control System ()( ) velocity determinations made during the performance test as specified in§60.18;continuous records of the flare pilot flame or flare flame monitoring and records of all periods of operations during which the pilot flame of the flare flame is absent. In order to demonstrate compliance with paragraph Gas Collection and GCCS-1 2.1.A.3(r)(iii)(A) A.3.b.iii through use of a landfill gas treatment No NA NA NA Control System system,records of the flow of landfill gas to,and bypass of,the treatment system. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 20 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Dc�'iatio is? non-compliance Control Device Maintained? Determining Comments Description (l es/N o) issue? ID Number(s) Permit Condition Number Condition Summary (Yes/No/NA) yes/No Compliance Status A site-specific treatment monitoring plan,to include monitoring records of parameters that are identified in the treatment system monitoring plan and that ensure Gas Collection and the treatment system is operating properly for each Control System GCCS-1 2.1.A.3(r)(iii)(B)(1) intended end use of the treated landfill gas.At a No NA NA NA minimum,records shall include records of filtration, de-watering,and compression parameters that ensure the treatment system is operating properly for each intended end use of the treated landfill gas. A site-specific treatment monitoring plan,to include monitoring methods,frequencies,and operating Gas Collection and GCCS-1 2.1.A.3(x )( )(2) ranges for each monitored operating parameter based No NA NA NA Control System r .ii B� on manufacturer's recommendations or engineering analysis for each intended end use of the treated landfill gas. Gas Collection and A site-specific treatment monitoring plan,to include Control System GCCS-1 2.1.A.3(r)(iii)(B)(3) documentation of the monitoring methods and ranges, No NA NA NA along with justification for their use. Gas Collection and A site-specific treatment monitoring plan,to include Control System GCCS-1 2.1.A.3(r)(iii)(B)(4) identify person responsible(by job title)for data No NA NA NA collection. Gas Collection and A site-specific treatment monitoring plan,to include Control System GC CS-5-1 2.1.A.3(r)(iii)(B)(5) processes and methods used to collect the necessary No NA NA NA data. A site-specific treatment monitoring plan,to include Gas Collection and GCCS-1 2.1.A.3 r m B 6 description of the procedures and methods that are No NA NA NA Control System ()( )( �( � used for quality assurance,maintenance,and repair of all continuous monitoring systems. The Permittee shall keep for 5 years up-to-date, readily accessible continuous records of the equipment operating parameters specified to be One municipal solid monitored in paragraphs A3.j through A.3.p as well waste landfill LS-1 2.1.A.3(s) as up-to-date,readily accessible records for periods of No NA NA NA operation during which the parameter boundaries established during the most recent performance test are exceeded. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 21 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) permit Condition Number Condition Summary (Yes/NO/NA) yes/No Compliance Status The Permittee shall keep up-to-date,readily accessible continuous records of the indication of One municipal solid ES-1 2.1.A.3(s)(i) flow to the control device or the indication of bypass No N A NA N A waste landfill flow or records of monthly inspections of car-seals or lock-and-key configurations used to seal bypass lines, specified in A.3.k through A.3.m of this section. The Permittee using an open flare shall keep up-to- date,readily accessible continuous records of the Candle Stick Flare CD-1 2.1.A.3(s)(ii) flame or flare pilot flame monitoring specified in A.3 No NA NA N A .1 of this section,and up-to-date,readily accessible records of all periods of operation in which the flame or flare pilot flame is absent. Gas Collection and The permittee shall keep records of periods when the Control System GCCS-1 2.1.A.3(s)(iii) collections stem or control device is not operating. No NA NA NA The Permittee shall keep for the life of the collection Gas Collection and system an up-to-date,readily accessible plot map Control System GCCS-1 2.I.A.3(t) showing each existing and planned collector in the No NA No Record Keeping system and providing a unique identification location label for each collector. Each owner or operator subject to the provisions of Gas Collection and this subpart shall keep up-to-date,readily accessible Control System GCCS-1 2.1.A.3(t)(i) records of the installation date and location of all No NA No Record Keeping newly installed collectors as specified in A.3.e of this section. Each owner or operator subject to the provisions of this subpart shall keep readily accessible documentation of the nature,date of deposition, Gas Collection and GCCS-1 2.1.A.3(t)(ii) amount,and location of asbestos-containing or No NA No Record Keeping Control System nondegradable waste excluded from collection as provided in§60.769(a)(3)(i)as well as any nonproductive areas excluded from collection as provided in§60.769(a)(3)(ii). The Permittee shall keep for at least 5 years up-to- date,readily accessible records of all collection and Gas Collection and control system exceedances of the operational Control System G C S-1 2.I.A.3(u)(i) standards in A.3.c of this section,the reading in the No N A N A N A subsequent month whether or not the second reading is an exceedance,and the location of each exceedance. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 22 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Comments Description (Y es/`o) )es/No/NA issue? Compliance Status ID Number(s) Permit Condition Number Condition SummaryYes/No) p The Permittee shall keep for at least 5 years up-to- Gas Collection and date,readily accessible records of each wellhead Control System GCCS-1 2.1.A.3(u)(ii) temperature monitoring value of 55°C or above,each No N A NA N A wellhead nitrogen level at or above 20 percent,and each wellhead oxygen level at or above 5 percent. The Penmittee shall keep for at least 5 years up-to- date,readily accessible records of for any root cause analysis for which corrective actions are required in Gas Collection and GCCS-1 2.1.A.3(u)( )iii A.3.d.iii.(A)or A.3 A.iv.(A)of this section,keep a No NA NA NA Control System record of the root cause analysis conducted,including a description of the recommended corrective actions taken,and the dates the corrective actions were completed. The Permittee shall keep for at least 5 years up-to- date,readily accessible records of For any root cause analysis for which corrective actions are required in A.3.d.iii.(B)or A.3.d.iv.(B)of this section,keep a Gas Collection and record of the root cause analysis conducted,the Control System GCCS-1 2.1.A.3(u)(iv) corrective action analysis,the dates for corrective No NA NA NA actions already completed following the positive pressure reading or high temperature reading,and a schedule for implementation for any corrective actions not already completed,including proposed commencement and completion dates. The Permittee shall keep for at least 5 years up-to- date,readily accessible records of For any root cause analysis for which corrective actions are required in A.3.d.iii.(C)or A.3.d.iv.(C)of this section,keep a record of the root cause analysis conducted,the Gas Collection and corrective action analysis,the dates for corrective Control System GCCS-1 2.1.A.3(u)(v) actions already completed following the positive No NA NA NA pressure reading or high temperature reading,a schedule for implementation for any corrective actions not already completed,including proposed commencement and completion dates,and a copy of any comments or final approval on the corrective action analysis or schedule from the DAQ. Revision 3.0 1 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 23 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Comments Description (Yes/No) issue? ID Number(s) Permit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status The Permittee shall keep for at least 5 years up-to- Control System Gas Collection and GCCS-1 2.1.A.3(v) date,readily accessible records of all collection and No NA NA NA control monitoring data from A.3.j of this section. For any leachate or other liquids addition reported under A.3.dd of this section,the Permittee shall keep records of any engineering calculations or company Gas Collection and GCCS-1 2.1.A.3(w) records used to estimate the quantities of leachate or No NA NA NA Control System liquids added,the surface areas for which the leachate or liquids were applied,and the estimates of annual waste acceptance or total waste in place in the areas where leachate or liquids were applied. The Permittee shall submit to DAQ annual reports of One municipal solid ES-I 2.1.A.3(x)(i) the recorded information:value and length of time for No NA NA NA waste landfill exceedance of applicable parameters monitored in A.3.j through A.3.m of this section. The Permittee shall submit to DAQ annual reports of the recorded information:Description and duration of Gas Collection and GCCS-1 2.1.A.3(x)( )ii all periods when the gas stream is diverted from the No NA NA NA Control System control device through a bypass line or the indication of bypass flow as specified in A.3.k through A.3.ru of this section. The Permittee shall submit to DAQ annual reports of Gas Collection and the recorded information:Description and duration of Control System GCCS-1 2.1.A.3(x)(iii) all periods when the control device was not operating, No NA NA NA and length of time the control device was not operating. Gas Collection and The Permittee shall submit to DAQ annual reports of Control System GCCS-1 2.1.A.3(x)(iv) the recorded information:All periods when the No NA NA NA collection system was not operating. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 24 of 33 Was Deviation a Emission Source Source or Terms and Conditions Deviations? Records Method(s)of Description (Yes/No) issue? Control Device Maintained? non-compliance Determining Comments ID Number(s) Permit Condition Number Condition Summary es/No/NA) No Compliance Status The Permittee shall submit to DAQ annual reports of the recorded information:The location of each exceedance of the 500 parts per million methane concentration and the concentration recorded at each Gas Collection and GCCS-1 2.1.A.3(x)(v) location for which an exceedance was recorded in the No NA NA NA Control System previous month. (A)The Permittee shall determine the latitude and longitude coordinates for the location,in decimal degrees with at least 5 decimal places,using an instrument with an accuracy of at Least 4 meters. The Permittee shall submit to DAQ annual reports of Gas Collection and the recorded information:The date of installation and GCCS-1 2.1.A.3(x)(vi) the location of each well or collection system No NA NA NA Control System expansion added in accordance with A.3.d.iii, A.3.d.iv,A.3.e and A.3.f iv of this section. The Permittee shall submit to DAQ annual reports of the recorded information:For any corrective action analysis for which corrective actions are required in A.3.d.iii and iv,and that take more than 60 days to Gas Collection and correct the exceedance,the root cause analysis Control System GCCS-1 2.1.A.3(x)(vii) conducted,including a description of the No NA NA NA recommended corrective actions,the dates for corrective actions already completed following the positive pressure reading,and,for actions not already completed,a schedule for implementation,including proposed commencement and completion dates. The Permittee shall submit to DAQ annual reports of Gas Collection and the recorded information:Summary of all DAQ Control System GCCS-1 2.1.A.3(x)(viii) approved well closures that have been No NA NA NA decommissioned in accordance with wells A3.c.ii(C) of this section. The Permittee shall submit to DAQ annual reports of Gas Collection and the recorded information:Summary of all DAQ Control System GCCS-1 2.1.A.3(x)(ix) approved nonproductive areas of the landfill in No NA NA NA accordance with§60.769(a)(3)(ii). Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 25 of 33 Source or Records Was Deviation aMetbod(s)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comment~ ID Number(s) Permit Condition Number Condition Summary (Yes/No/NA) (Yes/No) Compliance Status The Permittee shall submit to DAQ annual reports of the recorded information:The initial annual report Gas Collection and GCCS-1 2.1.A.3(x)(x) shall be submitted within 180 days of installation and No NA NA NA Control System start-up of the collection and control system,and shall include the initial performance test report required under§60.8. The Permittee shall submit a revised design plan to the DAQ for approval as follows: i.At least 90 days before expanding operations to an Gas Collection and area not covered by the previously approved design Control System GCCS-1 2.1.A.3(y) plan; No NA NA NA ii.Prior to installing or expanding the gas collection system in a way that is not consistent,with the design plan that was submitted to the DAQ according to §60.767(c). The Permittee shall submit a closure report to the DAQ within 30 days of waste acceptance cessation. The DAQ may request additional information as may Gas Collection and be necessary to verify that permanent closure has Control System GCCS-1 2.1.A.3(z) taken place in accordance with the requirements of40 No NA NA NA CFR 258.60.If a closure report has been submitted to the DAQ,no additional wastes may be placed into the landfill without filing a notification of modification as described under§60.7(a)(4). Gas Collection and The Permittee shall submit an equipment removal Control System GCCS-1 2.1.A.3(aa) report to the DAQ 30 days prior to removal or No NA NA NA cessation of operation of the control equipment. Gas Collection and The equipment removal report shall contain a copy of Control System GCCS-1 2.1.A.3(aa)(i)(A) the closure report submitted in accordance with No NA NA NA paragraph z of this section. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 26 of 33 Source or Records Was Deviation aMetbod(s)of Emission Source Terms and Conditions Deviations? non-compliance Control Device Maintained? Determining Comments Description ID Number(s) (Yes/No) (Yes/No/NA) issue? Compliance Status Permit Condition Number Condition Summary Yes/No The equipment removal report shall contain a copy of the initial performance test report demonstrating that the 15-year minimum control period has expired,or information that demonstrates that the GCCS will be Gas Collection and unable to operate for 15 years due to declining gas Control System GCCS-1 2.1.A.3(aa)(i)(B) flows.In the equipment removal report,the process No NA NA NA units tested,the pollutants tested,and the date that such performance test was conducted may be submitted in Lieu of the performance test report if the report has been previously submitted to the EPA's Central Data Exchange(CDX). The equipment removal report shall contain dated copies of three successive NMOC emission rate reports demonstrating that the landfill is no longer producing 34 megagrams or greater of NMOC per Gas Collection and year.If the NMOC emission rate reports have been Control System GCCS-1 2.1.A.3(aa)(i)(C) previously submitted to the EP A's CDX,a statement No NA NA NA that the NMOC emission rate reports have been submitted electronically and the dates that the reports were submitted to the EP A's CDX may be submitted in the equipment removal report in lieu of the NMOC emission rate reports. Gas Collection and The DAQ may request such additional information as Control System GCCS-1 2.1.A.3(aa)(ii) may be necessary to verify that all of the conditions No NA N.� N A for removal in§60.762(b)(2)(v)have been met. The Permittee shall submit reports to the EPA electronically according to§60.767(i)(L)and(2) One municipal solid FS-1 2.1.A.3(bb)(i) within 60 days after the date of completing each No NA NA NA waste landfill performance test(as defined in§60.8),the Permittee shall submit the results of each performance test according to the following procedures: Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 27 of 33 Source or Records Was Deviation a Method(s)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) permit Condition Number Condition Summary (Yes/No/NA) yes/No Compliance Status For data collected using test methods supported by the EPA's Electronic Reporting Tool(ERT)as Listed on the EPA's ERT Web site (https://www3.epa.gov/ttn/cbiefi'ert/ert_info.html)at the time of the test,you must submit the results of the performance test to the EPA via the Compliance and Emissions Data Reporting interface(CEDRI).CEDRI can be accessed through the EP A's Central Data One municipal solid ES-1 2.1.A.3(bb)(i)(A) Exchange(CDX)(https://cdx.epa.gov/).Performance No NA NA NA waste landfill test data must be submitted in a file format generated through the use of the EPA's ERT or an alternative file format consistent with the extensible markup language(XML)schema listed on the EPA's ERT Web site,once the XML schema is available.If some of the performance test information being submitted is claimed as confidential business information(CBI), the Permittee shall follow the procedure in §60.767(i)(1)(i)for submittal. For data collected using test methods that are not supported by the EPA's ERT as listed on the EP A's One municipal solid ES-1 2.1.A.3(bb)(i)(B) ERT Web site at the time of the test,you must submit No NA NA NA waste landfill the results of the performance test to the Administrator at the appropriate address listed in §60.4. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 28 of 33 Source or Records Was Deviation aMethods)of Emission Source Terms and Conditions Deviations? non-compliance Description Control Device (Yes/No) Maintained? issue? Determining Comments ID Number(s) permit Condition Number Condition Summary (Yes/No/NA) Yes/No Compliance Status The Permittee shall submit reports as required by this paragraph to the EPA via the CEDRI.(CEDRJ can be accessed through the EP A's CDX.)The owner or operator must use the appropriate electronic report in CEDRI for this subpart or an alternate electronic file format consistent with the XML schema listed on the CEDRI Web site (https://www3.epa.gov/ttn/chiefi'cedri/index.html).If One municipal solid the reporting form specific to this subpart is not No NA NA NA waste landfill �S-1 2.1.A.3(bb)(ii) available in CEDRI at the time that the report is due, the owner or operator must submit the report to the Administrator at the appropriate address listed in §60.4.Once the forum has been available in CEDRI for 90 calendar days,the Permittee shall begin submitting all subsequent reports via CEDRI.The reports shall be submitted by the deadlines specified in this subpart,regardless of the method in which the reports are submitted. For corrective action that is required according to A.3.d.iii(C)or iv.(C)and is expected to take longer than 120 days after the initial exceedance to complete,you must submit the root cause analysis, One municipal solid corrective action analysis,and corresponding waste landfill ES-1 2.1.A.3(cc)(i) implementation timeline to the DAQ Regional Office No NA NA NA as soon as practicable but no later than 75 days after the first measurement of positive pressure or temperature monitoring value of55°C(1317). F). DAQ must approve the plan for corrective action and the corresponding timeline. For corrective action that is required according to A.3.d.iii(C)or iv.(C)and is not completed within 60 One municipal solid days after the initial exceedance,you must submit a waste landfill ES-1 2.1.A.3(cc)(ii) notification to the Administrator as soon as No NA NA NA practicable but no later than 75 days after the first measurement of positive pressure or temperature exceedance. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 29 of 33 Source or Records Was Deviation aMet6od(s)of Emission Source Terms and Conditions Deviations? ? non-compliance Description Control Device (Yes/No) Maintained.(Yes/No/NA) issue? Compliance Status Determining Comments ID Number(s) permit Condition Number Condition Summary Yes/No) For affected landfills with a design capacity equal to or greater than 2.5 million megagrams and 2.5 million cubic meters that have employed leachate recirculation or added liquids based on a Research, One municipal solid ES-1 2.1.A.3(dd) Development,and Demonstration permit(issued No NA NA NA waste landfill through Resource Conservation and Recovery Act, subtitle D,part 258)within the last IO years,the Permittee shall submit to the Administrator annually, following the procedure specified in paragraph bb.ii of this section,the following information: Volume of leachate recirculated(gallons per year)and One municipal solid waste landfill ES-1 2.1.A.3(dd)(i) the reported basis of those estimates(records or No NA NA NA engineering estimates). One municipal solid Total volume of all other liquids added(gallons per waste landfill ES-1 2.1.A.3(dd)(ii) year)and the reported basis of those estimates No NA NA NA (records or engineering estimates). One municipal solid ES-1 2.1.A.3(dd)(iii) Surface area(acres)over which the leachate is No NA NA NA waste landfill recirculated(or otherwise applied). One municipal solid ES-1 2.1.A.3(dd)(iv) Surface area(acres)over which any other liquids are No NA NA NA waste landfill applied. The total waste disposed(megagrams)in the areas One municipal solid with recirculated leachate and/or added liquids based waste landfill ES-1 2.1.A.3(dd)(v) on onsite records to the extent data are available,or No NA NA NA engineering estimates and the reported basis of those estimates. The annual waste acceptance rates(megagrams per One municipal solid ES-1 2.1.A.3(dd)(vi) year)in the areas with recirculated leachate and/or N o N A N A N A waste landfill added liquids,based on on-site records to the extent data are available,or engineering estimates. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2020 30 of 33 Was Deviation a Source or Records Method(s)of Emission Source Terms and Conditions Deviations. non-compliance Description Control Device (Yes/N0) issue?Maintained? Determining Comments Nance Status ID Number(s) Permit Condition Number Condition Summary (Yes/No/NA) Yes/No Com p The initial report must contain items in paragraphs dd.i through vi of this section per year for the initial annual reporting period as well as for each of the previous 10 years,to the extent historical data are available in on-site records,and the report must be submitted no later than; (A)September 27,2017,for landfills that One municipal solid commenced construction,modification,or waste landfill ES-1 2.1.A.3(dd)(vii) reconstruction after July 17,2014 but before August No NA NA NA 29,2016 containing data for the first 12 months after or (B)Thirteen(13)months after the date of commenced construction,modification,or reconstruction for landfills that commence construction,modification,or reconstruction after August 29,2016 containing data for the first 12 months after August 29,2016. Subsequent annual reports must contain items in paragraphs dd.i through vi of this section for the 3 65- One municipal solid day period following the 365-day period included in waste landfill ES-1 2.1.A.3(dd)(viii) the previous annual report,and the report must be No NA NA NA submitted no later than 365 days after the date the previous report was submitted. Landfills may cease annual reporting of items in One municipal solid paragraphs deli through vii of this section once they waste landfill ES-1 2.l.A.3(dd)(ix) have submitted the closure report in paragraph z of No NA NA NA this section. The Permittee shall submit a summary report of monitoring and record keeping activities postmarked 1 st Half Semi-Annual Report on or before January 30 of each calendar year for the Monitoring/ submitted on 7/27/2020 for One municipal solid preceding six-month period between July and review. This 2020 Annual waste landfill ES-1 2.1.A.3(eej December and July 30 of each calendar year for the No Yes No ReRepor Reporting Certification of Compliance has Reporting preceding six-month period between January and been prepared to fulfill the 2nd June.All instances of deviations from the Half 2020 Semi-Annual Report. requirements of this permit must be clearly identified. Revision 3.0 North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2020 31 of 33 Terms and Conditions Deviations? Records Maintained? Was Deviation a non- Method(s)of Permit Condition Yes/No/NA compliance issue?(Yes/ Determining Comments Condition Summary (Yes/No) ( )Number No) Compliance Status 3.A General Provisions No NA No Comply with terms of Permit Facility keeps copy of Permit and application which 3.13 Permit available at facility No Yes No may be made available to Department upon request. Monitoring, 3.0 Severability Clause No NA No Reporting, I Recordkee in 3.1) Submissions of reports to regional office No Yes No Reporting Monitoring, 3.E Duty to Comply No Yes No Reporting, Recordkee in 3.F Circumvention No Yes No Operations 3.G Permit modifications and applications No Yes No Submittal If Requred Applications 3.H Changes Not Requiring Permit Modifications No Yes No Reporting Reporting requirements for excess emissions and permit 3.I.A,3.1.B No Yes No Reporting deviations,Other requirements 3.J Emergency Provisions No NA No Operations 3.K Permit renewal every five year No Yes No Permit Effective Date is 2/26/2019 3.L Need To Reduce or Halt Activity Not a Defense No NA No Operations 3.M Duty to submit any information requested by director No Yes No Recordkee in 3.N Duty to supplement No Yes No Reporting I _ r North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2020 32 of 33 Terms and Conditions Deviations? Records Maintained? Was Deviation a non- Method(s)of Permit Condition Yes/No/NA compliance issue?(Yes/ Determining Comments Condition Summary (Yes/No) ( )Number No) Compliance Status 3.0 Retention of records No Yes No Recordkee in 3.P Annual compliance certification No Yes No Reporting 3.Q Certification by responsible official No Yes No Reporting Operations, 3.R Permit Shield for Applicable Requirements No NA No Reporting, Monitoring,and Record-keeping 3.S Termination,Modification,and Revocation of the Permit No NA No Reporting and Record-Keeping 3.T Insignificant activities records available at facility No Yes No Recordkee in 3.0 Property Rights No NA No NA Permitee shall allow 3.V Inspection and entry No NA No DAQ access to facility and re aired 3.W Annual fee payment No Yes No Pay all required annual fees tal provided on mit b su 3.X Annual emission inventory requirement No Yes No Reporting El El submit 9/2020 3.Y Confidential Information No NA No Reporting 3.Z Construction and operation permits No Yes No Reporting, Recordkee ink 3.AA Standard Application Form and Required Information No NA No Re ortin 3.1313 Financial Responsibility and Compliance History No NA No Reporting and Record-keeping 3.CC Refrigerant requirements No Yes NA NA 3.DD Prevention of accidental releases—Section 112 r No Yes NA NA North Carolina Department of Environment and Natural Resources Division of Air Quality COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2020 33 of 33 Terms and Conditions Deviations? Records Maintained? Was Deviation a non- Method( )s of Permit Condition compliance issue?(Yes/ Determining Comments Number Condition Summary (Yes/No) (Yes/No/NA) No) Compliance Status 3.EE Prevention of accidental releases"General Duty Clause"- No NA NA N/A Section 112(r)(1) 3.FF Title IV Allowances No NA NA NA 3.GG Air Pollution Emergency Episode No NA No Operations 3.HH Registration of Air Pollution Sources No NA No Reporting 3.11 Ambient Air Quality Standards No NA No Operations 3.JJ Emission testing and reporting requirements No Yes No Testing,Reporting 3.KK Reopening for Cause No NA NA NA ILL Reporting requirements for non-operating equipment No Yes No Reporting INN Modification of a TV perinit No Yes No Reporting 3.00 Third party participation&EPA review No NA N/A N/A