Loading...
HomeMy WebLinkAboutAQ_F_0400043_20200701_EI_Apprd-EI 2019 Emissions Inventory Review / Data Tracking Form Facili Name: Triangle Brick Company - Wadesboro Brick Manufa Facility ID: 0400043 Facility Assigned to: Data Entry: Anson County Classification: Gregory Reeves Confidential Copy Submitted? Title V ❑❑ YES NO Initial Review/Data Entry Enter date received into ED. Date Received: 07 d Zv2� 0" Assigned to appropriate individual. Date Assigned: o7/oila®Zp Date Due: pq�,3v�2�� 9 Paper copy submitted: One copy received with supporting documentation,certification form signed by responsible official,and appears generally complete;OR C� Electronic copy submitted: All supporting documentation and certification form(with time/date stamp)signed by responsible official has been received. Comments: Inventory Review 13' All forms and supporting documentation appear to be complete if paper submission(check ED OS data if electronic). 0� Contact,address,phone number changes entered into I-Beam/Facilities if necessary. C3"' All known operating scenarios,control devices,and emission release points have been entered for each emission source(permitted, insignificant,and unpermitted)or note that the emission source was not operated or not required to report. N A heck if SCC codes for each OS are accurate and update if needed. �aluate"U" sources for significance and address according to policy. calculations/forms appear to add up correctly. l compliance issues are being addressed(e.g.Toxics limits,above TV thresholds, large emissions increase/decrease, installation Without a permit). ll volatile HAPs/TAPs were included in the VOC total. calculations and control efficiencies appear correct. Emission factors are the best available and most current factors appropriate for the reporting facility(e.g. stack testing,AP-42,etc.). _fD.—Review facility comments and address any issues. Update ED(Data Entry Main) if additional information is required(corrections due date and date received). 03,"Check all ED QA/QC reports. g!( Comparison with previous emission inventory must be made and outliers(> 10%)must be investigated and explained. a Put inventory review comments and summarize any changes in ED-Data Entry Main"DAQ internal comments". Print and attach the facility total report. [Date ate Info Requested: NIA Date Info Received: NIA Total Days on Hold: ZU ate Review Complete: v?7471V W Signature: Date Submitted to EI Coordinator: Approved: 9 W�� Initials: FacilityTotal CY 2019 Emission Summary Recorded in ED Facility ID#: 0400043 rY Facility Name: Triangle Brick Company - Wadesboro Brick Manufac Permit#(s): 08179T11 Green House Gases Pollutants(GHG) Actual Emissions Tons/Yr Pollutant CAS Demini- Change mus Not Not N/A Reported Reported CO2 equivalent(sum of individual GHG pollutant emission No GHGs times their 1995 IPCC Global Warming Potential (GWP), Reported converted to metric tons) Criteria Pollutants Actual Emissions (Tons/Year) Pollutant CAS CY 2019 CY 2018 Demini- % from ED from Fees mus Change CO CO 58.47 58.20 0.5 0.5% NOx NOx 12.77 12.71 0.5 0.5% PM(TSP) TSP 41.61 41.43 0.5 0.4% PM10 PM10 38.59 38.42 0.5 0.4% PM2.5 PM2.5 3 8.5 9 38.42 0.5 0.4% S02 S02 30.40 30.26 0.5 0.5% VOC VOC 6.15 6.19 0.5 -0.6% Hazardous Air Pollutants (HAPs) Actual Emissions and/or Toxic Air Pollutants (TAPs) (Pounds/Year) Pollutant CAS CY 2019 CY 2018 Demini- % from ED from Fees mus Change Antimony & Compounds (total mass, inc elemental SB) 5.47 5.45 10.0 7 i Antimony Unlisted Compounds- Specify Compounc SBC-Other 5.47 5.45 10.0 0.4% (Component of SBC) Arsenic & Compounds(total mass of elemental AS, arsine and 6.28 6.25 0.01 0.5% all inorganic compounds) Arsenic Unlisted Compounds- Specify Compound ASC-Other 6.28 6.25 0.01 0.5% (Component of ASC) Beryllium & compounds(Total mass) 0.080000 0.080000 1,0 0.0% Beryllium Metal (unreacted) (Component of BEC) 7440-41-7 0.080000 0.080000 1.0 0.0% Beryllium Unlisted Compounds- Specify Compounc BEC-Other Not Not 1.0 (Component of BEC) Reported Reported 09/17/2020 Page 1 of 4 Facility Total CY 2019 Emission Summary Recorded in ED Facility ID#: 0400043 Facility Name: Triangle Brick Company - Wadesboro Brick Manufac Permit#(s): 08179T11 Hazardous Air Pollutants (HAPs) Actual Emissions and/or Toxic Air Pollutants (TAPs) (Pounds/Year) Pollutant CAS CY 2019 CY 2018 Demini- % from ED from Fees mus Change Cadmium & compounds(total mass includes elemental metal) 3.04 3.02 0.1 0.7% Cadmium Metal, elemental, unreacted (Component( 7440-43-9 3.04 3.02 0.1 0.7% CDC) Cadmium Unlisted Compounds- Specify Compounc CDC-Other Not Not 0.1 (Component of CDC) Reported Reported Chromium-All/Total (includes Chromium (VI) categories, 10.33 10.28 0.1 0.5% metal and others) Chromic acid (VI) (Component of SolCR6 & CRC) 7738-94-5 Not Not 0.01 Reported Reported Chromium Unlisted Compounds- Specify Compoun CRC-Other 10.33 10.28 0.1 0.5% (Component of CRC) Chromium (VI) Soluble Chromate Compounds(Component of Not 0.000000 0.01 N/A CRC) Reported Chromic acid (VI) (Component of SoICR6 & CRC) 7738-94-5 Not Not 0.01 Reported Reported Cobalt& compounds 0.420000 0.420000 1.0 0.0% Cobalt Unlisted Compounds- Specify Compound COC-other 0.420000 0.420000 1.0 0.0% (Component of COC) Lead& compounds 30.40 30.26 1.0 0.5 Lead Unlisted Compounds- Specify Compound PBC-Other 30.40 30.26 10.0 0.5% (Component of PBC) Manganese & compounds 58.77 1778.51 10.0 0.4% Manganese Unlisted Compounds- Specify Compour MNC-Other 58.77 58.51 10.0 0.4% (Component of MNC) Mercury & Compounds-all total mass includes Hg Vapor 1.52 1.51 0.001 0.7% Mercury Unlisted Compounds- Specify Compound HGC-Other Not Not 0.001 (Component of HGC) Reported Reported Mercury, vapor(Component of HGC) 7439-97-6 1.52 1.51 0.001 0.7% Nickel& Compounds, sum total mass includes elemental 14.59 14.52 1.0 0.5% 09/17/2020 Page 2 of 4 Facility Total CY 2019 Emission Summary Recorded in ED Facility ID#: 0400043 Facility Name: Triangle Brick Company - Wadesboro Brick Manufac Permit#(s): 08179TI Hazardous Air Pollutants (HAPs) Actual Emissions and/or Toxic Air Pollutants (TAPS) (Pounds/Year) Pollutant CAS CY 2019 CY 2018 Demini- from ED from Fees mus Change Nickel metal (Component of NIC) 7440-02-0 14.59 14.52 1.0 0.5% Nickel Unlisted Compounds(Component of NIC - NIC-Other Not Not 1.0 Specify) Reported Reported Polycyclic Organic Matter(Specific Compounds from OAQPS 13.17 13.11 1.0 0.5% for TV) Naphthalene (Component of 83329/POMTV) 91-20-3 13.17 13.11 1.0 0.5% Benzene 71-43-2 587.69 585.05 1.0 0.5% Carbon disulfide 75-15-0 8.71 8.68 10.0 0.3% Chlorine 7782-50-5 263.45 262.26 100.0 0.5% DEHP(Di(2-ethylhexyl)phthalate) 117-81-7 405.30 403.49 10.0 0.4% Dibutylphthalate 84-74-2 28.37 28.24 100.0 0.5% Dichlorobenzene(p), 1,4- 106-46-7 9.73 9.69 1.0 0.4% Ethyl benzene 100-41-4 8.91 8.88 100.0 0.3% Ethyl chloride (chloroethane) 75-00-3 115.52 114.99 10.0 0.5% Fluorides (sum of all fluoride compounds as mass of 16984-48-8 1,558.73 1,551.75 10.0 0.4% ion) Formaldehyde 50-00-0 28.61 28.80 10.0 -0.7% Hydrogen chloride (hydrochloric acid) 7647-01-0 1,223.79 19218.31 100.0 0.4% Hydrogen fluoride(hydrofluoric acid as mass of HF) 7664-39-3 974.21 969.85 100.0 0.4% (Component of 16984488/Fluorides) MEK(methyl ethyl ketone, 2-butanone) 78-9J-3 44.58 44.39 100.0 0.4% Methyl chloride (chloromethane) 74-87-3 135.78 135.17 1.0 0.5% Methyl chloroform 71-55-6 0.960000 0.950000 100.0 1.1% Methyl iodide (iodomethane) 74-88-4 18.85 18.76 10.0 0.5% MIBK (methyl isobutyl ketone) 108-10-1 17.23 17.14 10.0 0.5% Perch loroethylene (tetrachloroethylene) 127-18-4 0.560000 0.570000 100.0 -1.8% Phenol 108-95-2 17.43 17.35 100.0 0.5% Selenium Compounds SEC 46.61 46.40 10.0 1 0.5% 09/17/2020 Page 3 of 4 Facility Total CY 2019 Emission Summary Recorded in ED Facility ID#: 0400043 Facility Name: Triangle Brick Company - Wadesboro Brick Manufac Permit#(s): 08179T 11 Hazardous Air Pollutants (HAPs) Actual Emissions and/or Toxic Air Pollutants (TAPs) (Pounds/Year) Pollutant CAS CY 2019 CY 2018 Demini- % from ED from Fees mus Change Styrene 100-42-5 4.05 4.03 100.0 0.5% Toluene 108-88-3 32.43 32.28 100.0 0.5% Xylene (mixed isomers) 1330-20-7 25.33 25.22 100.0 0.4% Largest Individual HAP Hydrogen chloride(hydrochloric acid) 1,223.79 lbs Total HAP Emissions 4,097.59 lbs Largest Individual CAP CO 58.47 tons Total CAP Emissions 146.38 tons Total TAP Emissions 5,280.79 lbs Total Aggregate 148.40 tons Emissions DAO's Comments Regarding Inventory 09/17/2020 Page 4 of 4 Triangle Brick _CW1 6523 NC Highway 55 June 24, 2020 Durham, NC 27713 Durham:(919)544-1796 Raleigh: (919)828-2070 Toll Free:800-672-8547 North Carolina Department of Fax: 800-849-0612 Environmental Quality Fayetteville Regional Office Division of Air Quality 225 Green Street, Suite 714 Fayetteville, North Carolina 28301 R E C EE I V E L)Attention: Heather Carter JUL s 1 2020 Regional Air Quality Supervisor TTEtilLLE REGIONAL OFFICE r Reference: Submittal of 2019 Air Emission Inventories Certification Form and Supporting Emission Calculations Triangle Brick Company—Wadesboro Dear Ms. Carter: Enclosed please find the 2019 Emission Inventory Certification Forms for Triangle Brick Company's Wadesboro, North Carolina facility. The actual emission inventory was submitted using NCDAQ's AERO system. In addition, attached are the supporting emission calculations for the emission inventory for the facility. Annual emissions were estimated using emission factors developed during a United States Environmental Protection Agency/Brick Association of North Carolina sponsored source test at our Merry Oaks facility, emission factors contained in the AP-42 Section 11.3 "Brick and Related Clay Products," and factors from the NC DEQ emission estimation spreadsheet for natural gas and fuel oil combustion. In addition, hydrogen fluoride, hydrogen chloride, and particulate emissions are based on site-specific source testing. Tank emissions are calculated in accordance with AP-42 Section 7.1 Organic Liquid Storage Tanks" (revised in 2020) using Emission Master Tanks software. Dryer particulate emissions are calculated utilizing AP-42 Section 11.19.1 "Sand and Gravel Processing." Greenhouse gas emissions are not included since it was not mandatory and more importantly, emission factors from brick plants are not readily available for these pollutants. Emissions of these pollutants will be included when required. If you have any questions, please do not hesitate to contact me at (919) 544-1796 or Kevin Eldridge at (919)428-9508 or by email at Kevin.Eldridge@ERM.com. Sincerely, TRIANGLE BRICK OMPANY Howard P. Brown,Jr. President and CEO Attachment cc: Ricky Merritt cc: David Gibson i, �F n � x a W„ III r �a y x ° o � Triangle Brick Company 2019 Air Emissions Inventonj Wadesboro, North Carolina Facility ID: 0400043 June 2020 Prepared by: ERM NC,Inc. 4140 Parklake Ave.,Suite 110 Raleigh, NC 27612 www.erm.com II Et"R k " a II AFRO EMISSION INVENTORY PRINTOUT TRIANGLE BRICK COMPANY- WADESBORO inventory Certification Form(Title V) Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US Hwy 52 Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO 25 North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 These forms must be completed and returned even if the facility did not operate or emissions were zero The legally defined "Responsible Official" of record for your facility is Howard Brown,Jr. This person or one that meets the definition below must sign this certification form. The official submitting the information must certify that he/she complies v.ith the requirements as specified in Title 15A NCAC 2Q.0520(b)which references and follows the federal definition.40 CFR Part 70.2 defines a responsible as meaning one of the followin!': 1. For a corporation: a president.secretary,treasurer,or vice-president of the corporation in charge of a principal business function,or any other person who performs similar policy or decision making functions for the overall operation of one or more manufacturing,production,or operating facilities applying for a or subject to a pen-nit and either i. the facilities employ more than 250 persons or have gross annual sales or expenditures exceeding$25 million(in second quarter 1980 dollars);or ii. the delegation of authority to such representatives is approved in advance by the permitting authority; 2. For partnership or sole proprietorship;a general partner or the proprietor,respectively; 3. For a municipality,state,federal,or other public agency includes the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency(e.g.,a Regional Administrator of EPA). CERTIFICATION STATEMENT: (Important: Legally Responsible Official,read and sign after all submissions are final.) 1 certify that I am the responsible official for this facility,as described above,and hereby certify that the information contained in this air emissions report, including attached calculations and docu nentation, is true, accurate and complete. (Subject to legal penalties of up to$25,000 per occurrence and possible imprisonment as outlined in G.S. § 143-215.3(a)(2)) Responsible Official's Signature Below (use blue ink): Date Signed: Printed Name: HoNvard Brown,Jr. Signature: This form applies to Title V facilities. If this facility is not classified asTitle V,please telephone your regional office Emission Inventory Contact at once for proper forms. Ernail address of Responsible Official: HowardBC-.TriangleBrick.com Information on this Form cannot be held confidential COPY of RECORD Date Submitted: 6/24/2020 09:05:56 1 'COPY oj�-,RTF'PCORID PP;ane Subm-tifted: 6/24/2020 09 ;0`6 Ass ernt-TE-wed in, --;kERO Facilitv Name: Triangle Brick Company - 'Wadesboro Brick Manufacturing Plant Facility ID : 0400043) US Hwy 52 Permit : 08179 Wadesboro,NC 218170 County : Anson DAQ Region : FRO Listing o1qE"mission Sources and Control Devices on Permit.See instructions ES Description ILI or, *CS ID CS Description CD 1131 s E S i't A;r'b-'erm i one cia\ -ic der Fi nish inish screen[NSPSS",)001 C( 11 Finish screen[NSPS 000] CG-12 Finish screen[NSPS 000] CG-13 Finish screen[NSPS 0001 C'G-14 One fines conveyor belt under screens[NSPS 0001 CG-1-5' One convenor belt to storage bins [NSPS 000] C(j-16 Onz conve-�or belt w,-er storage bins ;NSPS 0001 One storage bin[NSPS 0001 CG-18 One storage bin[NSPS 000] CG-19 One storage bin[NSPS 000] CG-2 One conveyor belt to scalping screen [NSPS 0001 C G_2 0 One storage bin[NSPS 0001 —7, C k"3'-21 One storage bin[NSPS 0001 Feeder under storage bin[NSPS %-- -22 000] CG-23 Feeder under storage bin[NSPS 0001 CG-24 Feeder under storage bin[NSPS I 000] Feeder under storage bin[NSPS CG-25 0001 Feeder under storage bin[NSPS [CG-26 000] One conveyor in front of storage bins [NSPS 0001 C6-28 Onc c(>n-veyor to pug m;11 [NSPS 0001 CG-29 One clay feeder ,I"G-3 One scalping screen[NSPS 000] CG-3)0 One conveyor belt to scalping screen [NSPS 0001 CG-3 I One scalping screen[NSPS 000] One return conveyor belt for oversize CG-32 from screens[NSPS 000] 2 One conveyor belt to hammer mill CG-33 , [NSI S 000] One hammer mill [NSPS 0001 One conveyor belt under hammer CG-�� mill [NSPS 0001 CG-36 One conveyor belt to finish screens I ['NSPS 000] CG-37 Finish screen[NSPS 0001 CG-;8 f r=finish screen[NSPS 0001 I C( y 9 Finish screen[NSPS 0001 � One return conveyor for oversize C" from screens[NSPS 000] 1 CCs-40 Finish screen[NSPS 000] CG_41 One tines conveyor belt under screens[NSPS 000] _ One conveyor belt to storage bins CCU 42 [NSPS 0001 One conveyor belt over storage bins CG_4' [NSPS 000] CG-44 Storage bin[NSPS 000] CG-415 Storage bin[NSPS 000] CG-46 Storage bin[NSPS 0001 CG-47 Storage bin[NSPS 0001 CG-48 Storage bin[NSPS 0001 CG-49 Feeder under storage bin[NSPS 000] One conveyor belt to hammer mill q [NSPS 0001 CG-50 Feeder under storage bin[NSPS 000] CG-S l Feeder under storage bin[NSPS 000] CG-52 Feeder under storage bin[NSPS 000] Feeder under storage bin[NSPS CG-53 000] CG-54 One conN evor in front of storage bins [NSPS 0001 J One conveyor to pug mill[NSPS CG-55 000] CG-6 One hammer mill [NSPS 0001 One conveyor belt under hammer CG-7 mill[NSPS 0001 One conveyor belt to finish screens [NSPS 000] One 3,000 gallon above ground IS-Tani: gasoline storage tank[GACT CCCCCC] e One 24.000 gallon above ground No. n 6 fuel oil storage tank 9 One 24.000 gallon above ground No. 2 fuel oil storage tank I>--3 One 24,000 gallon above ground No. 2 fuel oil storage tank 1T-4 One 24,000 gallon above ground i highway diesel fuel oil storage tank One 24,000 gallon above ground Additive"A"storage tank 3 One natural gas/No.2 fuel oil/No.6 fuel oil-fired Brick Tunnel Kiln(29.0 -1 tons per hour material output rate. s 42.8 million Btu per hour heat input rate) One natural gas/No.2 fuel oil/No.6 1 luel oil-fired Brick Tunnel Kiln(29.0 K-2 tons per hour material output rate. 42.8 million Btu per hour heat input rate) LS-1 Loam/sa,,;dust feeder LS-10 One sawdust screen[NSPS 000] One conveyor to storage bins[NSPS I.S l 0001 LS-12 One oversize conveyor from sawdust screen[NSPS 0001 LS-2 One conveyor from loam/sawdust feeder to finish screens[NSPS 0001 One loam screen[NSPS 0001 -' One loam crusher[NSPS 0001 R One oversize return conveyer from 1`JS-, A LS-3 [NSPS 0001 One oversize return chute[NSPS LC-6 000] LS-7 One fines conveyor belt under LS-3 to bunker belt conveyor[NSPS 0001 a One belt conveyor to bunker[NSPS l 1 LS-8 000] LS-9 One storage bunker[NSPS 0001 A PC-i One shale feeder PC-1 G One shuttle conveyor[NSPS 0001 PC:-? One shale feeder One scalp screen[NSPS 0001 6 l=C- ]:one scalp screen[NSPS 0001 ,i. One jaiv crusher[NSPS 0001 4; PC_6 One jaw crusher[NSPS 0001 PC,-7 One conveyor under PC-3 and PC-5 [NSPS 0001 One conveyor under PC-4 and PC-6 [NSPS 0001 I One cross-over conveyor[NSPS 0001 One natural gas-fired Rotary Coatings Dryer(8.1 tons of clay per SD-1 hour material input rate.0.3 million Btu per hour heat input rate)[NSPS UUtJ] 4 COPY of RECORD Date S)uhhwntted: 6/24/210.120 09:05.­_56 As en.-t-ered 1n .AER0 Facility Name: Triangle Brick Company- Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US Hwv 52 Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO Emission Source& Operating Scenario List-See Instructions ES Group ID XES ID !OS ID xOS Description 1 CG-1.CG-10,CG-11,CG- 12,CG-13,CG-14.CG-15. I CG-16,CG-17.CG-18.CG- 19.CG-2.CG-20.CG-21. CG-22,CG-23.CG-24.CG- 25,CG-26.CG-27.CG-28. CG-29,CG-3.CG-30.CG- 31.CG-32.CG-33,CG-34. CG-35,CG-36.CG-37.CG- GR33 38.CG-39.CG-4.CG-40. 12 anal crushing and screening and loam CG-41.CG-42.CG-43.CG- sawdust operation $ 44.CG-45.CG-46.CG-47. CG-48.CG-49,CG-5,CG- 50.CG-51.CG-52,CG-53. CG-54,CG-55.CG-6.CG- 7.CG-8,LS-1,LS-10,LS- 1 L LS-12.LS-2.LS-3,LS- 4,LS-5.LS-6.LS-7,LS-8, LS-9 PC-1.PC-10.PC-2.PC-3. G-45 PC-4.PC-5.PC-6.PC-7. i primar} crushing PC-8.PC-9 IS--Tank NONE NONE IT-1 15 No.6 fuel oil tank-standing emissions IT-2 16 workingNo.2 fuel oil tank-working and standing ` emissions 17 '" No.2 fuel oil tank--,wrkin and standing IT-3 g .. emissions Diesel tank-working and standing IT-4 18 emissions IT-5 14 Additive A Tank NG-tired Brick Tunnel Kiln 1 (42.8 4 mmBtu) 5 No.2 fuel oil fired Brick Tunnel Kiln(42.8 K-1 mi,�Btu} No.6 fuel oil tired Brick Tunnel Kiln(42.8 6 mmBtu) 9 Kiln#2 operating on Natural Gas K-2 10 Kiln 2 firing distillate oil 1 1 Kiln;2 tiring residual oil SD-1 13 Drying of sand for facing brick. Inclined rotating drum with natural gas burner. 5 COPY of RECORDate Submitted: /2 / 09-605:56 .As entered AERO Facility Name: Triangle Brick Company -Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US Hwv 52 Permit: 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) Group GR33 consisting ofCG-1, CG-10, CG-11, CG-12, CG-13, CG- or Emission Source Group ID 14,CG-15,CG-16,CG-17. CG-18. CG-19,CG-2, CG-20, CG-21, CG- 22,CG-23,CG-24. CG-25, CG-26, CG-27,CG-28, CG-29, CG-3, CG- 30,CG-J 1.CG-32, CG-33. CG-34, CG-35,CG-36, CG-37, CG-38, CG- 39,CG-4, CG-40, CG-41,CG-42, CG-43, CG-44, CG-45,CG-46, CG- 47,CG-48.CG-49, CG-5,CG-50,CG-51, CG-52, CG-53,CG-54, CG- 55,CG-6, CG-7, CG-8, LS-1, LS-10, LS-11, LS-12,LS-2,LS-3, LS-4, LS-5, LS-6, LS-7, LS-8,LS-9 2. Emission Source Description : Final Crushin_grinding,screening including Loam/Sawdust operation 3. Operating Scenario ID/ OS- 12/Final crushing and screening and loam sawdust operation Description: SCC Number/Description: 30500308/Brick Manufacture-Material Prep ; Screening j. Throughput/units in 2019: 266646 TON/yr (e.g. production or fuel use): 6. Fuel Information %Sulfur °oAsh Heat Content (if Fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented to Control De-vice or Stack): S.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information:(Sources vented to snore than one ERP use additional entn,lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter=-): (F) (FeeG'sec) Rate(Acfm) Rectangle(L x W) (in 0.1 feet) EP-CG FUGITIVE(NI O 1 72 Area= l final grinding STACK) 6 i Operating Scenario: OS - 12 Emission Source/Group ID: GR33 10.Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2019) Hours per Day ( 8 ) Days per Week ( 5 ) Weeks per Year ( 20 ) 11.Typical Start& End Times For Operating Scenario: Start: 800 End: 1600 12.Seasonal Periods Percent Annual Throughput: Jan-Feb+ Dec o March-May__] o June-Aug. Sept.-Nov. o 2019 10�O 2019 20/0 2019 2019 30/o 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG CAS GHG Estimation Efficiency Emission Ef Pollutants Pollutants Method Code ('yet afte( Factor Control (Tons%Year) (See Instructions) all controls) 2019 Criteria Emissions- Emission Control (NAAQS) Pollutant Criteria Estimation Efficiency Emission Ef Code Pollutants Method Code (`et after Factor Control Pollutants al►controls) (Tons Year) (See Instructions) 2019 CO CO 08 NOx NOX 08 TSP TSP 3.33 08 PM10 PM10 0.31 08 PM2.5 PM2.5 0.31 08 S02 S02 08 VOC VOC 08 Emissions Emission ,Control Emission EF HAP/TAP CAS Estimation Efficiency ficiency Factor Control Pollutants(ln:alphabetical Order) (see instructions) Method Code (Net after all controls) (Pounds,)`'ear) (See Instructions) 2019 8 �=` RACORD Date E: It � � : . As entered, .A.E. O Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US HNN.-v tit Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) Group G-45 consisting of PC-1, PC-10, PC-2, PC-3, PC-4, PC-5, PC-6, or Emission Source Group ID PC-7, PC-8, PC-9 2. Emission Source Description : primary crushing 3. Operating Scenario ID/ OS- I/primary crushing Description: - 4. SCC Number/Description: 30500340/Brick Manufacture-Material Prep ; Primary Crusher 5. Throughput/units in 2019: 266646 TON/yr (e.2.production or fuel use): 6. Fuel Information %Sulfur °ioAsll Heat Content (if fuel is used) (Btu./units) i. Capture Efficiency (%of Emissions from this Process Vented to Control Device or Stack): 8.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP)Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description in feet) Circle(enter=): (F) (Feet sec) Rate(Acfm) Rectangle(L x W) (in 0.1 feet) FUGITIVE(NO ;) Area= 1 primary crushing EP-PC STACK) 1 9 Operating Scenario: OS - 1 Emission Source/Group ID: G-45 10. Operating Schedule:(Source/OperatingScenario that best characterizes:-alendar Year 2019) Hours per Day ( 8 ) Days per Week ( 5 ) Weeks per Year ( 20 ) 11.Typical Start& End Times For Operating Scenario: Start: 800 End: 1600 12. Seasonal Periods Percent annual Throughput: Jan-Feb+Dec 10% March-May 20% dune-Aug. 40% Sept.-Nov. 30% 2019 2019 2019 2019 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control Emission EfGHG CAS GHG Estimation Efficiency Pollutants Pollutants Method Code (`'et after Factor Control (Tons/Year) (See Instructions) all controls) 2019 Criteria Emissions- Emission Control (NAAQS) Pollutant Emission Ef Criteria Estimation Efficiency Pollutants Code Pollutants Method Code (Net after Factor Control (Tons Year) (See Instructions) all controls) 2019 CO CO 08 NOx NOx 08 TSP TSP 7.87 08 PM10 PM10 7.87 08 PM2.5 PM2.5 7.87 08 S02 S02 08 VOC VOC 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF (see instructions) HAP/TAPS Efficiency Factor Control Pollutants(In.alphabetical Order) (Pounds, Method Code � Y"earj (:'et after all controls) (See Instructions) 2019 10 .As n l I°ems II -AERO Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US Hwy 52 Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) IT-1 or Emission Source Group ID 2. Emission Source Description : One 24,000 gallon above ground No. 6 fuel oil storage tank 3. Operating Scenario ID/ OS- 15/No. 6 fuel oil tank-standing emissions Description: 4. SCC NumberiDeseription: 40714697/Fixed Roof Tanks- Miscellaneous ; Specify In Comments: Breathing Loss 5. Throughputiunits in 2019: (e.g.production or fuel use): 6. Fuel Information °roSulfur %fs}1 Heat Content (If fuel is used) (Btu/units) Capture Efficiency (°%o ?;missions froth this Process Vented to Control Device or Stack): S.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in pen-nit) R 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter=): �F) (Feet sec) Rate ckcfm) Rectangle(L s W) (in 0.1 feet) FUGI11—VE(NO ERP for fugitive F_P-Ft T 1 72 Area= 1 sources STACK) 11 Operating Scenario: OS - 15 Emission Source/Group ID: IT-1 10.Operating Schedule:(Source,'OperatingScenario that best characterizes Calendar Year 2019) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11.Typical Start c& End Times For Operating Scenario: Start: 0 End: 2359 12.Seasonal Periods Percent Annual Throughput: Jan-Feb+ Dec March-Ma June-Au Sept.-Nov.o y o g• o P o 2019 2~/�' 2019 25/0 2019 25/0 2019 25/o 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG CAS GHG Estimation Efficiency Emission Ef Pollutants Pollutants Method Code (Net after Factor Control (Tons,'Year) (See Instructions) all controls) 2019 Criteria Emissions- Emission Control Pollutant Criteria Estimation Efficiency Emission Ef (?riAAQS) Factor Control Code Pollutants Method Code (Net after Pollutants jonsf Year) (See Instructions) all controls) 2019 CO CO 08 NOx NOx 08 � TSP TSP 08 PM10 PM10 08 PM2.5 PM2.5 08 S02 S02 08 VOC VOC 08 Emission Control HAP/TAP CAS Emissions Estimation Emission EF Efficiency Factor Control Pollutants(In.alphabetical Order) (see instructions) HAP/TAPSMethod Code (Net after all controls) (Pounds/Year) (See Instructions) 2019 12 " PY of RC ' 6`2410 1 09-05-5 OE0IR , -Daive , 0 6 n. As eniteredir; AERO Facility Name: Triangle Brick Company- Wadesboro Brick Manufacturing Plant Facility ID : 040004') US Hv,v 5') Permit : 08179 Wadesboro.NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) IT-2 or Emission Source Group ID 2. Emission Source Description One 24,000 gallon above ground No. 2 fuel oil storage tank 3. Operating Scenario ID/ OS- 16/No. 2fuel oil tank- working and standing emissions Operating Description: 4. SCC Number/Description- 40714697/Fixed Roof Tanks-Miscellaneous Specify In Comments: Breath-inc, Loss S. Throughput/units in 2019: (e.2.production or fuel use): 6. Fuel Information %Sulfur %As11 Heat Content (If fuel is used) (Btu/units) 7 Capture Efficiency (1)10 of Emissions from this Process Vented to Control Device or Stack): 8.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description T7 . - (in feet) Circle(enter#)i (F' ect,See) Rate(Acfm) Rectanifle(L x%V) FUGITIVE(NO (it)0.1 feed ERP for fugitive F.P-FLIGI STACK) 7 Area sources 13 Operating Scenario: OS - 16 Emission Source/Group ID: IT-2 10.Operating Schedule:(SourceiOperatingScenarto that best characterizes Calendar Year 2019) Hours per Day ( 24 ) Days per Week ( ? ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: - 'Jan-Fels+ Dec March-Ma June-Aug. ° Sept.-Nov. ° 2019 Z5% y 2019 25% 2019 25/° 2019 25/o 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG Emission Ef CAS GHG Estimation Efficiency Pollutants Pollutants Method Code fNet after Factor Control (Tons` ear) (see Instructions) all controls) 1 2019 Criteria Emissions- Emission Control Pollutant � Emission Ef (NAAQS) Criteria Estimation Efficiency Code Pollutants Method Code (Net after Factor Control Pollutants sl all controls) (Ton ear) (See Instructions) 2019 CO CO 08 NOA NOx 08 TSP TSP 08 PM10 PM10 08 PM2.5 PM2.5 08 S02 S02 08 VOC VOC 08 Emission 14APITAP CAS Emissions Estimation Control Emission EF (sec instructions) HAP/TAPS Efficiency Factor Control Pollutants(In.alphabetical Order) (Pounds Year) Method Code (\�t after all controls) (See Instructions) 2019 14 COPY of RECORD Date Subrynifted: 6/11N/2020 09-4015.,56 As entered in. AERO Facilitv Name: Triangle Brick Company- Wadesboro Brick Manufacturing Plant Facility ID : 040004') US Hwy 52 Permit 08179 Wadesboro.NC 28170 County Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) IT-3 or Emission Source Group ID 2. Emission Source Description One 241000 gallon above ground No. 2 fuel oil storage tank 3. Operating Scenario ID/ OS- 17/No. 2 fuel oil tank-working and standing emissions Description: 4. SCC Number/Description: 40714697/Fixed Roof Tanks- Miscelianeous ; Specify In Comments: Breathinc,Loss 5. Throughput/units in 2019: (e.g.production or fuel use): 6. Fuel Information O/oSulfur O/Ash Heat Content (if fLIC1 IS Used) (Btu/units) 7 Capture Efficiency (%of'Emissions from this Process Vented to Control Device or Stack): S.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter a): (F) (Feetisec) Rate(Acfm) an Rectgle(L x'W) (ill 0.1 feet) FUGITIVE(NO ?2ERP for fugitive STACK) Area 15 Operating Scenario: OS - 17 Emission Source/Group ID: IT-3 10. Operating Schedule:(Source/Operatin-Scenario that best characterizes Calendar Year 2019) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11.Typical Start& End Tunes For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb+ Dec March-May June-Aug,. Set Nov. 2019 25% 2019 25% 2019 b 25% 12019 25% 13. factual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG CAS GHG Estimation EfficiencyEmission Ef Pollutants Pollutants Method Code (Net after Factor Control (Tons%Yeari (See Instructions) all controls) 2019 Criteria Emissions- Emission Control (NAAQS) Pollutant Criteria Estimation Efficiency Emission Ef Code Pollutants Method Code (Net after Factor Control Pollutants all.controls) (Tons,Year) (See Instructions) 2019 CO CO 08 NOx NOx 08 TSP TSP 08 PM10 PM10 08 PM2.5 PM2.5 08 S02 S02 08 VOC VOC 08 Emission HAP/TAP CAS HAunEmissionsTAPS Estimation Control Emission EF ions) Efficiency Factor Control rscc instructions)Pollutants i In alphabetical Order) (Pound Method Code (Net after all controls) (See Instructions) 2019 16 CO o RECORD Date Submitted:ed: /2 /2 2 : - . As entered inA Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 Permit : 08179 US Hwy 5-1 Wadesboro, NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) IT-4 or Emission Source Group ID 2. Emission Source Description : One 24,000 gallon above ground highway diesel fuel oil storage tank 3. Operating Scenario ID/ OS- 18/Diesel tank-working and standing emissions Description: 4. SCC Number/Description: 40714697/Fixed Roof Tanks-Miscellaneous ; Specify In Comments: Breathing Loss 5. 'Throughput/units in 2019: 221837 GAL/yr (e.g.production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fuel is used) (Btu/units) 7. Capture Efficiency {°o of F-,missions from this Process vented to Control Device or Stack): 8.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP)Information: (Sources vented to more than one ERP use additional entry lines): FF ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet') Circle(enter T): (F) (Feet'sec) Rate(_�cfm) Rectangle(L x W) (in 0.1 feed FUGITIVE (NO ERP for fugitive I IG 1 72 Area= 1 STACK) sources 17 Operating Scenario: OS - 18 Emission Source/Group ID: IT-4 10. Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2019) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb+ Dec yjJune-Aug.March-Ma Sept.-Nov. ° 2019 25% 2019 25% 2019 25% 2019 25/o 13. Actual Emissions per Pollutant Listed !attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG CAS GHG Estimation Efficiency Emission Ef Pollutants Pollutants Method Code (Net after Factor Control (Tons bear) (See Instructions) all controls) 2019 Criteria Emissions- Emission Control (,vAAQS) Pollutant Emission Ef Criteria Estimation Efficiency I Code Pollutants Method Code (:yet after Factor Control Pollutants (-Cons Year) (See Instructions) all controls) 2019 CO CO 08 NOx NOx 08 TSP TSP 08 PM10 PM10 08 PM2.5 PM2.5 08 S02 S02 08 VOC VOC 0.01 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF instructions) HAP/TAPS Efficiency Factor Control Pollutants I In Alphabetical Order) (see Method Code (Poundsi`��car) (Net after all controls) (See Instructions) 2019 18 COPY of RECORD Date Subtruitted-b 6/24/2020 09-00,15:56 As entered in .AERO Facility, Name: Triangle Brick Company -Wadesboro Brick Manufacturino,Plant Facility ID : 040004') US Hwy 52 Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) IT-5 or Emission Source Group ID 2. Emission Source Description One 24,000 gallon above ground Additive "A" storage tank 3. Operating Scenario ID/ OS- 14/Additive A Tank Description: 4. SCC Number/Description: 40714697/Fixed Roof Tanks- Miscellaneous ; Specify In Comments: Breathing Loss 5. Throughput/units in 2019: 114321 GAL/yr tc.g. production or fuel use): 6. Fuel Information %Sulfur °oAsh heat Content f fuel is used) (Btu/units) 7. Capture Efficiency ('3,0' ot'LE-iiussions from this Process Vented to Control Device or Stack)- 8.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): Height Diameter Temperature Velocity Volume Flow ERP Description ERP ID ERP Type (in feet) Circle(enter=)- (F) (Feetsec) Rate(Acfm) Rectangle(L x W) (ill 0.1 feet) ERP for fugitive FUGITIVE(NO ERP Area= I g t:� F STACK) sources 19 Operating Scenario: OS - 14 Emission Source/Group ID: IT-5 10. Operating Schedule:(Source/OperatingScenario that best chara,:terizes Calendar Year 2019) Hours per Day ( 24 ) Bays per Week ( 7 ) Weeks per Year ( 52 ) 11.Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual'Throughput: .Ian-Feb+ Dec 1 y March-Ma June-Aug. Sept.-Nov. ° 2019 25% 2019 25% 2019 b 25% 2019 25/° 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef CAS Efficiency Pollutants Pollutants Method Code (Net after Factor Control jons Year (Sze Instructions) all controls) 2019 Criteria Emissions- Emission Control (NAAQS) Pollutant Criteria Estimation Efficiency Emission Ef Pollutants Code Pollutants Method Code (Net after y Factor Control (Tons Year) (See Instructions) all controls) 2019 CO CO 08 NOx NOx 08 TSP TSP 08 PM10 PM10 08 PM2.5 PM2.5 08 S02 S02 08 VOC VOC 0.38 08 Emission HAP/TAP CAS Emissions Estimation Control Emission EF (see instructions) HAP/TAPS Efficiency Factor Control Pollutants(in Alphabetical Order) (Pounds"Year) Method Code ("vet after all controls) (See Instructions) 2019 20 %"_A0'PY of RECORD Date Submitted: 6/24/122020 09:05:56 h-7 -� 17E R 0 Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043) US Hwy 52 Permit : 08179 Wadesboro.NC28170 County : Anson DAQ Region : FRO t5 North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 I. Emission Source ID(from permit) K-I or Emission Source Group ID 2. Emission Source Description One natural gas/No. 2 fuel oil/No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per hour material output rate,42.8 million Btu per hour heat input rate) 3. Operating Scenario ID/ OS-4/NG-fired Brick Tunnel Kiln 4"1 (42.8 mmBtu) Description: 4. SCC Number/Description: 30500331/Brick Manufacture-Curing& Firing ; Curing and Firing: Dual Fuel Fired Tunnel Kiln S. Throughput/units in 2019: 101414 TON/yr (e.g.production or fuel,use): 6. Fuel Information %Sulfur %Ash Heat Content iff rue! is u sed) (Btu/units) 7 Capture Efficiency (%of Emissions from this Process Vented to Control Device or Stack): S.Control Device Information :None Order CS-ID_ CD ID Control Device Description (as listed in pen-nit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feel,) Circle tenter 4): (F) Rate(Acfm) Rectangle(L x W) On 0 1 leet" VERTICAL EP-K I STACK 585 449 51 60082.95 Kiln No. I 21 Operating Scenario: OS -4 Emission Source/Group ID: K-1 10. Operating Schedule:(Source/OperatingScenario that hest iia;aczcrie5 Calendar Year 20 19) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11.Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12. Seasonal Periods Percent Annual Throughput: Jan-Feb+ Dec 25% March-May 25% June-Aug. 25% Sept.-Nov. 25% 2019 2019 2019 2019 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG CAS GHG Estimation Efficiencv Emission Ef Pollutants Pollutants Method Code (Net after Factor Control (Tons Year) (Sce instructions} all controls) 2019 Criteria Emissions- Emission Control (NAAQS) Pollutant Criteria Estimation Efficiency Emission Ef Code Pollutants Method Code (Net after Factor Control Pollutants all controls) (TonsiYear) (See Instructions) 2019 CO CO 29.26 08 NOx NOx 6.39 08 TSP TSP 15.21 08 PM10 PM10 I5.21 08 PM2.5 PM2.5 115.21 08 S02 S02 15.21 08 VOC VOC 2.88 08 Emission Control @ HAP/TAP CAS Emissions Estimation Emission EF (see instruction HAP/'PAPS Efficiency Factor Control Pollutants(In alphabetical Order) Method Code Net after all controls) (Poundsi fear) ( (See Instructions) 2019 Antimony Unlisted Compounds(Specify& SBC-Other 2.74 08 Component of SBC) Arsenic Unlisted Compounds ( Specify& ASC-Other 3.14 08 Component of ASC) Benzene 71-43-2 294.1 08 Beryllium ,metal (unreaeted) (Component 7440-41-7 0.04 08 of BEC) Cadmium Metal (elemental unreacted, 7440-43-9 1.52 08 Component of CDC) Carbon disulfide 75-15-0 4.36 08 Chlorine 7782-50-5 131.84 08 Chromium Unlisted CRC- Compounds (Specify& Other 5.17 08 Component of CRC) 22 Cobalt Unlisted Compound (Specify& COC }'Other 08 Component of COC) �`�� � Di(2-ethylhexyl)phthalate � r 117-81-7 270"°.8: (DEHP) 1itylphthalate 8=1-74-2 14.�' L r 1Dichlorobenzene(p), 1,4- 106-46-7 4.87 08 E thyl benzene 100-41-4 4.46 08 Ethyl chloride chYor oethane) 75-00-3 57.81 08 a luorides (sum of all 16984-48-8 780.05 08 fluoride compounds) Formaldehyde 50-00-0 13.55 08 Hydrogen chloride 7647-01-0 612.43 08 (hydrochloric acid) Hydrogen fluoride 7 (hydrofluoric acid as mass �� 7664-39-3 487.53 08 of HF-Com o F of ent Fluorides) 5 Lead Unlisted Compounds F 4 � h (Specify and Component PBC-Other 15.21 08 of PBC) Manganese Unlisted - MNC- Compounds(Specify & Other 29.41 08 Component of MNC) Mercury,vapor 7439-97-6 0.76 08 (Component of HGC) Methyl chloride 74-87-3 67.95 08 Methyl chloroform 71-55-6 0.48 08 Methyl ethyl ketone 78-93-3 22.31 08 Methyl iodide 74-88-4 9.43 E 08 Methyl isobutylketone 108-10-1 8.62 08 Naphthalene(Component _ r 91-2�,0-� 6.59 ,18 of POMTV) Nickel metal(Component 7440-02-0 7.3 08 of NIC) Perchloroethylene 127-18-4 0.28 i 08 (tetrachloroethylene) Phenol 108-95-2 8.72 08 SQledaium Compounds SEC 23.33 08 S"b gene 100-42-5 2.03 08 Toluene 108-88-3 16.23 08 lee 1330-20-7 12.68 08 4. 23 9 As enterednAE Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US Hwv 52 Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality- Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) K-1 or Emission Source Group ID 2. Emission Source Description : One natural gas/No. 2 fuel oil/No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per hour material output rate,42.8 million Btu per hour heat input rate) 3. Operating Scenario ID/ OS- 5/No. 2 fuel oil fired Brick Tunnel Kiln (42.8 mmBtu) Description: 4. SCC Number/Description: 30500312/Brick Manufacture -Curing& Firing ; Curing and Firing: Oil- fired Tunnel Kilns >. Throughput/units in 2019: (e.Q.}production or fuel use): 6. Fuel Information %Sulfur %Ash Heat Content (If fbel is used) (Btu,-units) 7. Capture Efficiency (%of Emissions from this Process Vented to Control Device or Stack): S. Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP'Type Height Diameter Temperature Velocity Volume Flow ERP Description 3 (in f et) Circle(enter_-Y (Feet'sec) Rectangie(L x Vti) (F) Rate{.acfm) (in 0.1 feet) VERTICAL � EP-KI 58 5 449 51 60082.95 Kiln No. 1 STACK 24 Operating Scenario: OS - 5 Emission Source/Group ID: K-I 10.Operating Schedule:(Source/OperatingScenario that best characterizes Calendar Year 2019) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 2. Seasonal Periods Percent Annual Throughput: Pan-Feb+Dec March-May 9, /® 12019 June-Aug. Sept.-Nov. 25 25% 2019 25% 2019 5 2 % [20, 1 1 1 13. .�"_Ictual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. GAG IEmissions- Emission Control Emission Ef CAS GHG Estimation Efficiency Pollutants Pollutants Method Code (Net after Factor Control (Tons./Year) (See Instructions) all controls) 2019 L C r i t et-i a Emissions- Emission Control Pollutant Criteria Estimation Emission E f (NAAQS) Efficiency Code Pollutants Method Code (Net after Factor Control Pollutants all controls) (Tony-Year! (See Instructions) 2019 co Co 08 NOx NOx 08 TSP TSP 08 P NI PMi a 08 PM2.5 PM2.5 08 S02 S02 08 voc j, VOC 08 Emission Emissions Control Emission EF RAP/TAP CAS Estimation (see instructions) HAPPYAPS Efficiency Factor Control Pollutants (InAlphabetical Order) PounGs: Method Code (Net af-tej-all control-,;) (see instructions) 91 2 5 crk"j"PY of RECORD Date Stibmitted: 6/24/2020 096-05:53% .As entered in AERO Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 040004') US Hwy 52 Permit 08179 Wadesboro,NC 28170 County Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) K- or Emission Source Group ID 2. Emission Source Description One natural gas/No. 2 fuel oil/No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per-hour material output rate,42.8 million Btu per hour heat input rate) 3. Operating Scenario ID/ OS-6/No. 6 fuel oil fired Brick Tunnel Kiln (41/.8 mi-nBtu) Description: 4. SCC Number/Description: 330500312/Brick Manufacture-Curing& Firing ; Curing and Firing: Oil- fired Tunnel Kilns 5. Throughput/units in 2019: (e.e.production or fuel use): 6. Fuel Information 0//oSulfur °gash Heat Content (if fuel is used) (Btu/units) 7. Capture Efficiency (%of Emissions from this Process Vented to Control Device or Stack): 8.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information: (Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter—"): (F) (--eetisec) Rate(_-kcfm) I Rect-am-fle(L x W) VERTICAL (in 0.1 Peet) I EP-K 1 58 5 1 449 511 60082.95 Kiln No. I STACK 26 Operating Scenario: OS-6 Emission Source/Group ID: K-i 10.Operating Schedule:(Source/OperatingScenario that beast characterizes Calendar Year 2019) )-lours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 i 2. Seasonal Periods Percent Annual Throughput: Jan-Feb+ Dec. ' March-Ma jJune-Aug. Set N 11 25% 2019 y 25°/e 2019 25'% 12019- 25°�j 2 g 1�,0 13. Actual Emissions per Pollutant Listed : Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Con4aroa GHG GHG Estimation Emission Ef Pollutants CAS Efficiency P Pollutants Method Code Factor Control (Tons/Year) (See Instructions) all controls) 5 2019 a x Criteria Emissions- Emission Control w T Pollutant Criteria Estimation Emission Ef (NAAQS) Efficiency Code Pollutants Method Code (Net after Factor Control Pollutants jonsiYear) (Sec Instructions) all controls) g 2019 R CO 08 l N,0,�L NOx 08 1 'S TSP 08 Pal 0 PM10 08 P?' 2.5 PM2.5 08 S02 S02 08 VOC VOC 08 Emissions Emission Control I HAP/TAP CAS Estimation Emission EF (see instructions) HAP/TAPS Efficiency Factor Control Pollutants(in Alphabetical Order) Method Code P (Pounds. "ear) ('vet after all Controls) a (See Instructions) 2019 E 27 COPI" of RECORD Dau Sub_rmitted,� 6/24/2010 ' 9-0'-'6 A 1 5.-_5 As eiate-reA In. AERO Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 040004') U'S Hwy 52 Permit : 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2019 1. Emission Source ID(from permit) K-2 or Emission Source Group ID 2. Emission Source Description One natural gas/No. 2 fuel oil/No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per-hour material output rate,42.8 million Btu per hour heat input rat--) I Operating Scenario ID/ OS -9/Ki1n42 operating on Natural Gas Description: 4. SCC Number/Description: 305003 /Brick Manufacture-Curing& Firing ; Curing and Firing: Gas- fired Tunnel Kilns S. Throughput/units in 2019: 101237 TON/yr (e.a.production or fuel use): 6. Fuel Information %Ash Hcat Content (Ir")lei ;S used) (Btu/units) 7. Capture Efficiency (Q"o ol'Fillissions Iron this Process Vented to Control Device or Stack): S.control Device Information -None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description On feet) Circle(enter-1): (F) (FeeLsec) Rate(Acfm) Rectan,de(1,x W) (ill 0,1 feet? EP-K2 VERTICAL 60 5.21 380 31.9 40804.42 Kiln No. 2 STACK 28 Operating Scenario: OS -9 Emission Source/Group ID: K-2 10. Operating Schedule:(Source/OperatingScenario that hest characterizes Calendar Year 2019) Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Fear ( 52 ) 11. Typical Start& End Times For Operating Scenario: Start: 0 End: 2359 12.Seasonal Periods Percent Annual Throughput: Jan-Feb+Dec 25%® March-May 25% June-Aug. 25% Sept.-Nov. 25% 2019 2019 2019 2019 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Control GHG GHG Estimation Emission Ef CAS Efficiency Pollutants Pollutants Method Code (vet after Factor Control (Tons Year) (See Instructions) all controls) 2019 Criteria Emissions- Emission Control T Pollutant Criteria Estimation Emission Ef (1•,,A,��S) Efficiency Code Pollutants Method Code (Net after Factor Control Pollutants all controls) (Tons Year) (See Instructions) 2019 CO CO 29.21 08 NOX NOx 6.38 08 TSP TSP 15.19 08 PM10 PM10 15.19 08 PM2.5 PM2.5 15.19 08 S02 S02 15.19 08 VOC VOC 2.88 08 EmissionHAP/TAP CAS Emissions Emission Emission EF Estimation (see instructions) HAP/TAPS Efficiency Factor Control Pollutants e In.alphabetical Orden (Pounds: Method Code Year) (Net alter all controls) (See Instructions) 2019 Antimony Unlisted Compounds(Specify& SBC-Other 2.73 08 Component of SBC) Arsenic Unlisted Compounds (Specify& ASC-Other 3.14 08 Component of ASC) Benzene 71-43-2 293.59 08 Beryllium metal (unreacted) (Component 7440-41-7 0.04 08 of BEC) Cadmium Metal (elemental unreacted, 7440-43-9 08 Component of CDC) Carbon disulfide 75-15-0 4.35 08 Chlorine 7782-50-5 1.31.61 08 Chromium Unlisted CRC- Compounds (Specify & Other 5.16 08 Component of CRQ 29 Cobalt Unlisted COC- Compound (Specify& 0.21 08 Component of COC) Other Di(2-ethylhexyl)phthalate 117-81-7 202.47 08 1 u DEHP) 1 a Dibutylphthalate 84-74-2 14.17 08 Dichlorobenzene(p), 1,4- 106-46-7 4.86 08 Ethyl benzene 100-41-4 4.45 08 Ethyl chloride 75-00-3 57.71 `> a (chloroethane) 1 Fluorides (sum of all 1 16984-48-8 778.68 08 fluoride compounds) Formaldehyde 50-00-0 15.06 08 Hvdrwen chloride I 7647-01-0 611.36 10 (Hydrochloric acid) i I4-vdrogen fluoride (hydrofluoric acid as mass 7664-39-3 486.68 10 of HF-Component of Fluorides) Lead Unlisted Compounds (Specify and Component PBC-Other 15.19 08 of PBC) Xtaabanese Unlisted Compounds(Specify& MNC_ 29.36 08 a Component of MNQ Other 1 Mercury,vapor 7439-97-6 0.76 08 omponent of HGCI n e 1etivl chloride g4-`7-3 67.83 08 Ntethyl chlorofor 1 71-55-6 0.48 08 e lethyl ethyl ketone 1 78-93-3 22.27 08 Methvl iodide 74-8894 9.42 t8 a Methvi Hsobutyl ketone 108-10-1 9.61 8 _ Naphthalene(Component 91-20-3 6.58 08 5 of POMTV) Nick L=s metal(Component 7440-02-0 7.29 08 of NIC) perchloroethylene 127-1 8-4 0.28 08 (tetrachloroethylene) Phenol 108-95-2 8.71 a 08 eleniam Compounds SEC 23.28 08 Styrene 100-42-5 2.02 08 Toluene 108-88-3 16.2 08 Xylene 13330-20-7 12.65 08 g 30 COPY of RECORD Date :'Subrnjitted: 6/24/2020 09:05:56 As entered in .AERO Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US HNA'v 52 Permit : 08179 1 Wadesboro, NC28170 County : Anson DAQ Region : FRO Z5 North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) K-2 or Emission Source Group ID 2. Emission Source Description One natural gas/No. 2 fuel oil/No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per hour material output rate,42.8 million Btu per hour heat input rate) 1. Operating Scenario ID/ OS- 1 O/Kiin 2 firing distillate oil Description: 4. SCC Number/Description- 30500312/Brick Manufacture -Curing& Firing ; Curing and Firing: Oil- fired Tunnel Kilns S. Throughput/units in 2019: (o.e. productioi-,or fuel use): 6. Fuel Information %Sulfur °/oAsh 1leat Content (if fuel is used) (Btu/units) 7. Capture Efficiency (%ol'Eniissions frorn this Process Vented to Control Device or Stack): S.Control Device information :None F—Order CS-ID CD ID Control Device Description (as listed in pen-nit) 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description (in feet) Circle(enter ii): (F) !Feet sec) Rate(Acfm) Rectangle(L x W) (w 0.1 feet) EID-K2 VERTICAL STACK 60 5.21 3 80 31.9 40804.42 Kiln No. 2 31 Operating Scenario: OS - 10 Emission Source/Group ID: K-2 in 119. Operating Schedule:(Source/operatingScenario tUt he--,' RECORD Date Submltte--,d-. 6/24/2020 09:0415.,56 g X A U-L As ente� ed in AERO Facility Name: Triangle Brick Company- Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US 52 Permit : 08179 : Anson Wadesboro,NC 28170 County DAQ Region : FRO North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory-Calendar Year 2019 1. Emission Source ID(from permit) SD-1 or Emission Source Group ID 2. Emission Source Description One natural gas-fired Rotary Coatings Dryer(8.1 tons of clay per hour material input rate, 0.3 million Btu per hour heat input rate) [NSPS UUU] 3. Operating Scenario ID/ OS- 13/Drving,of sand for facing brick. Inclined rotating drum xNith I - -- Description: natural gas burner. 4. SCC Number/Description- -30500')0 1/Brick Manufacture -Dryer Raw Material Drying 5. Throughput/units in 2019: 1442 TON/yr production or fuel use): (e.g.Z7 6. Fuel Information %Sulfur %Ash Heat Content (I fil"Llel is used) (Btu/unis) 7. Capture Efficiency (",'o o', Fmii,,sions from this Process Vented to Control Device or Stag): 8.Control Device Information :None Order CS-ID CD ID Control Device Description (as listed in permit) 9. Emission Release Point(ERP) Information:(Sources vented to more than one ERP use additional entry lines): ERP ID ERP Type Height Diameter Temperature Velocity Volume Flow ERP Description Jll feet') Circle ienter 40: 7eet SW Rectangle(I.x A%") (F) Rate(Acf.) (in 0A feel) Fugitive emission EP-SDI FUGITIVE (;'CIO 1 72 Area= I from sand dryer STACK) housed in building enclosure 35 �jpera,t,.P.Lr Scenario: OS - 113 Emission Source/Group ID: SD-J j 0. Operatinc,Schedule:(Source/"OperatingScenario that b:�st characterlZes Calendar Year 2019) t5 Hours per Day ( 4 j Days per Week ( 3 j Weeks per Year ( 10 1 L Typical pical Start& End Times For Operating Scenario: Start: 800 End: 1200 12. Seasonal Periods Perceint Annual Throughput: Pain-Feb Dee March-May June-Aug. Sept.-Nov. 0`�©1% 50% 50% (11% 2 0 11 19 2019 2019 2019 13. Actual Emissions per Pollutant Listed Attach calculations and documentation of emission factors or other estimation methods used. Emissions- Emission Controi GHG CAS GHG Estimation Efficiency Emission Ef Pollutants Pollutants Method Code (Net after Factor Control (Tons.'Year) (See Instructions) all controls) 2019 Criteria Poli Utan t Emissions- Emission Control Emission Ef (NAAQS) Criteria Estim Efficiencation y Code Pollutants Method Code (Net after Factor Contr®i Pollutants all controls) (Tons/Year) 'See Instruct,ons) 2019 Co 08 co NOx 08 Tsp 10.()I T S 08 O.Oi 08 P-N4_10 P110 PM2.5 PM2.5 0.01 08 S02 i S02 08 VOC Voc 08 Emission Emissions Control Emission EF CAS HAP/TAP HAP/TAPS Estimation Efficiency Factor Control (see instructions) Pollutants(In Alphabetical Order) Method Code (N,,ai-to,all controls) (see Instructions) 2019 Formaldehyde 50-00-0 0.00003 08 36 Facility Total CY 2019 Emissions Summary COPY of' RECORD 0�,)te 6/24/2020 0C'1-Vfi_:5-.,A56 As entered in AERO Facility Name: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID : 040004') US Hv\;y 52 Permit: 08179 Wadesboro,NC 28170 County : Anson DAQ Region : FRO 2_15 North Carolina Department of Environmental Quality Division of Air Quality Air Pollutant Point Source Emissions Inventory- Calendar Year 2019 Record Facility-Wide Totals From all Permitted and Non-Permitted AirPollutant Emission Sources Green House Gases Pollutants(GHG) IActual Emissions(Tons/Year) Pollutant CAS 12019 12018 %Change Criteria Pollutants Actual Emissions(Tons/Year) Pollutant CAS 2019 2018 %Change Co Co 58.47 58.2 0.4639183% '..Nox NOx 12.77 12.71 0.47207254% TSP 41.61 41.43 0.4344685% PNII 10 38.59 38.42 0.442148307% PT P1b12.5 338.59 38.42 0.44248307% S02 S02 30.4 30.26 0.46265495% 70C Voc 6.15 6.19 -0.6462029% Hazardous Air Pollutants(HA S)and/or Toxic Air Pollutants TAPS Actual Emissions(Pounds/Year) Pollutant CAS 2019 - 12018 %Change Pollutant Group:Antirnony&Compounds(total mass.inc elemental SB)Group Sum:5.47 Antimony Unlisted Compounds SBC-Other 5.47 �5_45 10.366972155% (Specily&Component of SBC) Pollutant Group.Arsenic& Compounds(total mass of elemental AS,arsine and all inorganic compounds)Group Sum:6.28 Arsenic unlisted Compounds( ASC-Other 6.28 6.25 0.48000336% Specify&Component ofASQ Pollutant Group4lorylliurn A, cornnotinds,(Total mass)Group Surn:_08_ Beryllium metal(unreacted) 1 7440-41-7 0.08 08 0.0% omponent of BEC) Pollutant Group:Cadmium&compounds(total mass inc elemental metal)Group Sum:3.04 Cadmium Metal(elemental 7440-43-9 E-3.04 3.02 0.66225106% Unreacted,Component of CDC) I I Pollutant Group:Chromium-All/Total(Inc Chromium(VI)categories.metal and Others)Group Sum:10.33 Chromium Unlisted Compounds CRC-Other 10.33 0.28 0.4863832% (SpeciCN!&Component of CRC)I 1 11 1 Pollutant Group:Cobalt compounds Group Sum:.42 37 Cob�at _'misted Compound COC-Other 0.42 .42 0.0% (Specil: &Component of COC.) Pollutant Grourli-ead and Lead compouriid's Group Sum:30.4 Lead Unlisted Compounds (Speci Iv and Component of PBC) PBC-Other 37 .-i 30.26 0.46265495% Pollutant Group:Manganese&compounds Group Sum:58.77 Manganese Unlisted Compounds NqNC-Other 58.77 58.5 l 0.44=t37215°i�� �, (Speeity&.Component of MNC) Pollutant Group:Mercui-N &Compounds-all total mass,inc Hg Vapor Group Sum:1.52 €Mercury.vapor(Component of 2 1.51 0.66225106% i_lCC) 7439-97-6 1.5� Polluta t ry;p:�,i l< ?-k Compounds,sum total mass.itic elemental Group Sun,:14.59 �' !���' metal(Component of NIC) 7440-02-0 14.59 14.52 0.48209155°ro ]Pollutant Group:Polycyclic Organic Matter(Specific Compounds from OAQPS for TV)Group Sum:13.17 Naphthalene(Component of 91-20-3 13.17 13.11 0.4576691% POMTV) Benzene 71-43-2 587.69 585.05 0.451246% Carbon disulfide 75-15-0 8.71 8.68 0.34561902% 7782-50-5 263.415 262.26 0.4537491% 'D:,2 t'�, :e,:� t .t_uiatc,�_=1 405.3 403.49 0.44858548% Dibutx 1phtha1ate 84-74-2 28.37 28.24 0.46034372% Dichlorobenzene(p). 1,4- 106-46-7 9.73 9.69 0.41279632% Ethel benzene 100-41-4 8.91 8.88 0.33783484% Ethel chloride(chloroethane; 75-00-3 115.52 114.99 0.4609086% 1 luorides(sum ofail fluoride 16984-48-8 1558.73 1551.75 0.44981346% compounds) f `0)3 28.80003 -0.6597234°o_1raiu'- 53-00-( �8.tiit. o Hydrogen chloride(hydrochloric acid) 7647-01-0 1223.79 1218.31 0.4498018% Hydrogen fluoride(hydrofluoric acid as mass of HF-Component of 7664-39-3 974.21 969.85 0.44955885% uorides} Methyl chloride 74-87-3 135.78 135.17 0.45128402% Methyl cl-dorolorrn 71-55-6 0.96 .95 1.0526305% Methyl ethyl ketone 78-93-3 44.58 44.39 0.42802984% Mc',L„ odide 74-88-4 18.85 18.76 0.47974494% Meth,,1 isobuv,I ketone 108-10-1 17.23 17.14 0.5250884% Perch I oroethyl ene 127-18-4 0.56 .57 -1.7543843% (tetrach l o�-oethy lene) Phenol 108-95-2 17.43 17.35 0.46109465% Selenium Compounds SEC 46.61 46.4 0.4525842% Styrene 100-42-5 4.05 4.03 0.49627742% Toluene 108- 8-3 32.43 32.28 0.46468875% X% cllr 133(t-2t}-; �5.�� 25.22 0.43616420/0 38 COPY OP ' of E IRL� Date a e S r ri��t e e : s 1 t s2 fa.:5� 0 0 0 .5-�,,aw,6 t:acility Name: Triangle Brick.Company - Wadesboro Brick Manufacturing Plant Facility ID : 0400043 US IiNvy 52 Permit : 08179 W'adesboro,NC 28170 County : Anson D AQ Region : FRO Comments From Facility: i i 39 SUPPORTING EMISSION CALCULATIONS TRIANGLE BRIG COMPANY- WADESBORO Table A-2 Calculation of Actual 2019 Air Emissions From Brick Tunnel Kiln#2 (Source I.D.-K-2) Triangle Brick C Table A-2 Calculation of Actual 2019 Air Emissions From Brick Tunnel Kiln #2 (Source I.D. - K-2) Triangle B Table A-3 2019 Air Emissions Inventory Supporting Emissions Calculations Formaldehyde Emissions From Natural Gas Combust Table A-4 2019 Air Emissions inventory Supporting Emissions Calculations Emissions From Natural Gas Combustion in Rotary Table A-6 2019 Air Emissions Inventory Supporting Emissions Calculations Natural Gas Combustion Emissions from Brick Tunnel Kilns Triangle Brick Company-Wadesboro Facility !Natural Gas Combusted (without any brick produced) VVADF_K1 ft3 WADEK2 Table A-7 2019 Air Emissions Inventory Supporting Emissions Calculations VOL Emissions from. Tanks Triangle Brick Company-Wadesboro Facility Annual Throughput(gallons) Additive A Tank 114,321 (1 tank) Highway a Diesel Tank 221,837 (1 tank) No. 2 E,mlssion Master 8.4.3.04 11:19:58 AM.6/1 1/2020 page I Wvadesboro 2019 Input Sheet.emm Title Page Product: Process: Process Cycle Time: 365 days Final Product Amount: 336158 gal Evaluation Date: 6/I 1/2020 File Name: Wadesboro 2019 Input Sheet.emm Connected Database: P:\Projects\0538550 Triangle Brick 2020 Compliance Support.KE\AEI\2019 AEI\_Tank Calculations\Triangle Brick EM Database Calculation type: MACT98 Condenser Calc.type:Zero Stage Charge Calc. type: Initial Composition Material Balance: No Emissions Subtracted Last Saved User: Last Saved Time: Comment: Imported from Excel on 11:18:17 AM, 6/11/2020. Defined Activities 1) [Storage] Wadesboro Additive A Tank From I/1/2019 to 12/31/2019 2) [Storage] Wadesboro Highway Diesel Tank From 1/l/2019 to 12/31/2019 3) [Storage] Wadesboro No.2 Fuel Oil Tank 1 From l/1/2019 to 12/31/2019 Emission Master 8.4.3.04 1 1:19:58 AM,6/1 1/2020 page 2 Wadesboro 2019 Input Sheet.eni n 1: Storage Tank Activity Title: Wadesboro Additive A Tank From I/1/2019 to 12/31/2019 Start Date: 1/1/2019 End Date: 12./31/2019 Elapsed Time: 365.0 days Vent I D: Noncondensable: Air A.0 scfh Saturation: 100% Pressure: -0.33 psig Using Monthly Avg. Temp. Location:North Carolina, Charlotte Volume Throughput: 114321.0 gal Crude Oil Factor-Kc: 1 Comment: Imported from Excel on 11:18:17 AM, 6/1 1/2020. Vessel Name: Wadesboro Additive A Tank Void Vol.: 26,077.08 gal Work Vol.: 25,000 gal No Control Devices Final Contents 13038.54 gal 56582.0116 lb 44.42 °F Weight Pure-Vp Z�'[i] X[i] A[i] XXVp*A [Liquid Phase] (lb) (mmHg) (mmHg) Calcium Lignosulfonate 56582.0116 8.897 1.0 1.0 1 8.897 Emissions From Vessel: Wadesboro Additive A Tank Effective Vp Working Breathinu Total Rate [Non Condensables] (mm Hg) (lb) (lb) y (lb) (lb/hr) Air 731.5522 1116.2)87 15 54.3972 2670.6843 0.3049 Condensables; (mm HO (Ib) (lb) (lb) (lb/hr) Calcium Lignosulfonate 11.3607 349.9777 406.8038 756.7815 0.0864 E aission Master 8.4.3.04 11:19:58 AM.6/l l/2020 page 3 Wadesboro 2019 input Sheet.emrn 2: Storage Tank Activity Title: Wadesboro Highway Diesel Tank From 1/l/2019 to 12/31/2019 Start Date: 1/1/2019 End Date: 12/31/2019 Elapsed Time: 365.0 days Vent I D: Noncondensable: Air @ 0 scfh Saturation: 100% Pressure: -0.33 psig using Monthly Avg. Temp. Location: North Carolina, Charlotte Vol uine Throughput: 221837.0 gal Crude Oil Factor-Kc: l Comment: Imported from Excel on 11:18:17 AM, 6/11/2020. Vessel Name: Wadesboro Highway Diesel Tank Void Vol.: 26,077.08 gal Work Vol.: 25,000 gal No Control Devices Final Contents 13038.54 gal 92598.8697 lb 44.42 °F Weight Pure-Vp W[i] X[i] A[i] IVp*A [Liquid Phase] (ib) (mmH(;) (minHO Distillate Fuel Oil No. 2 92598.8697 0.1904 1.0 1.0 1 0.1904 Emissions From Vessel: Wadesboro Highway Diesel Tank Effective Vp Working Breathing Total Rate ['Non Condensables] (mm Hg) (lb) (lb) (lb) (lb/hr) Air 742.5163 2202.2261 1481.9667 3684.1928 0.4206 [Condensables] (min Hg) (lb) (lb) (lb) (lb/hr) Distillate Fuel Oil No.2 0.3966 7.606 5.1641 12.77 0.0015 emission Master 8.4.3.04 t 1:19:58 A.M.6/1 1/2(120 page 4 Wadesboro 2019 Input Sheet.emm 3: Storage Tank Activity Title: Wadesboro No. 2 Fuel Oil Tank 1 From 1/1/2019 to 12/31,1?0!9 Start Date: 1/1/2019 End Date: 12/31/2019 Elapsed Time: 365.0 days Vent 1D: Noncondensable: Air @ 0 scfh Saturation: 100% Pressure: -0.33 psig Using Monthly Avg. Temp. Location:North Carolina, Charlotte Volume Throughput: 0 gal Crude Oil Factor-Kc: 1 Co=eEm:.rt: Imported from Excel on 11:18:17 AM, 6/11/2020. Vessel Name: Wadesboro No. 2 Fuel Oil, Tank 1 Void Vol.: 26.077.08 gal Work Vol.: 25,000 gal No Control Devices �I Final Contents 13038.54 gal 92598.8697 lb 44.42 OF Weight Pure-Vp W[i] X[i] A[i] X`Vp*A [Liquid Please] (lb) (mmHg) (mmHg) Distillate Fuel Oil No. 2 92598.8697 0.1904 1.0 1.0 1 0.1904 Emissions From Vessel: Wadesboro No. 2 Fuel Oil Tank 1 Effective Vp Working Breathing Total Rate Non Condensables] (mm Hg) (lb) (lb) (lb) (lb/hr) Air 742.5142 0 1481.9667 1481.9667 0.1692 [Condensables] (mm Hg) (lb) (Ib) (1_b) (Ib/hr) Distillate Fuel Oil No. 2 0.3987 0 5.1641 5.1641 6.0e-4 �I