Loading...
HomeMy WebLinkAboutAQ_F_0400043_20200210_CMPL_CompRpt REVIEW OF TITLE V 2019 ANNUAL COMPLIANCE CERTIFICATION Reviewer Assigned: EVANGELYN LOWERY-JACOBS FACILITY TRIANGLE BRICK COMPANY- FACILITY NAME: WADESBORO BRICK MFG PLANT ID: 0400043 1. Is the Certification sheet signed by the authorized/responsible official? OY N 2. Print the "Summary of Violations for a Facility" report from IBEAM and attach. 3. Are all NOD/NOV/NREs accounted for in the Deviation Summary Report? �Y N 4. If deviations are noted, did FRO address them all?(i.e. send letter)? Check paper file for any issues that may not be recorded in IBEAM Violations. Y N /A 5. Discuss deviations details with Compliance Coordinator. E N/ 6. If there was more than one permit applicable during the year, have all the permits been addressed in this ACC? Permit Numbers Y & N/A 7. Do reported sources and conditions match those in the permit(s)? Q N 8. Is the Compliance Summary Report for Specific Conditions complete and accurate? ® N 9. Is the Compliance Summary Report for General Conditions complete and accurate? Q N 10. Is compliance with the ACC requirements indicated? QY N 11. Record in IBEAM Actions/Re ortin date received date reviewed compliance status, comments p g ( .p ) Completed on Oz /L 4040 (date) REMEMBER—Compliance determination here refers to the ACC submitting requirements (late, not submitted, incomplete, etc). Talk to the Compliance Coordinator before you code a facility in violation. 12. Initial and date the to of the ACC Certification Sheet not this cover sheet). p ( ) 13. File FRO copy in a"Reports" or an"ACC" folder in facility file after Compliance Coordinator review. 14. Comments: Reviewed by: Date: Cz.�i Zl zC�rc 4iials) Coordinator Review: Date e2�t4 (initials) 02/12/2020 Page 1 of 2 Summary of Violations Violator: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID: 0400043 Letter Date(s): 05/11/2017 Violation(s): County: Anson Letter Type: NOD-report Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 08/26/2016 Violation(s): County: Anson Letter Type: FYI/Facilities Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 09/30/2009 Violation(s): County: Anson Letter Type: FYI/Facilities Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 12/21/2005 Violation(s): 2D .0524 New Source Performance Standards County: Anson Letter Type: NOV Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 09/06/2005 Violation(s): Permit Late Report (excluding ACC) County: Anson Letter Type: NOV Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 05/10/2005 Violation(s): County: Anson Letter Type: FYI/Facilities Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 03/09/2005 Violation(s): County: Anson Letter Type: FYI/Facilities Case#: Date Assessed: Amount Assessed: 02/12/2020 Page 2 of 2 ' Summary of Violations Violator: Triangle Brick Company - Wadesboro Brick Manufacturing Plant Facility ID: 0400043 Case Closed: Total Amount Paid: $0.00 Letter Date(s). 09/22/2004 Violation(s): County: Anson Letter Type: FYI/Facilities Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 09/25/2002 Violation(s): 2D .0524 New Source Performance Standards County: Anson Letter Type: NOV Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 08/13/2002 Violation(s): County: Anson Letter Type: FYI/Facilities Case #: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 06/17/2002 Violation(s): Permit Condition(s) late report County: Anson Letter Type: NOV Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 i a4wo 4-3 Triangle INNOVATIVE PRODUCTS. EXCEPTIONAL SERVICE B n c k North Carolina Department of Environmental Quality Fayetteville Regional Office Division of Air Quality 225 Green Street-Suite 714 NC Dept of Environmental Quality Fayetteville, North Carolina 28301-5043 Attention: Father Carter FEB 4 2020 Regional Air Quality Supervisor Raleigh Rea1onal Q8- t-WED Re: 2019 Annual Compliance Report RE Triangle Brick Company—Wadesboro Wadesboro, forth Carolina FEB 10 2020 Dear ills.Carter: M-O.FAYETTEVILLE REGIONAL OFFICE Enclosed please find the annual compliance report for our Wadesboro facility due on January 3C, 2020. Attachment 1 includes the statement of certification from the Responsible Official and details the annual requirements of the Title V permit and the facility's method of compliance. Attachment 2 includes the Bypass Damper Position Report. Attachment 3 presents the calculation of facility-wide emissions o; Hazardous Air Poilutants which presents the monthly and 12-month rolling totals for the reporting period. This report is for Title V Permit No. 08179T11,for the reporting period of January 1, 2019 through December 31, 2019. it is our belief that the attached information meets the reporting requirements as specified in our air permit. However,should you require additional information, please do not hesitated to contact me at (919)544-1796. Sincereiy, TRiANGLE BRICK COMPANY � JSTAG E PAID Howard P. Brown,Jr. Job ETTA,TX \ }/[�� AMOU9IST 0 President i7C CEO I VN17ED SERVES Pto `49OST4L SFAVECEC 1004 $14. 15 27699 R2305E125953-07 cc: Beverly A. Spagg—US EPA Region 4 UNI7 cc: Ricky Merritt—Triangle Brick Company POST, cc: David Gibson—Triangle Brick Cc-mpany 6523 NC HWY 55 Phone: 800.672.8547 DURHAM, NC 27713 Fax: 800.849.0612 trianglebrick.com Attachment I Annual Compliance Report North Carolina Department of Environmental Quality Division of Air Quality(DAQ) Title V Annual Compliance Certification Forms(1) Facility Name: Triangle Brick Company Facility Location: US Highway 52, Wadesboro,NC 28170 Facility ID Number: 0400043 (Refer to first page of Title V Permit) Title V Permit Number: 08179T1 l (Refer to first page of Title V Permit) Start of Reporting Period: January 1,2019 (Month, Day, Year) End of Reporting Period: December 31 2019 (Month, Day, Year) Compliance Statement (Check only one of the following options) X During the reporting period specified above, this facility was in compliance with all terms and conditions identified in the above referenced Title V Operating Permit. As such, there were no deviations(2), excess emissions events, or other reportable incidents including those attributable to equipment malfunctions, breakdown, or upset conditions (please fill out the Compliance Summary Report). During the reporting period specified above, this facility was in compliance with ALL terms and conditions identified in the above referenced Title V Operating Permit, EXCEPT for the deviations(2) identified in the Deviation Summary Report (please fill out both the Compliance Summary Report and Deviation Summary Report). Does the above compliance statement differ from what is indicated on your most recent Title V Report (i.e. last Semi-Annual Monitoring Report, Annual Emissions Inventory, etc)? Yes CKD Are you submitting this Annual Compliance Certification form to also fulfill a Ti Semi-Annual Monitoring reporting requirement? If so, this certification must be submitted by January 30. Yes No Certification By Responsible Official Based on information and belief formed after reasonable inquiry, the undersigned certifies under penalty of law (federal rule 40 CFR 70.5(d)) that all information and statements provided in this form (including any attachments) are true, accurate, and complete. Z� d�' A (Signature of Responsible Official) (Date) Name: (Type or Print) Number of Pages Attached 23 'A+: €G�RII?ifCiQ�ICIioRiAtf-,.u-=agr:aa�pa�.cD�af[:€i:=1�f 4'Jll1L:u:.rC,�,Sg:€t'{uF�}1.l.�t�lI..XGfi€i..i 2Q� ita1Q. :zsti S�ctr.3-CIEr�trsz;C,?rtfu�nP�fL Ts 'G =' SP� cac A Cav_r tfi��rrAt is0e W hatu d to bA*da?onh Cmdsra DW Qwtd At i�.&EPA W andEPCIA E)pWej=mr Braw.EPA,.mac t,61 Fom Smg Admstq G4 _V30-*. Ae wba imd dais jbr dis ACC a sp r#Ud st_Set'rart s-rmnlra CO)dSM P Qe34_v Tact I-pvvi, Far elf p.*pawsOfth:'sfi3k rharsrf-Idsowrion'meansarVacs;warcarryrrsm"awr;r►aradameiv_�&rhero-►-sand :andir s of rile rT;o V Operavng da-r.K )Peluz ng rhtese artrbaable ra itki O'A?!ft T Ify! rr0.'t bvaWa m aruparr :arts,vmjandfcrsxmss a+rssions @.vftts vgujmrA"rsis mar �acaso.^a;an atlrsas?ed o er of a r aksr on fix*wr,favI&OV ra.War±any a.-d aV de VVt'DM.n%Vy C4 rstatuts a vxalar an caf Me title V0pen .ngr%.nr.,r and rlle standord Fcrrrov ofarrratvm dxwrda►•la^tiarrs#aasarv6rrorhe D,j,Q rra.R'Q"aldrvr QUr•!turr4t Lhe t/'Of±!t!L+a<r of das'.�ar=An fa,+retie V nrpaz',A o an Lho CKC2 rrsb rae hsrp;f;`drri.nt.gtrz-Fab,ou tJd�v:sans°a_�t��+a��ry!s�s�g�ol�ty-a.��rrarr�n L�c�ega�_ss=onrday.�at�ans-rra'feinrtsarr- d+rsr~r.�nar=arts). Revision 3.0 Page: 1 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Permit Control Device Maintained.,� Determining Comments Description ID Number(s) Condition (Yes/No) (yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number Brick Tunnel Kiln& PM limit,calculated Dry Limestone K-1 &CD-K1, 2 1 A 1(a) using process weight No N/A No Testing,as required Absorber(DLA) K-2&CD-K2 rate[2D.0515(a)] Brick Tunnel Kiln& K-1 &CD-KL PM Testing 2D.0501(c)(3)and No emissions testing required during 2.l.A.1(b) Requirements No Yes No DLA K-2&CD-K2 General Condition JJ. the reporting period. 2D.0501 c 3 Semi-annual inspections (emissions ductwork The facility conducts Brick Tunnel Kiln& K-I &CD-KI, the required DLA K-2&CD-K2 2.1.A.I(c) and fuel combustion No Yes No inspections semi- system). annually. [2D.0508(f)] Maintain a log of Maintain inspection Brick Tunnel Kiln& K-1 &CD-K1, semi-annual logs with all required DLA K-2&CD-K2 2.1.A.I(d) inspections. No Yes No 'information including Logs contain all required information. i [2D.0508(t)] date,time,and results of each inspection. Submit semi-annual Submission of Brick Tunnel Kiln& K-1 &CD-K1, summary reports of semiannual inspection Inspections were performed DLA K-2&CD-K2 2.LA.I(e) semiannual No Yes No report to DAQ by semiannually as required and records inspections. reporting date. were maintained. Brick Tunnel Kiln& K-1 &CD-K1, SO2 Limit,2.3 DLA K-2&CD-K2 2.I.A.2(a) lb/mmbtu No N/A No Testing,as required. 2D.0516 a Page: 2 of 23 North Carolina Department of Environmental Quality _ Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device permit Maintained? issue? Determining Comments Description ID Number(s) Condition (Yes/No) (yes/No/NA) Compliance Status Condition Summary (Yes/No) Number Brick Tunnel Kiln& K-1 &CD-K1, SOZ Testing 2D.0501(c)(4)and Emissions testing was not required 2.I.A.2(b) Requirements No Yes No DLA K-2&CD-K2 General Condition JJ. during the reporting period. 2D.0501 c 4 Brick Tunnel Kiln& K-1 &CD-K1, No Monitoring or No monitoring or recordkeeping DLA K-2&CD-K2 2.1.A.2(c) Recordkeeping No N/A No N/A required when firing natural gas or 2D.0508 t No.2 fuel oil. 216 burners Brick Tunnel Kiln& K-1 &CD-K1, maximum allowable No No.6 fuel oil was tired during DLA K-2&CD-K2 2' .A.2(d) fired with No.6 Fuel No Yes No N/A this reporting period Oil(FO) Sulfur in No.6 FO FO supplier There were no No.6 fuel oil Brick Tunnel Kiln& K-1 &CD-K1, No Yes No not to exceed 2.1% certifications are DLA K-2&CD-K2 2.I.A.2(e) by weight. maintained per shipments received during the 2D.0508 t shipment. reporting period. FO certifications and FO supplier There were no No.6 fuel oil Brick Tunnel Kiln& K-1 &CD-K1, fuel records log, No Yes No certifications are DLA K-2&CD-K2 2.1.A.2(f) updated quarterly. maintained per shipments received during the [2D.0508(t)] shipment. reporting period. SO2 Emissions Semi-annual All monitoring and record keeping Brick Tunnel Kiln& K-1 &CD-Kl, Reporting monitoring and recordrequirements were met during this 2.I.A.2(g) Requirements No Yes No keeping summary DLA K-2&CD-K2 reporting period and no deviations [2Q.0508(f)] report turned into were reported. DA Page: 3 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device Maintained? Determining Comments Description ID Number(s) Permit Condition (Yes/No) (Yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number Opacity<20%based *6-min avg.periods may exceed 200% Monthly observation opacity if.(1)no 6-min period>87/o Brick Tunnel Kiln& K-1 &CD-K1. on a 6-minute avg for any visible opacity;(2)no more than I—6-min 2.1.A.3(a) *(See more detail in No N/A No DLA K-2&CD-K2 emissions above period>20%opacity in I hour;&(3) Comment column) [2D.052 Comment 1 o normal. no more than 4—6-min periods> 20%opacity in 24 hrs Brick Tunnel Kiln& K-1 &CD-K1, Opacity Testing2 1.A.3(b) Requirements No Yes No 2D.0501(c)8)and Emissions testing was not required DLA K-2&CD-K2 General Condition JJ. during the reporting period. 2D.0501 c 8 Opacity Monitoring Take and record Visible emissions observations made Brick Tunnel Kiln& K-I &CD-K 1, Requirements monthly observationevery month during the reporting 2.1.A.3(c) [2D.0508(f)] No Yes No for any visible DLA K-2&CD-K2 period.No observations above emissions above normal. normal. Opacity Maintain log 'sing Req Brick Tunnel Kiln& K-1 &CD-Kl, Recordkeep including date,time, DLA K-2&CD-K2 2.LA.3(d) [2Q.0508(f)] No Yes No results and corrective Logs contain all required information. action if necessary. Opacity Reporting Visible emissions observations made Brick Tunnel Kiln& K-1 &CD-Kl, Requirements Semi-annual opacity every month during the reporting 2.1.A.3(e) [2Q.0508(f)] No Yes No summary report DLA K-2&CD-K2 period.No observations of opacity submitted to DAQ. above normal during this period. L Page:4 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Terms and Conditions Was Deviation a Source or Records Method(s)of Emission Source Deviations? non-compliance Control Device Permit Maintained? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) issue.? Compliance Status Condition Summary (Yes/No) Number < 10 tons per year of each HAP,and<25 Compliance is required to remain a Testing,as required. tons per year of all Operate DLAs as minor source for hazardous air Brick Tunnel Kiln& K-1 &CD-K1, HAPs combined pollutants and avoid 15A NCAC DLA K-2&CD-K2 2.LAA(a) [2Q 0317] No N/A No required.Calculate 02D.1111:Maximum Achievable Emissions from production rates. Control Technology.Emission calculations attached. HAP Testing Requirements [2D.1 1111 Brick Tunnel Kiln& K-1 &CD-K1, 2 1.A.4(b) No N/A No Testing,as required. Emissions testing was not required DLA K-2&CD-K2 during the reporting period. Operate DLAs at all Exceptions during periods of startup, times when the Kilns Maintain records of Brick Tunnel Kiln& K-( &CD-K1, shutdown,or malfunction or during DLA K-2&CD-K2 2.LAA(c) are operational No Yes No operating time and operation in bypass mode for routine [2Q.0508(t)] down time. maintenance of the DLAs. Monitor amount of Maintain daily log Brick Tunnel Kiln& K-1 &CD-K1, limestone in verifying limestone DLA K-2&CD-K2 2.LAA(d) limestone hopper, No Yes No hopper and storage Logs contain all required information. storage bins,and bin DLAs. Use same grade of Maintain records of Brick Tunnel Kiln& K-1 &CD-KL limestone used 2.1.A.4(e) No Yes No source and grade of Logs contain all required information. DLA K-2&CD-K2 during performance limestone used. test. .0508 Page: 5 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? non-compliance Description Control Device Permit (Yes/No) Maintained? issue? Determining Comments ? ID Number(s) Condition Condition (Yes/No/NA) (Yes/No) Compliance Status Number Summary Maintain limestone feeder setting as Maintain daily log of DLA K-2&CD-K2 Brick Tunnel Kiln& K-1 &CD-K 2 1 A 4(t) DLA consistent with No Yes No limestone feeder Logs contain all required information. performance test. settings Ensure limestone feed system on DLAs replaces limestone as Maintain log of Brick Tunnel Kiln& K-1 &CD-KL frequently as the monthly check of DLA K-2&CD-KZ 2.1.A.4(g) q y No Yes No limestone feed Logs contain all required information. schedule set during performance test system. [.0508(f)] Secure the bypass Monitor damper damper in closed and position daily;if lock locked position. has been broken or Monitor the bypass Bypass Damper Position Report Brick Tunnel Kiln& K-1 &CD-K1, No Yes No damper position has Attached.Damper was closed and 2.1.A.4(h) damper position chap p DLA K-2&CD-K2 p p changed monitor and ' [.0508(f)] record damper locked for the entire reporting period. position every 15 mins. Records of times in Maintain records of which DLA bypassed each period in which Bypass Damper Position Report Brick Tunnel Kiln& K-1 &CD-K1, for maintenance the large tunnel kilns Attached.Kilns were not operated in No Yes No DLA K-2&CD-K2 2.1.A.4(i) [2Q.0508(f)] operate while bypass mode during the reporting bypassing the DLAs period. for maintenance. Page: 6 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Permit Control Device Maintained? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number Records of times in Maintain records of which DLA bypassed each period in which for startup,Brick Tunnel Kiln& K-1 &CD-K 1, shutdown or the large tunnel kilns Bypass Damper Position Report 2.1.A.40) No Yes No operate while Attached. DLA K-2&CD-K2 malfunction [2Q.0508(f)] bypassing the DLAs for startup,shutdown, or malfunction. Maintain records of production rates on Maintain log of Brick Tunnel Kiln& K-1 &CD-K1, fired-product basis production rates on P Logs contain all required information DLA K-2&CD-K2 2.I.A.4(k) and estimate HAP No Yes No fired-product basis and HAP emissions emissions and estimate HAP [2Q.0508(f)] emissions. Maintain records of Brick Tunnel Kiln& K-1 &CD-K1, 2.1.A.4(1 applicability No Yes No Maintain applicability Applicability determination kept on ) DLA K-2&CD-K2 determination determination on site site [20.0508(t)] Semi-annual report of monitoring and Semi-annual recordkeeping monitoring and Semiannual monitoring and Brick Tunnel Kiln& K-1 &CD-K1, recordkeeping summary report for 2.LAA(m) activities 2.LAA(b) No Yes No recordkeeping DLA K-2&CD-K2 through 1 July 12,2018 through December 3 1, g O summary report [2Q.0508(f)] submitted to DAQ. 2019 attached. Page: 7 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Terms and Conditions Was Deviation a Source or Records Method(s)of Emission Source Deviations? non-compliance Control Device Maintained? Determining Comments Description ID Number(s) Permit Condition (Yes/No) (Yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number SOz Limit,2.3 lb/mmbtu Emissions testing was not required Rotary Coatings Dryer SD-1 2.1.B.1(a) No N/A No Testing,if required during the reporting period. S02 Testing Rotary Coatings Dryer SD-1 2.1.B.1(b) Requirements No Yes No 2D.0501(c)(4)and Emissions testing was not required General Condition JJ. during the reporting period. 2D.0501 c 4 No Monitoring or No monitoring or recordkeeping Rotary Coatings Dryer SD-1 2.1.B.1(c) Recordkeeping No N/A No N/A required when firing natural gas. 2D.0508 f General compliance Rotary Coatings Dryer SD-1 2.1.B.2(a) statement No N/A No 2 .0508 Dryers PM limit, 0.057 g/dscm; 10% Emissions testing was not required Rotary Coatings Dryer SD-1 2.1.B.2(b) Opacity [40 CFR No N/A No Testing,as required. during the reporting period. 60.732 The opacity standards of this part Opacity standards set forth in this do not apply during �I part apply at all times except during Rotary Coatings Dryer SD-1 2.1.13.2(c) periods of startup, No N/A No II shutdown,or periods of startup,shutdown,or malfunction malfunction. 60.11 c Page: 8 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device Maintained? Determining Comments Description 1D Number(s) Permit Condition (Yes/No) (Yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number Maintain&operate Acceptable O&M is in a manner based on monitoring consistent with good results,opacity Rotary Coatings Dryer SD-1 2.1.B.2(d) air pollution control No N/A No observations,review practices for of maintenance and minimizing operating procedures, emissions. [60.11(d)] and source inspection. Opacity and Visible Initial compliance or The facility has demonstrated initial Rotary Coatings Dryer SD-1 2.1.13.2(e) Fugitive Emissions No N/A No When subsequent compliance and there was no Testing additional testing is additional testing during the reporting 2D.0501 c 3 required. period. Use Accepted Reference Methods Reference methods& No testing required during this Rotary Coatings Dryer SD-1 2.1.B.2(f) &Procedures for No N/A No procedures are reporting period.No above normal dailyobservations. documented. observations. 60.8 b Periodic inspection Conduct inspectionAt a minimum,the facility conducts and maintenance by Rotary Coatings Dryer SD-1 2.1.B.2(g) and maintenance. No Yes No the required inspections semi- recommended [60.732(a)(1)] procedures. annually. Maintain records of Maintain records and all monitoring results of observations observations No testing required during this Rotary Coatings Dryer SD-1 2.I.B.2(h) inspections,and No Yes No inspections,and reporting period maintenance. maintenance in logs 2 .0508 on-site. �I Page: 9 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Terms and Conditions Was Deviation a Source or Records Method(s)of Emission Source Deviations? non-compliance Control Device Permit Maintained? issue? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) Compliance Status Condition Summary (Yes/No) Number Retain records for at Records are retained for at least 5 Rotary Coatings Dryer SD-1 2.1.B.2(i) Retain records for 5 No Yes No least 5 years in years in electronic or hardcopy years. electronic or format. hardco format. Summary Reports of Semi-annual Inspections were conducted and logs inspection and summary Reports of maintained during reporting period. Rotary Coatings Dryer SD-1 2.1.B.20) maintenance No Yes No inspection and No performace testing was required activities [2Q.hies)] maintenance activities during this period. Maintain opacity log Opacity and visible observer Triangle Brick maintains records Rotary Coatings Dryer SD-1 2.1.B.2(k) Recordkeeping Req's No Yes No emission certifs.and including the visible emission [2Q.0508(f)] make available upon observer certification. request by DAQ. Notifications for re- Referenced Rotary Coatings Dryer SD-1 2,1.B.2(l) construction and No Yes No notifications are No notifications required during this initial startup. [60.7 made,as required. reporting period &60.15] See applicable Env.Management provisions, The facility complies with all Commission NSPS notifications,testing, Scalp screens,jaw requirements promulgated in 40 CFR PC-3 to PC-10 2.1.C.1(a) Standard[2D.0524 No Yes No reporting, crushers.&conveyors &NSPS Subpart recordkeeping and 60.670,Subpart 000,including Subpart A"General Provisions". 000] monitoring re uirements. Page: 10 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device Permit Maintained? issue? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) Compliance Status Condition Summary (Yes/No) Number Monthly observation 7 Opacity<10% for any visible There were no monthly visible 4 Scalp screens,jaw PC-3, , 8, 2.1.C.1(b) [40 CFR 60.672 No N/A No emissions observations above normal crushers,&conveyors and 9 emissions above (b),(c)&(e)] during the reporting period. normal. Monthly observation There were no monthly visible Scalp screens.jaw PC-5&PC-6 2.1.C.1(b) Opacity<15% No N/A No for any visible emissions observations above normal crushers,&conveyors [40 CFR 60.672(c)] emissions above during the reporting period. normal. Monthly observation Opacity<7%for There were no monthly visible Scalp screens,jaw PC-10 2.1.C.1(b) building openings No N/A No for any visible emissions observations above normal crushers,&conveyors [40 CFR 60.672(e)] emissions above during the reporting period. normal. Maintain&operate in a manner consistent with good Opacity standards set forth in this Scalp screens,jaw part apply at all times except during PC-3 to PC-10 2.1.C.1(c) air pollution control crushers.&conveyors practices for periods of startup,shutdown,or malfunction minimizing emissions. [60.11(c)] Maintain&operate Acceptable O&M is in a manner based on monitoring consistent with good results,opacity Scalp screens,jaw PC-3 to PC-10 2.1.C.1(d) air pollution control No Yes No observations,review crushers,&conveyors practices for of maintenance and minimizing operating procedures, emissions. [60.11(d)] and source inspection. Page: 11 of 23 North Carolina Department of Environmental Quality Division of Air Quality ' COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Terms and Conditions Was Deviation a Source or Records Method(s)of Emission Source Deviations? non-compliance Control Device Maintained? Determining Comments Description ID Number(s) permit Condition (Yes/No) (Yes/No/NA) issue. Compliance Status Condition Summary (Yes/No) Number Opacity and Visible Initial compliance or The facility has demonstrated initial Scalp screens,jaw when subsequent compliance and there was no PC-3 to PC- 2.I.C.l(e) Fugitive Emissions No Yes No crushers,&conveyors Testing[2Q.0508(f)] additional testing is additional testing during the reporting required. period. Observe fugitive Complete visible Scalp screens,jaw PC-3 to PC- 2.1.C.1(1) emissions monthly No Yes No fugitive emission Visible emissions observations were crushers,&conveyors [40 CFR 60.674, observation logs are conducted monthly as required. 2 .0508 t maintained on-site. Reestablishing Reestablishing normal visible Reestablishing normal visible Scalp screens,jaw normal visbie crushers,&conveyors PC-3 to PC-10 2.1.C.1(g) emission levels emissions by emissions was not required during [213.0524] observing each week this reporting period. for 30 days. Maintain a complete opacity Scalp screens,jaw log of op Complete opacity log crushers,&conveyors PC-3 to PC-10 2.1.C.I(h) observations. No Yes No is maintained. Logs contain all required information. [2D.0508(t)] Monthly Visible emissions observations were observations of Complete visible conducted monthly as required.No Scalp screens,jaw PC-3 to PC- 2.1.C.I(i) visible emissions,do No Yes No emission observation visible emissions above normal were crushers,&conveyors Method 9 if above log is maintained. observed.No changes made to the normal. existing facilities. See applicable Env.Management provisions, The facility complies with all Clay Grinding Plant& Commission NSPS notifications,testing, Associated CG-2 to CG-8 2.1.D.1(a) Standard[2D.0524 No Yes No reporting, requirements promulgated in 40 CFR CG-10 to CF-28 60.670, Subpart 000,including Conveyances &NSPS Subpart recordkeeping and Subpart A"General Provisions". 000] monitoring re uirements. Page: 12 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? non-compliance Description Control Device Permit (Yes/No) Maintained? issue? Determining Comments ID Number(s) Condition Condition (Yes/No/NA) (Yes/No) Compliance Status Number Summary Clay Grinding Plant& CG-2 to CG-8 Opacity<7%for for any visible Monthly observation There were no monthly visible Associated 2.1.D.1(b) building openings No N/A No emissions observations above normal Conveyances CG-10 to CF-28 [40 CFR 60.672(e)] emissions above p g duringthe reporting period. normal. Opacity standards set forth in this Clay Grinding Plant& requirement apply at Opacity standards set forth in this Associated CG-2 to CG-8 2.l.D.1(c) No N/A No all times except part apply at all times except during Conveyances CG-10 to CF-28 during periods of periods of startup,shutdown,or startup,shutdown,or malfunction malfunction 60.11 c Maintain&operate Acceptable O&M is in a manner based on monitoring Clay Grinding Plant& CG-2 to CG-8 consistent with good results,opacity Associated CG-10 to CF-28 2.1.D.1(d) air pollution control No Yes No observations,review it Conveyances practices for of maintenance and minimizing operating procedures, emissions. [60.11(d)] and source inspection. Clay Grinding Plant& Opacity and Visible Initial compliance or The facility has demonstrated initial Associated CG-2 to CG-8 2 l D.1(e) Fugitive Emissions No Yes No When subsequent compliance and there was no CG-10 to CF-28 additional testing is additional testing during the reporting Conveyances Testing[2Q.0508(f)] required. period. Clay Grinding Plant& Observe fugitive Complete visible CG-2 to CG-8 emissions monthly fugitive emission Visible emissions observations were Associated CG-10 to CF-28 2.1.D.I(f) [40 CFR 60.674, No Yes No observation logs are conducted monthly as required. Conveyances 2 .0508 maintained on-site. Page: 13 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device Permit Maintained? issue? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) Compliance Status Condition Summary (Yes/No) Number Reestablishing Reestablishing Clay Grinding Plant& CG-2 to CG-8 normal visible Reestablishing normal visible CG-10 to CF-28 emission levels Associated 2.1.D.1(g) normal visble No N/A No emissions by emissions was not required during Conveyances [2D.0524] observing each week this reporting period. for 30 days. Summary Reporting Semi-annual All monitoring and record keeping Clay Grinding Plant& Requirements monitoring and record requirements were met and no Associated C -1 to CF-8 ( 2.1.D.1 h CG-10 to C -28 ) [2Q.0508(f)] No Yes No keeping summary deviations were observed.No Conveyances report turned into changes have been made at any of the DA . exisiting facilites. See applicable Env.Management provisions, The facility complies with all Loam/Sawdust Commission NSPS notifications,testing, Preparation Area& LS-2 to LS-12 2.LE.1(a) Standard[2D.0524 No Yes No reporting, requirements promulgated CFR Assoc.Conveyances &NSPS Subpart recordkeeping and 60.670,Subpart 000,including Subpart A"General Provisions". 000] monitoring re uirements. Loam/Sawdust Opacity<7%for Monthly observationThere were no monthly visible Preparation Area& LS-2 to LS-12 2.1.E.I(b) building openings No N/A No for any visible emissions observations above normal emissions above duringthe reportingperiod. Assoc.Conveyances [40 CFR 60.67�(e)] normal. Opacity standards set forth in this Loam/Sawdust requirement apply at Opacity standards set forth in this all times except part apply at all times except during Preparation Area& LS-2 to LS-12 2.1.E.1(c) No N/A No Assoc.Convevances during periods of periods of startup,shutdown,or startup,shutdown,or malfunction malfunction 60.11 c J i Page: 14 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Description Permit (Yes/No) issue? Control Device Maintained? Determining Comments ID Number(s) Condition Condition (Yes/No/NA) (Yes/No) Compliance Status Number Summary Maintain&operate Acceptable O&M is in a manner based on monitoring Loam/Sawdust consistent with good results,opacity Preparation Area& LS-2 to LS-12 2.I.E.I(d) air pollution control No Yes No observations,review Assoc.Conveyances practices for of maintenance and minimizing operating procedures, emissions. [60.11(d)] and source inspection. Initial compliance or The facility has demonstrated initial Loam/Sawdust Opacity and Visible when subsequent compliance and there was no Preparation Area& LS-2 to LS-12 2.I.E.I(e) Fugitive Emissions No Yes No additional testing is additional testing during the reporting Assoc.Conveyances Testing[2Q.0508(f)] required. period. Observe fugitive Complete visible Loam/Sawdust emissions monthly fugitive emission Visible emissions observations were Preparation Area& LS-2 to LS-12 2.I.E.I(1) [40 CFR 60.674, No Yes No observation logs are conducted monthly as required. Assoc.Conveyances 2 .0508 maintained on-site. Reestablishing Reestablishing Loam/+A127:13131 Saw normal visble normal visible Reestablishing normal visible dust Preparation Area LS-2 to LS-12 2.I.E.1(g) emission levels emissions by emissions was not required during &Assoc.Conveyances [2D.0524] observing each week this reporting period. for 30 days. Summary Reporting Semi-annual All monitoring and record keeping Sencondary Clay CG-30 thru CG- Requirements monitoring and record requirements were met and no Grinding Plant& 55 2.I.E.I(h) [2Q.0508(f)] No Yes No keeping summary deviations were observed.No Assoc.Conveyances report turned into changes have been made at any of the DA . exisiting facilites. I J Page: 15 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device Permit Maintained? issue? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) Compliance Status Condition Summary (Yes/No) Number See applicable Env.Management provisions, The facility complies with all Sencondary Clay Commission NSPS notifications,testing, Grinding Plant& CG-30 thru CG- 2 1.F.1(a) Standard[2D.0524 No Yes No reporting, requirements promulgated in 40 CFR Assoc.Conveyances �5 &NSPS Subpart recordkeeping and 60.670,Subpart 000,including Subpart A "General Provisions". 000] monitoring re uirements. Sencondary Clay Opacity<7%for Monthly observationThere were no monthly visible Grinding Plant& CG-30 thru CG- 2 L 55 emissions above F.1(b) building openings No N/A No for any visible emissions observations above normal Assoc.Conveyances [40 CFR 60.672(e)] during the reporting period. normal. Opacity standards set forth in this Sencondary Clay requirement apply at Opacity standards set forth in this Grinding Plant& CG-30 thru CG- 2.1.F.1(c) No N/A No all times except part apply at all times except during Assoc.Conveyances 55 during periods of periods of startup,shutdown,or � startup,shutdown,or malfunction malfunction 60.11 c Maintain&operate Acceptable O&M is in a manner based on monitoring Sencondary Clay consistent with good results,opacity Grinding Plant& CG-3055ru CG- 2 1.F.1(d) air pollution control No Yes No observations,review Assoc.Conveyances practices for of maintenance and minimizing operating procedures, emissions. [60.11(d)] and source inspection. Page: 16 of 23 North Carolina Department of Environmental Quality Division of Air Quality ' COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Control Device Permit Maintained? Determining Comments Description ID Number(s) Condition (Yes/No) (Yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number Sencondary Clay Opacity and Visible Initial compliance or The facility has demonstrated initial Grinding Plant& CG-30 thru CG- 2 1.F.1(e) Fugitive Emissions No Yes No when subsequent compliance and there was no 55 additional testing is additional performance testing during Assoc.Conveyances Testing[2Q.0508(f)] required. the reporting eriod. Sencondary Clay Observe fugitive Complete visible CG-30 thru CG- emissions monthly fugitive emission Visible emissions observations were Grinding Plant& 55 2.1.F.1(0 [40 CFR 60.674, No Yes No observation logs are conducted monthly as required. Assoc.Conveyances 2 .0508 f maintained on-site. Reestablishing eestablishing Sencondary Clay CG-30 thru CG- normal visible Reestablishing normal visible Grinding Plant& 55 2.1.F.1(g) normal visble emission levels No N/A No emissions by emissions was not required during Assoc.Conveyances [2D.0524] observing each week this reporting period. for 30 days. Summary Reporting Semi-annual All monitoring and record keeping Sencondary Clay CG-' t Requirements monitoring and record requirements were met and no Grinding5 CG- 2 1 O F.Plant& 55 [2Q•0508(1)] No Yes No keeping summary deviations were observed.No Assoc.Conveyances report turned into changes have been made at any of the DA . exisiting facilites. Odorous emissions Implementing Facility All 2.2.A.I(a) must be controlled No Yes No management practices No objectionable odors beyond [2D.1806] or operating odor facility boundary. control equipment. Maximum feasible odor controls if No objectionable odors beyond Facility All 2.2.A.1(b) determined to have No N/A No N/A facility boundary were reported objectionable odor. during this reporting period. 2D.1806 Page: 17 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Description Control Device Permit (Yes/No) Maintained? issue? Determining Comments ID Number(s) Condition Condition (Yes/No/NA) (Yes/No) Compliance Status Number Summary Toxic Air Pollutants Facility is operated (TAPS)from facility and maintained to Brick Tunnel Kilns K-1 &K-2 2.2.A.2(a) not to exceed No Yes No keep actual emissions emission limit below emission limit. Maximum of 58.000 lbs of clay brick and Maintain production Records were maintained for the kilns Brick Tunnel Kilns K-1 &K-2 2.2.A.2(b) additives processed No Yes No records to be reported and submitted quarterly. per hour per kiln. semiannualy. 2D.0611 Maintain records of production rates, Records maintained Records are retained for at least 3 Brick Tunnel Kilns K-1 &K-2 2.2.A.2(c) throughputs,& No Yes No on-site for three years in electronic or hardcopy material usages. years. format. 2D.1100 DAQ has right to sample/analyze clay Brick Tunnel Kilns K-1 &K-2 2.2.A.2(d) &shales for No N/A No N/A hydrogen fluroide (HF)concentration. 2D.1100 Notify DAQ within 30 days of startup of Notifications are No new source of clay during this Brick Tunnel Kilns K-1 &K-2 2.2.A.2(e) use of any clay for No Yes No maintained on-site. reporting period. HF concentration. [2D.1100] a Page: 18 of 23 North Carolina Department of Environmental Quality Division of Air Quality ' COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records Was Deviation a Method(s)of Emission Source Deviations? ? non-compliance Control Device Maintained. Determining Comments Description ID Number(s) Permit Condition (Yes/No) (Yes/No/NA) issue? Compliance Status Condition Summary (Yes/No) Number Notify of new source Notifications are of clay or additives made with in 30 days Brick Tunnel Kilns K-1 &K-2 2.2.A.2(f) and provide No Yes No and results submitted No new source of supplies. analytical results of with in 30 days of HF. [213.1100] new source. All monitoring and record keeping Semi-annual Semi-annual requirements were met and no summary report of summary report of deviations were observed.Quarterly Brick Tunnel Kilns K-1 &K-2 2.2.A.2(g) monitoring and No Yes No monitoring and record reports showing maximum amount of record keeping keeping activities materials processed per hour have activities. [2D.0611] turned into DAQ. been submitted on a timely basis during this reporting period. Toxic Air Pollutants (TAPS)from facility Facility is operated not to exceed Toxic and maintained to Facility All 2.2.A.3(a) Permit Emission No Yes No keep actual emissions Rates(TPERs)for <TPERs for each of listed pollutants the listed pollutants. S02 limited to 250 Facility-wide S02 The K-1 SO.,emissions did not tons per consecutive emissions are Brick Tunnel Kiln K-1 2.2.B.1(a) 12-month period. No Yes No maintained monthly exceed 250 tpy during the reporting [2D.0530(g)] in a spreadsheet. period. Limits:920,000 gal/yr of No.6 FO; o Monthly records are Brick Tunnel Kiln K-1 2.2.B.1(b) 2.1/o SO2 by wt; No Yes No maintained on-site. 58,000 lb/hr production Page: 19 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Description Control Device Permit (Yes/No) Maintained? issue? Determining Comments ID Number(s) Condition Condition (Yes/No/NA) (Yes/No) Compliance Status Number Summary SO2 Testing Brick Tunnel Kiln K-1 2.2.B.1(c) Requirements No N/A No 2D.0501(c)(4)and Emissions testing was not required General Condition JJ. during the reporting period. 2D.0501 c 4 Maintain monthly records.including Monthly records are Brick Tunnel Kiln K-1 2.2.B.1(d) No Yes No fuel certification. maintained in a log. 2 .0508 Calculate and record Facility-wide SOZ SO2 emission logs, monthly emissions Records are retained for at least 5 Brick Tunnel Kiln K-1 2.2.B.1(e) available for 5 years. No Yes No spreadsheets are years in electronic or hardcopy [2Q.0508(1)] maintained for 5 format. years. Submit SO2 reports Submission of within 30 days after semiannual SO, Triangle Brick submitted quarterly Brick Tunnel Kiln K-1 2.2.B.I(f) each calendar No Yes No report to DAQ by reports during the reporting period. quarter. reporting date. 2 .0508 SO2 limited to 250 Facility-wide SO, tons per consecutive emissions are K-2's SO2 emissions did not exceed Brick Tunnel Kiln K-2 2.2.C.1(a) No Yes No 12-month period. maintained monthly 250 tpy during the reporting period. [2D.0530(g)] in a spreadsheet. SOZ Testing Brick Tunnel Kiln K-2 2.2.C.I(b) Requirements No N/A No 2D.OSOI(c)(4)and Emissions testing was not required General Condition JJ. during the reporting period. 2D.0501c4) Page: 20 of 23 North Carolina Department of Environmental Quality Division of Air Quality ` COMPLIANCE SUMMARY REPORT For Calendar Year 2019 Source or Terms and Conditions Records was Deviation a Method(s)of Emission Source Deviations? non-compliance Description Control Device Permit (Yes/No) Maintained? issue'. Determining Comments ID Number(s) Condition Condition (Yes/No/NA) (Yes/No) Compliance Status Number Summary Maintain monthly records of amount of fuel used sulfur Monthly records are Brick Tunnel Kiln K-2 2.2.C.1(c) No Yes No content,&fuel maintained in a log. certification. 2 .0508 Maintain monthly Facility-wide SO, records of SO2 monthly emissions Records are retained for at least 5 Brick Tunnel Kiln K-2 2.2.C.I(d) emissions in a No Yes No spreadsheets are years in electronic or hardcopy logbook. maintained for 5 format. [2D.05301 years. Submit semiannual summary reports of Submission of monthly SO2 semiannual SO, Triangle Brick submitted quarterly Brick Tunnel Kiln K-2 2.2.C.1(e) emissions&monthly No Yes No report to DAQ by reports during the reporting period. quantities of natural reporting date. gas. Revision 3.0 Page: 21 of 23 North Carolina Department of Environmental Quality Division of Air Quality DEVIATION SUMMARY REPORT For Calendar Year 2019 Source or Control I, Emission Source Deviation Deviation Suspected Cause of Description Device ID Pollutant Description Date(s) Deviation Deviation Duration Corrective Action Taken Number(s) No deviations during the reporting period. Revision 3.0 Page: 22 of 23 North Carolina Department of Environmental Quality Division of Air Quality COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2019 Terms and Conditions Deviations? Records Maintained' Was Deviation a non- Method(s)of compliance issue?(Yes/ Determining Comments Permit Condition (Yes/No/NA) Number Condition Summary (Yes/No) No) Compliance Status 3.A General provisions No Yes No N/A No Yes No Permit kept on-site 3.B Permit available at facility No Yes No Reports sent to 3.D Submissions of reports to regional office Regional Office Submit permit Request for permit modification was submitted No Yes No applications as during previous reporting period. 3.G Permit modifications and applications needed No Yes No N/A All changes reflected in most recent permit 3.H Changes not requiring permit mofifications modification. Reporting requirements for excess emissions and permit No Yes No Record of report 3.I.A,3.I.13 deviations Permit expires June 3.K Permit renewal every five year NO N/A No 30,2023 3.M Duty to submit any information requested by director No N/A No N/A 3.N Duty to supplement No N/A No N/A Record kept on-site 3.0 Retention of records No Yes No for 5 vears. Submit annual compliance No Yes No certification by Submitted early with semi-annual report. 3.P Annual compliance certification March 1 each year Certification No Yes No Responsible Official certified report 3.Q Certification by responsible official required On-site 3.T Insignificant activities records available at facility No Yes No recordkeeping On-site 3.V inspection and entry No Yes No recordkeeping On-site 3.W Annual fee payment No Yes No recordkeeping Annual fee was paid on time. On-site No emissions inventory required during this IxAnnual emission inventory requirement No Yes No recordkeeping ireporting period. Page: 23 of 23 3.Y Confidential information No N/A No N/A On-site 32 Construction and operation permits No Yes No recordkeeping 3.AA Standard application form and required information No N/A No N/A The Wadesboro facility does not operate any No Yes No N/A equipment that contains Class I or Class II 3.CC Refrigerant requirements refrigerants. 3.DD Prevention of accidental releases—Section 1 12(r) No Yes No N/A Take steps to prevent Prevention of accidental releases"General Duty Clause"- No Yes No accidental releases. 3.EE Section 112(r)(1) On-site 3.II Ambient air quality standards No Yes No recordkeeping On-site 3.JJ Emission testing and reporting requirements No Yes No recordkeeping On-site 3.LL Reporting requirements for non-operating equipment No Yes No recordkeeping No new sources added during reporting period. No Yes No N/A Quarterly reporting requirements changed to INN Modification of a TV permit semiannual. 3.00 Third party participation&EPA review No N/A No N/A Revision 3.0 Attachment 2 Bypass Damper Position Report a I i i i I I i I { i 1 i i i i 1 3 l 1 k in Re uirements ® eratin Monitarin and Record ee Associated with the operation of the DLA Limestone Feeder Settings Diff. Kiln Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure Date CPD Emissions Closed Auto Leve! Delivered ON OFF ON OFF Pa. r 217/2018 12/8/2018 12/9/2018 12/10/2018 x < 12/11/2018 12/12/2018 V Q 12/13/2018 L 12/14/2018 1 211 5/20 1 8 '_ 12/16/2018 12/171201$ M7 12/18/2018 !�� E `, v ( >tj 12/19/2018 ~ ' 12/20I201$ 6 Q c. 12/21/2018 12/22/2018 -T(7 12/23/2018 12/24/204 8 12/2512018 12/26/2018 � c� - �� 'Q_ 12/27/2018 r v' ,� 12/2812018 "'" } Z, 12129/2018 ; 12/30/2018 a 12/31/2018 1/1/2019 - ._. 1/2/2019 r' 3/2019 4/2019 1/5/2019 1/6/2019 1/712019 1/8/2019 f' 43r6 1/9/2019 �'N Vr �s. ,, >a 1110/2019 30 1/11/2019 1/12/2019 1/13/2019 1/14/2019 1/15/2019 1/16/2019 1/17/2019 1/18/2019 Gr r t ��-� ;� Z i 1/19/2019 (A tr } 1/20/2019 ��> �� 1/2112019 1/22/2019 � ! 1/23/2019 t i crr o tJ 1/24/2019 1/25/2019 k "1 1/26/2019 1/27/2019 eIi �' A ; 1/28/2019 1/29/2019 1� L L� c) � 1/3012019 _1 131/2019 [TIE ,./2/2019 t� om t '1/2019 IT2/3/2019 0 2/4/2019 - 2/5/2019 1 Q erat�n Mon and �ecordkee in Re uirernents itori n Asso dated with the operation, of the DLA Limestone Feeder Sew Di Screw Pressure Kiln Visual Bypass DLA in Limestone Limestone Peeling DOFF oN OFF Pa. yate CPD Emi_ s Closed Auto Level Delivered ON yT 1 , 419/2010 4/1012a1 r 4111/2014 4/12/2018 4/13/201 6 - - t,�' c,....-•- t..,--"" , N,. .,� .• l 4/14/2014 7 r 4/15/201 4/16/201 tF t c� f 1201 -7 4l18 - 4/19/201 4/20/201 + •,-} 4/21/201$ 4/22/201 4/23/201$ w xy 4/24I201 4/25/2018 t M r 4/26/201 1, 5y c� - 4/27/201 tt 4/29/2018 41301201'. ,, 511/201 d/ 5/2/201 5/31201 `1/201 5/61201$ 5171201. 5/8/2018 f - 5/9/201, 5/10/2018 1 5/11/2010 5/121201B 5/13/201 t? < 5/14/201 5115/201 0 �s o - .i t/ 6/16/201$ � 5/17/201$ 5118/201 -7 5/19/2018 .� tom ., �., �) 5/21/2018; 51221201Ae 5123/2018 1 r 5/24120 1� — 5/25/201 7 5/26/2018 "7 5/27/201 n 5/28/201 "%' 5/29/201 IA ► :- " 6/3012018 5/31/2018 J. - _ ... 2/2018 7 V 0/4/201 6/6/2018 617/20 IS y ' a eratin Monitorin and Recordkee in Requirements Associated with the operation of the ®LA . Limestone Feeder Settings Diff. Kiln Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure CPD Emiss' ns Closed Auto Level Delivered ON OFF ON OFF Pa. Date j •• 6/8/2019 6/912019 3/1012019 y - r..:... _ f 'Z 6/11/2019 6/12/2019 6/13/2019 �•'' '` .. �. ~ k_., 6/14/2019 ` 6/15/2019 6/16/2019 ? 6/17/2019 6/18/2019 �� 7- c 6119/2019 i ! u' 6/20/2019 7 r - • 6/21/2019 .. , .. 6/2212019 t 6/23/2019 7 / ��" 6/24/2019 , 6/25/2019 J 6/26/2019 - 6/27/20194— '3 e t.�; > ! 6/28/2019 r.� f t-� z - _.. a 6/29/2019 17 r.- 6/30/2019 ,S ✓ 7/1/2019 c 7/2/2019 .> 7 7/3/2019 7/4/2019 `, -5/2019 t_�- c i�-'" � } � - 6/20197/7/2019 7/8/2019 () 7/9/2019 7/10/2019 IJ 7/11/2019 1 > 7/12/2019 !�-.. .' s t r) 7/13/2019 7 !. L, 7/1412019 __y t..- f 5 C c) 7/15/2019 `l ► 'M �777 7/16/2019 7 c a Lam' 7q 7/17/2019 7/18/2019 7/19/2019 t ' 7I2012019 Y ti 7/21/2019i..- 7/22/2019 7 7/23/2019 712412019 r rE 7/25/2019 7/26/2019 7/27/2019 7/28/2019 7/29/2019 } 7/30/2019 0 7/31/2019 EIE 811/20191777 Rt?12019 L.-' U I _ ,12019 r4/2019 w 8/5/20198/6/2019 817!2019 I OiDerating, Monitorin and Recordkee in Re uirements Associated with the o eration of the DLA Limestone Feeder Settings Diff. Kiln Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure Date CPD Emissions Closed Auto Level Delivered ON OFF ON OFF Pa. 818/2019 ►/ a 0 8/9/2019 ! « v R Z 8/10/2019 t' {� �a S 1 8/12/2019 8113/2019 8/1412019 �• C) _:� :r.._ S r� 8/15/2019 8/1612019 e..r� rr}t. _ e 8/17/2019 fa 8/18/2019 8/1912019 -� ' 8/2012019 - r ? C� .`... k..r 1... 8/21/2019 8/22/2019 8/23/2019 8/2412019 8/25/2019 8/2612019 ,...� 8/2712019 .—� — �, �•- (� 1 �{ Ir" 8/28/2019 8/29/2019 8/30/2019 8/31/2019 t~.-- T o { 911/20199/2/2019 3 013/2019 w,. r f 1 4/2019 L/ } 9/6/2019 !..- 9/6/2019 ! 9/7/2019 9/8/2019 J ) 9/9/2019 9/10/2019 9/11l2019 9/12(2019 9/13/2019 9/14/2019 9115/2019i,..,- j:� � ?- •,�> 9/16/2019 t +.. 9/17/2019 It 9/18/2019 9Cj /19/2019 9/20/2019 �.� � v r.,-' ,.- •��;.� •.ti 9/2112019 9/23/2019 sr 9/24/2019 l r 9125/201931 /' �..r �.-.✓ G� •�� j, r/ ��_. 9126/2019 9/2712019 v' C,.-- t^••r' �} c .� :� .� c 2, . 9/28/2019 U 0 �. 9/29/2019 €" 9/30/2019 1011/2019 44- 2/2019 m. ri 13/2019 `101412019 .� 10/5/2019 .11 10/6/2019 :r �A. ? tl '1017/2019 Operating, Monitorinq and Recordkee in Re uirements Associated with the operation of the ILA Limestone Feeder Settings Diff, Kiln # Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure Date CPD Emissions Closed Auto Level Delivered ON OFF ON OFF Pa. 10/8/2019 J `l 10J9/2019 3 to 10/10/2019 10/11/2019 J r ti. 10/12/2019 1 d 10/13/2019 10/14/2019 �.. (:�r..... 10/15/2019 10/1612019 10/1712019 - 10/18/2019 � 7 10/19/2019 1 '� 10/20/2019 10/21/2019 ,.,., t_..._. ►.. 1 C �._ 10/2212019 � 10/23/2019 10/24/2019 10/25/2019 1 Q/26/2Q19 t. t, r'' 1, o 10/27/2019 10/28/2019 { 1012912019 .i 5 _: e' x 10/30/2019 <. c ; i,, ~- 10/31/2019 11/1/2019 1 1/21201 9 V'3 r.. , Z a l3/2019 _. .` . ` 12019 ( ! ;1115/2019 11/612019 11/7/2019 �- 11/812019 J 0 x 1119/2019 ,; 1 111 0/201 9 11/11/2019 11/12/2019 11/13/2019 11/14/2019 11/15/2019 \,7 11/16/2019 " V1.7 `% 5! } y 11/17/2019 ,' 11/18/2019 _7 ►�' 11/19/2019 " 11/20/2019 11/21/2019 11/22/2019 LI 11/23/2019 11124J2019 - 11/25/2019 7 V V � ... 4'.._.. r. 11/26/2019 �.t (�,f r 1 J 2� 11/27/2019 L (7 11/28/2019 -' t� l r s ) D � 11/29/2019 v 11/30/2019 - r1_ { '2/2019 _/3/2019 12/4/2019 12/5/2019 121612,019 12/7/2019 = ::� Associated with the operation of the DLA Limestone Feeder Se-t—fin, -s OUt � — Bypass Kiln i Pa. Date CPD Emissions Closed Auto Level Delivered 'OFF ON FF 12/8/2019 � 12��o19 � 12n0/201977 � 1uMiQU1e 12/1n/2010 12o13/2018 1o/i4/2}1S 1z/15/2O1n 1ox10/2O10 12M7/2010 1m18/2o10 -15 12/1e/2O1g 1z/20/2O1O 1om1m019 1212o/2O1m 12/2ooO18 17 1u124/2O18 1umo/2o10 1o/28/2U10 12/27n2o1O 12/2a/2o10 1u12g/2o1e 1z/38/2oi9 12/o1/2o1n o112n2o 1/2/20zo 1m12ozo 2-1 w2o2o .,o/uO2O 1mx2000 1/7/202o 10/2O20 1/0/2O2o 1/1o/2000 1/11/2U20 1/1z/2000 o13/2oou 1/14/20zo 1/15/ooau 1/1612000 1/17/2Uoo n1m/2Onn j11g/2020 i/2u12o20 1/21/oo2o 112z/20oO 1xz3/a000 1xz4/20un 1m5/2oo0 1/2{K202U 1/27/2U2O 1/oe/2D20 1/2912OzO 1/3O/202o 1/31/2o2o '1/2O2o 2/2Ozo 2/3/zozn 2^*/oU2o zm/ ouoPEI o/mao2o --inci Reauirements Operating-, Monitoring and Recordkeep Associated with the operation of the DLA Limestone Feeder Settings Diff. stone Peeling Drum Screw Pressure Kiln 2 Visual Bypass DLA in Unnestonel-ime Date CPD Emissions Closed Auto Level Delivered ON OFF ON OFF 2a. 12/7/2018 12/8/2018 4e; 1219/2018 12/10/2018 .3 1211112018 12/1212018 tA 12/1312018 6k 12/14/2018 Q 12/15/2018 t) (1 12/16/2018 q tf to �A 12/17/2018 1211812018 3C.8 12/19/2018 12/20/2018 _._j GA 12/2112018 12/22/2018 1 2123/20 1 8 Ll 54 12124/2018 12/25/2018 12/2612018 12/27/2018 12/28/2018 12/29/2018 12/30/2018 12/31/2018 '7 1/1/2019 1/2/2019 2— '3/2019 A/2019 (7) q 115/2019 1-? 1/6/2019 —7T77-- 117/2019 1/8/2019 2�6 1/9/2019 1/10/2019 tA Ili 1/2019 Ll t 1/1212019 1/13/2019 1/14/2019 1/15/2019 tk 1/1612019 IC) I 1117/2019 1118/2019 1/19/2019 1/20/2019 2- 2-- 1/21/2019 1/22/2019 U I 1/23/2019 1?1 C) 1/24/2019 1125/2019 3 t" 1/26/2019 1/27/2019 c,-) 1/28/2019 6) ...... 1/29/2019 .... )o r 7 1130/2019 lio ";1/2019 7 S!5- 1/2019 2/2/2019 3 c 2/3/2019 0 D 2/4/2019 777 �T Ski 2/5/2019 J Recordkeepinq R eauirements. Operating,-monitoring_gnd D LA Associated with the operation of the - Limestone Feeder Setting Diff Kiln 2 Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure Auto Level Delivered ON OFF OU NN 00 IF FF Date CRD Emissions Closed Pa. 2/6120 2f7/20 2/8/201 =f 2/9/201 --- -3 c� --I*. 2/10/201 —61 ...... 2111/201 2/12/201 2/13/201 '77— 2/14/201 2/15/201 2116J20V -T- 2/17/20fl 2/18/201 2/19/201 2/20/201 2121/201 2122/201 rn 2/2312 r 2124201 2/25/201 —21— ---777- 2/27/201 2128/201 31l/201 3/21201 313/201 ------------ 5/20 3/6/201 317/201 3/8/201 . ............ 3/9/201 3/101201 3/111201 3/12/201 ------- 3 131201 Z if 3/14/201 --r, --A 3115/201 3116/201 ....... 3/17/201 C) 3118/201 3/191201 9 3120/201 31211201 3/221201 A 3/23/201 L 3/24/201 3/25/20 3/26/201 3/27/201 '.1 3/28/201 3129/201 31301201 A6 3131/201 3 .4/1/201 2- 421201 ------- fk 13/201 X/ 4141201 77� -J-- 415/201 7:1 Z-- 4)7/201 t Associated with the ration of the DLA ttings DKf Kiln 2 Visual Bypass DLA in LimestoneLirnestone PeeliDg_Drurn Screw Pressure Date _Issions Closed 80/ o10 8/0/2010 6n8/201g G/t1/201S O/12/oO18 O/13/2U10 8/14/2O1e 6/1m2o1Q G/1a/2O10 a/17C01e 8/18/uO1y 8/18/2O1e 6/uo/2D18 8/21/2D10 VC2u/2O10 6/23/2O10 8/24/2o1m 6/zo/2o1e a/28/un1O 6/o7/zo10 8/o8/2O1Q G/28/zO1m 8/3n/201g 30 7/1/2o18 r/o/2O10 7/3/2010 7/4/ 010 `512U1s .m/uo1e n7mU1e 7/8/2OiQ 7/9x2O1g IAI 7/10ZO1n 7/11/2019 7/12/2o1y r/13/2810 7/1^W2U1Q 7/15/2010 7/161201g —77 7/in2V19 711812019 7/10u018 7/2O/2O18 7/21/2018 7/22/201g 7/2n/2O1e 7/24/281O no5/2o1S 7xcm/2o1g U CIS 7/27/zO19 7/o8/2O1U 7/20/2o19 tj 7/3&mO1S 7/31/2o10 8/1/uo1Q -n/2/2o1e 12019 uw/2o19ell- a/5/uo19 a/612o1g 7. a/nQo10 � eratin Aonitorin and Recordkeer)inq Requirements Associated with the operation of the DLA Limestone Feeder Settings Diff. _ Kiln 2 Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure Date CPD Emissions Closed Auto Level Delivered ON OFF N OFF Pa. 8/8/2019 8/9/2019 - 8/10/2019 8/1'!l2019 8/12/2019 8/13/2019 ' 8/14/2019 7 8/15/2019 ' 8/16/2019 8/17/2019 8/18/2019 8/19/2019 8/20/2019 `1 8/21/2019 8/22/2019 `� � c'� yy `` 5 8/23/2019 8/24/2019 8/25/2019 8/26/2019 , 8/27/2019 A $128/2019 j G ., �> 8129/2019 IL 8/30/2019 �z c �+�� 8/3112019 "r 9/1/2019 9/2/2019 , N3/2019 14 a� 4/2019 c r :. -F f�.� t )50 9/5/2019 9/6/2019 9/7/2019 _ 9/8/2019 0, ... 919l2019 9110/2019 9111/2019 _ - - ' ,-, �:• r 9 9112/2019 9/13/2019 9/14/2019 9/15/2019 CA - 4d-7 9/16/2019 J. f 9/17/2019 9/18/2019 ' r 9/1912019 9/20/2019 9/21/2019 t j _; � i..,} ;7 ? T 9/22/2019 9/23/2019 9/2412019 � q l 9/25/2019 -/1 V 9/26/2019 9/27/2019 - " 9/28/2019 ` r 9/29/2019 5 „ ,,,;- ., s — 9/30/2019 C 1011/2019 2/2019 n .2' :� n 10/4/2019 10/5/2019 �� 101612019 10/7/2019 Operating, Monitoring and Recordkeeping Requirements Associated with the o e Assoc p ration of the DLA Limestone Feeder Settings Diff: Kiln 2 Visual Bypass DLA in Limestone Limestone Peeking Drum Screw Pressure Date CPD Emissions Closed Auto Level Delivered ON OFF 4N OFF Pa. 10/8/2019 r� �2 i,� ,�-- �" 1 Q/9/2019 1 011 0/20 1 9 3t1 iJ 10/11/2019 t.. �;� : r` 7-, '►}. - 10/1212019 1 ' 10/13/2019 ` 10/14/2019 ) 10/15/2019 10/16/2019 _ "?�,� c 10/17/2019 - 10/18/2019 ;f.. 10/19/2019 o 10/20/2019 1 fl/2112019 ' ? 10/2212019 10/23/2019 10/24/2019 ;r ) �° ,�. w.� 10/25/2019 < y 10/26/2019 10/27/2019 01 10/28/2019 It _-. .�- .. •�, � 10l29/2019 ti l L. 10/30/2019 ' 10/31/2a19 t:� ,�:M� .. 4, c, . 11/1 J2fl19 _.._ ._..__ 1112/2019 �' 19 .'1/3/2019 - ;� { 14, 3` _ 4/2019 11/5/2019 ct 111612019 _.:._ ,-� ? ,.1 7 11/7/2019 _._ d- ... _, ; 11/812019 1119/2019 1111012019 11/11/2019 —__ _ {, � 1 1/1 21201 9 11/1312019 Cl - :2 '2.- 12. 111 11/14/2019 '1. 11/15/2019 ) d i 11/16/2019 `r� ; .5 11/17/2019 11/18/2019 11119/2019 11/20/2019 11/21/2019 11/22/2019C_y 11/23/2019 - {..� -- 11/24/2019 "� E 1112512019 7 — 3 cry' 11 J26/2019 _ _ _ �... o © V7 11/27/2019 �- ,�d,� t; 11/28/2019 11/29/2019 11/30/2019 Y/Y 1.2/112019 "?L) 2/2019 .t/3/2019 12/412019 CI 12/5/2019 ' 12/6/2019 ` �: t I 12/7/2019 , t 0 i f i Associated with the ration of the DLA OUf. Kiln 2 Visual Bypass DLA in LimestoneLimestone Peeling Drum Screw Pressure Date CPD Emissions Closed &Ut-0 L ON OFF --ON OFF Pa. DelMered 12/8/ M 12/9/2Uxm 12/102O18 12/11D01e 12n2/2o1m 12n3/2O19 12U4/20im 12/15/2o18 12/16/2018 � 12/17o01e � 12M8/201m iz/19/2818 1z/2u/ 010 12121/2n1g 1u/22/2o10 12/2�2o1Q � 12/24/201g 1rxz5/uo19 1o/2o/2O1n 12/27mo1e 12/28/2019 � 1u/2e/oo19 1zmuxzo1m 12/31/2019 t7 � 1/i/2O2O � //2/202o � -,/o/2ozu x000n .m/2o2o � 1m/2Oon 117/2020 1m/2000 1/9mnzo 1M012ouo io 1/11oO2o 1/12/2o2o 1/13/202o 1/14/2zzu o1o/2Ou0 1n8/2ozn 1/17/2nzo i/1a/202o 1/1g/2o2u 1/2O/2Ouo 1/21/2oao 1/22/2oa0 1/23/2Uoo 1m412o2o o25/2nz0 1/26/202O 1/o7/2O2O 1/28/2O2o 1/29/202o 1/ooxzOao 1/81/u02O — '1/no2O 2/2n2o r/o/2O2o sw/ O2o am/onuo z/6/ ouo Attachment 3 Facility-wide emissions of Hazardous Air Pollutants HAP Report � Triangle Brick.Company . Wadesboro,lNorth Carolina V January/2019-June/2019 Month Monthly Monthly Rolling History Rolling History HAP Max lbs HAP total lbs NAP Max lbs HAP total lbs Jan-19 Hydrogen Chloride 104 353 Hydrogen Chloride 1,323 4,478 Feb-19 Hydrogen Chloride 106 360 Hydrogen Chloride 1,338 4,529 Mar-19 Hydrogen Chloride 114 385 Hydrogen Chloride 1,354 4,582 Apr-19 Hydrogen Chloride 95 322 Hydrogen Chloride 1,342 4,542 May-19 Hydrogen Chloride 96 324 Hydrogen Chloride 1,346 4,554 Jun-19 Hydrogen Chloride 91 309 Hydrogen Chloride 1,338 4,528 Triangle Brick started reporting HAP in January 2018. "Rolling History"includes the months since January 2018 for each month reported. In July 2019-"Rolling History"will include 12 months for each month reported. Monday,January 13,2020 Triangle Bricl(Company . Wadesboro,North Carolina July/2019-December/2019 Month Monthly Monthly rolling history Rolling History HAP Max lbs HAP total lbs HAP Max lbs HAP totai lbs Jul-19 Hydrogen Chloride 92 311 Hydrogen Chloride 1,332 4,509 ` Aug-19 Hydrogen Chloride 110 372 Hydrogen Chloride 1,340 4,535 en Se -19 Hydrogen Chloride 110 371 Hydrogen Chloride 1,336 4,523 P Y g Oct-19 Hydrogen Chloride 116 391 Hydrogen Chloride 1,355 4,587 Nov-19 Hydrogen Chloride 95 321 Hydrogen Chloride 1,334 4,514 Dec-19 Hydrogen Chloride 96 325 Hydrogen Chloride 1,327 4,492 Triangle Brick started reporting HAP in January 2018. "Rolling History"includes the months since January 2018 for each month reported. In July 2019-"Rolling History"will include 12 months for each month reported. Monday,January 13,2020