Loading...
HomeMy WebLinkAboutAQ_F_1900009_20210922_CMPL_NOD-Resp 00/' NC De Pt of P Environmental Quality General Shale Building The American Dream, SFP , , 2021 Via Certified Mail Raleigh Regional Office September 8, 2021 Ms.Taylor Hartsfield Regional Supervisor NCDEQ, Division of Air Quality 3800 Barrett Drive Raleigh, NC 27609 Re: Notice of Deficiency- Quarterly Reporting Requirements General Shale Brick, Inc.-Moncure Facility Plant Nos. 24&25 Permit No.4384T40, Facility ID: 05/19/00009,Chatham County Dear Ms. Hartsfield: General Shale Brick("GSB") is required by the above referenced permit to submit a quarterly report within 30 days after each calendar quarter.GSB received a Notice of Deficiency for failure to submit a quarterly report within 30 days after the second calendar year quarter or July 30, 2021.As required by Section A.11.b of the permit. b) Reporting Requirement-For compliance purposes, within 30 days after each calendaryear quarter, regardless of the actual emissions, the following shall be reported to the Regional Supervisor, DAQ: i. The maximum hourly combined feed rates for kilns 1 and 2(ID Nos. ES-K1 and ES-K2)and for the kilns 3 and 4(ID Nos. ES-K3 and ES-K4)during each day of the reporting quarterly. It is GSB's belief the report may have been lost or misplaced by the USPS so a report was submitted August 19, 2021. GSB will submit all reports via USPS certified mail, FedEx or UPS in order to facilitate tracking information in the future. Please feel free to contact Warren Paschal at(919) 774-6533 (Ext. 221) or at warren_pachal generalshale.com should you have any questions concerning the information provided. Sincerel , evin Ham Vice President cc Larry Cockerill Warren Paschal P.O. Box 3547 3015 Bristol Highway Johnson City,Tennessee 37602 TEL 1-800-414-4661 Fnx 423-952-4104 www.GeneralShale.com