HomeMy WebLinkAboutAQ_F_1900009_20210922_CMPL_NOD-Resp 00/' NC De Pt of
P Environmental Quality
General Shale
Building The American Dream, SFP , , 2021
Via Certified Mail Raleigh Regional Office
September 8, 2021
Ms.Taylor Hartsfield
Regional Supervisor
NCDEQ, Division of Air Quality
3800 Barrett Drive
Raleigh, NC 27609
Re: Notice of Deficiency- Quarterly Reporting Requirements
General Shale Brick, Inc.-Moncure Facility Plant Nos. 24&25
Permit No.4384T40, Facility ID: 05/19/00009,Chatham County
Dear Ms. Hartsfield:
General Shale Brick("GSB") is required by the above referenced permit to submit a quarterly report within 30
days after each calendar quarter.GSB received a Notice of Deficiency for failure to submit a quarterly report
within 30 days after the second calendar year quarter or July 30, 2021.As required by Section A.11.b of the
permit.
b) Reporting Requirement-For compliance purposes, within 30 days after each calendaryear quarter,
regardless of the actual emissions, the following shall be reported to the Regional Supervisor, DAQ:
i. The maximum hourly combined feed rates for kilns 1 and 2(ID Nos. ES-K1 and ES-K2)and
for the kilns 3 and 4(ID Nos. ES-K3 and ES-K4)during each day of the reporting quarterly.
It is GSB's belief the report may have been lost or misplaced by the USPS so a report was submitted August 19,
2021. GSB will submit all reports via USPS certified mail, FedEx or UPS in order to facilitate tracking information
in the future.
Please feel free to contact Warren Paschal at(919) 774-6533 (Ext. 221) or at warren_pachal generalshale.com
should you have any questions concerning the information provided.
Sincerel ,
evin Ham
Vice President
cc Larry Cockerill
Warren Paschal
P.O. Box 3547 3015 Bristol Highway Johnson City,Tennessee 37602
TEL 1-800-414-4661 Fnx 423-952-4104 www.GeneralShale.com