HomeMy WebLinkAboutAQ_F_1400068_20220302_CMPL_InspRpt 1490o6z -Alt
NORTH CAROLINA DIVISION OF Asheville Regional Office
AIR QUALITY Quality Hardwoods, LLC
NC Facility ID 1400068
Inspection Report County/FIPS: Caldwell/027
Date: 03/02/2022
Facility Data Permit Data
Quality Hardwoods, LLC Permit 02765/R12
2402 Norwood Street SW Issued 2/8/2017
Lenoir,NC 28645 Expires 1/31/2025
Lat: 35d 52.1666m Long: 81 d 31.1666m Class/Status Small
SIC: 2421 /Sawmills &Planing Mills General Permit Status Active
NAILS: 321912/Cut Stock, Resawing Lumber,and Planing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Chris Herman Scott Greene Kathryn Perdue MALT Part 63: Subpart 6J
Yard Manager President Manager
(336)838-1117 (336)838-1117 (336)838-1117
Compliance Data
Comments:
Inspection Date 03/02/2022
Inspector's Name Bob Graves
Inspector's Signature: 4 Operating Status Operating
Compliance Status Compliance- inspection
Action Code FCE
Date of Signature: -3 13 ) Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 * HAP
2015 8.74 0.3000 5.93 0.8700 7.26 3.47 460.00
2011 19.38 0.1200 2.27 0.4300 2.78 2.61 176.32
* Highest HAP Emitted(in pounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE: None
Date Test Results Test Method(s) Source(s)Tested
1) Location: Quality Hardwoods, LLC is located at 2402 Norwood Street SW in Lenoir,NC.
Caldwell County.
Quality Hardwoods, LLC
Page 2
Directions: From Morganton, take Highway 18 to Lenoir. At the intersection of business 18,turn
right onto S. W. Boulevard bypass. Follow bypass to Highway 321 A and turn right. Facility is
located on the right,just before the Singer Complex.
2) Facility Overview: This facility dry kiln's dimensional lumber for use by furniture industry.
Process Description: Dimensional lumber is brought to the site by truck,then stacked, kiln dried
and planned. The facility uses sawdust and planer shavings to fire a wood waste boiler. Steam
produced the by the boiler heats the drying kilns.
Inspection Overview: On February 24, 2022 at approximately 3:25pm, I called Chris Herman,
Yard Manager and my facility contact. Based on my conversation with him, we discussed the
following:
A. Mr. Herman said the front gate is locked and the plant is shutdown. The boiler was shut
down on December 1, 2021. The facility is moving to Wilkesboro,NC. New dry kilns
are being built at their new location. The facility is using this property as a storage yard
only. Mr. Herman said he will talk with Patrick Ballard about the pros and cons of
keeping or rescinding the air permit. Mr. Herman will discuss with the facility's owner if
he wants to keep or rescind it.
B. On March 2, 2022, I arrived at the facility and observed it shut-down.
3) Emission Sources:
._._...
...
.___
Emission Emission Source Control Control System
Source ID Description System ID Description
ES-2 wood-fired boiler CD-2 f one multi-cyclone
(NESHAP) (13.9 million Btu per hour '(three, 6-inch diameter tubes)
maximum heat input rate)
ES-3 _woodwaste collection system CD-3� one simple cyclone�
(72 inches in diameter)
Insignificant Sources:
......................__..�.._ . .. _._______
Date of Exemption Source of Source of
Source Title V
Application Regulation TAPS?
Pollutants?
I-1 - Lumber Kilns N/A 2Q .0102 No Yes
(c)(2)(E)(i)
I-ES-4 - De-Stick Operation 4/27/07 2Q .0102 No Yes
(c)(2)(E)(i)
.... _
2Q .0102
F
S-S - Wood Dip Tank 4/27/07 (c)(2)(E)(i) No Yes
Quality Hardwoods, LLC
Page 3
4) Comments and Compliance Statement: Based on my discussion with Chris Herman, and
visual observations,this facility appeared to be operating in compliance by shutdown.