Loading...
HomeMy WebLinkAboutAQ_F_1400068_20220302_CMPL_InspRpt 1490o6z -Alt NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Quality Hardwoods, LLC NC Facility ID 1400068 Inspection Report County/FIPS: Caldwell/027 Date: 03/02/2022 Facility Data Permit Data Quality Hardwoods, LLC Permit 02765/R12 2402 Norwood Street SW Issued 2/8/2017 Lenoir,NC 28645 Expires 1/31/2025 Lat: 35d 52.1666m Long: 81 d 31.1666m Class/Status Small SIC: 2421 /Sawmills &Planing Mills General Permit Status Active NAILS: 321912/Cut Stock, Resawing Lumber,and Planing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP Chris Herman Scott Greene Kathryn Perdue MALT Part 63: Subpart 6J Yard Manager President Manager (336)838-1117 (336)838-1117 (336)838-1117 Compliance Data Comments: Inspection Date 03/02/2022 Inspector's Name Bob Graves Inspector's Signature: 4 Operating Status Operating Compliance Status Compliance- inspection Action Code FCE Date of Signature: -3 13 ) Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 * HAP 2015 8.74 0.3000 5.93 0.8700 7.26 3.47 460.00 2011 19.38 0.1200 2.27 0.4300 2.78 2.61 176.32 * Highest HAP Emitted(in pounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE: None Date Test Results Test Method(s) Source(s)Tested 1) Location: Quality Hardwoods, LLC is located at 2402 Norwood Street SW in Lenoir,NC. Caldwell County. Quality Hardwoods, LLC Page 2 Directions: From Morganton, take Highway 18 to Lenoir. At the intersection of business 18,turn right onto S. W. Boulevard bypass. Follow bypass to Highway 321 A and turn right. Facility is located on the right,just before the Singer Complex. 2) Facility Overview: This facility dry kiln's dimensional lumber for use by furniture industry. Process Description: Dimensional lumber is brought to the site by truck,then stacked, kiln dried and planned. The facility uses sawdust and planer shavings to fire a wood waste boiler. Steam produced the by the boiler heats the drying kilns. Inspection Overview: On February 24, 2022 at approximately 3:25pm, I called Chris Herman, Yard Manager and my facility contact. Based on my conversation with him, we discussed the following: A. Mr. Herman said the front gate is locked and the plant is shutdown. The boiler was shut down on December 1, 2021. The facility is moving to Wilkesboro,NC. New dry kilns are being built at their new location. The facility is using this property as a storage yard only. Mr. Herman said he will talk with Patrick Ballard about the pros and cons of keeping or rescinding the air permit. Mr. Herman will discuss with the facility's owner if he wants to keep or rescind it. B. On March 2, 2022, I arrived at the facility and observed it shut-down. 3) Emission Sources: ._._... ... .___ Emission Emission Source Control Control System Source ID Description System ID Description ES-2 wood-fired boiler CD-2 f one multi-cyclone (NESHAP) (13.9 million Btu per hour '(three, 6-inch diameter tubes) maximum heat input rate) ES-3 _woodwaste collection system CD-3� one simple cyclone� (72 inches in diameter) Insignificant Sources: ......................__..�.._ . .. _._______ Date of Exemption Source of Source of Source Title V Application Regulation TAPS? Pollutants? I-1 - Lumber Kilns N/A 2Q .0102 No Yes (c)(2)(E)(i) I-ES-4 - De-Stick Operation 4/27/07 2Q .0102 No Yes (c)(2)(E)(i) .... _ 2Q .0102 F S-S - Wood Dip Tank 4/27/07 (c)(2)(E)(i) No Yes Quality Hardwoods, LLC Page 3 4) Comments and Compliance Statement: Based on my discussion with Chris Herman, and visual observations,this facility appeared to be operating in compliance by shutdown.