Loading...
HomeMy WebLinkAboutAQ_F_0000031_20201230_CMPL_InspRpt A NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Hickory Springs Manufacturing Company-Micav ** INACTIVE** Inspection Report NC Facility ID 0000031 Date: 01/25/2021 County/FIPS:Yancey/199 Facility Data Permit Data Hickory Springs Manufacturing Company-Micav** INACTIVE** Permit n/a 455 Hickory Springs Road Issued n/a Micaville,NC 28755 Expires n/a Lat: 35d 52.8000m Long: 82d 13.2833m Class/Status Permanently Closed SIC: 3495/Wire Springs Permit Status Inactive NAICS: 332612/Spring(Light Gauge)Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact George Beauvais Rick Anthony Steve Hannah Plant Manager VP of Home Furnishings Corporate EHS Manager (828)675-4101 (828)328-2201 (828)328-2213 Compliance Data Comments: Facility is shut down.No operations are underway. Inspection Date 12/30/2020 Inspector's Name Lisa Whitaker Inspector's Signature: / Operating Status Permanently Closed Compliance Status Compliance-shutdown Action Code FCE Date of Signature:January 25,2021 Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP *Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested Directions From Burnsville: travel East on Highway 19 to Highway 80 South through Micaville. Approximately two and half miles South of Micaville,turn right onto Hickory Springs Road,and the facility will be located on the left. There is a HSM Solutions sign as well as a Convenience Center sign at the intersection of 80 South and Hickory Springs Road. Visitor's parking is located near the loading docks. Facility Overview: Required Safety Equipment: Safety shoes and glasses. Facility Description: This facility manufactured inner springs for mattresses and was permitted because of VOC emissions. Inspection Discussion: On December 30,2020,I(Lisa Whitaker)made a site visit and observed no activity at the facility and no apparent production. The facility is considered closed. Permit Exemption: The Division of Air Quality issued a permit rescission letter on November 02,2020 following application 0000031.20A,which informed DAQ that the facility had ceased operations and no longer required an air quality permit. Emission Source Emission Emission SouEbendling Source ID _ —Description FUG-1 one mattress assembly operation incland cutting process Insignificant Sources Source I-2-one propane/natural gas-fired edge clip oven(0.08 million Btu per hour heat input) 1-3 -one propane/natural gas-fired heat-treat oven(5.2 million Btu per hour heat input) Compliance Conclusion Hickory Spring Manufacturing Company-Micaville appeared to have ceased operation, as stated. Based on this observation,the permit has been correctly rescinded.