Loading...
HomeMy WebLinkAboutAQ_F_1600005_20191204_CMPL_InspRpt NORTH CAROLINA DIVISION OF Wilmington Regional Office AIR QUALITY Atlantic Veneer Corporation NC Facility ID 1600005 Inspection Report County/FIPS:Carteret/031 Date: 12/04/2019 Facility Data Permit Data Atlantic Veneer Corporation Permit n/a 2457 Lennoxville Road Issued n/a Beaufort,NC 28516 Expires n/a Lat: 34d 42.5710m Long: 76d 37.7250m Class/Status Permit Exempt SIC: 2435/Hardwood Veneer And Plywood Permit Status Inactive NAICS: 321211 /Hardwood Veneer and Plywood Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SJP Scott Van der Werf Michael Kraszeski Scott Vander Werf MACT Part Subpart 6J Plant Engineer President Plant Engineer NSPS: Subpart Dc (252)723-9224 (252)223-8002 (252)723-9224 Compliance Data Comments: Inspection Date 12/03/2019 Inspector's Name Tony Sabetti Inspector's Signature: / Operating Status Operating Compliance Code Compliance-inspection Action Code FCE G3 On-Site Inspection Result Compliance Date of Signature: A7 141 r2 La /9 Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2015 26.91 1.88 11.99 2.22 32.33 20.35 2045.28 2010 21.06 4.43 7.22 1.79 11.04 9.47 1067.19 *Highest HAP Emitted inpounds) Five Year Violation History: Date Letter Tvoe Rule Violated Violation Resolution Date 08/09/2017 NOV 213.1904 Air Curtain Burners 07/25/2017 01/24/2017 NOV Part 63 -NESHAP/GACT Subpart JJJJJJ Industrial, 03/16/2017 Commercial and Institutional Boilers at Area Sources 10/29/2015 NOV Part 63 -NESHAP/GACT Subpart JJJJJJ Industrial, 12/08/2015 Commercial and Institutional Boilers at Area Sources Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested Compliance Inspection Contact for the inspection was made with Scott Van der Werf,plant engineer. The facility was operating during the inspection. Personnel should wear safety shoes, safety glasses, head protection (hard-hat),and hearing protection(ear plugs) during inspections. Compliance History Atlantic Veneer Corporation has had three NOVs during the past 5 years. October 29, 2015 for not performing a tune up on boiler 1. Failure to conduct biannual tune ups for ES-Boiler 2 and 3 were not done within 25 months of the previous tune ups,a NOV dated 1/24/17 was issued. NOV dated 8/9/17 for operating an unauthorized air curtain burner to open burn wood waste. Plant Description Atlantic Veneer Corporation receives hardwood veneers. Veneers are clipped horizontally and vertically. Waste is conveyed to a waste hog then blown through cyclone CD-5 and loaded into a trailer. Air Emission Sources Atlantic Veneer Corporation is operating the air emissions sources and air cleaning devices below: ES-5 one clipper line CD-5 one simple cyclone (72 inches in diameter CD-5 Applicable DAQ Rules Atlantic Veneer Corporation shall comply with applicable Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter 2D .0202, .0512, .0515, .0521, .0535, .0540 and 2D .0611. 15A NCAC 2D .0202,"Registration of Air Pollution Sources" -Atlantic Veneer Corporation is registered and exempt from permitting effective July 30,2019. 15A NCAC 2D .0512 "Particulates from Wood Products Finishing Plants," Atlantic Veneer Corporation is properly operating adequate duct work and collection devices on all particulate emitting sources and all collection devices are registered and approved by the Commission. 15A NCAC 2D.0515, "Particulates from Miscellaneous Industrial Processes" Particulate matter emissions from emission source ES-5 is controlled by approved collection device CD-5. 15A NCAC 2D .0521,"Control of Visible Emissions" Visible emissions were evaluated to be zero percent at the cyclone vent and 10 percent opacity at the discharge vent into the trailer. Scott stated that Atlantic Veneer are going to install a door on the trailer to better control the wood chip collection. 15A NCAC 2D .0535,"Excess Emissions Reporting and Malfunctions",No reported excess emissions during the compliance period. 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," No substantive complaints have been received during the compliance period and no fugitive emission were observed beyond the property line. 15A NCAC 2D .0611, "Monitoring Emissions from other Sources" Cyclone Requirements-Inspection and maintenance requirements were verified during the compliance inspection. Electronic log book records were reviewed during the inspection. Cyclone CD-8 was last inspected on 12/2/2019. Inspection Summary From the observed information, recommend accept this facility as operating in compliance with applicable EMC Air Quality Regulations at this time.