HomeMy WebLinkAboutAQ_F_1000067_20180712_CMPL_NOV-NRE ROY COOPER {'. Governor MICHAEL S. REGAN Seereavy Air Quality MICHAEL A. ABRACZINSKAS ENVIRONMENTAL QUALITY Dhecto, July 12, 2018 Certified Mail No. 7016 0910 0000 6171 3671 Return Receipt Requested Mr. Frank Hayward, Plant Manager CPI USA North Carolina - Southport Plant 1281 Powerhouse Drive SE Southport,NC 28461 SUBJECT: Addendum to January 24, 2017 Notice of Violation/Notice of Recommendation for Enforcement 15A NCAC 2D .0530 "Prevention of Significant Deterioration" (PSD) 40 CFR 51.166 "Prevention of Significant DeterioraTi-on of Air Quality" S02 Emissions—Boiler ID Nos. ES-1 and ES-2 CPI USA North Carolina - Southport Plant Southport, Brunswick County,North Carolina Air Permit No. 05884T21, Facility ID No. 1000067 Dear Mr. Hayward: Reference is made to the NOV/NRE dated January 24, 2017 that was sent by this office to your facility for failure to submit a Prevention of Significant Deterioration (PSD) permit application for the 2008 Boiler Control Retrofit and Increased Wood/Biomass Firing Project. As described in the 2017 NOV/NRE, the Division of Air Quality received a report on March 2, 2016, from CPI USA North Carolina- Southport Plant (CPI) summarizing projected vs. actual emissions for the plant boilers, ID Nos. ES-1 and ES-2. In the report, the actual emissions of carbon monoxide (CO), sulfur dioxide (S02), and particulate matter(PM) were significantly higher than the projected emissions contained in the original permit application for the project. This resulted in DAQ reviewing the calculations contained in the original application and utilized by the facility to justify the avoidance of submitting a PSD application. DAQ determined that your facility's CO and PM emissions were greater than the projected actual emissions originally submitted, which resulted in the January 24, 2017 NOV/NRE. Since that time, our central office permitting staff conducted an additional review and found that the PSD threshold level of 40 tons per year for S02 was also exceeded. Based on this analysis, a PSD application for S02 should have been submitted for the 2008 project. Slate of North Carolina Environmental Quality I Air Quality Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington.North Carolina 28405 910 796 7215 T 1 910 350 2004 F CPI - Southport Page 2 This letter is intended to notify you that CPI is in violation of 15A NCAC 2D .0530 and 40 CFR 50.166 for failure to submit a Prevention of Significant Deterioration (PSD) permit application for S02 for the 2008 NOx/SO2 Boiler Control Retrofit and Increased Wood/Biomass Firing Project. After the January 24, 2017 NOV/NRE, CPI Southport did submit the required PSD application for CO and PM. Please submit a PSD application for S02 to this office within 45 days of receipt of this NOWNRE. Please be advised that this office intends to submit a recommendation for enforcement action to the Director of the Division of Air Quality. North Carolina General Statute 143-215.114A provides that a civil penalty of not more than $25,000.00 per violation may be assessed against a company who violates or fails to act in accordance with the terms, conditions, or requirements of a permit required by North Carolina General Statute 143-215.108. If you have an explanation for the violation that you wish to present, or if you believe the findings stated in this letter are incorrect, please respond in writing within fifteen (15) days after receipt of this letter. Your documentation will be forwarded with the enforcement package to the Director for his review. If you have any questions or concerns regarding this matter,please contact Ashby Armistead or myself at 910-796-7215. Sincerely,,)l v� Brad ewland Regional Air Quality Supervisor Division of Air Quality, NCDEQ cc: WiRO Files BTN