HomeMy WebLinkAboutAQ_F_0400059_20170323_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY GGP of NC,LLC
NC Facility ID 0400059
Inspection Report County/FIPS:Anson/007
Date: 03/23/2017
Facility Data Permit Data
GGP of NC,LLC Permit 10373/R02
Airport Road Issued 10/31/2016
Wadesboro,NC 28170 Expires 10/31/2022
Lat: 34d 59.1174m Long: 80d 4.9908m Classification Title V
SIC: 4931 /Elec&Other Services Combined Permit Status Active
NAICS: 221119/Other Electric Power Generation Current Permit Application(s)State
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Ratnalee Patil Gary Bailey Ratnalee Patil MACT Part 63: Subpart W, Subpart ZZZZ
Energy Specialist Managing Member Energy Specialist NSPS: Subpart Db,Subpart IIII
(919)832-6303 (702)296-2525 (919)832-6303
Compliance Data
Comments:
Inspection Date 03/23/2017
Inspector's Name Gregory Reeves
Inspector's Signaturei� Operating Status Operating
Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: /7 On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 * HAP
2015 --- --- ---
2014 --- --- ---
*Hi est HAP Emitted(inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
GGP of NC,LLP
Compliance Inspection Report
Page 2 of 2
1. DIRECTIONS TO SITE:
From FRO,take US Hwy 401 South through Raeford and Wagram. Just past Wagram,turn right onto Old Wire
Road(NC 144). Follow Old Wire Road across US 15/501 and through Laurel Hill to US 74. Turn right onto
US 74. Follow US 74 35 miles to Wadesboro,then turn right onto N.Greene St/NC Hwy 109. Drive 0.75
miles,then turn left onto Airport Road. Drive 0.6 miles. The facility is on the left side of the road.
2. SAFETY CONSIDERATIONS:
The usual FRO safety gear is required, including hard hat,safety shoes,safety glasses, and hearing protection.
At the date of this inspection,the facility had not yet commenced construction.
3. FACILITY DESCRIPTION:
The proposed facility is a large vegetable greenhouse operation. Five wood-fired boilers will operate to supply
steam to five steam turbine-driven electrical generators. Electricity will be sold to the local electrical grid,and
the exhaust steam from the turbines will be used to supply heat to the greenhouse operations. In addition,an
electrical solar panel farm will also supply electricity for the facility. The facility will operate three diesel-fired
emergency generators,and will operate a biomass processing facility with transfer station,storage pile,and
hammermill operation.
4. FACILITY INSPECTION SUMMARY:
On 03/23/17,I spoke with Ms. Ratnalee Patel,Energy Specialist to obtain an update on the status of the facility.
Ms.Patel stated that the company has not yet broken ground for the construction of the facility. She stated that
there are no firm plans on when the company expects to begin construction of the facility. The company has
plans to submit a permit modification application to allow the use of Tire-Derived Fuel(TDF)in the boilers.
This application has not yet been submitted to DAQ,but a Non-Hazardous Secondary Material applicability
determination has been completed for Anson Renewable Fuels,who will be the supplier of the TDF for GGP.
5. CONCLUSIONS/RECOMMENDATIONS:
The facility APPEARS IN COMPLIANCE. The facility has not yet commenced construction