Loading...
HomeMy WebLinkAboutAQ_F_0100055_20170119_CMPL_InspRpt (4) r NORTH CAROLINA DIVISION OF Winston-Salem Regional Office AIR QUALITY Kingsdown,Incorporated NC Facility ID 0100055 Inspection Report County/FIPS:Alamance/001 Date: 01/19/2017 Facility Data Permit Data Kingsdown,Incorporated Permit 05935/R09 126 West Holt Street Issued 6/23/2015 Mebane,NC 27302 Expires 5/31/2023 E Lat: 36d 5.7160m Long: 79d 16.2060m Classification Small SIC: 2515/Mattresses And Bedsprings Permit Status Active NAICS: 33791 /Mattress Manufacturing Current Permit Application(s)Rescission Request Contact Data Facility Contact Authorized Contact Technical Contact Program Applicability Abdul Majid Abdul Majid Abdul Majid SIP Vice President Vice President Vice President (919)563-3531 (919)563-3531 (919)563-3531 Compliance Data Comments: Inspection Date 01/19/2017 Inspector's Name Paul E Williams Inspector's Signature: ��O _ Operating Status Operating Compliance Code Compliance-inspection Action Code FCE Date of Signature: I �V 1 ���— RS On-Site Inspection Result Compliance Total Actual emissions in TONSIYEAR: TSP S02 NOX VOC CO PM10 *HAP 2014 0.1800 --- 0.0800 --- 0.0600 0.1800 2.70 2009 0.5160 --- 0.2400 0.0200 0.2100 0.5160 4.10 *Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Methods) Source(s)Tested 4 i Permitted Sources �_.. ...... . s Emissions Emissions Source Control FControl System Source ID Description System ID Description ES-1 Natural gas fired curing range(2.5 million Btu per BF- Prefilter/drum filter-oil mist hour maximum heat input rate) — � eliminator Transfer cyclone(CD-CYl)in ES-2 Garnet operation dust collection system IC D-CYI,BF-B series with bagfilter(2,587 square feet of filter area)(BF-B) Five hoods installed on a mattress pad manufacturing Bagfilter(1,062 square feet of ES 3 process area BF C filter area) Insignificant/Exempt Activities Source(s) Exemption Regulation Source of Source of Title V TAPs? Pollutants? IS-2—Natural gas-fired boiler rated 0.6 2 0102 c 2 B n Yes Yes MMBtu/hr Q O( )( )( ) Introduction/Discussion On January 19,2017,Paul Williams,Environmental Specialist,contacted Mr.Rick Allmond,Facility Maintenance Supervisor,for Kingsdown,Inc. in order to perform an unannounced targeted compliance inspection. The facility was previously inspected on May 27,2015 by Stephen Helms, former Environmental Specialist, and was found to be operating in compliance with all Air Quality standards and regulations at that time. The facility is permitted as a mattress manufacturer. Mr.Allmond confirmed all IBEAM contacts as accurate. It should be noted that that a letter, signed by Mr.4bdul Majid, Vice-President of Manufacturing, was received by DAQ WSRO on November 28, 2016 asking for a cancellation of4ir Permit#05935R09. This cancellation request was sent due to the manufacturing operations, at this facility, being permanently halted. During the initial interview,Mr.Allmond stated that all manufacturing operations ceased in April of 2016. He also stated that all of the permitted equipment remains onsite,but that the company is in the process of trying to find a buyer and that after the equipment is removed the company plans to demolish the building. Mr.Allmond then escorted this inspector into the production area. Upon entering it was clear that all of the manufacturing had ceased,though the permitted equipment(ES-1,ES-2,ES-3 and IS-2)was still in place. Safety Equipment Safety shoes,hearing and eye protection are required within production areas. Applicable Regulations According to permit Condition A.1,the facility is subject to the following regulations: Title 15A North Carolina Administrative Code(NCAC), Subchapter 2D .0202,2D .0515,2D .0516,2D .0521,2D .0535,2D .0540,213 .0611 and 2D .1806. The facility is not subject to the RMP requirements of the 112(r)program since it does not use or store any of the regulated chemicals in quantities above the threshold in the rule. The facility is only subject to the General Duty clause of the Section 112(r)program. Permit Conditions/Applicable Regulations This facility complies with all applicable Air Quality standards and regulations since it has ceased all manufacturing operations. 1 NSPS/NESHAP : The facility does not appear to be subject to any NSPS/NESHAP regulations at this time. Facility Wide Emissions Facility wide actual emissions, as reported by this facility for CY 2009 and CY 2014,are located in the report header. a i Permit Considerations [ This facility appears to have ceased operations at this time and all permitted equipment is in the process of being sold. p The facility has not operated since April of 2016. 4 Stack Testing No stack testing has ever been conducted at this facility. j 5-Year Compliance History This facility has not been issued an NOD,NOV or NOV/RE within the past five years. t Conclusion Based on visual observations and review of records,Kingsdown,Incorporated appears to be operating in compliance with all applicable Air Quality standards and regulations at the time of this inspection since it has ceased operations. i i i k i i 2 i f k 3 j F i I I f i'. t { 1 i I t i C i f i p[f 6 t I f f