HomeMy WebLinkAboutAQ_F_1000067_20160909_PRMT_Permit PAT MCCRORY
',x
DONALD R. VAN DER VAART
'�C'P,T"
Air Quality SHEILA C. HOLMAN
ENVIRONMENTAL QUALITY /W',•yq
September 9,2016
Mr.David H. Groves
Plant Manager
CPI USA North Carolina—Southport Plant
1281 Powerhouse Drive
Southport,NC 28461
SUBJECT: Air Quality Permit No. 05884T21
Facility ID: 1000067
CPI USA North Carolina—Southport Plant
Southport,Brunswick County,North Carolina
Fee Class: Title V
PSD Class: Major
Dear Mr. Groves:
In accordance with your completed Air Quality Permit Application for Renewal of your Title V
permit received September 23,2015,we are forwarding herewith Air Quality Permit No. 05884T20 to CPI
USA North Carolina—Southport Plant, 1281 Powerhouse Drive SE, Southport,North Carolina,authorizing
the construction and operation of the emission source(s) and associated air pollution control device(s)
specified herein. Additionally, any emissions activities determined from your Air Quality Permit
Application as being insignificant per 15A North Carolina Administrative Code 02Q .0503(8)have been
listed for informational purposes as an "ATTACHMENT." Please note the requirements for the annual
compliance certification are contained in General Condition P in Section 3. The current owner is
responsible for submitting a compliance certification for the entire year regardless of who owned the facility
during the year.
As the designated responsible official it is your responsibility to review, understand, and abide by
all of the terms and conditions of the attached permit. It is also your responsibility to ensure that any person
who operates any emission source and associated air pollution control device subject to any term or
condition of the attached permit reviews,understands, and abides by the conditions of the attached permit
that are applicable to that particular emission source.
If any parts, requirements, or limitations contained in this Air Quality Permit are unacceptable to
you, you have the right to request a formal adjudicatory hearing within 30 days following receipt of this
permit, identifying the specific issues to be contested. This hearing request must be in the form of a written
petition, conforming to NCGS (North Carolina General Statutes) 150B-23, and filed with both the Office
of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714 and the
Division of Air Quality, Permitting Section, 1641 Mail Service Center, Raleigh, North Carolina 27699-
1641. The form for requesting a formal adjudicatory hearing may be obtained upon request from the Office
of Administrative Hearings. Please note that this permit will be stayed in its entirety upon receipt of the
request for a hearing. Unless a request for a hearing is made pursuant to NCGS 150B-23,this Air Quality
Permit shall be final and binding 30 days after issuance.
State of North Carolina I Environmental Quality I Air Quality
1641 Mail Service Center 1 217 W.Jones Street,Suite 4000 1 Raleigh,NC 27609-1641
919 707 8400
Mr. David H.Groves
September 9, 2016
Page 2
You may request modification of your Air Quality Permit through informal means pursuant to
NCGS 150B-22. This request must be submitted in writing to the Director and must identify the specific
provisions or issues for which the modification is sought. Please note that this Air Quality Permit will
become final and binding regardless of a request for informal modification unless a request for a hearing is
also made under NCGS 150B-23.
The construction of new air pollution emission source(s) and associated air pollution control
device(s), or modifications to the emission source(s) and air pollution control device(s) described in this
permit must be covered under an Air Quality Permit issued by the Division of Air Quality prior to
construction unless the Permittee has fulfilled the requirements of NCGS 143-215.108A(b) and received
written approval from the Director of the Division of Air Quality to commence construction. Failure to
receive an Air Quality Permit or written approval prior to commencing construction is a violation of NCGS
143-215.108A and may subject the Permittee to civil or criminal penalties as described in NCGS 143-
215.114A and 143-215.114B.
The Brunswick County has been triggered for PMIo and SOz,with respect to minor source baseline
date. However,this modification(issuance of renewed permit)does not affect these triggered pollutants.
This Air Quality Permit shall be effective from September 9, 2016 until August 31, 2021, is
nontransferable to future owners and operators, and shall be subject to the conditions and limitations as
specified therein.
Should you have any questions concerning this matter, please contact Rahul P. Thaker,P.E., QEP,
at(919) 707-8740.
Sincerely yours,
/-VkA m-,�d GtA,,,L
William D. Willets, P.E., Chief,Permitting Section
Y Division of Air Quality,NCDEQ
Enclosure
c: EPA Region 4
Wilmington Regional Office
Central Files
ATTACHMENT to Air Quality Permit No. 05884T21
CPI USA North Carolina—Southport Plant
Insi nificant Activities under 15A NCAC 02Q.0503(8)
Emission Source ID Emission Source Description
I-EFP One diesel fired 340 hp emergency fire pump
I-FOST1 One diesel fuel oil storage tank
I-FOST2 One fire pump fuel oil storage tank
I-SPC One solvent parts cleaner using hot water solution
containing no reportable HAPs
I-TLOT1 and I-TLOT2 Two turbine lube oil tanks
I-TS One tire shredder
I-1 Haul Roads
I-WHS Wood handling and storage
I-TDFHS TDF handling and storage
I-UREA S TK1 One urea storage tank
I-UREA D TK1 One urea dilution tank
I-10A and I-10B Two submerged drag chain systems for removal and
transport of bottom ash to storage pits
1. Because an activity is insignificant does not mean that the activity is exempted from an applicable requirement
or that the owner or operator of the source is exempted from demonstrating compliance with any applicable
requirement.
2. When applicable,emissions from stationary source activities identified above shall be included in determining
compliance with the permit requirements for toxic air pollutants under 15A NCAC 02D.1100"Control of
Toxic Air Pollutants"or 02Q .0711 "Emission Rates Requiring a Permit".
3. For additional information regarding the applicability of GACT see the DAQ page titled"The Regulatory Guide
for Insignificant Activities/Permits Exempt Activities". The link to this site is as follows:
http://daq.state.nc.us/permits/insig/
ATTACHMENT to Air Quality Permit No. 05884T21
CPI USA North Carolina—Southport Plant
The following changes were made to the CPI USA North Carolina—Southport Plant Air Quality Permit No.
05884T20:
Old Page No. New Page No. Condition No. Changes
[Air Permit No. [Air Permit No.
05884T20] 05884T21]
3 3 Section 1 Table Include a reference for MACT Subpart DDDDD
for existing boilers. Include footnotes for both
case-by-case MACT and MACT 5D w/r/t
compliance dates.
5 5 Section 2.1 A. Table Remove opacity as regulated pollutant for NSPS
Subpart Db. The regulated pollutant is
particulate matter and not opacity.
Remove applicability of vacated CAIR
requirements for annual and ozone season NOx
and annual SO2.
Include applicability of CSAPR requirements for
both annual and ozone season NOx and annual
SO2.
8 8 Section 2.1 A.2.d. and Switch the Section numbers for NOx and opacity
e. limits.
10 10 Section 2.1 A.3.j. Modify this Section to include a streamlined
monitoring requirement for CO via Sections 2.1
A.4.j-k.
12 12 Section 2.1 AA.i. Clarify the streamlined monitoring requirements
for PM(PMio), SO2,sulfuric acid mist and NOx,
via Section 2.1 A.Lc,A.2.f-j and n,and A.3.g-i.
12 12 Section 2.1 A.4.j. Make it Section 2.1 A.41 and clarify the
reporting requirement for PMio, SO2, sulfuric
acid mist and NOx, is via Section 2.1 A.l.d, 2.1
A.2.p,and 2.1 A.31-1.
- 12 Sections 2.1 A.4.j.and Include these new Sections for CO monitoring
k. requirement.
- 12 Section 2.1 AA.m. Include this new Section for semi-annual
reporting requirement for CO.
16 15 Section 2.1 A.6.c. Clarify that the excursion defining in the form of
visible emissions exceeding 15 percent limit does
not include start-up, shutdown, and malfunction
periods.
Replace the existing QIP threshold with the
following threshold: accumulation of excursions
exceeding 1 percent duration of the operating
time for a six-month reporting period.
17 16 Section 2.1 A.6.d. Clarify that the excursion defining in the form of
visible emissions exceeding 15 percent limit does
not include start-up, shutdown, and malfunction
periods.
17 17 Section 2.1 A.7.a. Clarify the applicability time periods for both
§§1120)and(d)standards.
- 27 Section 2.1 A.9. Include a new applicable requirement under
federal-only CSAPR.
27 Section 2.1 A.10. Include a new applicable requirement under
§112(d)(40CFR 63 Subpart DDDDD).
28 32 Section 2.1 B.I.c. Include a requirement to establish "normal"
emissions for sources(ES-3A and ES-313)within
30 days of issuance of the air permit(05884T20).
- 38 Section 2.1 F. Include a new rail tie grinder(RTG-2).
36, 37 - Section 2.2 Remove these vacated CAIR permit
requirements.
State of North Carolina
Department of Environmental Quality
Division of Air Quality
AIR QUALITY PERMIT
Permit No. Replaces Permit Nos . Effective Date Expiration Date
05884T21 05884T20 September 9, 2016 August 31, 2021
Until such time as this permit expires or is modified or revoked,the below named Permittee is permitted to construct and
operate the emission source(s)and associated air pollution control device(s)specified herein,in accordance with the terms,
conditions, and limitations within this permit. This permit is issued under the provisions of Article 21B of Chapter 143,
General Statutes of North Carolina as amended, and Title 15A North Carolina Administrative Codes (15A NCAC),
Subchapters 02D and 02Q,and other applicable Laws.
Pursuant to Title 15A NCAC,Subchapter 02Q,the Permittee shall not construct,operate,or modify any emission source(s)
or air pollution control device(s)without having first submitted a complete Air Quality Permit Application to the permitting
authority and received an Air Quality Permit,except as provided in this permit.
Permittee: CPI USA North Carolina — Southport Plant
Facility ID: 1000067
Facility Site Location: 1281 Powerhouse Drive SE
City, County, State,Zip: Southport,Brunswick County,North Carolina 28461
Mailing Address: P. O. Box 10836
City, State, Zip: Southport,North Carolina 28461
Application Numbers: 1000067.15B, 1000067.13B, 1000067.13C, 1000067.16A, and
1000067.16C
Complete Application Date: September 23,2015,June 16, 2013, May 6,2013,October
24,2015, and April 8, 2016
Primary SIC Codes: 4911
Division of Air Quality, Wilmington Regional Office
Regional Office Address: 127 Cardinal Drive Extension
Wilmington,North Carolina 28405
Permit issued this the September 9,2016.
/AM M-,,M 0, LL
William D. Willets, tE., Chief, Permitting Section
By Authority of the Environmental Management Commission
Table Of Contents
SECTION 1: PERMITTED EMISSION SOURCE(S) AND ASSOCIATED AIR POLLUTION
CONTROL DEVICE(S) AND APPURTENANCES
SECTION 2: SPECIFIC LIMITATIONS AND CONDITIONS
2.1 Emission Sources Specific Limitations and Conditions
(Including specific requirements, testing,monitoring, recordkeeping, and
reporting requirements)
SECTION 3: GENERAL PERMIT CONDITIONS
ATTACHMENT
List of Acronyms
Air Quality Permit No. 05884T21
Page 3
SECTION 1 - PERMITTED EMISSION SOURCE(S) AND ASSOCIATED
AIR POLLUTION CONTROL DEVICE(S) AND
APPURTENANCES
The following table contains a summary of all permitted emission sources and associated air pollution control devices
and appurtenances:
Page Nos. Emission Source ID Emission Source Description Control Device ID Control Device
No. No. Description
5 ES-1 (Unit 1)and Two electricity generating units CD-1-IA Six bagfilters(16,800
ES-2 (Unit 2) consisting of CD-1-113 square feet of filter
(PSD; PSD CD-l-IC area,each)
Avoidance; Six watertube design coal/natural CD-2-IA
NSPS,Subpart Db; gas/No. 2 and No.4 fuel oil/tire CD-2-113
2D.1109 Case-by- derived fuel/pelletized paper fuel/ CD-2-IC
Case MACTI; flyash briquette/unadulterated
SB3 BACT;MACT wood3/unadulterated CD-1-5A
Subpart DDDDD2) biomass/adulterated resinated wood/ CD-1-513 Six rotating overfire
creosote treated woods-fired steam, CD-1-5C air(ROFA)systems
electric generating,boilers(223 CD-2-5A
million Btu per hour nominal heat CD-2-513
input capacity,each; ID Nos.ES-1- CD-2-5C
1A,ES-1-113,ES-14C,ES-24A,
ES-2-113 and ES-24C) CD-1-6A
CD-1-613 Six furnace sorbent
CD-1-6C injection(FSI)
CD-2-6A systems
CD-2-6B
CD-2-6C
CD-1-7A
CD-1-7B
CD-1-7C Six selective non-
CD-2-7A catalytic reduction
CD-2-713 (SNCR)systems
CD-2-7C
31 ES-2A through ES- Six coal bunkers CD-2A through Six bagfilters(161
2F CD-2F square feet of filter
(PSD) area each,
respectively)
The Permittee shall comply with this CAA§1120)standard until May 19,2019.
2 The Permittee shall comply with 40 CFR Part 63,Subpart DDDDD, "National Emission Standards for Hazardous Air
Pollutants for Industrial,Commercial,and Institutional Boilers and Process Heaters,"beginning May 20,2019.
3 Unadulterated wood means wood that is not painted,varnished,stained,oiled,waxed,or otherwise coated or treated
with any chemical. Plywood,particle board,and resinated wood are not unadulterated wood.
4 Resinated wood includes plywood,oriented-strand board,and manufactured word products such as laminated
beams,untreated wood pellets and lumber scraps that are not part of any construction and demolition.
s Creosote treated wood including railroad ties and utility poles as defined in the approved NHSM determination.
(Reference: htip://www.ncair.org/perrnits/memos/NHSM Determination CPI USA-NC.pdf)
6 The installation of selective non-catalytic reduction systems on each boiler is optional.
Air Quality Permit No. 05884T21
Page 4
Page Nos. Emission Source ID Emission Source Description Control Device ID Control Device
No. No. Description
31 ES-3A and ES-313 Two flyash silos with dedicated wet CD-3A and CD-313 Two silo binvents(100
(PSD) slurry pugmills for unloading square feet of filter
area,each),one
located on each silo
31 ES-4A through ES- Four ash system vacuum transport CD-4G and CD-4H Two simple cyclones
4D pumps (42 inches in diameter)
(PSD)
CD-4E and CD-417 Two bagfilters(528
square feet of filter
area,each)
CD-4A through
CD-41) Four in-line filters
(one per pump,
respectively)
33 ES-5 One coal unloading/storage and Wetsup One wet
(PSD) transfer operation suppression/chemical
binder system
34 ES-8A and ES-813 Two cooling towers(32,400 gallons None
per minute recirculating water flow
rate each)
35 ES-9A and ES-913 Two alkaline sorbent(limestone, CD-9A and Vent fabric filters
lime or trona)silos(12,554 ft3 CD-913 (3.9:1 air-to-cloth ratio
maximum storage capacity each) each)
37 RTG-1 and RTG-2 Two rail tie grinders(up to 60 CD-10 and CD-11 Water spray bars
tons/hour capacity each)
Air Quality Permit No. 05884T21
Page 5
SECTION 2 - SPECIFIC LIMITATIONS AND CONDITIONS
2.1 - Emission Source(s) and Control Devices(s) Specific Limitations and
Conditions
The emission source(s)and associated air pollution control device(s)and appurtenances listed below are subject to the
following specific terms, conditions, and limitations, including the testing, monitoring,record keeping,and reporting
requirements as specified herein:
A. Two electricity generating units consisting of:
Six watertube design coal/natural gas/No. 2 and No.4 fuel oil/tire derived fuel/pelletized paper fueUflyash
briquette/unadulterated wood/unadulterated biomass/adulterated resinated wood/creosote treated wood-
fired boilers (ID Nos. ES-14A, ES-14B, ES-14C, ES-24A, ES-24B and ES-24C), and associated
bagfilters (ID Nos. CD-14A, CD-14B, CD-14C, CD-24A, CD-24B and CD-24C),rotating overfire air
(ROFA)systems(ID Nos.CD-1-5A,CD-1-5B,CD-1-5C,CD-2-5A,CD-2-5B and CD-2-5C),furnace sorbent
injection (FSI) systems (ID Nos. CD-1-6A, CD-1-6B, CD-1-6C, CD-2-6A, CD-2-6B and CD-2-6C) and
selective non-catalytic reduction (SNCR)systems (ID Nos. CD-1-7A, CD-1-7B, CD-1-7C, CD-2-7A,CD-2-
7B and CD-2-7C)
The following table provides a summary of limits and/or standards for the emission source(s)described above.
Regulated Pollutant Limits/Standards Applicable Regulation
Sulfur dioxide 2.3 pounds per million Btu heat input per boiler* 15A NCAC 02D .0516
Particulate matter 0.051 pounds per million Btu heat input per boiler* 15A NCAC 02D.0524
(40 CFR 60,Subpart Db)
(60.43b(a)(1))
20 percent(6-minute average)opacity per common stack* 15A NCAC 02D.0524
(40 CFR 60, Subpart Db)
(60.43b(f))
Nitrogen oxide Coal-firing only 15A NCAC 02D .0524
0.60 pounds per million Btu heat input per boiler* (40 CFR 60, Subpart Db)
(60.44b(a))
Nitrogen oxide Simultaneously burning coal with fuel oil or a mixture of 15A NCAC 02D .0524
these fuels with natural gas or any other fuel(per boiler*): (40 CFR 60,Subpart Db)
(60.44b(c))
En=(0.1 Hgo+0.3Hro+0.6H,)/(H6o+Hro+H,)
Where:
E„= nitrogen oxide emission limit(lbs/mmBtu)
Hgo= heat input from the combustion of natural gas or
distillate oil(mmBtu)
Hr.= heat input from the combustion of residual oil
(mmBtu)
H,= heat input from the combustion of coal(imnBtu)
PMio 6.02 pounds per hour per boiler* 15A NCAC 02D
.0501(c)
Sulfur dioxide 327.8 pounds per hour per boiler* 15A NCAC 02D
453.6 pounds per hour per unit** .0501(c)
Nitrogen oxide 120.4 pounds per hour per boiler* 15A NCAC 02D
.0501(c)
Carbon monoxide 120.4 pounds per hour per boiler* 15A NCAC 02D
.0501(c)
Particulate matter 0.027 pounds per million Btu heat input per boiler* 15A NCAC 02D .0530
Sulfur dioxide 1.47 pounds per million Btu heat input per boiler* 15A NCAC 02D.0530
Nitrogen oxide 0.54 pounds per million Btu heat input per boiler* 15A NCAC 02D .0530
Air Quality Permit No.05884T21
Page 6
Regulated Pollutant Limits/Standards Applicable Regulation
Carbon monoxide 0.54 pounds per million Btu heat input per boiler* 15A NCAC 02D .0530
Sulfuric acid mist 0.019 pounds per million Btu heat input per boiler* 15A NCAC 02D .0530
PM,PMjo,NOx, As defined in specific conditions 15A NCAC 02D
S02,CO,and VOC .0530(u)
Particulate matter Compliance Assurance Monitoring 15A NCAC 02D .0614
HAPs All fuel combinations,based on each of these boilers being a 15A NCAC 02D .1109
"unit designed to burn biomass/bio-based solid subcategory"
as defined in 40 CFR 63.7575:
Particulate Matter(filterable only): 0.18 lb/million Btu
• Mercury: 0.000005 lb/million Btu
• Hydrogen Chloride: 0.02 lb/million Btu
• Carbon Monoxide: 508 ppmvd,corrected to 7%02,30-
day rolling average
Particulate matter 0.027 pounds per million Btu heat input per boiler* North Carolina General
less than 10 microns Statute 62-133.8(g)
in diameter(PMio) / "Control of Emissions"
Particulate matter Senate Bill 3(SB3)State
less than 2.5 microns Best Available Control
in diameter(PM2.5) Technology(BACT)
Nitrogen oxides 0.54 pounds per million Btu heat input per boiler* (30 day)
Carbon monoxide 0.54 pounds per million Btu heat input per boiler* (30 day) State-only requirement
Sulfuric acid mist 0.019 pounds per million Btu heat input per boiler*
Sulfur dioxide 1.47 pounds per million Btu heat input per boiler* (TDF)
Burning inherently low sulfur biomass (wood)
Volatile organic Burning biomass
compounds Good Combustion Practices
Mercury 5.00 E-6 pounds per million Btu heat input per boiler*
Nitrogen oxide As defined in specific conditions 40 CFR Part 97,Subpart
Sulfur dioxide AAAAA"TR NOx
Annual Trading
Program",Subpart
BBBBB"TR NOx
Ozone Season Trading
Program",and Subpart
CCCCC"TR SO2 Group
1 Trading Program".
Federal-only
requirement
*Stack measured or calculated emissions represent the collective emissions for the six boilers(ID Nos.ES-14A,ES-1-113,ES-1-
1C,ES-24A,ES-2-1B and ES-24C)in the power units. "Per boiler"emissions are derived by dividing the measured emissions
by the boilers in operation during the timeframe specified. Compliance certification on a per boiler basis is based on the common
stack emissions performance divided by the boilers in operation at the time of measurement per power unit.
**Stack measured or calculated emissions represent the collective emissions for each unit,Unit 1 (ID Nos.ES-14A,ES-1-113,
ES-14C)and Unit 2,(ES-24A,ES-2-1B and ES-2-1C).
1. 15A NCAC 02D.0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES
a. Emissions of sulfur dioxide from these sources(ID Nos.ES-1-IA,ES-1-111,ES-1-IC,ES-2-IA,ES-2-111
and ES-2-1C)shall not exceed 2.3 pounds per million Btu heat input. Sulfur dioxide formed by the
combustion of sulfur in fuels,wastes,ores,and other substances shall be included when determining
compliance with this standard. [15A NCAC 02D.0516]
Air Quality Permit No.05884T21
Page 7
Testing[15A NCAC 02Q.0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 A.La above,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D.0516.
Monitorin/Recordkeepins[15A NCAC 02Q.0508(f)]
c. To assure compliance,the Permittee shall monitor the sulfur content of the coal by using coal supplier
certification per total shipment received. The coal supplier certification shall be recorded in a logbook
(written or electronic format)per total shipment and include the following information:
i. the name of the coal supplier;
ii. the maximum sulfur content of the coal received per total shipment;
iii. a statement verifying that the methods used to determine the maximum sulfur content of the coal was in
accordance with the following:
A. sampling—ASTM Method D 2234;
B. preparation—ASTM Method D 2013;
C. gross calorific value(Btu)—ASTM Method D 5865;
D. moisture content—ASTM Method D 3173;and
E. sulfur content—ASTM Method D 3177 or ASTM Method D 4239.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0516 if the sulfur content of
the coal is not monitored and recorded.
Upon certification of SO2 continuous emission monitoring(CEM)systems,the Permittee shall determine
compliance with SO2 emission limit in Section 2.1 A.La. above,using SO2 CEM instead of using coal
supplier certification. Monitoring and record keeping for SO2 CEM shall be in accordance with 2.1 A.4.cc
below. If any 24-hour block average of SO2 exceeds the emission limit per Section 2.1 A.La.above or the
records are not maintained,the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0516.
Reporting[15A NCAC 02Q.0508(f)]
d. The Permittee shall submit a summary report of the coal supplier certifications postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. Also,the Permittee
shall submit a certified statement signed by the responsible official that the records of coal supplier
certification submitted represent all of the coal fired during the reporting period. All instances of deviations
from the requirements of this permit must be clearly identified.
Upon certification of SO2 CEM,the Permittee shall submit reports for SO2 in pounds per million Btu in
accordance with Section 2.1 AAA&and ee.
2. 15A NCAC 02D.0524: NEW SOURCE PERFORMANCE STANDARDS
a. The Permittee shall comply with all applicable provisions,including the testing,reporting,recordkeeping,
and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC
02D.0524"New Source Performance Standards(NSPS)"as promulgated in 40 CFR Part 60 Subpart Db,
including Subpart A"General Provisions." [15A NCAC 02D.0524] ID Nos.ID Nos.ES-1-IA,ES-1-113,
ES-1-1C,ES-2-1 A,ES-2-1B and ES-2-1C
b. Testing[l5A NCAC 02Q.0508(f)]
i. Before Modifying or Replacing Existing induced Draft Fans on Boilers (ID Nos. ES-14A, ES-1-113,
ES-1-1C,ES-2-1A,ES-2-113 and ES-2-1C)
The Permittee shall conduct a performance test for particulate matter within 60 days of achieving the
maximum production rate at which the affected facility(ID Nos. ES-14A, ES-1-113, ES-1-IC, ES-2-
IA,ES-2-113 and ES-2-IC) will be operated but no later than 180 days after the startup of the furnace
sorbent injection(FSI)systems on boilers(ID Nos.ID Nos.ES-14A,ES-1-113,ES-14C,ES-24A,ES-
2-113 and ES-2-1C) in accordance with General Condition JJ found in Section 3. This testing shall be
Air Quality Permit No. 05884T21
Page 8
used consistent with 40 CFR 60 Appendix C when the facility performs stack testing pursuant to Section
2.1 A.2.b.ii.below.
Prior to modifying/replacing the induced draft fans on boilers (ID Nos. ES-1-IA, ES-1-113, ES-1-IC,
ES-2-IA,ES-2-1B and ES-2-1C),the Permittee shall perform an engineering evaluation demonstrating
that the increase in flue gas flow rate will not increase the boiler's potential heat input rate when firing
100%coal,50%coal/50%TDF,and 25%coal/50%TDF/25%wood,to greater than 250 million Btu/hr.
The Permittee shall submit the results of this engineering evaluation 60 days prior to
modification/replacement of the induced draft fans on these boilers.
ii. After Modifyingor r Replacing Existing Induced Draft Fans on Boilers(ID Nos.ES-1-1A,ES-1-1B,
ES-1-1C,ES-2-1A,ES-2-113 and ES-2-10
The Permittee shall conduct a performance test for particulate matter within 60 days of achieving the
maximum production rate at which the affected facility(ID Nos.ES-1-IA,ES-1-1B,ES-1-1C,ES-2-IA,
ES-2-113 and ES-2-IC) will be operated but no later than 180 days after the startup of the
modified/replaced induced draft fans on boilers(ID Nos. ES-1-IA,ES-1-1B,ES-1-1C,ES-2-1 A,ES-2-
113 and ES-2-IC) in accordance with General Condition JJ found in Section 3. If the results of this
performance test,consistent with 40 CFR 60 Appendix C,demonstrate that increase in particulate matter
has occurred at boilers (ID Nos. ES-1-IA, ES-1-1B, ES-1-1C, ES-2-1 A, ES-2-1B and ES-2-1 C) or the
above performance test is not conducted,the modified boilers(ID Nos.ID Nos.ES-1-IA,ES-1-1B,ES-
1-1C,ES-2-1 A,ES-2-1B and ES-2-1 C)are subject to the applicable requirements for particulate matter
(category:boilers modified after February 28,2005)in accordance with 40 CFR 60 Subpart Db.
Within 60 days of achieving the maximum production rate at which the affected facility(ID Nos.ES-1-
1 A, ES-1-1 B, ES-1-1 C, ES-2-IA, ES-2-1 B and ES-24 C) will be operated but no later than 180 days
after the startup of the modified/replaced induced draft fans on boilers(ID Nos.ES-1-IA,ES-1-113,ES-
MC, ES-2-1 A, ES-2-1 B and ES-2-IC), the Permittee shall determine, in accordance with General
Condition JJ found in Section 3,maximum heat input capacity for each boiler(ID Nos. ES-1-IA,ES-1-
1B, ES-1-1C, ES-24A, ES-2-113 and ES-2-IC) when firing 100% coal, 50% coal/50% TDF and 25%
coal/50% TDF/25%wood, based upon a 4-hour averaging period at a maximum fan capacity. If this
demonstration indicates that the maximum heat input capacity exceeds 250 million But/hr for any boiler,
the boilers(ID Nos.ES-1-IA,ES-1-1B,ES-1-1C,ES-2-IA,ES-2-1B and ES-2-1 C)shall become subject
to the requirements in 40 CFR 60 Subpart Da.
Emission Limitations[15A NCAC 02D.0524]
Particulate matter-
c. Particulate emissions from these sources(ID Nos.ES-1-1A,ES-1-1B,ES-14C,ES-2-1A,ES-2-1B and
ES-24C)shall not exceed 0.051 pounds per million Btu heat input when firing coal with other fuels.
d. These sources(ID Nos.ES-1-1A,ES-1-1B,ES-14C,ES-2-1A,ES-2-1B and ES-24C)shall not cause to
be discharged into the atmosphere any gases that exhibit greater than 20 percent opacity(six-minute
average)each,except for one six-minute period per hour of not more that 27 percent opacity.
e. Nitrogen oxides-
i. Nitrogen oxides emissions when firing coal shall not exceed 0.60 pounds per million Btu heat input.
ii. Nitrogen oxides emissions from the simultaneous combustion of coal with fuel oil or a mixture of these
fuels with natural gas or any other fuel shall not be in excess of the rate calculated by the following
formula[40 CFR Part 60,Subpart 60.44b(c)]:
En=(0.I Hbo+0.3H,o+0.6Hc)/(Hg,,+H,o+Hc)
Where: E,,=nitrogen oxide emission limit(lb/million Btu)
H,=heat input from combustion of natural gas or distillate oil(million Btu)
Ho=heat input from the combustion of residual oil(million Btu)
Hc=heat input from the combustion of coal(million Btu)
iii. Compliance with the nitrogen oxide emission limits is determined on a 30-day rolling average basis[40
Air Quality Permit No. 05884T21
Page 9
CFR Part 60, Subpart 60.44b(i)].
Monitoring[15A NCAC 02Q.0508(f)]
f. 40 CFR 60.48b(a)—The Permittee shall calibrate,maintain,and operate a continuous monitoring system for
measuring the opacity of emissions discharged to the atmosphere and record the output of the system.
g. 40 CFR 60.48b(b)—The Permittee shall calibrate,maintain,and operate a continuous monitoring system for
measuring nitrogen oxide emissions discharged to the atmosphere and record the output of the system.Data
reported to meet the requirements of§60.49b shall not include data substituted using the missing data
procedures in Subpart D of Part 75 of 40 CFR,nor shall the data have been bias adjusted according to the
procedures of Part 75 of 40 CFR.
h. 40 CFR 60.48b(c)—operation of nitrogen oxide continuous monitoring systems and data recording.
i. 40 CFR 60.48b(d)—measurement of nitrogen oxide 1-hour averages.
j. 40 CFR 60.48b(e)—installation,evaluation,and operation of continuous monitoring systems.
k. 40 CFR 60.48b(f)—continuous monitoring systems breakdowns,repairs,calibration checks and zero and
span adjustments.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0524 if the monitoring requirements in
Sections 2.1 A.21.through k. above,are not complied with.
Recordkeeping[I 5A NCAC 02Q.0508(f)]
1. 40 CFR 60.49b(d)—recordkeeping of the amounts of each fuel fired each day.
m. 40 CFR 60.49b(e)—quarterly recordkeeping of the nitrogen content of the residual oil if burned.
n. 40 CFR 60.49b(f)—recordkeeping of the opacity.
o. 40 CFR 60.49b(g)—daily recordkeeping of the nitrogen oxide emission rates and supporting data.
p. 40 CFR 60.49b(h)—reporting of excess emissions.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0524 if the recordkeeping requirements
in Sections 2.1 A.21 through p. above,are not complied with.
Reporting[15A NCAC 02Q .0508(f)]
q. The Permittee shall submit a summary report of the monitoring and recordkeeping activities,including the
requirements of 40 CFR 60.49b(i)and(h),postmarked on or before January 30 of each calendar year for the
preceding six-month period between July and December and July 30 of each calendar year for the preceding
six-month period between January and June. All instances of deviations from the requirements of this
permit must be clearly identified.
3. 15A NCAC 02D.0501(c): COMPLIANCE WITH NATIONAL AMBIENT AIR QUALITY
STANDARDS
a. Particulate matter(PMio)emissions from each source(ID Nos.ES-14A,ES-1-111,ES-14C,ES-2-1A,
ES-2-1B and ES-2-1C)shall not exceed 6.02 pounds per hour.
b. Sulfur dioxide emissions shall not exceed:
i. from each source(ID Nos.ES-1-1A,ES-1-111,ES-1-1C,ES-2-1A,ES-2-111 and ES-24C),327.8
pounds per hour,24-hour average;
ii. on and after June 24,2016,from each unit,Unit 1 (ID Nos.ES-14A,ES-1-111,ES-14C)and
Unit 2(ID Nos.ES-1-2A,ES-2-111,ES-24C),453.6 pounds per hour, 1-hour average.
iii. Within 90 days of permit issuance the Permittee shall provide an ambient monitor or monitors to
allow the North Carolina Division of Air Quality to demonstrate that the facility does not cause or
contribute to an exceedance of the one-hour National Ambient Air Quality Standard for sulfur
dioxide.The monitor(s)shall meet the specifications approved by the North Carolina Division of
Air Quality.
c. Nitrogen oxide emissions from each source(ID Nos.ES-14A,ES-1-111,ES-14C,ES-24A,ES-2-111 and
ES-24C)shall not exceed 120.4 pounds per hour.
d. Carbon monoxide emissions from each source(ID Nos.ES-14A,ES-1-113,ES-14C,ES-24A,ES-24B
and ES-2-1C)shall not exceed 120.4 pounds per hour.
e. The maximum sulfur content of any coal received and burned in these sources(ID Nos.ES-14A,ES-1-111,
ES-14C,ES-24A,ES-2-111 and ES-24C)shall not exceed 1.0 percent by weight.
Air Quality Permit No. 05884T21
Page 10
Testing [15A NCAC 02Q.0508(f)]
f. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above any limit given in Section 2.1 A.3.a through d above,the Permittee shall be
deemed in noncompliance with 15A NCAC 02D .0501(c).
Monitoring/Recordkeeping[15A NCAC 02Q.0508(f)]
g. Particulate matter emissions from these sources(ID Nos.ES-1-1A,ES-1-1B,ES-1-1C,ES-2-1A,ES-2-1B
and ES-2-1C)shall be controlled by six bagfilters(ID Nos.CD-14A,CD-14B,CD-14C,CD-24A,CD-
2-1B and CD-24C),one each. To assure compliance,the Permittee shall perform inspections and
maintenance as recommended by the manufacturer. In addition to the manufacturer's inspection and
maintenance recommendations,or if there are no manufacturer's inspection and maintenance
recommendations,as a minimum,the inspection and maintenance requirement shall include an annual
internal inspection of the bagfilters(ID Nos.CD-14A,CD-14B,CD-14C,CD-24A,CD-2-1B and CD-
2-1C)for structural and fabric filter integrity. The Permittee shall be deemed in noncompliance with 15A
NCAC 02D .0501(c)if the bagfilters(ID Nos.CD-14A,CD-14B,CD-14C,CD-24A,CD-2-1B and
CD-24C)are not inspected and maintained.
h. The Permittee shall install,operate,and maintain a pressure drop indicator on each bagfilter(ID Nos.CD-
1-1A,CD-14B,CD-14C,CD-24A,CD-2-1B and CD-24C). The pressure drop across each bagfilter
(ID Nos.CD-14A,CD-14B,CD-14C,CD-24A,CD-24B and CD-24C)shall not exceed 10 inches of
water. The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0501(c)if the pressure drop
is not maintained within the prescribed limits.
i. The results of inspection and maintenance shall be maintained in a logbook(written or electronic format)
on-site and made available to an authorized representative upon request. The logbook shall record the
following:
i. the date and time of each recorded action;
ii. the pressure drop once weekly at a minimum when the source(ID Nos.ES-14A,ES-14B,ES-14C,
ES-24A,ES-24B and ES-2-1C)is operating;
iii. the results of each inspection;
iv. a report of any maintenance performed on the bagfilters(ID Nos.CD-14A,CD-14B,CD-14C,CD-
24A,CD-24B and CD-24C);and
v. any variance from manufacturer's recommendations, if any,and corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0501(c)if these records are not
maintained.
j. The Permittee shall follow the monitoring and recordkeeping requirements in Sections 2.1 A.Lc,2.1 A.2.f-
j,and 2.1 A.2.n above,and Section 2.1 A.4.j-k below. The Permittee shall be deemed in noncompliance
with 15A NCAC 02D.0501(c)if this monitoring and recordkeeping is not performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0501(c)if sulfur dioxide emissions
(24-hour block average)or sulfur content exceed the limits in Section 2.1 A.3.b. and e.,respectively.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0501(c) if NOx emissions(30-day
rolling average)exceed the limit in Section 2.1 A.3.c. above.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0501(c) if CO emissions (30-day
rolling average)exceed the emission limit in Section 2.1 A.3.d.above.
Reporting[15A NCAC 02Q .0508(f)]
k. Within 30 days of a written request from DAQ,the Permittee shall submit a report of any maintenance
performed on the bagfilters(ID Nos.CD-14A,CD-14B,CD-14C,CD-24A,CD-24B and CD-24C).
1. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and
July 30 of each calendar year for the preceding six-month period between January and June. All instances
of deviations from the requirements of this permit must be clearly identified.
m. Option for Obtaining Construction and Operation Permit[15A NCAC 02Q.0504(d)]
The Permittee shall have one year from the issuance of the permit(05884T20)to file an amended application
Air Quality Permit No.05884T21
Page 11
following the procedures of Section 15A NCAC 02Q .0500.
aa. Sulfur dioxide emissions shall be limited as described in 2.1 A. 3. b. i. and ii. above. [15A NCAC 02D
.0501(c)]
Testing[15A NCAC 02Q.0508(fl]
bb. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ found
in Section 3. If the results of this test are above any limit given in Section 2.1 A. 3. aa. above,the Permittee
shall be deemed in noncompliance with 15A NCAC 02D.0501(c).
Monitoring/Recordkeeping[15A NCAC 02Q .0508 (f)]
cc. i. The Permittee shall assure compliance with 2.1 A. 3.b. i. above by determining sulfur dioxide emissions
in pounds per hour using a continuous emissions monitoring(CEM)system meeting the requirements of
40 CFR Part 75 except that unbiased values may be used(missing data shall be filled in accordance with
40 CFR Part 75,except that the lookback periods per 40 CFR 75.33 (Tables 1 and 2)shall consist of the
available data up to the appropriate quality-assured hours.Also,the replacement procedures for monitor
data availability between 80 and 90 percent may be used at values below 80 percent). The missing data
procedure in Part 75 shall be used whenever the boiler combusts any fuel. Compliance with sulfur
dioxide emission standards shall be determined by averaging hourly continuous emission monitoring
system values over a 24-hour block period beginning at midnight. To compute the 24-hour block
average,the average hourly values(missing data shall be filled in accordance with 40 CFR Part 75,
except that the lookback periods per 40 CFR 75.33 (Tables 1 and 2)shall consist of the available data up
to the appropriate quality-assured hours. Also,the replacement procedures for monitor data availability
between 80 and 90 percent may be used at values below 80 percent)shall be summed,and the sum shall
be divided by 24. The minimum number of data points,equally spaced,required to determine a valid
hour value shall be determined by 40 CFR Part 75. If any 24-hour block average exceeds the limit per
Section 2.1 A.3.b. i. above or the records are not maintained,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D.0501(c).
ii. The Permittee shall assure compliance with 2.1 A. 3.b. ii.above by determining sulfur dioxide emissions
in pounds per hour using a continuous emissions monitoring(CEM)system meeting the requirements of
40 CFR Part 75 except that unbiased values may be used(missing data shall be filled in accordance with
40 CFR Part 75,except that the lookback periods per 40 CFR 75.33 (Tables 1 and 2)shall consist of the
available data up to the appropriate quality-assured hours.Also,the replacement procedures for monitor
data availability between 80 and 90 percent may be used at values below 80 percent). The missing data
procedure in Part 75 shall be used whenever the boiler combusts any fuel. Compliance with sulfur
dioxide emission standards shall be determined using hourly continuous emission monitoring system
values beginning at midnight(missing data shall be filled in accordance with 40 CFR Part 75,except that
the lookback periods per 40 CFR 75.33 (Tables 1 and 2)shall consist of the available data up to the
appropriate quality-assured hours. Also,the replacement procedures for monitor data availability
between 80 and 90 percent may be used at values below 80 percent). The minimum number of data
points,equally spaced,required to determine a valid hour value shall be determined by 40 CFR Part
75. If any 1-hour average exceeds the limit per Section 2.1 A.3.b ii. above or the records are not
maintained,the Permittee shall be deemed in noncompliance with 15A NCAC 02D .0501(c).
Reporting[15A NCAC 02Q .0508(f)]
dd. i. The Permittee shall submit the continuous emissions monitoring data showing the 1-hour and 24-hour
values in pounds per hour for sulfur dioxide emissions for each averaging period during the reporting
period no later than January 30 of each calendar year for the preceding three-month period between
October and December, April 30 of each calendar year for the preceding three-month period between
January and March,July 30 of each calendar year for the preceding three-month period between April
and June,and October 30 of each calendar year for the preceding three-month period between July and
September. All instances of deviations from the requirements of this permit must be clearly identified.]
ii. "Excess Emissions"-means an emission rate that exceeds any applicable emission limitation or standard
allowed by any rule in Sections.0500,.0900,.1200,or.1400 of Subchapter 02D.The Permittee shall report
excess emissions of the emission limitation in 2.1 A. 3. b. ii. pursuant to 02Q .0508(f)by notifying the
Regional Supervisor or Director of any such occurrence by 9:00 a.m. Eastern Time of the Division's next
business day of becoming aware of the occurrence.
Air Quality Permit No. 05884T21
Page 12
ee. CEMs Monitor Availability-The Permittee shall submit sulfur dioxide CEM system monitor downtime
reports,including monitor availability values(as calculated for 40 CFR Part 75)for the last hour of the
reporting period,no later than January 30 of each calendar year for the preceding three-month period
between October and December,April 30 of each calendar year for the preceding three-month period
between January and March,July 30 of each calendar year for the preceding three-month period between
April and June,and October 30 of each calendar year for the preceding three-month period between July
and September.
4. 15A NCAC 02D.0530: PREVENTION OF SIGNIFICANT DETERIORATION
a. Particulate matter(PMio)emissions from each source(ID Nos.ES-1-1A,ES-1-111,ES-14C,ES-2-IA,
ES-2-111 and ES-2-1C)shall not exceed 0.027 pounds per million Btu heat input.
b. Sulfur dioxide emissions from each source(ID Nos.ES-14A,ES-14B,ES-14C,ES-2-1A,ES-24B and
ES-24C)shall not exceed 1.47 pounds per million Btu heat input.
c. Nitrogen oxide emissions from each source(ID Nos.ES-14A,ES-1-111,ES-14C,ES-24A,ES-2-111 and
ES-24C)shall not exceed 0.54 pounds per million Btu heat input.
d. Carbon monoxide emissions from each source(ID Nos.ES-14A,ES-1-111,ES-14C,ES-24A,ES-24B
and ES-24C)shall not exceed 0.54 pounds per million Btu heat input.
e. Sulfuric acid mist emissions from each source(ID Nos.ES-14A,ES-1-111,ES-14C,ES-24A,ES-24B
and ES-24C)shall not exceed 0.019 pounds per million Btu heat input.
f. The maximum sulfur content of any coal received and burned in these sources(ID Nos.ES-14A,ES-1-111,
ES-14C,ES-24A,ES-2-111 and ES-24C)shall not exceed 1.0 percent by weight.
Testing[15A NCAC 02Q.0508(f)]
g. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above any limit given in Section 2.1 A.4.a-e above,the Permittee shall be deemed
in noncompliance with 15A NCAC 02D.0530.
h. Under the provisions of NCGS 143-215.108,the Permittee shall conduct an emission stack test for
particulate matter(PMio)on each source stack(Unit 1 -ID Nos.ES-14A,ES-1-111,and ES-1-IC; or
Unit 2—ID Nos.ES-2-1A,ES-2-111 and ES-2-1C)once per permit term to determine the emission rate in
pounds per hour and pounds per million Btu for particulate matter(PMIo)as follows:
i. the emissions stack test shall include the following operating scenarios:
A. 10%unadulterated wood,70%coal,and 20%tire-derived fuels;and
B. 16%tire-derived fuels and 84%coal.
If physical design limitations exist which prevent the Permittee from achieving either of the above feed
compositions,the Permittee shall conduct the tests with the maximum feasible feed rated of wood,in
the first scenario,and maximum feasible feed rates of tire-derived fuels,in the second scenario.
ii. all testing shall be conducted in accordance with a testing protocol approved by the DAQ, as provided
in Section 3,General Condition JJ of this permit.
iii. the Permittee shall submit a written report of the test results to the DAQ Regional Supervisor within 60
days of completion of each test.
If the required stack test is not conducted or if the results of this test are above the limits given in Section
2.1 A.4.a above,the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530.
Monitoring/Recordkeeping[15A NCAC 02Q .0508(o]
i. For particulate matter(PMio),S02,sulfuric acid mist,and NOx,the Permittee shall follow the monitoring
and recordkeeping requirements in Section 2.1 A.Lc,A.2.f-j and n,and A.3.g-i. The Permittee shall be
deemed in noncompliance with 15A NCAC 02D.0530 if this monitoring and recordkeeping is not
performed.
j. The Permittee shall determine and monitor emission rate of CO in the unit of pounds per million Btu
heat input,using the CEM data in Section 2.1 A.71.below. If any 30-day rolling average emission rate
exceeds the emission limit of CO in Section 2.1 AAA.,the Permittee shall be deemed in noncompliance
with 15A NCAC 02D.0530.
k. The Peemittee shall maintain records of actual emission rate of CO in the unit of pounds per million Btu
heat input. The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530 if these records
are not maintained.
Air Quality Permit No. 05884T21
Page 13
Reporting [15A NCAC 02Q.0508(f)]
1. For particulate matter(PMio),SO2,sulfuric acid mist,and NOx,the Permittee shall follow the reporting
requirements in Section 2.1 A.l.d,2.1 A.2.p,and 2.1 A.314 above.
in. For CO,the Permittee shall submit a summary report of monitoring and recordkeeping activities
postmarked on or before January 30 of each calendar year for the preceding six-month period between July
and December and July 30 of each calendar year for the preceding six-month period between January and
June. All instances of deviations from the requirements of this permit must be clearly identified.
aa. Sulfur dioxide emissions from each boiler(ID Nos. ES-1-1A,ES-1-113,ES-1-1C,ES-2-1A,ES-2-113 and
ES-2-1C)shall not exceed 1.47 pounds per million Btu heat input. [15A NCAC 02D.0530]
Testing[15A NCAC 02Q.0508(f)]
bb. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ found
in Section 3. If the results of this test are above any limit given in Section 2.1 A.4. aa. above,the Permittee
shall be deemed in noncompliance with 15A NCAC 02D .0530.
Monitorin2/Recordkeeping[15A NCAC 02Q.0508 (f)]
cc. The Permittee shall assure compliance with 2.1 A.4.aa. above by determining sulfur dioxide emissions in
pounds per million Btu using a continuous emissions monitoring(CEM)system meeting the requirements of
40 CFR Part 75 except that unbiased values may be used(missing data shall be filled in accordance with 40
CFR Part 75,except that the lookback periods per 40 CFR 75.33(Tables 1 and 2)shall consist of the available
data up to the appropriate quality-assured hours. Also, the replacement procedures for monitor data
availability between 80 and 90 percent may be used at values below 80 percent). The missing data procedure
in Part 75 shall be used whenever the boiler combusts any fuel. Compliance with sulfur dioxide emission
standards shall be determined by averaging hourly continuous emission monitoring system values over a 24-
hour block period beginning at midnight. To compute the 24-hour block average,the average hourly values
(missing data shall be filled in accordance with 40 CFR Part 75,except that the lookback periods per 40 CFR
75.33 (Tables 1 and 2) shall consist of the available data up to the appropriate quality-assured hours. Also,
the replacement procedures for monitor data availability between 80 and 90 percent may be used at values
below 80 percent) shall be summed, and the sum shall be divided by 24. The minimum number of data
points,equally spaced,required to determine a valid hour value shall be determined by 40 CFR Part 75. If
any 24-hour block average exceeds the limits per Section 2.1 A.4.aa.above or the records are not maintained,
the Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530.
Reporting[15A NCAC 02Q .0508(f)]
dd. The Permittee shall submit the continuous emissions monitoring data showing the 24-hour daily block values
in pounds per hour for sulfur dioxide emissions for each 24-hour daily block averaging period during the
reporting period no later than January 30 of each calendar year for the preceding three-month period between
October and December,April 30 of each calendar year for the preceding three-month period between January
and March,July 30 of each calendar year for the preceding three-month period between April and June,and
October 30 of each calendar year for the preceding three-month period between July and September. All
instances of deviations from the requirements of this permit must be clearly identified.
ee. CEMs Monitor Availability - The Permittee shall submit sulfur dioxide CEM system monitor downtime
reports, including monitor availability values (as calculated for 40 CFR Part 75) for the last hour of the
reporting period,no later than January 30 of each calendar year for the preceding three-month period between
October and December,April 30 of each calendar year for the preceding three-month period between January
and March,July 30 of each calendar year for the preceding three-month period between April and June,and
October 30 of each calendar year for the preceding three-month period between July and September.
5. 15A NCAC 02D.0530(u): PREVENTION OF SIGNIFICANT DETERIORATION
a. The Permittee has used projected actual emissions to avoid applicability of prevention of significant
deterioration requirements for a project consisting of increasing the feed rate of tire derived fuel above 35%
but,less than or equal to 50%of heat input rate in each boiler(ID Nos.ES-1-1A,ES-1-113,ES-1-1C,ES-2-
Air Quality Permit No.05884T21
Page 14
1A, ES-2-1B and ES-2-1C), installing rotating opposed overfire air systems (ID Nos. CD-1-5A through
CD-1-5C and CD-2-5A through CD-2-5C),furnace sorbent injection systems(ID Nos.CD-1-6A through
CD-1-6C and CD-2-6A through CD-2-6C)and selective non-catalytic reduction systems(ID Nos. CD-1-
7A through CD-1-7C and CD-2-7A through CD-2-7C)on boilers(ID Nos.ES-1-1A,ES-1-1B,ES-14C,
ES-24A, ES-24B and ES-24C), and installing alkaline sorbent silos (ID Nos. ES-9A and CD-9B) and
associated vent fabric filters(ID No.CD-9A and CD-9B).
In order to verify the assumptions used in the projected actual emissions calculations, the Permittee shall
comply with the testing,record keeping and reporting requirements in Section 2.1 A.5.b.through d.below.
Testing[15A NCAC 02Q.0508(f)]
b. Under the provisions of NCGS 143-215.108, the Permittee shall conduct emissions testing for boilers (ID
Nos.ES-14A,ES-1-1B,ES-14C,ES-24A,ES-24B and ES-24C)for PM,PMio, and VOC,by October
8, 2015, if any of the conditions in(i) through(iv)below have commenced: (i) commencement of feeding
tire derived fuel above 35%,but less than or equal to 50%of the heat input rate in any individual boiler,or
(ii)installing rotating opposed overfire air system on any individual boiler,or(iii)installing furnace sorbent
injection system on any individual boiler, or(iv)installing selective non-catalytic reduction system7 on any
individual boiler,or(v)installing alkaline sorbent silos and associated vent fabric filters.
Details of emissions testing and reporting requirements can be found in Section 3-General Condition JJ.
The Permittee shall establish emission factors based on the average of all runs performed in the units of
pounds per million Btu heat input for PM,PMio,and VOC. In addition,the emission factors for NOx, SO2,
and CO,shall be established as follows:
The Permittee shall establish emission factor for NOx in the unit of pounds per million Btu heat input,using
the CEM data in Section 2.1 A.2.g.above.
The Permittee shall establish emission factor for SO2 in the unit of pounds per million Btu heat input,using
the CEM data in Section 2.1 A.4.cc. above.
The Permittee shall establish emission factor for CO in the unit of pounds per million Btu heat input, using
the CEM data in Section 2.1 A.71.below.
The emissions factors for PM,PM,o,VOC,NOx,5O2,and CO shall be used along with the actual fuel input
rates to calculate monthly emissions from each boiler(11D Nos.ES-14A,ES-14B,ES-14C,ES-24A,ES-
24B and ES-24C). The calculated monthly emissions shall be used in reporting actual emissions for these
pollutants in Section 2.1 A.5.d.below.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530(u),if the emissions testing for
each boiler is not conducted for PM,PMio, and VOC, by October 8, 2015, or the emissions factors for PM,
PMio,VOC,NOx, 5O2,and CO,are not established.
Recordkeeaing[15A NCAC 02Q .0508(f)]
c. Beginning in calendar year 2015, the Permittee shall maintain records of actual emissions for PM, PM,o,
NOx,SO2,CO,and VOC in tons per year on a calendar year basis for five years following the resumption of
regular operations after(i)commencement of feeding tire derived fuel above 35%,but less than or equal to
50%of the heat input rate in any individual boiler(ID Nos. ES-14A,ES-14B,ES-14C,ES-24A,ES-2-
1B and ES-24C),or(ii)installing rotating opposed overtire air system(ID Nos.CD-1-5A through CD-1-
5C and CD-2-5A through CD-2-5C)on any individual boiler(ID Nos.ES-14A,ES-14B,ES-14C,ES-
24A,ES-24B and ES-24C),or(iii)installing furnace sorbent injection system(ID Nos.CD-1-6A through
CD-1-6C and CD-2-6A through CD-2-6C) on any individual boiler (ID Nos. ES-14A, ES-14B, ES-1-
1C, ES-24A, ES-24B and ES-24C), or(iv) installing selective non-catalytic reduction system(ID Nos.
CD-1-7A through CD-1-7C and CD-2-7A through CD-2-7C)on any individual boiler(ID Nos.ES-14A,
The installation of selective non-catalytic reduction systems on each boiler is optional.
Air Quality Permit No. 05884T21
Page 15
ES-1-1B,ES-1-IC,ES-2-IA,ES-2-1B and ES-2-IC),or(v) installing alkaline sorbent silos(ID Nos.ES-
9A and CD-9B)and associated vent fabric filters(ID No.CD-9A and CD-9B).
The Permittee shall make the information, documented and maintained in this Section 2.1 A.5.c., available
to the Director or the general public pursuant to the requirements in 40 CFR 70.4(b)(3)(viii).
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530(u), if the recordkeeping
requirements in this Section 2.1 A.5.c. are not complied with, or the records are not made available to the
Director or the general public.
Reporting[15A NCAC 02Q.0508(f)]
d. The Permittee shall submit a report for PM,PMio,NOx,S02,CO,and VOC emissions to the Director within
60 days after the end of each calendar year during which the records in Section 2.1 A.5.c.must be generated.
The report shall contain the items listed in 40 CFR 51.166(r)(6)(v)(a)through(c).
The reported actual emissions for each of the five calendar years for PM,PM 10,NOx, SO2, CO,and VOC
will be compared to the respective projected actual emissions as included below:
Pollutant Projected Actual Emissions Projected Actual
Emission Factor Emissions"`
Lb/Million Btu Tons per Year
PM 0.0184` 86.1
PMio 0.0184* 83.2
NOx 0.35 1296
S02 1.37(Coal/TDF) 3700
0.021 (Wood)
CO 0.077(CoaUTDF) 306
0.1 (Wood)
VOC 0.0037 (CoaUTDF) 27
0.017(Wood)
`The emission factor is for boiler only.
'*The projected actual emissions are not enforceable limitations. If the reported actual emissions exceed the
projected actual emissions, the Permittee shall include in its annual report an explanation as to why actual
emissions exceeded the projected actual emissions.
6. 15A NCAC 02D.0614: COMPLIANCE ASSURANCE MONITORING
a. Per 40 CFR 64 and 15A NCAC 02D .0614,the Permittee shall comply with the following.
b. Background
i. Emission Unit(s).
(A) Description: Six watertube design coal/natural gas/No.2 and No.4 fuel oil/tire derived
fuel/pelletized paper fuel/flyash briquette/unadulterated wood/creosote treated wood-fired boilers
(B) Identification. ID Nos.ES-1-1A,ES-1-lB,ES-14C,ES-2-1A,ES-2-1B and ES-2-lC
ii. Applicable Regulation,Emission Limit,and Monitoring Requirements.
(A) Regulations: 15A NCAC 02D.0524(Subpart Db)
15A NCAC 02D.0501(e)
15A NCAC 02D .0530
(B) Emission limits:
1. 0.051 pounds per million Btu heat input(40 CFR 60.43b(a)(1))—[particulate matter]
2. 6.02 pounds per hour per boiler[PM�o]
3. 0.027 pounds per million Btu heat input per boiler[PMio]
(C) Control Technology. Six bagfilters(ID Nos.CD-1-lA,CD-1-lB,CD-1-IC,CD-2-1A,CD-2-IB
and CD-2-1C)
Air Quality Permit No. 05884T21
Page 16
c. Monitoring Approach The key elements of the monitoring approach for particulate matter,including
parameters to be monitored,parameter ranges and performance criteria are presented in the following table.
1 2
1. Indicator Visible emissions Pressure drop
Measurement Approach Visible emissions from the fabric filter Pressure drop across the fabric filter is
will be monitored continuously using measured with a differential pressure gauge
COM system on each common stack
II. Indicator Range An excursion is defined as visible An excursion is defined as a pressure drop
emissions in amounts greater than or greater than 9.5 inches of water. Excursions
equal to 15%(six-minute average), trigger an inspection,corrective action,and
excluding periods of start-up,shutdown a reporting requirement.
or malfunction. Excursions trigger an
inspection,corrective action,and a
reporting requirement.
QIP Threshold The QIP threshold is an accumulation of None selected
excursions exceeding 1 percent duration
of the operating time for a six-month
rcpmrting period.
III. Performance Criteria
A. Data Representativeness Measurements are being made at the Pressure taps are located at the fabric filter
emission point(fabric filter outlet)of inlet and outlet. The gauge has a minimum
each common stack accuracy of 0.5 inches of water.
B. Verification of NA NA
Operational Status
C. QA/QC Practices The COM systems shall be calibrated, The pressure gauge is checked daily for
maintained and operated according to 40 operation.
CFR 60,Appendix F,Procedure 3.
D. Monitoring Frequency Data is collected continuously with COM Pressure drop is monitored daily.
systems.
E. Data Collection Date from the COM systems is collected Pressure gauge readings are manually
Procedures electronically and maintained on the Data recorded daily.
Acquisition and Handling System
computer along with information on the
operating status of the boilers.
F. Avera in Periods NA NA
d. Justification
i. Background. The pollutant-specific emission units are the six identical stoker boilers used to produce
steam(a portion of which is sold to a nearby industrial facility for use in their process). The remainder
of the steam is used to drive a steam turbine connected to an electrical generator to generate electricity
for wholesale to the connected utility. The particulate matter emissions from each boiler are controlled
by fabric filters with approximately 16,800 square feet of filter area,each.
ii. Rationale for Selection of Performance Indicators. Visible emissions was selected as the performance
indicator because it is a good indicator of the proper operation and maintenance of the filter units.
When the filter units are operating properly,there will not be any visible emissions in the exhaust
outlet.Any increase in visible emissions indicates reduced performance of the filter units,therefore,the
presence of visible emissions in levels exceeding or equal to 15%(six-minute average),excluding
periods of start-up,shutdown or malfunction,is used as a performance indicator.
Air Quality Permit No. 05884T21
Page 17
In general,filters are designed to operate at a relatively constant pressure drop. Monitoring pressure
drop provides a means of detecting a change in operation that could lead to an increase in emissions.
An increase in pressure drop can indicate that the cleaning cycle is not frequent enough,cleaning
equipment is damaged/broken,the bags are becoming blinded,or the airflow has increased. A decrease
in pressure drop may indicate broken or loose bags,but this is also indicated by the presence of visible
emissions,indicator No. 1. A pressure drop across the filter unit also serves to indicate that there is
airflow through the control device.
iii. Rationale for Section of Indicator Ranges. Per operating knowledge of the systems,the facility has
selected an indicator range of greater than or equal to 15%opacity(six-minute average),excluding
periods of start-up,shutdown or malfunction. When an excursion occurs,corrective action will be
initiated,beginning with an evaluation of the occurrence to determine the action required to correct the
situation. All excursions will be documented and reported. This indicator range was selected because:
(1)an increase in visible emissions is indicative of an increase in particulate emissions;and(2)a
COMB is a well-established monitoring technique for these sources.
The selected QIP threshold for fabric filter visible emissions is an accumulation of excursions
exceeding 1 percent duration of the operating time for a six-month reporting period. If the QIP
threshold is exceeded in a semiannual reporting period,a QIP will be developed and implemented.
The indicator range chosen for the fabric filter pressure drop is greater than 9.5 inches water. An
excursion triggers an inspection,corrective action,and a reporting requirement. The pressure drop is
recorded daily. As the pressure drop approaches 9.5 inches water the bags are scheduled for
replacement.
Reporting[15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of all monitoring activities postmarked on or before January
30 of each calendar year for the preceding six-month period between July and December and July 30 of
each calendar year for the preceding six-month period between January and June. The report shall also
include the following information,as applicable:
(i) Summary information on the number,duration and cause(including unknown cause, if applicable)of
excursions or exceedances,as applicable,and the corrective actions taken;
(ii) Summary information on the number,duration and cause(including unknown cause,if applicable)for
monitor downtime incidents(other than downtime associated with zero and span or other daily
calibration checks,if applicable);and
(iii)A description of the actions taken to implement a QIP during the reporting period as specified in§64.8.
Upon completion of a QIP,the owner or operator shall include in the next summary report
documentation that the implementation of the plan has been completed and reduced the likelihood of
similar levels of excursions or exceedances occurring.
All instances of deviations for the requirements of this permit must be clearly identified.
7. 15A NCAC 02D .1109: Case-by-Case MACT
a. The Permittee shall comply with this CAA§1120)standard until May 19,2019. The Permittee shall be
subject to the requirements of CAA §112(d)standard for"National Emission Standards for Hazardous Air
Pollutants for Industrial,Commercial,and Institutional Boilers and Process Heaters"starting May 20,
2019, as specified in Section 2.1.A.10.below.
Emissions Standards
b. The following emission standards shall apply to the affected boilers(ID Nos.ES-14A,ES-1-11R,ES-1-1C,
ES-24A,ES-24B and ES-24C):
i. All fuel combinations,based on each of these boilers being a"unit designed to burn biomass/bio-based
solid subcategory"as defined in 40 CFR 63.7575:
(A) Particulate Matter(filterable only): 0.18 lb/million Btu
(B) Mercury: 0.000005 lb/million Btu
(C) Hydrogen Chloride:0.02 lb/million Btu
Air Quality Permit No.05884T21
Page 18
(D) Carbon Monoxide: 508 ppmvd,corrected to 7%02,30-day rolling average
The initial compliance date for the emission standards,operating requirements,and associated monitoring,
recordkeeping,and reporting requirements is June 2,2013. These terms need not be included in the annual
compliance certification until after the initial compliance date. These standards shall apply all times,
except for periods of startup,shutdown,and malfunction.The Permittee shall follow the procedures in 15A
NCAC 02D. 0535 for any excess emissions that occur during the periods of startup,shutdown,or
malfunction.
Operating Requirements
c. If the facility utilizes a fabric filter to comply with the particulate matter(PM)(filterable only)and mercury
(Hg)emissions standards in Section 2.1 A.7.b.above,the Permittee shall comply with the following:
i. Install and operate the fabric filter such that the bag leak detection system alarm does not sound more
than 5 percent of the operating time during each 6-month period;or,
ii. Maintain opacity of exhaust from the control device at less than or equal to 20 percent(6-minute
average)except for one 6-minute period per hour of not more than 27 percent.
d. If the facility utilizes a sorbent injection system(such as FSI)to comply with the hydrogen chloride(HCI)
emissions standards listed in Section 2.1 A.7.b.above,the Permittee shall maintain the minimum sorbent
injection rate at or above the operating levels,adjusted for variability,established during the performance
test that demonstrated compliance with the applicable emissions standards.
e. If the facility utilizes fuel analysis to comply with the Hg and HCI emissions standards in Section 2.1
A.7.b. above,the Permittee shall maintain the fuel type or fuel mixture such that the Hg and HCI emissions
rates calculated according to the procedures in Section 2.1 A.7.i.below are less than the applicable
emission standards.
Testing[15A NCAC 02Q.0508(f)]
f. No initial or subsequent annual testing is required to demonstrate compliance with the emissions standards
associated with burning of No. 2 fuel oil and natural gas in the affected boilers.
g. No initial or subsequent annual testing is required if a facility can demonstrate compliance with applicable
emissions standards using fuel analysis according to the procedures in Section 2.1 A.7.i.below.
h. Initial Testing Requirement-The Permittee shall conduct an initial compliance test while burning mixed
fuel of a ratio,by heat input,of approximately 50 percent wood and 50 percent coal/TDF for emissions of
PM(filterable only),Hg,HCI,and CO.
The initial compliance test for these fuels shall be conducted within 180 days of the initial compliance date.
The initial compliance test is not required if the NC DAQ—SSCB approves any previously conducted
performance test as an equivalent compliance demonstration. Testing shall be conducted in accordance
with General Condition JJ found in Section 3.
The Permittee shall establish operating parameters,as applicable,during the initial compliance test in
accordance with the following Table.
Operating Parameters Established by Performance Testing
Control Device Pollutant(s) Requirements for Performance Test
Sorbent Injection HCI 1.Collect sorbent injection rate data every 15 minutes during the
System(such as entire period of the performance test;and,
FSI) 2.Determine the average sorbent injection rate for each individual test
run in the 3-run performance test by computing the average of all the
15-minute readings taken during each test run.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D .1109 if the required tests are not
conducted,or if the results of the emissions tests exceed the emission standards in Section 2.1.A.7.b. above,
or if the operating parameters,as applicable,are not established.
i. If the Permittee chooses to demonstrate compliance with the emissions standards in Section 2.1 A.7.b.
above using the fuel analyses,the following procedures shall be complied with.
i. Develop and submit a site-specific fuel analysis plan to the NC DAQ—SSCB for review and approval
Air Quality Permit No.05884T21
Page 19
no later than 60 days before the date that the Permittee plans to demonstrate compliance. The plan
shall include the following information:
(A) The identification of all fuel types anticipated to be burned in each affected boiler or process
heater.
(B) For each fuel type,identification of whether the fuel analysis will be conducted by the Permittee
or a fuel supplier.
(C) For each fuel type,a detailed description of the sample location and specific procedures to be used
for collecting and preparing the composite samples if the procedures are different from paragraph
c.or d. below. Samples should be collected at a location that most accurately represents the fuel
type,where possible,at a point prior to mixing with other dissimilar fuel types.
(D) For each fuel type,the analytical methods,with the expected minimum detection levels,to be used
for the measurement of C12 and Hg.
ii. Obtain,at a minimum,three composite fuel samples for each fuel type according to the following
procedures,or according to the procedures in Table in this Section:
(A) If sampling from a belt(or screw) feeder,collect fuel samples as follows:
(1) Stop the belt and withdraw a 6-inch wide sample from the full cross-section of the stopped
belt to obtain a minimum two pounds of sample. Collect all the material(fines and coarse)in
the full cross-section. Transfer the sample to a clean plastic bag.
(2) Each composite sample will consist of a minimum of three samples collected at
approximately equal intervals during the testing period.
(B) If sampling from a fuel pile or truck,collect fuel samples according as follows:
(1) For each composite sample,select a minimum of five sampling locations uniformly spaced
over the surface of the pile.
(2) At each sampling site,dig into the pile to a depth of 18 inches. Insert a clean flat square
shovel into the hole and withdraw a sample,making sure that large pieces do not fall off
during sampling.
(3) Transfer all samples to a clean plastic bag for further processing.
iii. Prepare each composite sample according to the procedures in paragraphs(A).through(G)below:
(A) Thoroughly mix and pour the entire composite sample over a clean plastic sheet.
(B) Break sample pieces larger than 3 inches into smaller sizes.
(C) Make a pie shape with the entire composite sample and subdivide it into four equal parts.
(D) Separate one of the quarter samples as the first subset.
(E) If this subset is too large for grinding,repeat the procedure in paragraph iii. above with the quarter
sample and obtain a one-quarter subset from this sample.
(F) Grind the sample in a mill.
(G) Use the procedure in paragraph(C)above to obtain a one-quarter subsample for analysis. If the
quarter sample is too large,subdivide it further using the same procedure.
iv. Determine the concentration of Hg and C12 in unit of lb/million Btu of each composite sample for each
fuel type according to the procedures in the following Table:
Pollutant(s) Task Method
Hg and HCl Collect Fuel Samples • Procedure in paragraph c.above;or,
• ASTM D2234-00,D2234M-03(for coal)(IBR,see 40 CFR 63.14(b));or,
• ASTM D6323-98(2003)(for biomass)(IBR,see 40 CFR 63.14(b)).
Prepare Composited Fuel • S W-846-3050B(for solid samples);or,
Samples • SW-846-3020A(for liquid samples);or,
• ASTM D2013-04(for coal)(IBR,see 40 CFR 63.14(b));or,
• ASTM D5198-92(2003)(for biomass)(IBR,see 40 CFR 63.14(b)).
Determine Heat Content • ASTM D5865-04(for coal)(IBR,see 40 CFR 63.14(b));or,
• ASTM E711-87(for biomass)(113R,see 40 CFR 63.14(b)).
Determine Moisture • ASTM D3137-03(BR,see 40 CFR 63.14(b));or,
Content • ASTM E871-82(1998)(113R,see 40 CFR 63.14(b)).
Hg Measure Hg Concentration • ASTM D6722-01 (for coal)(IBR,see 40 CFR 63.14(b));or,
in Sample • SW-846-7471A(for solid samples);or,
• SW-846-7470A(for liquid samples).
Convert Concentration into Method 19 F-factor methodology in 40 CFR 60,Appendix A
lbs/MMBtu
Air Quality Permit No.05884T21
Page 20
Pollutant(s) Task Method
HCl Measure HCl • SW-846-9250 or ASTM D6721-01 (for coal);or,
Concentration in Sample • ASTM E776-87(1996)(for biomass)(IBR,see 40 CFR 63.14(b)).
Convert Concentration into Method 19 F-factor methodology in 40 CFR 60,Appendix A
Ibs/MMBtu
v. Establish the maximum chlorine fuel input(Cinput)during the initial performance testing according to
the following procedures:
(A) Determine the permitted fuel type or fuel mixture that has the highest content of chlorine.
(B) During the performance testing for HCl,determine the fraction of the total heat input for each fuel
type burned(Qi)based on the fuel mixture that has the highest content of chlorine,and the average
chlorine concentration of each fuel type burned(Ci).
(C) Establish a maximum chlorine input level using the following equation.
Clinput=Y-i=1 to n [Ci/Qi
Where:
Clinput = Maximum amount of chlorine entering the boiler or process heater
through fuels burned in lbs/million Btu.
Ci = Arithmetic average concentration of chlorine in fuel type,i,determined
by fuel analysis,in lbs/million Btu.
Qi = Fraction of total heat input from fuel type,i,based on the fuel mixture
that has the highest content of chlorine. If multiple fuel types are not
fired during the performance testing,insert a value of"1" for Qi.
n = Number of different fuel types burned in your boiler or process heater
for the mixture that has the highest content of chlorine.
vi. Establish the maximum Hg fuel input level(Mercurythput)during the initial performance testing using
the procedures provided below.
(A) Determine the fuel type or fuel mixture that can be burned in the boiler or process heater with the
highest content of Hg.
(B) During the compliance demonstration for Hg,determine the fraction of total heat input for each
fuel burned(Qi)based on the fuel mixture that has the highest content of mercury,and the average
mercury concentration of each fuel type burned(HGi).
(C) Establish a maximum mercury input level using the following equation:
Mercuryinpu,=Ei=1 ton [HG/Qi]
Mercuryinput=Maximum amount of mercury entering the boiler or process heater
through fuels burned in lbs/million Btu.
HGi = Arithmetic average concentration of mercury in fuel type,i,determined
by fuel analysis,in lbs/million Btu.
Qi = Fraction of total heat input from fuel type,i,based on the fuel mixture
that has the highest content of chlorine. If multiple fuel types are not
fired during the performance testing,insert a value of"1" for Qi.
n = Number of different fuel types burned in your boiler or process heater
for the mixture that has the highest content of Hg.
vii. If the affected source can burn more than one fuel type,determine the fuel mixture that would result in
the maximum emission rates of the pollutant(s)for which compliance will be demonstrated by fuel
Air Quality Permit No.05884T21
Page 21
analysis.
viii.Determine the 90th percentile confidence level fuel pollutant concentration of the composite samples
analyzed for each fuel type using the one-sided z-statistic test described in the following equation.
P90=mean+(SD x t)
Where:
P90 = 90th percentile confidence level pollutant concentration,in lb/million
Btu.
mean = Arithmetic average of the fuel pollutant concentration in the fuel
samples,in lb/million Btu.
SD = Standard deviation of the pollutant concentration in the fuel samples,
in lb/million Btu.
t = t distribution critical value for 90th percentile(0.1)probability for
the appropriate degrees of freedom(number of samples minus one)
as obtained from a Distribution Critical Value Table.
ix. To demonstrate compliance with the applicable emission standard for HCI,the calculated HCI
emission rate,using the following equation,for the affected source shall be less than the applicable
emission standard.
HCl =Et=t to" = [Ci90 x Qj x 1.028]
Where:
HCI =HCl emission rate from the boiler or process heater in lbs/million Btu.
Ci90 = 90th percentile confidence level concentration of chlorine in fuel type,
i,in lbs/MMBtu(calculated using Equation in Section 2.1 A.7.i.viii.
above)
Qi = Fraction of total heat input from fuel type,i,based on the fuel mixture
that has the highest content of chlorine.If the affected source does not
burn multiple fuel types,insert a value of"V for Qi.
n = Number of different fuel types burned in the affected source for the
mixture that has the highest content of chlorine.
1.028 =Molecular weight ratio of HCI to chlorine.
x. To demonstrate compliance with the applicable emission standard for mercury,the calculated mercury
emission rate,using the following equation,for the affected source shall be less than the applicable
emission standard.
Mercury =Im to" _ [HGj9ox Qj
Where:
Mercury=Mercury emission rate from boiler or process heater in lbs/million Btu.
HGi90 = 90th percentile confidence level concentration of mercury in fuel type,
i,in lbs/MMBtu (calculated using Equation in Section 2.1 A.7.i.viii.
above)
Qi = Fraction of total heat input from fuel type,i,based on the fuel mixture
that has the highest content of mercury. If the affected source does not
burn multiple fuel types,insert a value of"V for Qi.
n = Number of different fuel types burned in the affected source for the
mixture that has the highest mercury content.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D.1109 if the requirements of
Air Quality Permit No. 05884T21
Page 22
this Section 2.1 A.7.i.are not complied with or the calculated emission rates of Hg or HCl exceed the
applicable emissions standards in Section 2.1.A.7.b.above.
j. Annual Testing Requirement-The Permittee shall conduct subsequent performance tests for mercury,
hydrogen chloride and particulate matter(filterable only)on an annual basis to comply with the emissions
standards in Section 2.1 A.7.b.above,when firing coal or tire derived fuel or pelletized paper fuel or
flyash briquette,No.4 fuel oil,and green wood,unless it meets the requirements listed in i.through iii.
below. Annual performance tests,if required,shall be completed between 10 and 12 months after the
previous performance test.
i. The Permittee may conduct performance tests less often for a given pollutant if the performance tests
for at least 3 consecutive years show compliance with the emission limit.In this case,the Permittee
need not conduct a performance test for that unit,consisting of three boilers,for that pollutant for the
next 2 years,but shall conduct a performance test during the third year and no more than 36 months
after the previous performance test. If any unit shows noncompliance with an emission standard,this
shall be considered a separate compliance issue with each individual boiler.
ii. If the affected unit continues to meet the emission limit,the Permittee may conduct performance tests
every third year,but each such performance test shall be conducted no more than 36 months after the
previous performance test.
iii. If a performance test shows noncompliance with an emission limit,the Permittee shall conduct annual
performance tests for that pollutant until all performance tests over a consecutive 3-year period show
compliance.
iv. If the Permittee uses fuel analysis to demonstrate compliance with the emissions standards in Section
2.1 A.7.b.above,the Permittee shall conduct a fuel analysis for each type of fuel burned no later than 5
years after the previous fuel analysis.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D.1109 if any subsequent annual
tests or fuel analysis are not conducted,or if the results of the emissions tests exceed the applicable
emissions standards in Section 2.1.A.7.b. above.
Monitoring[15A NCAC 02Q.0508(f)]
k. For complying with the emission standards associated with coal/tire derived fuel/pelletized paper fuel/flyash
briquette,No.4 fuel oil,dry wood,and green wood burning,the Permittee shall install,operate,and
maintain a continuous emission monitoring system(CEMS)for carbon monoxide and oxygen or carbon
dioxide according to the procedures listed in i.through iv.below. The carbon monoxide and oxygen or
carbon dioxide shall be monitored at the same location at the outlet of the unit.
i. Each CEMS shall be installed,operated,and maintained according to the applicable procedures under
Performance Specification(PS)3 or 4A of 40 CFR 60,Appendix B,and according to the site-specific
monitoring plan(See Section 7).
ii. Conduct a performance evaluation of each CEMS according to the requirements in 40 CFR 63.8 and
according to PS 4A of 40 CFR 60,Appendix B.
iii. Each CEMS shall complete a minimum of one cycle of operation(sampling,analyzing,and data
recording)for each successive 15-minute period.
iv. The CEMS data shall be reduced as specified in 40 CFR 63.8(g)(2).
V. An alternate monitoring method may be used by substituting carbon dioxide instead of oxygen to
calculate carbon monoxide for purposes of CAA 1120)standard and 15A NCAC 02D. 1109 only. A
carbon dioxide diluent cap of 5.0%can be used if carbon dioxide concentrations fall below 5.0%.
Based on 40 CFR Part 60 Appendix A Method 19 Equations 19-1 and 19-7,the following formula can
be used as an alternate approach to calculate carbon monoxide corrected to 7%oxygen:
Fc 100 (20.9—%02 correction)
Cd — CW X X Fd X %CO2w 20.9
Where:
Cd =pollutant concentration,dry basis
CW =pollutant concentration,wet basis
Fc=Method 19 carbon F-factor for wood
Air Quality Permit No.05884T21
Page 23
Fd=Method 19 wet F-factor for wood
%02 correction=7%
vi. The Permittee shall calculate and record a 30-day rolling average emission rate on a daily basis. A
new 30-day rolling average emission rate is calculated as the average of all of the hourly CO emission
data for the preceding 30 operating days. This 30-day rolling average for CO will begin on November
29,2013,and the CO CEMS must be certified and operable by that date.
vii. Except for monitor malfunctions,associated repairs,and required quality assurance or control activities
(including,as applicable,calibration checks and required zero and span adjustments),the monitor shall
continuously record(or collect data at all required intervals)at all times that the affected source is
operating.
viii. For purposes of calculating data averages,the Permittee may not use data recorded during periods of
monitoring malfunctions,associated repairs,out-of-control periods,required quality assurance or
control activities,or when the boiler or process heater is operating at less than 50 percent of its rated
capacity. The Pennittee shall use all the data collected during all other periods in assessing
compliance. Any period for which the monitoring system is out-of-control and data are not available
for required calculations constitutes a deviation from the monitoring requirements.
ix. A 30-day rolling average emission rate above the applicable emission limitation shall constitute a
violation of the standard.
X. The CEMS monitor downtime(MD)shall not exceed 5.0 percent.
Percent Monitor Downtime MMD)Calculation:
%MD= Total Monitor Downtime x 100
Total Source Operating Time"
* Total Monitor Downtime includes Quality Assurance(QA)activities unless exempted by regulation or defined in
an agency approved QA Manual. The amount of exempt QA Time will be reported in the quarterly report as such.
** If a source operates less than 2200 hours during any quarter,the source may calculate the%MD using all operating
data for the current quarter and the preceding quarters until 2200 hours of data are obtained.[N.C.G.S. 143-215.110]
The Permittee shall be deemed in non-compliance with 15A NCAC 02D.1109 if the requirements of this
Section 2.1 A.71. are not complied with or any 30-day rolling average emission rate of CO is above the
applicable CO emissions standards in Section 2.1 A.7.b.above when burning coal,tire derived fuel,
pelletized paper fuel,flyash briquette,No.4 fuel oil,dry wood,and green wood.
1. If the option to comply with the opacity operating requirement is selected in Section 2.1 A.7.c.above,the
Permittee shall install,operate,certify and maintain each continuous opacity monitoring system(COMS)
according to the procedures listed below.
i. Each COMS shall be installed,operated,and maintained according to PS 1 of 40 CFR 60,Appendix B.
ii. Conduct a performance evaluation of each COMS according to the requirements in 40 CFR 63.8 and
according to PS 1 of 40 CFR 60,Appendix B.
iii. As specified in 40 CFR 63.8(c)(4)(i),each COMS shall complete a minimum of one cycle of sampling
and analyzing for each successive 10-second period and one cycle of data recording for each
successive 6-minute period.
iv. The COMS data shall be reduced as specified in 40 CFR 63.8(g)(2).
v. Except for monitor malfunctions,associated repairs,and required quality assurance or control activities
(including,as applicable,calibration checks and required zero and span adjustments),monitor
continuously(or collect data at all required intervals)at all times that the affected source is operating.
vi. Include in the site-specific monitoring plan(See Section 7)procedures and acceptance criteria for
operating and maintaining each COMS according to the requirements in 40 CFR 63.8(d). At a
minimum,the monitoring plan shall include a daily calibration drift assessment,a quarterly
performance audit,and an annual zero alignment audit of each COMS.
vii. Operate and maintain each COMS according to the requirements in the monitoring plan and the
requirements of 40 CFR 63.8(e). Identify periods the COMS is out-of-control including any periods
that the COMS fails to pass a daily calibration drift assessment,a quarterly performance audit,or an
Air Quality Permit No. 05884T21
Page 24
annual zero alignment audit.
viii.Determine and record all the 6-minute averages(and 1-hour block averages as applicable)collected for
periods during which the COMS is not out of control.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D .1109 if the requirements of this
Section 2.1 A.71 are not complied with or any 6-minute average of opacity exceeds the operating
requirement in Section 2.1 A.7.c.ii. above.
m. For each operating limit that requires the use of a CMS,the Permittee must install,operate,and maintain
each continuous parameter monitoring system(CPMS)according to the procedures listed below.
i. The CPMS must complete a minimum of one cycle of operation for each successive 15-minute period.
A valid hour of data must have a minimum of four successive cycles of operation.
ii. Except for monitoring malfunctions,associated repairs,and required quality assurance or control
activities(including,as applicable,calibration checks and required zero and span adjustments),
conduct all monitoring in continuous operation at all times that the affected unit is operating. A
monitoring malfunction is any sudden,infrequent,not reasonably preventable failure of the monitoring
to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless
operation are not malfunctions.
iii. For purposes of calculating data averages,the Permittee may not use data recorded during monitoring
malfunctions,associated repairs,out-of-control periods,or required quality assurance or control
activities.The Permittee must use all the data collected during all other periods in assessing
compliance. Any period for which the monitoring system is out-of-control and data are not available
for required calculations constitutes a deviation from the monitoring requirements.
iv. Determine 3-hour block average of all recorded readings,except as provided in paragraph iii.above.
v. Record the results of each inspection,calibration,and validation check.
vi. Operation above the established maximum or below the established minimum operating limits shall
constitute a violation of established operating limits.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D.1109 if the requirements of this
Section 2.1 A.7.m. are not complied with.
n. If the option to comply with the fabric filter bag leak detection system operating requirement in Section 2.1
E.7.c.above is selected,the Permittee shall install,calibrate,maintain,and continuously operate a bag leak
detection system as specified below:
i. Install and operate a bag leak detection system for each exhaust stack of the fabric filter.
ii. Each bag leak detection system shall be installed,operated,calibrated,and maintained in a manner
consistent with the manufacturer's written specifications and recommendations and in accordance with
the guidance provided in EPA-454/R-98-015, September 1997.
iii. The bag leak detection system shall be certified by the manufacturer to be capable of detecting PM
emissions at concentrations of 10 milligrams per actual cubic meter or less.
iv. The bag leak detection system sensor shall provide output of relative or absolute particulate matter
loadings.
v. The bag leak detection system shall be equipped with a device to continuously record the output signal
from the sensor.
vi. The bag leak detection system shall be equipped with an alarm system that will sound automatically
when an increase in relative particulate matter emissions over a preset level is detected. The alarm
shall be located where it is easily heard by plant operating personnel.
vii. For positive pressure fabric filter systems that do not duct all compartments of cells to a common
stack,a bag leak detection system shall be installed in each baghouse compartment or cell.
viii.Where multiple bag leak detectors are required,the system's instrumentation and alarm may be shared
among detectors.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D .1109 if the requirements of this
Section 2.1 E.7.n.are not conducted with.
o. If an affected source unit is controlled with a fabric filter and the facility demonstrates continuous
compliance using a bag leak detection system,the Permittee shall:
i. Initiate corrective action within 1 hour of a bag leak detection system alarm and complete corrective
actions as soon as practical,and operate and maintain the fabric filter system such that the alarm does
not sound more than 5 percent of the operating time during a 6—month period.
ii. Maintain records of the date,time,and duration of each alarm,the time corrective action was initiated
and completed,and a brief description of the cause of the alarm and the corrective action taken.
Air Quality Permit No. 05884T21
Page 25
iii. Record the percent of the operating time during each 6-month period that the alarm sounds.
(A) If inspection of the fabric filter demonstrates that no corrective action is required,no alarm time is
counted.
(B) If corrective action is required,each alarm shall be counted as a minimum of 1 hour.
(C) If it takes longer than 1 hour to initiate corrective action,the alarm time shall be counted as the
actual amount of time taken to initiate corrective action.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D .1109 if the requirements of this
Section 2.1 A.7.o. are not complied with or if the alarm on the fabric filter leak detection system sounds
more than 5 percent of the operating time during any 6—month period.
p. For each operating requirement that requires the use of equipment to monitor sorbent injection rate(e.g.,
weigh belt,weigh hopper,or hopper flow measurement device),the Permittee shall meet the requirements
in Section 2.1 A.7.m.above, in addition to the following requirements:
i. Locate the device in a position(s)that provides a representative measurement of the total sorbent
injection rate.
ii. Install and calibrate the device in accordance with manufacturer's procedures and specifications.
iii. At least annually,calibrate the device in accordance with the manufacturer's procedures and
specifications.
The Permittee shall be deemed in non-compliance with 15A NCAC 02D.1109 if the requirements of this
Section 2.1 A.7.p.are not complied with.
Recordkeepin2 Requirements [15A NCAC 02Q .0508(f)]
q. The Permittee shall maintain a copy of each notification and report required by this standard,including all
documentation supporting any Notification of Compliance Status.
r. The Permittee shall maintain records of performance tests,fuel analyses,or other compliance
demonstrations,CMS performance evaluations,and opacity observations.
s. For each required CEMS and COMS,the Permittee shall maintain the following records:
i. All required measurements needed to demonstrate compliance with a relevant standard(including,but
not limited to, 15-minute averages of CMS data,raw performance testing measurements,and raw
performance evaluation measurements,that support data that the source is required to report);
ii. A record of each period during which a CMS is malfunctioning or inoperative(including out-of-
control periods);
iii. All CMS calibration checks;and,
iv. All adjustments and maintenance performed on CMS;
t. The Permittee shall maintain records of all monitoring data and calculated averages for applicable
operating requirements such as opacity,fabric filter leak detection system alarm sounding,and sorbent
injection rate,used to demonstrate compliance with the standard.
u. For the affected boiler,the Permittee shall maintain the following records:
i. Records of monthly fuel use by each affected source,including the type(s)of fuel and amount(s)used.
ii. A copy of all calculations and supporting documentation of maximum Clz,and Hg fuel input that were
conducted to demonstrate compliance with and associated emissions standards through performance
testing.Supporting documentation should include results of any fuel analyses and basis for the
estimates of maximum Clz,and Hg fuel input.The Permittee may use the results from one fuel analysis
for multiple boilers and process heaters provided they are all burning the same fuel type. However,the
Permittee shall calculate C12 and Hg fuel input for each boiler and process heater.
iii. A copy of all calculations and supporting documentation of HCI and Hg emission rates that were
conducted to demonstrate compliance with the associated limits through fuel analysis. Supporting
documentation should include results of any fuel analyses and basis for the estimate of emission rate.
The Permittee may use the results from one fuel analysis for multiple boilers and process heaters
provided they are all burning the same fuel type. However,the Permittee shall calculate the emission
rate for each boiler and process heater.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.1109 if the records required in
Section 2.1 A.7. q.through u. are not kept.
Reporting Requirements[15A NCAC 02Q.0508(f)]
v. Performance Testing and Fuel Analyses. For each required performance test or fuel analyses,the
Permittee shall comply with the notification and reporting requirements in General Condition JJ of
Air Quality Permit No.05884T21
Page 26
its Title V air quality permit. The Permittee shall report the results of each performance test or fuel
analyses within 60 days after such event. These reports should also include the verification that the
operating requirements for the affected boilers have not changed or provide documentation of revised
operating requirements.
w. Notification of Compliance Status. The Permittee shall submit a Notification of Compliance Status that
meets the requirements of§63.9(h)(2)(ii)before the close of business on the 60th day following the
completion of the final required performance test and/or other initial compliance demonstration. The
Notification of Compliance Status report shall contain the following information, as applicable:
i. A description of the affected source(s)including identification of which subcategory the source is in,
the capacity of the source,a description of the add-on controls used on the source description of the
fuel(s)burned,and justification for the fuel(s)burned during the performance test.
ii. Summary of the results of all performance tests,fuel analyses,and calculations conducted to
demonstrate initial compliance including all established operating limits.
iii. Identification of whether the facility is complying with the PM emission limit or the alternative TSM
emission limit.
iv. Identification of whether the facility demonstrated compliance with each applicable emission limit
through performance testing or fuel analysis.
v. Identification of whether the facility plans to demonstrate compliance by emissions averaging.
vi. A certification signed by the Responsible Official that the facility has met all applicable emission
limits and work practice standards.
vii. A summary of the CO emissions monitoring data and the maximum CO emission levels recorded
during the performance test to show that the facility has met any applicable work practice standard in
Section 2.
viii.If the affected source fires only gaseous fuel and/or distillate fuel oil,include a certification of such
that is signed by the Responsible Official.
x. Semiannual Summary Report. The Permittee shall submit a summary report by January 30 of each
calendar year for the preceding six-month period between July and December,and July 30 of each calendar
year for the preceding six-month period between January and June. The first summary report shall be
required on January 31,2014. The report shall include the following:
i. Company name,address and facility ID number;
ii. Statement by a responsible official with that official's name,title,and signature,certifying the truth,
accuracy,and completeness of the content of the report;
iii. Date of report and beginning and ending dates of the reporting period;
iv. The total fuel use by each affected source for each calendar month within the semiannual reporting
period,including,but not limited to,a description of the fuel and the total fuel usage amount with units
of measure;
v. A summary of the results of the annual performance tests and documentation of any operating limits
that were reestablished during this test,if applicable.
vi. A signed statement indicating that no new types of fuels were fired in the affected sources.
State-enforceable only
8. Best Available Control Technology(BACT):
General Assembly of North Carolina,Session Law 2007-397,Senate Bill 3 (SB3)-Under the provisions of
a Renewable Energy and Energy Efficiency Portfolio Standard(REPS),the Permittee will be categorized as a
new renewable energy facility that delivers electric power to an electric power supplier. SB3,pursuant to North
Carolina General Statute(NCGS)62-133.8(g)requires biomass combustion processes at a new renewable
energy facility to meet Best Available Control Technology(BACT).
A. In order to comply with the BACT determination pursuant to NCGS 62.133.8(g)for each pollutant,the
following shall apply:
1. PM�o emissions shall not exceed 0.027 pounds per million Btu heat input per boilers.
s Stack measured or calculated emissions represent the collective emissions for the six boilers(ID Nos.ES-1-IA,ES-1-113,ES-
MC,ES-2-1A,ES-2-113 and ES-2-1C)in the power units. "Per boiler"emissions are derived by dividing the measured
emissions by the boilers in operation during the timeframe specified. Compliance certification on a per boiler basis is based on
the common stack emissions performance divided by the boilers in operation at the time of measurement per power unit.
Air Quality Permit No. 05884T21
Page 27
(Stack test: 3-run average for both filterable and condensable)
2. Nitrogen oxide emissions shall not exceed 0.54 pounds per million Btu heat input per boiler.
(CEMS: 30-day rolling average)
3. Carbon monoxide emissions shall not exceed 0.54 pounds per million Btu heat input per boiler.
(CEMS: 30-day rolling average)
5. Sulfuric acid mist emissions shall not exceed 0.019 pounds per million Btu heat input per boiler.
6. Sulfur dioxide emissions shall not exceed 1.47 pounds per million Btu heat input per boiler when
burning tire derived fuel(TDF). (CEMS: 30-day rolling average)
7. Inherently low sulfur biomass/wood shall be burned in the boilers.
8. Volatile organic compounds emissions from the biomass-fired boilers shall be minimized by utilizing
Good Combustion Practices.
9. Mercury emissions shall not exceed 5.00 E-6 pounds per million Btu heat input per boiler.
(Stack test: 3-run average)
Testing[15A NCAC 02Q.0508(f)]
B. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ.
1. PMio emission test results(lb/million Btu)based on the testing requirements in Section 2.1 AA.h.
above shall be used to demonstrate compliance with the PM10 State BACT limits listed above in this
Section.
2. Mercury emission test results(lb/million Btu)based on the testing requirements in Section 2.1 A.7.j.
above shall be used to demonstrate compliance with the mercury State BACT limits listed above in this
Section.
Monitorin2/Recordkeepin [15A NCAC 02Q.0508(f)]
C. The Permittee shall follow the monitoring and recordkeeping requirements below:
l. Section A.3.g-i. for complying with the PM10 S133 BACT limit.
2. Section 2.1 A.2.f-j.and n.for complying with the nitrogen oxide S133 BACT limit.
3. Section 2.1 A.7.k.,in.,and r-t. for complying with the carbon monoxide S133 BACT limit.
4. Section 2.1 A.4.cc.for complying with the sulfur dioxide S133 BACT limit when burning TDF.
5. Section 2.1 A.7.u.i.for monthly recordkeeping of the amounts each fuel fired in the boilers.
Reporting [15A NCAC 02Q.0508(f)]
D. The Permittee shall submit a summary report of monitoring and recordkeeping activities detailed in
Sections 2.1 A.2.p.and q.,2.1 A.31-1.,2.1 A.4.dd-ee.,and 2.1 A.7.x.,above and postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June.
Federal-enforceable only
9. Cross-State Air Pollution Rule(CSAPR)Requirements
For fossil-fuel fired boilers(ID Nos.ES-1-1A,ES-1-111,ES-14C,ES-24A,ES-2-111 and ES-2-1C),the
Permittee shall comply with all applicable requirements in 40 CFR Part 97,Subpart AAAAA"TR NOx Annual
Trading Program",Subpart BBBBB "TR NOx Ozone Season Trading Program",and Subpart CCCCC"TR S02
Group 1 Trading Program".
10. 15A NCAC 02D.1111: MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY
Applicability [40 CFR 63.7485, §63.7490(d),§63.7499(i),(p)]
a. For the existing sources(s)in the subcategories of"stokers/sloped grate/other units designed to bum wet
biomass/biomass-based solid"and"units designed to burn solid fuel',the Permittee shall comply with all
applicable provisions,including the monitoring,recordkeeping,and reporting contained in Environmental
Management Commission Standard 15A NCAC 02D.I I I I "Maximum Achievable Control Technology"
(MACT)as promulgated in 40 CFR 63, Subpart DDDDD"National Emission Standards for Hazardous Air
Pollutants for Major Sources: Industrial,Commercial,and Institutional Boilers and Process Heaters"
(Subpart 5D)and Subpart A"General Provisions."
Air Quality Permit No. 05884T21
Page 28
i. The Permittee shall comply with the CAA§1120)standard in Section 2.1 A.7. above through May 19,
2019. The Permittee shall be subject to the requirements of 40 CFR 63, Subpart DDDDD,starting
May 20,2019. Note that the requirements of this standard may require action on behalf of the
Permittee prior to May 20,2019.
Definitions and Nomenclature[§63.7575]
b. For the purpose of this permit condition,the definitions and nomenclature contained in 40 CFR 63.7575
shall apply.
40 CFR Part 63 Subpart A General Provisions [§63.7565]
c. The Permittee shall comply with the requirements of 40 CFR 63 Subpart A General Provisions according to
the applicability of Subpart A to such sources as identified in Table 10 to Subpart 5D.
Compliance Date 1§63.7510(e), §63.56(b)]
d. The Permittee shall:
i. Complete the initial tune up and the one-time energy assessment(i.e.,Sections 2.1 A.10.r.and u.
below)no later than May 20,2019.
ii. Complete the initial compliance requirements in Section 2.1 A.IO.m.below no later than November
16,2019 and according to the applicable provisions in§63.7(a)(2).
General Compliance Requirements 1§63.7505(a), §63.7500]
e. At all times the affected unit(s) is operating,the Permittee shall be in compliance with the emission
standards in Section 2.1 A.10.g.below,except during periods of startup and shutdown. During startup and
shutdown,the Permittee shall comply only with items 5 and 6 of Table 3 of Subpart 5D.
f. At all times,then Permittee shall operate and maintain any affected source(as defined in§63.7490),
including associated air pollution control equipment and monitoring equipment,in a manner consistent
with safety and good air pollution control practices for minimizing emissions.Determination of whether
such operation and maintenance procedures are being used will be based on information available to the
Administrator that may include,but is not limited to,monitoring results,review of operation and
maintenance procedures,review of operation and maintenance records,and inspection of the source.
Emission Limits[15A NCAC 02Q.0508(f), §63.7500(a)(1), and Table 2 to the Subpart]
g. The affected units shall meet the following emission limits:
Pollutant Emission Limit
Hydrochloric Acid(HCl) 2.2E-02 lb per MMBtu of heat input
Mercury(Hg) 5.7E-06 lb per MMBtu of heat input
1,500 ppm by volume on a dry basis corrected to 3
Carbon Monoxide(CO) percent oxygen,3-run average;or(720 ppm by volume
on a dry basis corrected to 3 percent oxygen,30-day
rolling average)
Filterable Particulate 3.7E-02 lb per MMBtu of heat input;or(2.4E-04 lb
Matter(PM)or Total per MMBtu of heat input)
Suspended Metals(TSM)
Operating Limits[15A NCAC 02Q.0508(f), §63.7500(a)(2) ,and Table 4 to the Subpart]
h. The Permittee shall comply with the following operation limits:
Maintain opacity to less than or equal to 10 percent opacity or the highest hourly average opacity reading
measured during the performance test run demonstrating compliance with the PM (or TSM) emission
limitation(daily block average);
or
Install and operate a bag leak detection system according to §63.7525 and operate the fabric filter such that
the bag leak detection system alert is not activated more than 5 percent of the operating time during each 6-
month period.
Air Quality Permit No. 05884T21
Page 29
i. For boilers and process heaters that demonstrate compliance with a performance test, the Permittee shall
maintain the 30-day rolling average operating load of each unit such that it does not exceed 110 percent of
the highest hourly average operating load recorded during the performance test.
Testing[15A NCAC 2Q.0508(f)]
j. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test(s)are above the limit given in Section 2.1 A.1 O.g. above,the Permittee shall be
deemed in noncompliance with 15A NCAC 2D.I 111.
Notifications 115ANCAC 02Q .0508(f), §§63.7545,63.7530]
k. The Permittee shall submit a Notification of Intent to conduct a performance test at least 60 days before the
performance test is scheduled to begin.
1. For the initial compliance demonstration for each affected source,the Permittee shall submit the
Notification of Compliance Status,including all performance test results and fuel analyses,before the close
of business on the 60th day following the completion of all performance test and/or other initial compliance
demonstrations for all affected sources at the facility The Notification of Compliance Status report must
contain all the information specified in paragraphs(e)(1)through(8)of§63.7545 as applicable.
[§§63.9(h)(2)(ii),63.10(d)(2),63.7545(e)]
The Permittee shall be deemed in noncompliance with 15A NCAC 2D.1111 if the requirements in Sections
2.1 A.10.k.through 1. above are not met.
Initial compliance requirements [15A NCAC 02Q.0508(f), §63.7510]
in. The Permittee shall demonstrate compliance with the limits in Section 2.1 A.10.g.above by conducting
initial performance test(s)and fuel analyses,establishing operating limits and conducting continuous
monitoring system(CMS)evaluation(s)as necessary according to §§63.7510,63.7525 and 63.7530.
The Permittee shall be deemed in noncompliance with 15A NCAC 2D .1111 if the requirements in this
Section 2.1 A.10.in.are not met.
Subsequent compliance requirements[15A NCAC 02Q .0508(f), §63.7515]
n. The Permittee shall conduct subsequent performance tests and fuel analyses as necessary according to
§63,7515.
o. The Permittee shall demonstrate continuous compliance with each emission limit and operating limit that
applies according to§63.7540.
The Permittee shall be deemed in noncompliance with 15A NCAC 2D.1111 if the requirements in Sections
2.1 A.l0.n.through o. above are not met.
Monitoring requirements [15A NCAC 2Q.0508(f), §63.7525]
p. The Permittee shall install,operate,and maintain an oxygen analyzer system,as defined in§63.7575,or
install, certify,operate and maintain continuous emission monitoring systems for CO and oxygen(or
carbon dioxide)according to the procedures§63.7525(a).
q. The Permittee shall meet the requirements for all monitoring systems as applicable according to§63.7525.
The Permittee shall be deemed in noncompliance with 15A NCAC 2D.1111 if the requirements in Sections
2.1 A.l0.p. and q. above are not met.
Work Practice Standards[15A NCAC 02Q.0508(f)]
r. The Permittee shall conduct a tune-up of the source(s)every year as specified below.The Permittee shall
conduct the tune-up while burning the type of fuel(or fuels in case of units that routinely bum a mixture)
that provided the majority of the heat input to the boiler or process heater over the 12 months prior to the
tune-up.
i. As applicable,inspect the burner,and clean or replace any components of the burner as necessary(the
Air Quality Permit No. 05884T21
Page 30
Permittee may perform the burner inspection any time prior to the tune-up or delay the burner
inspection until the next scheduled unit shutdown;
ii. Inspect the flame pattern,as applicable,and adjust the burner as necessary to optimize the flame
pattern.The adjustment should be consistent with the manufacturer's specifications,if available;
iii. Inspect the system controlling the air-to-fuel ratio,as applicable,and ensure that it is correctly
calibrated and functioning properly(you may delay the inspection until the next scheduled unit
shutdown);
iv. Optimize total emissions of carbon monoxide.This optimization should be consistent with the
manufacturer's specifications,if available,and with any NOx requirement to which the unit is subject;
and
v. Measure the concentrations in the effluent stream of carbon monoxide in parts per million,by volume,
and oxygen in volume percent,before and after the adjustments are made(measurements may be either
on a dry or wet basis,as long as it is the same basis before and after the adjustments are made).
Measurements may be taken using a portable CO analyzer.
[§§63.7500(a), §63.7540(a)(10)]
s. Each tune-up shall be conducted no more than 13 months after the previous tune-up. [40CFR 63.7515(d)]
t. If the unit is not operating on the required date for a tune-up,the tune-up must be conducted within 30
calendar days of startup. [§63.7540(a)(13), §63.7515(g)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.I I I I if the requirements in
Sections 2.1 A.10.r.through t. above are not met.
Energy Assessment Requirements[15A NCAC 02Q.0508(f)]
u. The Permittee shall have a one-time energy assessment performed by a qualified energy assessor.The
energy assessment must address the requirements in Subpart 5D,Table 3,with the extent of the evaluation
for items(a)to(e)in Table 3 appropriate for the on-site technical hours listed in§63.7575:An energy
assessment completed on or after January 1,2008,that meets or is amended to meet the energy assessment
requirements in this table,satisfies the energy assessment requirement. [§63.7500(a)(1),Table 3]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.I I I I if the requirements in
Section 2.1 A.l0.u. are not met.
Recordkeeaing Requirements [15A NCAC 02Q.0508(f), §63.7555]
v. The Permittee shall:
i, Keep a copy of each notification and report submitted to comply with Subpart 5D,including all
documentation supporting any Initial Notification or Notification of Compliance Status,or semiannual
compliance report that has been submitted.
[§§63.7555(a)(1),63.10(b)(2)(xiv)]
ii. Keep records of performance tests,fuel analyses,or other compliance demonstrations and performance
evaluations. [§63.10(b)(2)(viii)]
iii. Maintain on-site and submit,if requested by the Administrator,an annual report containing the
information in paragraphs(A)through(C)below:
A. The concentrations of carbon monoxide in the effluent stream in parts per million by volume,and
oxygen in volume percent,measured at high fire or typical operating load,before and after the
tune-up of the boiler or process heater;
B. A description of any corrective actions taken as a part of the tune-up;and
C. the type and amount of fuel used over the 12 months prior to the annual adjustment,but only if the
unit was physically and legally capable of using more than one type of fuel during that period.
Units sharing a fuel meter may estimate the fuel use by each unit.
[§63.7540(a)(10)(vi)]
iv. For each CEMS,COMS,and continuous monitoring system,keep records according to paragraphs
(b)(1)through(5)of§63.7555.
v. Keep records required in Table 8 of Subpart 5D including records of all monitoring data and calculated
averages for applicable operating limits,such as opacity,pressure drop,pH,and operating load,to
show continuous compliance with each emission limit and operating limit that applies.
vi. Keep the applicable records in paragraphs(d)(1)through(13)of§63.7555.
Air Quality Permit No. 05884T21
Page 31
w. The Permittee shall:
i. Maintain records in a form suitable and readily available for expeditious review;
ii. Keep each record for 5 years following the date of each occurrence,measurement,maintenance,
corrective action,report,or record;and
iii. Keep each record on site for at least 2 years after the date of each occurrence,measurement,
maintenance,corrective action,report,or record.The Permittee can keep the records offsite for the
remaining 3 years.
[§63.7560,§63.10(b)(1)]
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .1111 if the requirements in
Sections 2.1 A.10.v. and w.above are not met.
Reporting Requirements[15A NCAC 02Q .0508(f), §63.7550]
x. The Permittee shall submit a compliance report to the DAQ on a semi-annual basis,postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December
and July 30 of each calendar year for the preceding six-month period between January and June.
i. The first compliance report shall be postmarked on or before July 30,2019 and cover the period from
May 20,2019 through June 30,2019.
ii. The compliance reports shall also be submitted electronically to the EPA via the procedures in
§63.7550(h).
y. The compliance report shall contain:
i. The information in§63.7550(c)as applicable.
ii. For each deviation from an emission limit or operating limit,the report shall contain the information
in§§63.7550(d)and(e)as applicable.
z. Within 60 days after the date of completing each performance test(defined in§63.2)including any
associated fuel analyses and/or CEMS performance evaluation(defined in§63.2) as required by Subpart
5D,the Permittee shall submit the results to the DAQ pursuant to 63,10(d)(2)and to the EPA via the
procedures in§63.7550(h).
B. Six coal bunkers(ID Nos. ES-2A through ES-2F)and associated bagfilters(ID Nos.CD-2A through CD-
2F)
Two flyash silos with dedicated wet slurry pugmills for unloading(ID Nos.ES-3A and ES-3B)and
associated binvents(ID Nos.CD-3A and CD-3B)
Four ash system vacuum transport pumps(ID Nos.ES-4A through ES-4D)and associated filters(ID Nos.
CD-4A through CD-4D),two bagfilters(ID Nos.CD-4E and CD-4F),and two simple cyclones(ID Nos.
CD-4G and CD-4H)
The following table provides a summary of limits and/or standards for the emission source(s)described above.
Regulated Pollutant Limits/Standards Applicable Regulation
Visible emissions 20 percent opacity 15A NCAC 02D.0521
Particulate matter (ID Nos.ES-2A through ES-2F) 15A NCAC 02D .0530
Fuel bunkers for coal,tire-derived fuel,pelletized paper,
and flyash briquette handling,only
2.7x 10-1 pounds per hour—each fuel bunker
(ID Nos.ES-3A and ES-3B)
Flyash silos
0.032 pounds per hour—each ash silo
(ID Nos.ES-4A through ES-4D)
Ash transport
0.032 pounds per hour—each ash silo pump
Air Quality Permit No.05884T21
Page 32
1. 15A NCAC 02D.0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from these sources(ID Nos.ES-2A through ES-2F,ES-3A,ES-311,and ES-4A
through ES-4D)shall not be more than 20 percent opacity when averaged over a six-minute period.
However,six-minute averaging periods may exceed 20 percent opacity not more than once in any hour and
not more than four times in any 24-hour period. In no event shall the six-minute average exceed 87 percent
opacity. [15A NCAC 02D .0521(d)]
Testing[15A NCAC 02Q .0508(f)]
b. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 B.l.a above,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring[15A NCAC 02Q.0508(f)]
c. To assure compliance,once a week the Permittee shall observe the emission points from these sources(ID
Nos.ES-2A through ES-2F,ES-3A,ES-311,and ES-4A through ES-4D)for any visible emissions above
normal. The Permittee shall establish normal for the sources(ID Nos.ES-3A and ES-3B)in the first 30
days of issuance of air quality permit(05884T21). If visible emissions from these sources(ID Nos.ES-2A
through ES-2F,ES-3A,ES-311,and ES-4A through ES-4D)are observed to be above normal,the
Permittee shall:
i. take appropriate action to correct the above-normal emissions within the monitoring period and record
the action taken as provided in the recordkeeping requirements below,or
ii. demonstrate that the percent opacity from the emission points of the emission sources (ID Nos. ES-2A
through ES-2F,ES-3A,ES-311,and ES-4A through ES-4D)in accordance with 15A NCAC 02D.2610
(Method 9)for 12 minutes is below the limit given in Section 2.1 B.l.a. above.
If the above-normal emissions are not corrected per i.above or if the demonstration in ii.above cannot be
made,the Permittee shall be deemed to be in noncompliance with 15A NCAC 02D.0521.
Recordkeeping[15A NCAC 02Q.0508(f)]
d. The results of the monitoring shall be maintained in a logbook(written or electronic format)on site and
made available to an authorized DAQ representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be
in noncompliance along with any corrective actions taken to reduce visible emissions;and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521 if these records are not
maintained.
Reporting[15ANCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each
calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
2. 15A NCAC 02D.0530: PREVENTION OF SIGNIFICANT DETERIORATION
a. When handling coal,tire-derived fuel,pelletized paper,and/or flyash briquettes,particulate matter
emissions from each source(ID Nos.ES-2A through ES-2F)shall not exceed 2.7x10-5 pounds per hour.
b. Particulate matter emissions from each source(ID Nos.ES-3A and ES-311)shall not exceed 0.032 pounds
per hour.
c. Particulate matter emissions from each source(ID Nos.ES-4A through ES-4D)shall not exceed 0.032
pounds per hour.
Monitoring/Recordkeeping [15A NCAC 02Q.0508(f)]
d. Particulate matter emissions from these emission sources(ID Nos.ES-2A through ES-2F,ES-3A,ES-311,
and ES-4A through ES-4D) shall be controlled by eight bagfilters(ID Nos.CD-2A through CD-2F,CD-
4E and CD-4F),two simple cyclones(ID Nos.CD-4G and CD-411), two binvents(ID Nos.CD-3A and
CD-3B),and four in-line filters(ID Nos.CD-4A through CD-4D)as described above. To assure
Air Quality Permit No. 05884T21
Page 33
compliance,the Permittee shall perform inspections and maintenance as recommended by the
manufacturers. In addition to the manufacturer's inspection and maintenance recommendations or if there
are no manufacturer's inspection and maintenance recommendations,as a minimum,the inspection and
maintenance requirement shall include the following:
i. an annual(for each 12 month period following the initial inspection)internal inspection of the simple
cyclones structural integrity;and
ii. an annual(for each 12 month period following the initial inspection)internal inspection of the
bagfilters/binvents/in-line filters for structural and fabric filter integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0530 if the binvents,cyclones,in-
line filters,and bagfilters are not inspected and maintained.
e. The results of inspection and maintenance shall be maintained in a logbook(written or electronic format)on
site and made available to an authorized DAQ representative upon request. The logbook shall record the
following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the control devices;and
iv. any variance from manufacturer's recommendations,if any,and corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530 if these records are not
maintained.
Reporting[15A NCAC 02Q.0508(f)]
£ Upon request from the DAQ,the Permittee shall submit,within 30 days of such request,a report of any
maintenance performed on a control device.
g. The Permittee shall submit a summary report of the monitoring and recordkeeping postmarked on or before
January 30 of each calendar year for the preceding six-month period between July and December and July
30 of each calendar year for the preceding six-month period between January and June. All instances of
deviations from the requirements of this permit must be clearly identified.
C. Coal unloading/storage and transfer operations(ID No.ES-5)and associated wet suppression system(ID
No.Wetsup)
The following table provides a summary of limits and/or standards for the emission source(s)described above.
Regulated Pollutant Limits/Standards Applicable Regulation
Visible emissions 20 percent opacity 15A NCAC 02D.0521
Particulate matter Wet suppression shall be used on the following: 15A NCAC 02D.0530
-rail car unloading
-coal pile load-in/out
-wind erosion coal piles
1. 15A NCAC 02D.0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from this source(ID No.ES-5)shall not be more than 20 percent opacity when averaged
over a six-minute period. However,six-minute averaging periods may exceed 20 percent opacity not more
than once in any hour and not more than four times in any 24-hour period. In no event shall the six-minute
average exceed 87 percent opacity. [15A NCAC 02D.0521(d)]
Testing[15A NCAC 02Q .0508(f)]
b. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 C.La above,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D.0521.
Monitoring[15A NCAC 02Q.0508(f)]
c. To assure compliance,once a week the Permittee shall observe this source(ID No.ES-5)for any visible
emissions above normal. If visible emissions from this source(ID No.ES-5)are observed to be above
normal,the Permittee shall:
Air Quality Permit No. 05884T21
Page 34
i. take appropriate action to correct the above-normal emissions within the monitoring period and record
the action taken as provided in the recordkeeping requirements below,or
ii. demonstrate that the percent opacity from the emission points of the emission source(ID No. ES-5) in
accordance with 15A NCAC 02D .2610 (Method 9) for 12 minutes is below the limit given in Section
2.1 C.l.a. above.
If the above-normal emissions are not corrected per i. above or if the demonstration in ii.above cannot be
made,the Permittee shall be deemed to be in noncompliance with 15A NCAC 02D .0521.
Recordkeeping [15A NCAC 02Q.0508(f)]
d. The results of the monitoring shall be maintained in a logbook(written or electronic format)on site and
made available to an authorized DAQ representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be
in noncompliance along with any corrective actions taken to reduce visible emissions;and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0521 if these records are not
maintained.
Reporting[15A NCAC 02Q.0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each
calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
2. 15A NCAC 02D.0530: PREVENTION OF SIGNIFICANT DETERIORATION
a. The Permittee shall employ wet suppression on the rail car unloading,the coal pile load-in/out,and the
wind erosion coal piles. [15A NCAC 02D.0530]
Monitoring[15A NCAC 02Q .0508(f)]
b. Particulate matter emissions from this emission source(ID Nos.ES-5)shall be controlled by wet
suppression(ID No.Wetsup). To assure compliance,the Permittee shall perform inspections and
maintenance on the wet suppression system(ID No.Wetsup)as recommended by the manufacturer. In
addition to the manufacturer's inspection and maintenance recommendations,or if there are no
manufacturer's inspection and maintenance recommendations,as a minimum,the inspection and
maintenance requirement shall include a monthly external inspection of the system for integrity of piping
and nozzles. The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530 if the system is
not inspected and maintained.
Recordkeepin¢ [15A NCAC 02Q .0508(f)]
c. A wet suppression log shall be maintained indicating areas and dates wet suppression was applied. No
reporting is required but the log shall be made available to a DAQ representative upon request. The
Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530 if the wet suppression log is not
maintained.
d. The results of inspection and maintenance activities shall be maintained in a logbook(written or electronic
format)onsite and made available to an authorized representative upon request. The logbook shall record
the following:
i. the date and time of each recorded action;
ii. the results of each action or inspection;
iii. a report of any maintenance performed on the wet suppression system(ID No.Wetsup);and
iv. any variance from manufacturer's recommendations,if any,and corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0530 if these records are not
maintained.
Air Quality Permit No. 05884T21
Page 35
Reporting[15A NCAC 02Q.0508(f)]
e. Within 30 days of a written request from the DAQ,the Permittee shall submit a report of any maintenance
performed on the wet suppression system(ID No.Wetsup).
f. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and
July 30 of each calendar year for the preceding six-month period between January and June. All instances
of deviations from the requirements of this permit must be clearly identified.
D. Two cooling towers(ID Nos.ES-8A and ES-8B)
The following table provides a summary of limits and standards for the emission source(s)described above:
Regulated Pollutant Limits/Standards Applicable Regulation
particulate matter
E=4.10 x P 0.67 for P<30 tons/hr 15A NCAC 02D .0515
or
E=55.0 x P 0" -40 for P>30 tons/hr
where:
E= allowable emission rate in pounds per hour
P= process weight rate in tons per hour
1. 15A NCAC 02D.0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from these sources(ID Nos.ES-8A and ES-813)shall not exceed an allowable
emission rate as calculated by the following equation: [15A NCAC 02D .0515(a)]
E=4.10 x P 0.67 for P<30 tons per hour or
E=55.0 x PO•11 -40 for P>30 tons per hour
where E=allowable emission rate in pounds per hour
P=process weight in tons per hour
Liquid and gaseous fuels and combustion air are not considered as part of the process weight.
Testing[15A NCAC 02Q.0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in 2.1 D.l.a. above, the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0515.
Monitoring/Recordkeeping/Reporting[15A NCAC 02Q.0508(f)]
c. No monitoring/recordkeeping/reporting is required for particulate matter emissions from these sources.
E. Two alkaline sorbent (limestone/lime/trona) silos (ID Nos. ES-9A and ES-911) and associated vent
fabric filters(ID Nos.CD-9A and CD-9B)
The following table provides a surninary of limits and standards for the emission so rce(s)described above:
Regulated Limits/Standards Applicable Regulation
Pollutant
particulate E=4.10 P.67 15A NCAC 02D.0515
matter where:
E=allowable particulate emission rate in pounds per hour
P=process weight rate in tons per hour
Air Quality Permit No.05884T21
Page 36
visible 20 percent opacity(except during startups,shutdowns,and 15A NCAC 02D .0521
emissions malfunctions)when averaged over a six-minute period
except that six-minute periods averaging not more than 87
percent opacity may occur not more than once in any hour
nor more than four times in any 24-hour period.
1. 15A NCAC 02D.0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from these sources(ID Nos.ES-9A and ES-9B)shall not exceed an allowable
emission rate as calculated by the following equations: [15A NCAC 02D.0515(a)]
E=4.10 x P 0.67Where E=allowable emission rate in pounds per hour
P=process weight in tons per hour
Liquid and gaseous fuels and combustion air are not considered as part of the process weight.
Testing[15A NCAC 02Q.0508(f)]
b. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 E. 1. a. above,the Permittee shall be deemed
in noncompliance with 15A NCAC 02D.0515.
Monitoring/Recordkeeping[15A NCAC 02Q.0508(f)]
c. Particulate matter emissions from the silos(ID Nos. ES-9A and ES-913)shall be controlled by the bagfilters
(ID Nos. CD-9A and CD-913). To assure compliance, the Permittee shall perform inspections and
maintenance as recommended by the manufacturer. In addition to the manufacturer's inspection and
maintenance recommendations, or if there is no manufacturer's inspection and maintenance
recommendations,as a minimum,the inspection and maintenance requirement shall include the following:
i. a monthly visual inspection of the system ductwork and material collection unit for leaks;and
ii. an annual(for each 12 month period following the initial inspection)internal inspection of the bagfilter's
structural integrity.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0515 if the ductwork and bagfilters
are not inspected and maintained.
d. The results of inspection and maintenance shall be maintained in a logbook(written or electronic format)on-
site and made available to an authorized representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each inspection;
iii. the results of any maintenance performed on the bagfilters;and
iv. any variance from manufacturer's recommendations,if any,and corrections made.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D .0515 if these records are not
maintained.
Reporting[15A NCAC 02Q.0508(f)]
e. The Permittee shall submit the results of any maintenance performed on the bagfilters within 30 days of a
written request by the DAQ.
f. The Permittee shall submit a summary report of monitoring and recordkeeping activities postmarked on or
before January 30 of each calendar year for the preceding six-month period between July and December and
July 30 of each calendar year for the preceding six-month period between January and June. All instances
of deviations from the requirements of this permit must be clearly identified.
2. 15A NCAC 02D.0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from these sources(ID Nos. ES-9A and ES-913)shall not be more than 20 percent opacity
when averaged over a six-minute period. However,six-minute averaging periods may exceed 20 percent not
more than once in any hour and not more than four times in any 24-hour period. In no event shall the six-
minute average exceed 87 percent opacity. [15A NCAC 02D .0521 (d)]
Air Quality Permit No. 05884T21
Page 37
Testing[15A NCAC 02Q.0508(f)]
b. If emissions testing is required, the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 E.2.a.above,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D .0521.
Monitoring [15A NCAC 02Q.0508(f)]
c. To assure compliance,once a month the Permittee shall observe the emission point of these sources(ID Nos.
ES-9A and ES-913)for any visible emissions above normal when these source are operating. The Permittee
shall establish"normal'for these sources in the first 30 days following the start-up. If visible emissions from
these sources are observed to be above normal,the Permittee shall either:
i. take appropriate action to correct the above-normal emissions as soon as practicable and within the
monitoring period and record the action taken as provided in the recordkeeping requirements below,or
ii. demonstrate the that percent opacity from emission points of the emission sources in accordance with
15A NCAC 02D.2610(Method 9)for 12 minutes is below the limit given in Section 2.1 E.2.a. above.
If the above-normal emissions are not corrected per(i)above or if the demonstration in(ii)above cannot be
made,the Permittee shall be deemed to be in noncompliance with 15A NCAC 02D.0521.
F. Two rail tie grinders(ID Nos.RTG1 and RTG2)and associated water spray bars(ID Nos.CD-10 and
CD-11)*
The following table provides a summary of limits and/or standards for the emission source(s)described above.
Regulated Pollutant Limits/Standards Applicable Regulation
particulate matter E=4.10 x PO 61 for process rates<30 tons per hour,or 15A NCAC 02D.0515
E= 55.0 x P° 1—40 for process rates> 30 tons per hour
Where:
E=allowable emission rate in pound per hour
P =process weight rate in tons per hour
Visible emissions 20 percent opacity 15A NCAC 02D.0521
Odor State Enforceable Only 15A NCAC 02D.1806
Odorous emissions must be controlled
*The installation/operation of the water spray bars(ID Nos.CD-10 and CD-11)is optional.
1. 15A NCAC 02D .0515: PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES
a. Emissions of particulate matter from these sources (ID Nos. RTG1 and RTG2) shall not exceed an
allowable emission rate as calculated by the following equation
E=4.10 x P°.67 for process rates<30 tons per hour,or
E= 55.0 x P0-11—40 for process rates>30 tons per hour
Where:
E=allowable emission rate in pounds per hour
P=process weight rate in tons per hour
Liquid and gaseous fuels and combustion air are not considered as part of the process weight.
Testing[15ANCAC 02Q .0508(f)]
b. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 F.La above,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D.0515.
Monitoring/Recordkeeping[15A NCAC 02Q.0508(f)]
c. The Permittee shall maintain records for the sources (ID Nos. RTG1 and RTG2) such that the process
rates"P"in tons per hour,as specified by the formulas contained above can be derived,and shall make these
Air Quality Permit No. 05884T21
Page 38
records available to a DAQ authorized representative upon request. The Permittee shall be deemed in
noncompliance with 15A NCAC 02D.0515 if the production records are not maintained.
Reporting[15A NCAC 02Q.0508(f)]
d. No reporting is required for particulate matter emissions from the sources.
2. 15A NCAC 02D .0521: CONTROL OF VISIBLE EMISSIONS
a. Visible emissions from these sources(ID Nos.RTG-1 and RTG-2)shall not be more than 20 percent
opacity when averaged over a six-minute period. However,six-minute averaging periods may exceed 20
percent opacity not more than once in any hour and not more than four times in any 24-hour period. In no
event shall the six-minute average exceed 87 percent opacity.
Testing [15A NCAC 02Q .0508(f)]
b. If emissions testing is required,the testing shall be performed in accordance with General Condition JJ. If
the results of this test are above the limit given in Section 2.1 F.2.a above,the Permittee shall be deemed in
noncompliance with 15A NCAC 02D.0521.
Monitoring [15A NCAC 02Q.0508(f)]
c. To assure compliance,once a month the Permittee shall observe the sources(ID No.RTG-1 and RTG-2)
for any visible emissions above normal. The monthly observation must be made for each month of the
calendar year period to ensure compliance with this requirement. The Permittee shall establish normal for
these sources in the first 30 days of commencement of operation. If visible emissions from these sources
are observed to be above normal,the Permittee shall:
i. take appropriate action to correct the above-normal emissions within the monitoring period and record
the action taken as provided in the recordkeeping requirements below,or
ii. demonstrate that the percent opacity from the emission points of the emission sources(ID Nos.RTG-1
and RTG-2)in accordance with 15A NCAC 02D .2610(Method 9) for 12 minutes is below the limit
given in Section 2.1 F.2.a. above.
If the above-normal emissions are not corrected per i. above or if the demonstration in ii. above cannot be
made,the Permittee shall be deemed to be in noncompliance with 15A NCAC 02D.0521.
Recordkeeping[15A NCAC 02Q .0508(f)]
d. The results of the monitoring shall be maintained in a logbook(written or electronic format)on site and
made available to an authorized DAQ representative upon request. The logbook shall record the following:
i. the date and time of each recorded action;
ii. the results of each observation and/or test noting those sources with emissions that were observed to be
in noncompliance along with any corrective actions taken to reduce visible emissions;and
iii. the results of any corrective actions performed.
The Permittee shall be deemed in noncompliance with 15A NCAC 02D.0521 if these records are not
maintained.
Reporting[15A NCAC 02Q .0508(f)]
e. The Permittee shall submit a summary report of the observations postmarked on or before January 30 of
each calendar year for the preceding six-month period between July and December and July 30 of each
calendar year for the preceding six-month period between January and June. All instances of deviations
from the requirements of this permit must be clearly identified.
STATE-ONLY REQUIREMENT:
3. 15A NCAC 02D.1806: CONTROL AND PROHIBITION OF ODOROUS EMISSIONS
The Permittee shall not operate the facility without implementing management practices or installing and
operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or
contributing to objectionable odors beyond the facility's boundary.
Air Quality Permit No. 05884T21
Page 39
SECTION 3 - GENERAL CONDITIONS (version 4.012/17/15)
This section describes terms and conditions applicable to this Title V facility.
A. General Provisions [NCGS 143-215 and 15A NCAC 02Q .0508(i)(16)]
1. Terms not otherwise defined in this permit shall have the meaning assigned to such terms as defined
in 15A NCAC 02D and 02Q.
2. The terms,conditions,requirements,limitations,and restrictions set forth in this permit are binding
and enforceable pursuant to NCGS 143-215.114A and 143-215.114B, including assessment of civil
and/or criminal penalties.Any unauthorized deviation from the conditions of this permit may
constitute grounds for revocation and/or enforcement action by the DAQ.
3. This permit is not a waiver of or approval of any other Department permits that may be required for
other aspects of the facility which are not addressed in this permit.
4. This permit does not relieve the Permittee from liability for harm or injury to human health or
welfare, animal or plant life,or property caused by the construction or operation of this permitted
facility, or from penalties therefore,nor does it allow the Permittee to cause pollution in
contravention of state laws or rules,unless specifically authorized by an order from the North
Carolina Environmental Management Commission.
5. Except as identified as state-only requirements in this permit,all terms and conditions contained
herein shall be enforceable by the DAQ,the EPA,and citizens of the United States as defined in the
Federal Clean Air Act.
6. Any stationary source of air pollution shall not be operated,maintained,or modified without the
appropriate and valid permits issued by the DAQ,unless the source is exempted by rule. The DAQ
may issue a permit only after it receives reasonable assurance that the installation will not cause air
pollution in violation of any of the applicable requirements. A permitted installation may only be
operated,maintained, constructed, expanded,or modified in a manner that is consistent with the
terms of this permit.
B. Permit Availability[15A NCAC 02Q .0507(k)and.0508(i)(9)(B)]
The Permittee shall have available at the facility a copy of this permit and shall retain for the duration of
the permit term one complete copy of the application and any information submitted in support of the
application package. The permit and application shall be made available to an authorized representative
of Department of Environmental Quality upon request.
C. Severability Clause[15A NCAC 02Q .0508(i)(2)]
In the event of an administrative challenge to a final and binding permit in which a condition is held to
be invalid,the provisions in this permit are severable so that all requirements contained in the permit,
except those held to be invalid, shall remain valid and must be complied with.
D. Submissions [15A NCAC 02Q .0507(e)and 02Q .0508(i)(16)]
Except as otherwise specified herein,two copies of all documents,reports,test data,monitoring data,
notifications,request for renewal,and any other information required by this permit shall be submitted
to the appropriate Regional Office. Refer to the Regional Office address on the cover page of this
permit. For continuous emissions monitoring systems(CEMS)reports,continuous opacity monitoring
systems(COMS)reports, quality assurance(QA)/quality control(QC)reports,acid rain CEM
certification reports,and NOx budget CEM certification reports, one copy shall be sent to the
appropriate Regional Office and one copy shall be sent to:
Supervisor, Stationary Source Compliance
North Carolina Division of Air Quality
1641 Mail Service Center
Air Quality Permit No.05884T21
Page 40
Raleigh,NC 27699-1641
All submittals shall include the facility name and Facility ID number(refer to the cover page of this
permit).
E. Duty to Comply [15A NCAC 02Q .0508(i)(3)]
The Permittee shall comply with all terms,conditions,requirements, limitations and restrictions set forth
in this permit.Noncompliance with any permit condition except conditions identified as state-only
requirements constitutes a violation of the Federal Clean Air Act. Noncompliance with any permit
condition is grounds for enforcement action, for permit termination,revocation and reissuance,or
modification,or for denial of a permit renewal application.
F. Circumvention-STATE ENFORCEABLE ONLY
The facility shall be properly operated and maintained at all times in a manner that will effect an overall
reduction in air pollution. Unless otherwise specified by this permit,no emission source may be
operated without the concurrent operation of its associated air pollution control device(s)and
appurtenances.
G. Permit Modifications
1. Administrative Permit Amendments [15A NCAC 02Q .0514]
The Permittee shall submit an application for an administrative permit amendment in accordance
with 15A NCAC 02Q .0514.
2. Transfer in Ownership or Operation and Application Submittal Content [15A NCAC 02Q .0524 and
02Q .0505]
The Permittee shall submit an application for an ownership change in accordance with 15A NCAC
02Q.0524 and 02Q .0505.
3. Minor Permit Modifications [15A NCAC 02Q .0515]
The Permittee shall submit an application for a minor permit modification in accordance with 15A
NCAC 02Q .0515.
4. Significant Permit Modifications [15A NCAC 02Q .0516]
The Permittee shall submit an application for a significant permit modification in accordance with
15A NCAC 02Q .0516.
5. Reopening for Cause [15A NCAC 02Q .0517]
The Permittee shall submit an application for reopening for cause in accordance with 15A NCAC
02Q .0517.
H. Changes Not Requiring Permit Modifications
1. Reporting Requirements
Any of the following that would result in new or increased emissions from the emission source(s)
listed in Section 1 must be reported to the Regional Supervisor,DAQ:
a. changes in the information submitted in the application;
b. changes that modify equipment or processes; or
c. changes in the quantity or quality of materials processed.
If appropriate,modifications to the permit may then be made by the DAQ to reflect any necessary
changes in the permit conditions. In no case are any new or increased emissions allowed that will
cause a violation of the emission limitations specified herein.
2. Section 502(b)(10)Changes [15A NCAC 02Q .0523(a)]
a. "Section 502(b)(10)changes"means changes that contravene an express permit term or
condition. Such changes do not include changes that would violate applicable requirements or
Air Quality Permit No.05884T21
Page 41
contravene federally enforceable permit terms and conditions that are monitoring(including test
methods),recordkeeping,reporting, or compliance certification requirements.
b. The Permittee may make Section 502(b)(10)changes without having the permit revised if:
i. the changes are not a modification under Title I of the Federal Clean Air Act;
ii. the changes do not cause the allowable emissions under the permit to be exceeded;
iii. the Permittee notifies the Director and EPA with written notification at least seven days
before the change is made; and
iv. the Permittee shall attach the notice to the relevant permit.
c. The written notification shall include:
i. a description of the change;
ii. the date on which the change will occur;
iii. any change in emissions; and
iv. any permit term or condition that is no longer applicable as a result of the change.
d. Section 502(b)(10)changes shall be made in the permit the next time that the permit is revised
or renewed,whichever comes first.
3. Off Permit Changes[15A NCAC 02Q .0523(b)]
The Permittee may make changes in the operation or emissions without revising the permit if:
a. the change affects only insignificant activities and the activities remain insignificant after the
change; or
b. the change is not covered under any applicable requirement.
4. Emissions Trading[15A NCAC 02Q .0523(c)]
To the extent that emissions trading is allowed under 15A NCAC 02D,including subsequently
adopted maximum achievable control technology standards,emissions trading shall be allowed
without permit revision pursuant to 15A NCAC 02Q .0523(c).
LA Reporting Requirements for Excess Emissions and Permit Deviations [15A NCAC 02D .0535(f)
and 02Q .0508(f)(2)]
"Excess Emissions"-means an emission rate that exceeds any applicable emission limitation or
standard allowed by any rule in Sections .0500, .0900, .1200, or.1400 of Subchapter 02D; or by a
permit condition; or that exceeds an emission limit established in a permit issued under 15A NCAC 02Q
.0700. (Note:Definitions of excess emissions under 02D.1110 and 02D.HH shall apply where
defined by rule)
"Deviations"-for the purposes of this condition,any action or condition not in accordance with the
terms and conditions of this permit including those attributable to upset conditions as well as excess
emissions as defined above lasting less than four hours.
Excess Emissions
1. If a source is required to report excess emissions under NSPS(15A NCAC 02D .0524),NESHAPS
(15A NCAC 02D .I 110 or .1111),or the operating permit provides for periodic(e.g.,quarterly)
reporting of excess emissions,reporting shall be performed as prescribed therein.
2. If the source is not subject to NSPS(15A NCAC 02D .0524),NESHAPS(15A NCAC 02D.1110
or.1111),or these rules do NOT define"excess emissions,"the Permittee shall report excess
emissions in accordance with 15A NCAC 02D .0535 as follows:
a. Pursuant to 15A NCAC 02D .0535,if excess emissions last for more than four hours resulting
from a malfunction,a breakdown of process or control equipment,or any other abnormal
condition,the owner or operator shall:
i. notify the Regional Supervisor or Director of any such occurrence by 9:00 a.m.Eastern
Time of the Division's next business day of becoming aware of the occurrence and provide:
• name and location of the facility;
• nature and cause of the malfunction or breakdown;
Air Quality Permit No.05884T21
Page 42
• time when the malfunction or breakdown is first observed;
• expected duration; and
• estimated rate of emissions;
ii. notify the Regional Supervisor or Director immediately when corrective measures have
been accomplished; and
iii. submit to the Regional Supervisor or Director within 15 days a written report as described
in 15A NCAC 02D .0535(f)(3).
Permit Deviations
3. Pursuant to 15A NCAC 02Q .0508(f)(2),the Permittee shall report deviations from permit
requirements(terms and conditions)as follows:
a. Notify the Regional Supervisor or Director of all other deviations from permit requirements not
covered under 15A NCAC 02D .0535 quarterly. A written report to the Regional Supervisor
shall include the probable cause of such deviation and any corrective actions or preventative
actions taken. The responsible official shall certify all deviations from permit requirements.
LB Other Requirements under 15A NCAC 02D.0535
The Permittee shall comply with all other applicable requirements contained in 15A NCAC 02D .0535,
including 15A NCAC 02D .0535(c) as follows:
1. Any excess emissions that do not occur during start-up and shut-down shall be considered a
violation of the appropriate rule unless the owner or operator of the sources demonstrates to the
Director,that the excess emissions are a result of a malfunction. The Director shall consider,along
with any other pertinent information,the criteria contained in 15A NCAC 02D .0535(c)(1)through
(7)•
2. 15A NCAC 02D .0535(g). Excess emissions during start-up and shut-down shall be considered a
violation of the appropriate rule if the owner or operator cannot demonstrate that excess emissions
are unavoidable.
J. Emergency Provisions[40 CFR 70.6(g)]
The Permittee shall be subject to the following provisions with respect to emergencies:
1. An emergency means any situation arising from sudden and reasonably unforeseeable events
beyond the control of the facility,including acts of God,which situation requires immediate
corrective action to restore normal operation,and that causes the facility to exceed a technology-
based emission limitation under the permit,due to unavoidable increases in emissions attributable to
the emergency. An emergency shall not include noncompliance to the extent caused by improperly
designed equipment, lack of preventive maintenance,careless or improper operation,or operator
error.
2. An emergency constitutes an affirmative defense to an action brought for noncompliance with such
technology-based emission limitations if the conditions specified in 3.below are met.
3. The affirmative defense of emergency shall be demonstrated through properly signed
contemporaneous operating logs or other relevant evidence that include information as follows:
a. an emergency occurred and the Permittee can identify the cause(s)of the emergency;
b. the permitted facility was at the time being properly operated;
c. during the period of the emergency the Permittee took all reasonable steps to minimize levels of
emissions that exceeded the standards or other requirements in the permit;and
d. the Permittee submitted notice of the emergency to the DAQ within two working days of the
time when emission limitations were exceeded due to the emergency. This notice must contain
a description of the emergency, steps taken to mitigate emissions,and corrective actions taken.
4. In any enforcement proceeding,the Permittee seeking to establish the occurrence of an emergency
has the burden of proof.
Air Quality Permit No. 05884T21
Page 43
5. This provision is in addition to any emergency or upset provision contained in any applicable
requirement specified elsewhere herein.
K. Permit Renewal [15A NCAC 02Q .0508(e)and 02Q .0513(b)]
This 15A NCAC 02Q .0500 permit is issued for a fixed term not to exceed five years and shall expire at
the end of its term. Permit expiration terminates the facility's right to operate unless a complete 15A
NCAC 02Q .0500 renewal application is submitted at least nine months before the date of permit
expiration. If the Permittee or applicant has complied with 15A NCAC 02Q .0512(b)(1),this 15A
NCAC 02Q .0500 permit shall not expire until the renewal permit has been issued or denied. Permit
expiration under 15A NCAC 02Q .0400 terminates the facility's right to operate unless a complete 15A
NCAC 02Q .0400 renewal application is submitted at least six months before the date of permit
expiration for facilities subject to 15A NCAC 02Q .0400 requirements. In either of these events,all
terms and conditions of these permits shall remain in effect until the renewal permits have been issued
or denied.
L. Need to Halt or Reduce Activity Not a Defense[15A NCAC 02Q .0508(i)(4)]
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to
halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
M. Duty to Provide Information(submittal of information) [15A NCAC 02Q .0508(i)(9)]
1. The Permittee shall furnish to the DAQ, in a timely manner,any reasonable information that the
Director may request in writing to determine whether cause exists for modifying,revoking and
reissuing,or terminating the permit or to determine compliance with the permit.
2. The Permittee shall furnish the DAQ copies of records required to be kept by the permit when such
copies are requested by the Director.For information claimed to be confidential,the Permittee may
furnish such records directly to the EPA upon request along with a claim of confidentiality.
N. Duty to Supplement [15A NCAC 02Q .0507(o]
The Permittee,upon becoming aware that any relevant facts were omitted or incorrect information was
submitted in the permit application, shall promptly submit such supplementary facts or corrected
information to the DAQ. The Permittee shall also provide additional information as necessary to
address any requirement that becomes applicable to the facility after the date a complete permit
application was submitted but prior to the release of the draft permit.
O. Retention of Records [15A NCAC 02Q .0508(f)and 02Q .0508(1)]
The Permittee shall retain records of all required monitoring data and supporting information for a
period of at least five years from the date of the monitoring sample,measurement,report,or application.
Supporting information includes all calibration and maintenance records and all original strip-chart
recordings for continuous monitoring information,and copies of all reports required by the permit.
These records shall be maintained in a form suitable and readily available for expeditious inspection and
review. Any records required by the conditions of this permit shall be kept on site and made available
to DAQ personnel for inspection upon request.
P. Compliance Certification[15A NCAC 02Q .0508(n)]
The Permittee shall submit to the DAQ and the EPA(Air and EPCRA Enforcement Branch,EPA,
Region 4,61 Forsyth Street SW,Atlanta,GA 30303)postmarked on or before March 1 a compliance
certification(for the preceding calendar year)by a responsible official with all federally-enforceable
terms and conditions in the permit, including emissions limitations,standards,or work practices. It
shall be the responsibility of the current owner to submit a compliance certification for the entire year
regardless of who owned the facility during the year. The compliance certification shall comply with
Air Quality Permit No. 05884T21
Page 44
additional requirements as may be specified under Sections 114(a)(3)or 504(b)of the Federal Clean Air
Act. The compliance certification shall specify:
1. the identification of each term or condition of the permit that is the basis of the certification;
2. the compliance status(with the terms and conditions of the permit for the period covered by the
certification);
3. whether compliance was continuous or intermittent; and
4. the method(s)used for determining the compliance status of the source during the certification
period.
Q. Certification by Responsible Official [15A NCAC 02Q .0520]
A responsible official shall certify the truth,accuracy, and completeness of any application form,report,
or compliance certification required by this permit. All certifications shall state that based on
information and belief formed after reasonable inquiry,the statements and information in the document
are true,accurate,and complete.
R. Permit Shield for Applicable Requirements [15A NCAC 02Q .0512]
1. Compliance with the terms and conditions of this permit shall be deemed compliance with
applicable requirements,where such applicable requirements are included and specifically
identified in the permit as of the date of permit issuance.
2. A permit shield shall not alter or affect:
a. the power of the Commission, Secretary of the Department,or Governor under NCGS 143-
215.3(a)(12),or EPA under Section 303 of the Federal Clean Air Act;
b. the liability of an owner or operator of a facility for any violation of applicable requirements
prior to the effective date of the permit or at the time of permit issuance;
c. the applicable requirements under Title IV; or
d. the ability of the Director or the EPA under Section 114 of the Federal Clean Air Act to obtain
information to determine compliance of the facility with its permit.
3. A permit shield does not apply to any change made at a facility that does not require a permit or
permit revision made under 15A NCAC 02Q .0523.
4. A permit shield does not extend to minor permit modifications made under 15A NCAC 02Q .0515.
S. Termination,Modification,and Revocation of the Permit[15A NCAC 02Q .0519]
The Director may terminate,modify, or revoke and reissue this permit if:
1. the information contained in the application or presented in support thereof is determined to be
incorrect;
2. the conditions under which the permit or permit renewal was granted have changed;
3. violations of conditions contained in the permit have occurred;
4. the EPA requests that the permit be revoked under 40 CFR 70.7(g)or 70.8(d); or
5. the Director finds that termination,modification,or revocation and reissuance of the permit is
necessary to carry out the purpose of NCGS Chapter 143,Article 21B.
T. Insignificant Activities [15A NCAC 02Q .0503]
Because an emission source or activity is insignificant does not mean that the emission source or
activity is exempted from any applicable requirement or that the owner or operator of the source is
exempted from demonstrating compliance with any applicable requirement. The Permittee shall have
available at the facility at all times and made available to an authorized representative upon request,
documentation, including calculations, if necessary,to demonstrate that an emission source or activity is
insignificant.
Air Quality Permit No. 05884T21
Page 45
U. Property Rights [15A NCAC 02Q .0508(i)(8)]
This permit does not convey any property rights in either real or personal property or any exclusive
privileges.
V. Inspection and Entry [15A NCAC 02Q .0508(1)and NCGS 143-215.3(a)(2)]
1. Upon presentation of credentials and other documents as may be required by law,the Permittee
shall allow the DAQ, or an authorized representative,to perform the following:
a. enter the Permittee's premises where the permitted facility is located or emissions-related
activity is conducted, or where records are kept under the conditions of the permit;
b. have access to and copy,at reasonable times, any records that are required to be kept under the
conditions of the permit;
c. inspect at reasonable times and using reasonable safety practices any source,equipment
(including monitoring and air pollution control equipment),practices,or operations regulated or
required under the permit; and
d. sample or monitor substances or parameters,using reasonable safety practices, for the purpose
of assuring compliance with the permit or applicable requirements at reasonable times.
Nothing in this condition shall limit the ability of the EPA to inspect or enter the premises of the
Permittee under Section 114 or other provisions of the Federal Clean Air Act.
2. No person shall refuse entry or access to any authorized representative of the DAQ who requests
entry for purposes of inspection,and who presents appropriate credentials,nor shall any person
obstruct,hamper, or interfere with any such authorized representative while in the process of
carrying out his official duties. Refusal of entry or access may constitute grounds for permit
revocation and assessment of civil penalties.
W. Annual Fee Payment[15A NCAC 02Q .0508(i)(10)]
1. The Permittee shall pay all fees in accordance with 15A NCAC 02Q .0200.
2. Payment of fees may be by check or money order made payable to the N.C.Department of
Environmental Quality. Annual permit fee payments shall refer to the permit number.
3. If,within 30 days after being billed,the Permittee fails to pay an annual fee,the Director may
initiate action to terminate the permit under 15A NCAC 02Q .0519.
X. Annual Emission Inventory Requirements [15A NCAC 02Q .0207]
The Permittee shall report by June 30 of each year the actual emissions of each air pollutant listed in
15A NCAC 02Q .0207(a) from each emission source within the facility during the previous calendar
year. The report shall be in or on such form as may be established by the Director. The accuracy of the
report shall be certified by a responsible official of the facility.
Y. Confidential Information [15A NCAC 02Q .0107 and 02Q. 0508(i)(9)]
Whenever the Permittee submits information under a claim of confidentiality pursuant to 15A NCAC
02Q .0107,the Permittee may also submit a copy of all such information and claim directly to the EPA
upon request. All requests for confidentiality must be in accordance with 15A NCAC 02Q .0107.
Z. Construction and Operation Permits [15A NCAC 02Q .0100 and.0300]
A construction and operating permit shall be obtained by the Permittee for any proposed new or
modified facility or emission source which is not exempted from having a permit prior to the beginning
of construction or modification, in accordance with all applicable provisions of 15A NCAC 02Q .0100
and.0300.
Air Quality Permit No.05884T21
Page 46
AA. Standard Application Form and Required Information[15A NCAC 02Q .0505 and.0507]
The Permittee shall submit applications and required information in accordance with the provisions of
15A NCAC 02Q .0505 and .0507.
BB. Financial Responsibility and Compliance History [15A NCAC 02Q .0507(d)(4)]
The DAQ may require an applicant to submit a statement of financial qualifications and/or a statement
of substantial compliance history.
CC. Refri2erant Requirements(Stratospheric Ozone and Climate Protection) [15A NCAC 02Q
.0501(e)]
1. If the Permittee has appliances or refrigeration equipment, including air conditioning equipment,
which use Class I or 11 ozone-depleting substances such as chlorofluorocarbons and
hydrochlorofluorocarbons listed as refrigerants in 40 CFR Part 82 Subpart A Appendices A and B,
the Permittee shall service,repair,and maintain such equipment according to the work practices,
personnel certification requirements,and certified recycling and recovery equipment specified in 40
CFR Part 82 Subpart F.
2. The Permittee shall not knowingly vent or otherwise release any Class I or 11 substance into the
environment during the repair,servicing,maintenance,or disposal of any such device except as
provided in 40 CFR Part 82 Subpart F.
3. The Permittee shall comply with all reporting and recordkeeping requirements of 40 CFR 82.166.
Reports shall be submitted to the EPA or its designee as required.
DD. Prevention of Accidental Releases-Section 112(r) [15A NCAC 02Q .0508(h)]
If the Permittee is required to develop and register a Risk Management Plan with EPA pursuant to
Section 112(r)of the Clean Air Act,then the Permittee is required to register this plan in accordance
with 40 CFR Part 68.
EE.Prevention of Accidental Releases General Duty Clause-Section 112(r)(1)—FEDERALLY-
ENFORCEABLE ONLY
Although a risk management plan may not be required,if the Permittee produces,processes,handles,or
stores any amount of a listed hazardous substance,the Permittee has a general duty to take such steps as
are necessary to prevent the accidental release of such substance and to minimize the consequences of
any release.
FF. Title IV Allowances [15A NCAC 02Q .0508(i)(1)]
This permit does not limit the number of Title IV allowances held by the Permittee,but the Permittee
may not use allowances as a defense to noncompliance with any other applicable requirement. The
Permittee's emissions may not exceed any allowances that the facility lawfully holds under Title IV of
the Federal Clean Air Act.
GG.Air Pollution Emergency Episode [15A NCAC 02D.0300]
Should the Director of the DAQ declare an Air Pollution Emergency Episode,the Permittee will be
required to operate in accordance with the Permittee's previously approved Emission Reduction Plan or,
in the absence of an approved plan,with the appropriate requirements specified in 15A NCAC 02D
.0300.
HH.Registration of Air Pollution Sources [15A NCAC 02D .0202]
The Director of the DAQ may require the Permittee to register a source of air pollution. If the Permittee
is required to register a source of air pollution,this registration and required information will be in
accordance with 15A NCAC 02D .0202(b).
Air Quality Permit No.05884T21
Page 47
H. Ambient Air Ouality Standards [15A NCAC 02D .0501(c)]
In addition to any control or manner of operation necessary to meet emission standards specified in this
permit, any source of air pollution shall be operated with such control or in such manner that the source
shall not cause the ambient air quality standards in 15A NCAC 02D .0400 to be exceeded at any point
beyond the premises on which the source is located. When controls more stringent than named in the
applicable emission standards in this permit are required to prevent violation of the ambient air quality
standards or are required to create an offset,the permit shall contain a condition requiring these controls.
JJ. General Emissions Testing and Regortin2 Requirements [15A NCAC 02Q .0508(i)(16)]
Emission compliance testing shall be by the procedures of Section .2600, except as may be otherwise
required in Rules .0524, .0912, .1110, .1111, or.1415 of Subchapter 02D. If emissions testing is
required by this permit or the DAQ or if the Permittee submits emissions testing to the DAQ to
demonstrate compliance,the Permittee shall perform such testing in accordance with 15A NCAC 02D
.2600 and follow the procedures outlined below:
1. The owner or operator of the source shall arrange for air emission testing protocols to be provided
to the Director prior to air pollution testing. Testing protocols are not required to be pre-approved
by the Director prior to air pollution testing.The Director shall review air emission testing
protocols for pre-approval prior to testing if requested by the owner or operator at least 45 days
before conducting the test.
2. Any person proposing to conduct an emissions test to demonstrate compliance with an applicable
standard shall notify the Director at least 15 days before beginning the test so that the Director
may at his option observe the test.
3. The owner or operator of the source shall arrange for controlling and measuring the production
rates during the period of air testing. The owner or operator of the source shall ensure that the
equipment or process being tested is operated at the production rate that best fulfills the purpose
of the test.The individual conducting the emission test shall describe the procedures used to
obtain accurate process data and include in the test report the average production rates determined
during each testing period.
4. Two copies of the final air emission test report shall be submitted to the Director not later than 30
days after sample collection unless otherwise specified in the specific conditions. The owner or
operator may request an extension to submit the final test report.The Director shall approve an
extension request if he finds that the extension request is a result of actions beyond the control of
the owner or operator.
a. The Director shall make the final determination regarding any testing procedure deviation
and the validity of the compliance test. The Director may:
i. Allow deviations from a method specified under a rule in this Section if the owner or
operator of the source being tested demonstrates to the satisfaction of the Director that the
specified method is inappropriate for the source being tested.
ii. Prescribe alternate test procedures on an individual basis when he finds that the
alternative method is necessary to secure more reliable test data.
iii. Prescribe or approve methods on an individual basis for sources or pollutants for which
no test method is specified in this Section if the methods can be demonstrated to
determine compliance of permitted emission sources or pollutants.
b. The Director may authorize the Division of Air Quality to conduct independent tests of any
source subject to a rule in this Subchapter to determine the compliance status of that source or
to verify any test data submitted relating to that source.Any test conducted by the Division of
Air Quality using the appropriate testing procedures described in Section 02D .2600 has
precedence over all other tests.
Air Quality Permit No.05884T21
Page 48
KK.Reopening for Cause [15A NCAC 02Q .0517]
1. A permit shall be reopened and revised under the following circumstances:
a. additional applicable requirements become applicable to a facility with remaining permit term
of three or more years;
b. additional requirements(including excess emission requirements)become applicable to a
source covered by Title IV;
c. the Director or EPA finds that the permit contains a material mistake or that inaccurate
statements were made in establishing the emissions standards or other terms or conditions of the
permit; or
d. the Director or EPA determines that the permit must be revised or revoked to assure compliance
with the applicable requirements.
2. Any permit reopening shall be completed or a revised permit issued within 18 months after the
applicable requirement is promulgated. No reopening is required if the effective date of the
requirement is after the expiration of the permit term unless the term of the permit was extended
pursuant to 15A NCAC 02Q .0513(c).
3. Except for the state-enforceable only portion of the permit,the procedures set out in 15A NCAC
02Q .0507, .0521,or.0522 shall be followed to reissue the permit. If the State-enforceable only
portion of the permit is reopened,the procedures in 15A NCAC 02Q .0300 shall be followed. The
proceedings shall affect only those parts of the permit for which cause to reopen exists.
4. The Director shall notify the Permittee at least 60 days in advance of the date that the permit is to be
reopened,except in cases of imminent threat to public health or safety the notification period may
be less than 60 days.
5. Within 90 days,or 180 days if the EPA extends the response period,after receiving notification
from the EPA that a permit needs to be terminated,modified,or revoked and reissued,the Director
shall send to the EPA a proposed determination of termination,modification,or revocation and
reissuance, as appropriate.
LL.Reporting Requirements for Non-Operating Equipment[15A NCAC 02Q .0508(i)(16)]
The Permittee shall maintain a record of operation for permitted equipment noting whenever the
equipment is taken from and placed into operation. During operation the monitoring recordkeeping and
reporting requirements as prescribed by the permit shall be implemented within the monitoring period.
MM.Fugitive Dust Control Requirement[15A NCAC 02D .0540] - STATE ENFORCEABLE ONLY
As required by 15A NCAC 02D .0540 "Particulates from Fugitive Dust Emission Sources,"the
Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive
complaints or excess visible emissions beyond the property boundary. If substantive complaints or
excessive fugitive dust emissions from the facility are observed beyond the property boundaries for six
minutes in any one hour(using Reference Method 22 in 40 CFR,Appendix A),the owner or operator
may be required to submit a fugitive dust plan as described in 02D.0540(f).
"Fugitive dust emissions"means particulate matter from process operations that does not pass through a
process stack or vent and that is generated within plant property boundaries from activities such as:
unloading and loading areas,process areas stockpiles, stock pile working,plant parking lots,and plant
roads(including access roads and haul roads).
NN. Specific Permit Modifications [15A NCAC 02Q.0501 and.0523]
1. For modifications made pursuant to 15A NCAC 02Q .0501(c)(2),the Permittee shall file a Title V
Air Quality Permit Application for the air emission source(s) and associated air pollution control
device(s)on or before 12 months after commencing operation.
2. For modifications made pursuant to 15A NCAC 02Q .0501(d)(2), the Permittee shall not begin
operation of the air emission source(s)and associated air pollution control device(s)until a Title
Air Quality Permit No.05884T21
Page 49
V Air Quality Permit Application is filed and a construction and operation permit following the
procedures of Section .0500 (except for Rule .0504 of this Section)is obtained.
3. For modifications made pursuant to 502(b)(10), in accordance with 15A NCAC 02Q
.0523(a)(1)(C),the Permittee shall notify the Director and EPA(EPA-Air Planning Branch, 61
Forsyth Street SW, Atlanta,GA 30303)in writing at least seven days before the change is made.
The written notification shall include:
a. a description of the change at the facility;
b. the date on which the change will occur;
C. any change in emissions; and
d. any permit term or condition that is no longer applicable as a result of the change.
In addition to this notification requirement, with the next significant modification or Air Quality
Permit renewal, the Permittee shall submit a page "E5"of the application forms signed by the
responsible official verifying that the application for the 502(b)(10)change/modification, is true,
accurate, and complete. Further note that modifications made pursuant to 502(b)(10) do not relieve
the Permittee from satisfying preconstruction requirements.
00. Third Party Participation and EPA Review [15A NCAC 02Q .0521, .0522 and .0525(7)]
For permits modifications subject to 45-day review by the federal Environmental Protection Agency
(EPA), EPA's decision to not object to the proposed permit is considered final and binding on the
EPA and absent a third party petition,the failure to object is the end of EPA's decision-making
process with respect to the revisions to the permit. The time period available to submit a public
petition pursuant to 15A NCAC 02Q .0518 begins at the end of the 45-day EPA review period.
Air Quality Permit No. 05884T21
Page 50
ATTACHMENT
List of Acronyms
AOS Alternate Operating Scenario
BACT Best Available Control Technology
Btu British thermal unit
CAA Clean Air Act
CSAPR Cross-State Air Pollution Rule
CEM Continuous Emission Monitor
CFR Code of Federal Regulations
DAQ Division of Air Quality
DEQ Department of Environmental Quality
EMC Environmental Management Commission
EPA Environmental Protection Agency
FR Federal Register
GACT Generally Available Control Technology
HAP Hazardous Air Pollutant
MACT Maximum Achievable Control Technology
NAA Non-Attainment Area
NCAC North Carolina Administrative Code
NCGS North Carolina General Statutes
NESHAP National Emission Standards for Hazardous Air Pollutants
NOx Nitrogen Oxides
NSPS New Source Performance Standard
OAH Office of Administrative Hearings
PM Particulate Matter
PM10 Particulate Matter with Nominal Aerodynamic Diameter of 10 Micrometers or Less
POS Primary Operating Scenario
PSD Prevention of Significant Deterioration
RACT Reasonably Available Control Technology
SIC Standard Industrial Classification
SH' State Implementation Plan
SO2 Sulfur Dioxide
tpy Tons Per Year
VOC Volatile Organic Compound