HomeMy WebLinkAboutAQ_F_0900043_20160106_CMPL_InspRpt 4
t NORTH CAROLINA DIVISION OF ' Fayetteville Regional Office I
AIR QUALITY North Carolina Renewable Power-Elizabethtown, I
3 LLC
Inspection Report E NC Facility ID 0900043
Date: 01/12/2016 1 County/FIPS:Blades 017
g
Facility Data Permit Data
North Carolina Renewable Power-Elizabethtown,LLC Permit 05455/T20
3100 West Broad Street t Issued 2/11/2015
Elizabethtown,NC 28337 9 Expires 12/31/2016
Lat:34d 38.8086m Long:78d 38.4900m Classification Title V
g SIC: 4911 /Electric Services Permit Status Active
NAICS: 2211121 Fossil Fuel Electric Power Generation 1 Current Permit Application(s)None a
Contact Data Program Applicability
( Facility Contact Authorized Contact Technical Contact t
s I SIP l Title V/PSD i
MACT Part 63: Subpart 6J,Subpart ZZZZ t
Chris Colucci I Chris Colucci Chris Colucci 1
VP of Operations VP of Operations r VP of Operations
i (205)313-3350 (205)313-3350 (205)313-3350
Compliance Data
Comments
Inspection Date 01106/2016
Inspector's Name Joshua L. Harris
Inspector's Signature: _ _ Operating Status Operating
� �
Compliance Code Compliance- inspection
Action Code FCE
t Date of Signature: rj=jz , On-Site Inspection Result Compliance
I
Total Actual emissions in TONS/YEAR
TSP S02 NOx VOC CO PMIO x HAP
2014 --- --- --- --- --- ---
2013 -- -- 0.0500 0.3100 0.0100 -- 0.0229
2012 --- --- 0.0600 0.3100 0.0100 --- 0.0279
x Highest HAP Emitted(in pounds)
Five Year Violation History:
D,,,ate Z etfer Type Rule Violated Violation Resolution Date I
03/09/201 I NOVINRE Permit Late Title V ACC 03/09/2011
t
i
Performed Stack Tests since last FCE:None i
Date Test Results Test Method(s) Source(s)Tested
� l
I
I. DIRECTIONS TO SITE: From FRO,take Hwy 87 South about 20 miles. Turn left onto Business Hwy
87 W(Broad Street)toward Elizabethtown. Travel for about 1.5 miles. The facility is located on the Ieft,
behind Peanut Processors,Inc.
II. SAFETY: Standard FRO safety gear.
III. FACILITY DESCRIPTION: North Carolina Renewable Power—Elizabethtown, LLC is the current
name of a facility that has a long list of previous oveners, with the current owners purchasing the facility
in August 2014,and receiving their permit on I I February 2015.Previously known as Elizabethtown
Energy,LLC,the facility is an old coal burning power plant,which houses two boilers and is permitted to
combust myriad fuels. The facility will likely undergo modification similar to that performed at its sister
plant in Lumberton, Robeson County(Facility ID 7800166),to allow the boilers to burn primarily
non-CISWI wood fuel, with some percentage of poultry litter to produce steam for energy production,
The facility is checked approximately weekly by Kevin Mixon of NRG Energy,Inc.,Plant Manager at
NCRP—Lumberton. NRG will be operating the plant in the fiiture once the new owners decide to
proceed with boiler modifications.
IV. INSPECTION SUMMARY: On 06 January 2016,Heather Carter, DAQ FRO, arrived at North
Carolina Renewable Power—Elizabethtown, LLC in Elizabethtown,Bladen County.Upon arrival,she
found the gate to be chained and locked, and there was no apparent activity at the facility. The:facility
has been shutdown since 2009.
V. PERMITTED EMISSION SOURCES:
*No sources were observed to be operating, nor have any sources operated M the facility since 2009.
E Etni such r�
54#ivee ; mtsstunSourD�sext
P
ESAA and two coat/natural gas/No.2 and No.4 CD-IA3 and CD- two selective non-catalytic;
ES-1 B fuel oil/fire derived f tellpelletized paper I133 reduction systems(300 lbs/hr
( PSD fuet/flyash briquettelnon-CISWI subject aqueous ammonia injection rate
CAM wood-fired steam,electric generating, each)
boilers(215 million Btu per hour heat
input each)including over-fire air CD-IA2 and CD- two multiclones(132 Nos.tubes
systems" I B2 each,9 inches in diameter each)
CD-IA4 and CD- two dry sorbent injection systems
1134 (50 lbslltr sodium bicarbonate or 4
sodium sesquicarbonate(trona)
injection rate each)
CD-IA and CD-I B two bagfilters(each not to exceed t
3.26:1 air-to-cloth ratio)
ES-2A and two coal bunkers CD-2A and CD-2B two bagfilters(64 square feet of
ES-213 filter area,each) 1
PSD
ES-3 one fly ash silo with wet slurry pugmill CD-3 one silo binvent filter(400 square 1
PSD for unloading feet of filter area) t ,;
1 ESA one bottom ash silo with a retractable CDA one silo binvent filter(I00 square
PSD bulk unloading spout and enclosed vent feet of filter area) I
return
;i
s
R
ES-5A and two ash system vacuum transport pumps CD-5E one simple cyclone(42 inches in
ES-5B diameter)located on the bottom
PSD ash silo )
CD-5D one bagfilter(528 square feet of
filter area)located on the fly ash l
silo
i
a
CD-SG one simple cyclone(42 inches in t
diameter)located on the fly ash §
i silo t
t I
CD-5A &CD-513 two in-line filters(one per pump)
ES-6 ` coal unloading/storage and transfer Wetsup wet suppression/chemical binder
PSD
ES-15 one 7100 gallons aqueous ammonia None NIA
t storage tank
I ES-I one diesel fired 340 hp emergency fire None NIA
€ pump
VI. INSIGNIFICANT ACTIVITIES:
Insignificant Activities pursuant to 15A NCAC 2Q.0503(8
Sourcellll�lo:, EnitssiotiSllnrce,i} seri}ifion: '.
IES-2 one diesel fuel oil storage tank
IES-3 one fire pump fuel oil storage tank
F
IES-4 one solvent parts cleaner
I IES-5 one turbine tube oil tank vent
IES-6 one cooling tower
IES-7 tire shredders t
i
IES-8 truck dumper No. I for receiving biomass fuel
vt @
IES-9 truck dumper No.2 for receiving biomass fuel
IES-10 fuel storage piles
a
IES-1I fuel material handling including conveyors, front-end
loader/dozer and other vehicular traffic in the fuel yard
IES-12`s paved roads �
IES-13 one sorbent silo
$ IES-14 one bottom and sifting ash bunker }
a
IES-UNPVDRD unpaved roads
... ........ ...... ....
`3
VII. NON-COMPLIANCE HISTORY SINCE 2010:
05115/2015 NOD issued for late quarterly report.
03/25/2014 NOD for failure to conduct an energy assessment IAW NESHAP 6.1 requirements.
01/09/2011 NOWNRE for continuing late ACC submittal.Facility was assessed a$2,171
enforcement on 15 April 2011,which was paid in full on 17 May 2011
03/11/2010 NOV for late ACC.
VIII. RISK MANAGEMENT(112r)s This facility does not use or store any 112(r)subject materials above
threshold limits.
IX. CONCLUSION AND RECOMMENDATIONS-
North Carolina Renewable Power—Elizabethtown,LLC appeared to be IN COMPLIANCE with their air
quality permit at the time of the inspection.
- Recommend conducting regular compliance inspections,and maintaining contact with the facility
operators to determine a start-up date for the facility.