Loading...
HomeMy WebLinkAboutAQ_F_1000067_20150807_CEM_RptRvwLtr AT A+�� WDERR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary August 7, 2015 Mr. David H. Groves Plant Manager Capital Power Corporation P.O. Box 10836 1281 Powerhouse Drive SE Southport,North Carolina 28461 SUBJECT: Certification report for NOx Continuous Emission Monitoring System (CEMS)on Unit 1 and Unit 2 Air Permit No. 05884T17 Facility ID: 1000067 Dear Mr. Groves, The Division of Air Quality(DAQ) has reviewed the subject report submitted by The Capital Power Corporation in a letter dated June 22,2015. The reports were submitted for the Continuous Emission Monitoring System(CEMS) on Unit 1 and Unit 2, each consisting of three Boilers with the common stack. The purpose of the report was to request a certification of the following NOx, and CO2 CEMS operating on Unit 1 and Unit 2. Source ID Parameter Model Serial No. Manufacturer Unit 1 NOx 42C 71812369 Thermo Environmental Scientific CO2 41 CHL 71589369 Thermo Environmental Scientific Unit 2 NOx 42C 71830369 Thermo Environmental Scientific CO2 41CHL 71588369 Thermo Environmental Scientific The certification report included a relative accuracy test audit(RATA) conducted on May 21 and 22, 2015 and the 7-day drift test performed from May 28, 2015 through June 3, 2015. Since the NOx, and CO2 CEMS appear to have met the requirements of 40 CFR 60, Appendix B, Performance Specification(PS) 2, and 3 respectively, the NOx CEMS on Unit 1 and Unit 2 are certified effectively June 3, 2015. The reports also indicated that the relative accuracy values for the SO2, CO CEMS and flow monitor on Unit 1 and Unit 2 are within the specifications given in 40 CFR 60 Appendix F, and therefore the test(RATA)results are acceptable. 1641 Mail Service Center,Raleigh,North Carolina 27699-1641 Phone:919-707-8400 4 Internet:www.ncdenr.gov An Equal Opportunity l Affirmative Action Employer-Made in part by recycled paper Mr. David H. Groves August 7, 2015 Page 2 The next annual RATA for the CEMS and flow monitor on Unit 1 and Unit 2 should be conducted by June 30, 2016. If you have any questions, please contact me at (919) 707-8409 or samir.parekh ymcdenr.g_ov. Sincerely, Samir Parekh, P.E., Environmental Engineer Division of Air Quality, NCDENR cc: Michael Pjetraj Brad Newland—WiRO Central File—Brunswick Co. IBEAM—Documents— 1000067