Loading...
HomeMy WebLinkAboutAQ_F_0400059_20150121_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY GrowGreen Power, Inc. NC Facility ID 0400059 Inspection Report County/FIPS:Anson/007 Date: 01/23/2015 Facility Data Permit Data GrowGreen Power,Inc. Permit 10373/R01 Airport Road Issued 7/7/2014 Wadesboro,NC 28170 Expires 5/31/2022 Lat: 34d 59.1174m Long: 8od 4.9908m Classification Title V SIC: 4931 /Elee&Other Services Combined Permit Status Active NAICS: 221119/Other Electric Power Generation Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP MACT Part 63: Subpart 6J,Subpart ZZZZ Ratnalee Patil Gary Bailey Ratnalee Patil Energy Specialist Owner Energy Specialist NSPS: Subpart Db,Subpart IIII (919)832-6303 (919) 832-6303 (919)832-6303 Compliance Data Comments: Inspection Date 01/21/2015 Inspector's Name Gregory Reeves Inspector's Signature: Operating Status Operating Compliance Code Compliance-inspection Action Code FCE Date of Signature: ®!/L3/za 11— On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP No emissions inventory on record.The emissions inventory is due June 30th of every year. *Highest HAP Emitted(inpounds) Five Year Violation History:None Date Letter Tvae Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested 1. DIRECTIONS TO SITE: From FRO,take US Hwy 401 South through Raeford and Wagram. Just past Wagram,turn right onto Old Wire Road(NC 144). Follow Old Wire Road across US 151501 and through Laurel Hill to US 74. Turn right onto US 74. Follow US 74 35 miles to Wadesboro,then turn right onto N.Greene SYNC Hwy 109. Drive 0.75 miles,then turn left onto Airport Road. Drive 0.6 miles. The facility is on the left side of the road. GrowGreen Power, Inc. Compliance Inspection Report Page 2 of 2 2. SAFETY CONSIDERATIONS: The usual FRO safety gear is required,including hard hat,safety shoes,safety glasses,and hearing protection. At the time of this inspection,the facility had not yet commenced construction. 3. FACILITY DESCRIPTION: The facility is a large vegetable greenhouse operation. Five wood-fired boilers will operate to supply steam to five steam turbine-driven electrical generators. Electricity will be sold to the local electrical grid,and the exhaust steam from the turbines will be used to supply heat to the greenhouse operations. In addition, an electrical solar panel farm will also supply electricity for the facility. 4. FACILITY INSPECTION SUMMARY: On 01/22/2015 I,Greg Reeves,visited the propose site for the GrowGreen Power,Inc.facility. As of this date, the company has not yet commenced construction and no personnel were on site. On 01/23/15,I spoke with Mr. Gary Bailey,Owner to obtain an update on the status of the facility. Mr.Bailey stated that the company is in process of finalizing the mechanical construction contract and plans to start construction sometime in the Mar-May 2015 time period. 5. CONCLUSIONS/RECOMMENDATIONS: The facility appeared to be IN COMPLIANCE during my visit. The facility has not yet commenced construction.