HomeMy WebLinkAboutAQ_F_0400059_20150121_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY GrowGreen Power, Inc.
NC Facility ID 0400059
Inspection Report County/FIPS:Anson/007
Date: 01/23/2015
Facility Data Permit Data
GrowGreen Power,Inc. Permit 10373/R01
Airport Road Issued 7/7/2014
Wadesboro,NC 28170 Expires 5/31/2022
Lat: 34d 59.1174m Long: 8od 4.9908m Classification Title V
SIC: 4931 /Elee&Other Services Combined Permit Status Active
NAICS: 221119/Other Electric Power Generation Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
MACT Part 63: Subpart 6J,Subpart ZZZZ
Ratnalee Patil Gary Bailey Ratnalee Patil
Energy Specialist Owner Energy Specialist NSPS: Subpart Db,Subpart IIII
(919)832-6303 (919) 832-6303 (919)832-6303
Compliance Data
Comments:
Inspection Date 01/21/2015
Inspector's Name Gregory Reeves
Inspector's Signature: Operating Status Operating
Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: ®!/L3/za 11— On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 *HAP
No emissions inventory on record.The emissions inventory is due June 30th of every year.
*Highest HAP Emitted(inpounds)
Five Year Violation History:None
Date Letter Tvae Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
1. DIRECTIONS TO SITE:
From FRO,take US Hwy 401 South through Raeford and Wagram. Just past Wagram,turn right onto Old Wire
Road(NC 144). Follow Old Wire Road across US 151501 and through Laurel Hill to US 74. Turn right onto
US 74. Follow US 74 35 miles to Wadesboro,then turn right onto N.Greene SYNC Hwy 109. Drive 0.75
miles,then turn left onto Airport Road. Drive 0.6 miles. The facility is on the left side of the road.
GrowGreen Power, Inc.
Compliance Inspection Report
Page 2 of 2
2. SAFETY CONSIDERATIONS:
The usual FRO safety gear is required,including hard hat,safety shoes,safety glasses,and hearing protection.
At the time of this inspection,the facility had not yet commenced construction.
3. FACILITY DESCRIPTION:
The facility is a large vegetable greenhouse operation. Five wood-fired boilers will operate to supply steam to
five steam turbine-driven electrical generators. Electricity will be sold to the local electrical grid,and the
exhaust steam from the turbines will be used to supply heat to the greenhouse operations. In addition, an
electrical solar panel farm will also supply electricity for the facility.
4. FACILITY INSPECTION SUMMARY:
On 01/22/2015 I,Greg Reeves,visited the propose site for the GrowGreen Power,Inc.facility. As of this date,
the company has not yet commenced construction and no personnel were on site.
On 01/23/15,I spoke with Mr. Gary Bailey,Owner to obtain an update on the status of the facility. Mr.Bailey
stated that the company is in process of finalizing the mechanical construction contract and plans to start
construction sometime in the Mar-May 2015 time period.
5. CONCLUSIONS/RECOMMENDATIONS:
The facility appeared to be IN COMPLIANCE during my visit. The facility has not yet commenced
construction.