HomeMy WebLinkAboutAQ_F_1000067_20080501_CEM_GenCorr WA
A
®
LT
..........
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Air Quality
Michael F. Easley, Governor William G. Ross, Jr., Secretary
B, Keith Overcash, P.E., Director
May 1,2008
Mr. Lynn Haynes
Air Monitoring and Technical Support Branch
U.S. Environmental Protection Agency
The Atlantic Federal Center, 61 Forsyth Street SW
Atlanta, Georgia 30303
SUBJECT: Part 75 EPA Field Audit Summary Report
Primary Energy—Southport Facility,Units 1 and 2
Facility I.D. No. 1000067 OBIS 10378
Dear Mr. Haynes:
Attached is the Part 75 Level I audit report for Primary Energy's Southport Facility, Units 1 and 2 that I
conducted on February 26, 2007. The original RATA audit dates were changed with short notice to
accommodate installation of new flow monitors. The audit addressed all aspects of a Level I audit
including: Inspections of the CEMS and records review.
During the Level I audit, no compliance problems involving any regulatory requirements of Part 75 were
observed. The Quality Assurance manual appears complete and fully implemented. The maintenance logs
as well as emission data records appear complete.
Records from EPA's Monitoring Data Checking software 4.2.57 (MDC 4.2.57)were checked with facility
records. The facility information was consistent with the MDC information for missing data, failed
calibrations, linearity test reports, CEMs model numbers and serial numbers. These records correctly
reflect the daily and quarterly activities on the CEM systems. Additional data and RATA results are
attached in Appendix 1.
If you have any questions regarding this audit,please call me at(919) 715-0726.
Sine ety
Richard R. Simpson
Environmental Engineer
Attachment
cc: Mr.Manuel Olivia, EPA Clean Air Market Division
Mr. Gregory Wagoner, Primary Energy- Southport
Mr. Wayne Cook, WilRO
Central Files, Brunswick Co.
Mike Aldridge, NCDENR-w/o attachment
Dennis Igboko; NCDENR
IMPAQ— Documents— 1000067
Technical Services Section 1�7one 7
1641 Mail Service Center,Raleigh,North Carolina 27699-1641 1v orthCdrolina
2728 Capital Blvd.,Raleigh,North Carolina 27604 ;Vahavlly
Phone: 919-733-17281 FAX 919-733-1812/Internet: www.ncair.org
An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper
PART 75 CEMS FIELD AUDIT MANUAL:
Appendix A - Example Audit Forms and Guide Sheets
Primary Energy
Southport Units 1 and 2
North Carolina
EPA Region 4
CEMS Inspection Sheet Appendix A
CEMS Inspection Sheet
1. Plant and Audit Information
Plant Name: Primary Energy-Southport
ORIS Code: 10378
City: Southport
State: North Carolina
Plant Contact: Gregory Wagner
Contact Phone Number: 1-910-457-5056 x29
Inspector Name: Richard Simpson
Audit Date: February 26,2008
2. Probe and Probe Location Checks
What to Check Observations
Probe locations in the stack or duct are in the Probe locations are the same as in the monitoring plan.
same location as in the monitoring plan?
Has the duct or stack location been Stack location is the same and has not changed.
modified? (Dimensions)
Have the probe or probe components(e.g., Probe and components are the same and has not changed.
dilution probe orifice) been changed? New flow monitors were installed on Units I and 2.
Page A-2 Part 75 Field Audit Manual-July 16,2003
Appendix A CEMS Inspection Sheet
3. Flow Monitors
What to Check I Observations
Ask the source to perform a daily Daily interference checks procedure as per QA/QC plan.
interference check or review the results of the
most recent test. App. B §2.1.2 requires a
daily interference check for flow monitors.
The interference check procedure and criteria
are not defined by rule in Part 75. It should be
described in the QA/QC Plan.
When were the filters or transducers last Filters and transducers are replaced as needed.
replaced? How does this compare to the
QA/QC Plan?
Ask what the QA/QC procedures are for any All temperature and stack pressure monitors compares with
temperature and stack pressure monitors QA/QC plan and procedures.
used in conjunction with the flow monitor.
Have there been any problems? Compare to
the QA/QC plan and maintenance records.
Check if there have been any changes to k- High flow with gas RATA was performed with monitors at
factors and polynomial coefficients since the high/normal load. No changes on k-factors,temp. may
last RATA. Changes to correction factors fluctuate so equation may change.
should be recorded in the maintenance log.
A three load RATA is required following any
change to flow monitor k-factors(§75.20(b)).
Also see Table 8 -DAHS.
What is the status of the control panel lights, All control panel lights, indicators and alarms were
indicators and alarms? Displays will vary by functional and O.K.
analyzer, so ask the source what the displays
are and what they mean.
Check range settings, and compare to the Range/span settings were compared to MDC data and O.K.
monitoring plan. Has the source done the NOx—400 ppm, CO2—20%.
annual span/range check required by App.A?
E
Part 75 Field Audit Manual—July 16, 2003 Page A-3
CEMS Inspection Sheet Appendix A
4. Dilution Air Systems (Including Air Cleaning Subsystem)
What to Check Observations
Has the dilution probe orifice been changed? The dilution probe orifice is normally changed as needed
If the orifice has been changed, ask if there is and according to the QA/QC plan.
a procedure for changing the orifice in the
QA/QC Plan, what prompts a change,and
how the dilution ratio is verified.
Is the dilution probe ejector pump vacuum NA.
at or below the certification value? How often
is it checked?
What is the dilution ratio? Check the Dilution ratio is 100:1 and analyzer flow settings correspond
dilution air and analyzer flow settings. to the QA/QC plan.
How are these set and verified? These should
all be described in the QA/QC plan.
Are correction factors applied to the dilution Correction factors are not used on this small system
ratio for changes in pressure, temperature,or
molecular weight? Have these been changed
since the last RATA? Changes to correction
factors should be recorded in the maintenance
log,. QA testing may also be required .
(Also see Table 8 -DAHS).
Check the inlet and outlet pressures of COZ The inlet pressure is 100 psi and outlet pressure is 70 psi.
air cleaner filter. Compare levels to the Levels compare to QA/QC procedure.
QA/QC Plan.
How often are the air cleaning filters and Heatless filter replaced quarterly as needed.
drying agents replaced? Compare to the
QA/QC plan.
5. Source Level Extractive Systems
What to Check •. Observations'`
Check the umbilical lines entering the CEMS Umbilical lines were checked and no moisture was present.
shelter for condensation(visible water drops).
For a dry system using chillers check the Wet, NA
chiller temperature. What is the proper
temperature range, and how often is it
verified? Compare against the QA/QC Plan.
Page A-4 Part 75 Field Audit Manual—July 16,2003
Appendix A CEMS Inspection Sheet
6. Analyzers
What to Check Observations
Ask the source if there have been any changes since the No major changes have taken place. Analyzer
last audit or certification/recertification. Document the serial numbers correspond to MDC data and the
serial numbers and compare to those in the monitoring monitoring plan.
plan.
What is the status of the control panel lights, indicators All control panel lights ,indicators and alarms
and alarms? Displays will vary by analyzer,so ask the were functional and O.K.
source what the displays are and what they mean.
Check range settings, and compare to the monitoring Range/span settings were compared to MDC
plan. Has the source done the annual span/range check data and O.K.
required by App. A? NOx—400 ppm, CO2—20%, Flow 4020 afpm
Compare the sample flow rate, if displayed by a Sample flow rate is displayed and corresponds to
rotameter(or a digital reading),to the QA/QC Plan. the QA/QC plan.
Unit 1: NOx—0.816 Lpm CO2—0.518 Lpm
Unit 2: NOx—0.613 Lpm CO2—0.490 Lpm
Have there been any changes to correction factors(NO, No known changes to the correction factors.
quenching and moisture monitors)since the last RATA?
Changes to correction factors should be recorded in the
maintenance log,and the QA/QC Plan should outline the
procedures for changing the correction factors(Appendix
B, Section 1.1.3). QA testing may also be required(See
§75.20(b),and Recertification and Diagnostic Testing
Policy).
Part 75 Field Audit Manual—July 16,2003 Page A-5
CEMS Inspection Sheet Appendix A
7. Calibration Gases
What to Inspect Observations
Spot check the cylinder certificates versus the cylinder Cylinder numbers engraved checked with
numbers engraved on the cylinder. Table A may be used certificates and everything o.k.
to record information for each cylinder.
Verify that gases meet calibration gas definition in§ Verified and o.k.
72.2. See Table B.
Check the expiration date of gas in cylinders. Use of an All cylinders in use before expiration and o.k.
expired cylinder is not in compliance with§ 75.21(c).
Check the concentration values for each cylinder. Are Concentration ranges are correct with the span.
concentration ranges correct for the span? Linearity
test point ranges are shown below:
Point 1: 20%-30%of span
Point 2: 50%-60%of span
Point 3: 80%- 100%of span
Check the zero air gas documentation. (Supplier Just zero air is used not zero gas.
certification):
SOz, NO,and THC s 0.1 ppm
CO s 1 ppm,and COZ < 400 ppm
[See§ 72.2 and Policy Manual 10.2, 10.3]
Record the concentration values to check against the Concentration values checked with DAHS
values recorded by the DAHS for calibration error and through daily calibration.
linearity tests.
Read the cylinder regulator pressure. Cylinder pressure All cylinder regulator pressures are above
should not be< 150 psi. 150 psi.
Check the regulator outlet pressure. The pressure or Checked and pressure as per QA test and
calibration gas flow rate should be set as specified in the QA/QC procedure.
QA test procedures in the QA/QC plan.
Are stainless steel regulators used for SOZ cylinders? NA
Page A-6 Part 75 Field Audit Manual—July 16,2003
Appendix A CEMS Inspection Sheet
Table A:
Calibration Gas Records
Gas Cylinder Certificate Type of Cal Gas Cylinder Expiration Certificate
No.: Concentration (e.g.,SRM,IPRM,, .Pressure I Date on File
etc.,
NOx CC109673 230 Daily Calibration 1650 1/15/09 Yes
CO2 CC50771 10.81% Daily Calibration 350 3/20/10 Yes
Table B:
Part 75 Calibration Gases (§ 72.2)
Calibration Gas Type Abbr. Description
NIST-standard reference material SRM Calibration gas obtained from the National Institute of
Standards and Technology(NIST)
NIST- standard reference material- PRM Listed in a declaration of equivalence with "EPA
equivalent compressed gas primary Traceability Protocol for Assay and Certification of
reference material Gaseous Calibration Standards," September 1997, EPA-
600/R-97/121[Traceability Protocol]
NIST-traceable reference material NTRM Tested and certified by NIST
NIST/EPA-approved certified CRM Approved by EPA and NIST as evidenced by a certificate
reference materials or other documentation issued by a certifying
standard-setting body
Gas manufacturer's intermediate GMIS Assayed and certified by direct comparison to one of the
standard other NIST standards listed in this table according to
section 2.1.2.1 of the Traceability Protocol
EPA protocol gas Protocol Vendor-certified to be within 2.0 percent of the cylinder
label concentration [See Traceability Protocol]
Zero air material Zero Air Calibration gas certified by gas vendor: SO2,NO,,and
Total Hydrocarbons s 0.1 ppm, CO s 1 ppm,or CO2 s 400
ppm. If a mixture, other components certified not to
interfere with target compound.
Research gas mixture RGM NIST analyzed and certified as "NIST traceable."
8. DAHS
Part 75 Field Audit Manual—July 16,2003 Page A-7
CEMS Inspection Sheet Appendix A
What'to Check Observations
Make sure that the version used is previously DAHS certified per MDC information and
certified/recertified by checking against the Monitoring monitoring plan.
Plan.
Ask to see and check the DAHS verification test for the DAHS verified for missing data procedure for
missing data and calculation routines. Verification test Unit 1 on 7/15/07 at 11:00 with substituted data
results for the missing data routines and emissions of NOX at 160.4 ppm.
calculations are required to be kept on site by§§
75.20(c)(9)and 75.63(a)(2)(iii). A vendor certification
that the software meets Part 75 requirements is sufficient
for missing data routines.
Ask the source what type of correction factors are Correction factors are applied when needed and
applied, and how they are entered into the DAHS as noted in QA/QC procedure. Real time data of
(pressure/temperature compensation,flow and moisture boiler variables are attached in Appendix 1.
monitoring polynomials,sonic velocity correction factors,
NO,;quenching correction factors,dilution ratio settings).
Also ask if any changes have been made. Changes to
correction factors should be recorded in the maintenance
log, and the QA/QC Plan should outline the procedures for
changing the correction factors(Appendix B, Section
1.1.3). QA testing may also be required(See§75.20(b),
and Recertification and Diagnostic Testing Policy).
How are the RATA results recorded? RATA reference RATA results are recorded in the 600 records
method data and RATA results can be input by hand. through MDC. The stack testing transfer results
Review some recent tests to verify that hard copy and through computer disc or laptop.
electronic data match. Check that the dates and time,
linearity error,relative accuracy,and bias adjustment
factors(BAF)match. (See the RATA review sheet for
additional checks.)
Is any other data input by hand? If so spot check to see No other known data is input by hand.
that the DAHS data agree with hard copy data.
The following types of data may be entered manually:
-Negative(<0)emission values
-Erroneous emission values(if significant must be
approved by EPA)
-SO2 concentration<2.0 ppm
-Reference method back-up data
-RATA reference method data and RATA results
-Leak checks,7-day calibration error tests,and cycle time
tests
-Operating data(load and time)
-Add-on control equipment operation during missing data
periods[See item 8,below]
Page A-8 Part 75 Field Audit Manual—July 16,2003
Appendix A CEMS Inspection Sheet
9. Optional Control Equipment Parameter Monitoring (§ 75.34)
hat to Check Observation W s
Check the QA/QC Plan which will identify add-on SOZ or NA
NO,control equipment parameters and acceptable
ranges if the source is using add-on control equipment
missing data options. Parameters and acceptable ranges
are required by App B,§ 1.1.1.
Review control equipment parameter monitoring NA
records for a number of missing data periods. Compare
the parameter data to the acceptable ranges in the QA/QC
Plan. Identify any periods when the range is exceeded and
how the missing data period was flagged in the DAHS
(control operating properly or not operating properly).
Ask the source how it enters proper control equipment NA
operation for missing data periods into the DAHS.
Manual entry of missing data period information is
allowed by Part 75.
Part 75 Field Audit Manual—July 16,2003 Page A-9
CEMS Inspection Sheet Appendix A
10. Maintenance Log Review
What to Check! Observation
Do the log entries sufficiently describe the action taken? Log entry sufficiently described the action taken
Are the entries understandable? and entry was understandable.
Does the log show maintenance checks at the frequency The maintenance log represents the correct
identified in the QA/QC Plan? Are all records available 'frequency and were available as per QA/QC
(see Table C)? procedure.
Identify recurring failures or malfunctions recorded in No recurring failures and malfunctions were
the log. recorded outside of quarterly maintenance. A
new flow monitor was installed.
Are malfunctions resolved as specified in the QA/QC Malfunctions were resolved as per QA/QC plan.
Plan?
Do events in the maintenance log correspond to reported Maintenance log corresponds to the missing data
missing data periods in the quarterly reports? periods.
Are there repeated adjustments to the zero or span? No known repeated adjustments to the zero or
span.
Have system parts or components been replaced? If so has No known major replacements or components.
the proper recertification or diagnostic testing been However new flow monitors were installed on
performed? Units 1 and 2.
Does the log show any pre-RATA adjustments? No known pre-RATA adjustments.
Table C:
Maintenance Record Requirements (Appendix B § 1.1.3)
The following records are required by the QA/QC Plan provisions of Part 75:
• date, time, and description of any testing, adjustment, repair, replacement,or preventive maintenance action
performed on any monitoring system.
• records of any corrective actions associated with a monitor's outage period.
• any adjustment that changes a system's ability to record and report emissions data(e.g., changing of flow
monitor or moisture monitoring system polynomial coefficients, K factors or mathematical algorithms,
changing of temperature and pressure coefficients and dilution ratio settings).
• a written explanation of the procedures used to make the adjustment(s)shall be kept.
Page A-10 Part 75 Field Audit Manual—July 16,2003
Appendix A CEMS Inspection Sheet
11. QA/QC Plan Review
What to Check Observation
Is there a written QA/QC Plan (it may be stored QA/QC procedure documents were revised on
electronically but should be available),and when was it 9/4/04. However, facility will revise for the new
last updated? flow monitors.
(Appendix B § 1)
Are calibration error test and linearity test procedures Calibration error test and linearity test
outlined in the plan? procedures were outlined in the QA/QC
(Appendix B, § 1.2.1) procedure.
Are calibration and linearity test adjustment Calibration and linearity test adjustment
procedures outlined? (Appendix B,§ 1.2.2) procedures were outlined in the QA/QC
procedure.
Preventive maintenance procedures and recordkeeping Preventive maintenance procedures and record
identified? keeping were outlined in the QA/QC procedure.
(Appendix B, §§ 1.1.1 and 2)
Are RATA test procedures provided? (Appendix B,§ RATA test procedures are provided in the
1.2.3) QA/QC procedure.
Are emissions and QA test recordkeeping and reporting Record keeping and reporting procedures were
procedures, including missing data procedures, outlined in the QA/QC procedures.
addressed? (Appendix B, § 1.1.2)
If using add-on control equipment missing data options, NA
are control equipment parameters identified?(Appendix
B,§ 1.1.1)
Part 75 Field Audit Manual-July 16, 2003 Page A-1 I
Daily Calibration Error Test Observation Sheet Appendix A
Daily Calibration Error Test Observation
If offline calibrations are done,was the offline-online test passed? _NA
System/Component ID: Parameter Monitored: Span Value,S:
CE Results
Date/time Calibration Value,R CEM Response,A
(ppm,%,SCFH or fpm) (ppm,%,SCFH or fpm) (%of span) R-A
(ppm,%,SCFH or fpm)
Zero level check ee a ace ai y calibration sheet.
Upscale check
System/Component ID: Parameter Monitored: Span Value,S:
CE Results
Date/time Calibration Value.R CEM Response,A
(ppm,%,SCFH or fpm) (ppm,%,SCFH or fpm) (%of span) R-A
(ppm,%,SCFH or fpm)
Tern IPvel rherk
I Incrale rherk
System/Component ID: Parameter Monitored: Span Value,S:
CE Results
Date/time Calibration Value,R CEM Response,A
(ppm,%,SCFH or fpm) (ppm,%,SCFH or fpm) (%of span) R-A
(ppm,%,SCFH or fpm)
7Prn level rherk
1lnsrale.rherk
System/Component ID Parameter Monitored: Span Value,S.
CE Results
Date/time Calibration Value,R CEM Response,A
(ppm,%,SCFH or fpm) (ppm,%,SCFH or fpm) (%of span) R-A
(ppm,%,SCFH or fpm)
Tern Ievel rherk
Ilncrale rherk
For NOx and SO2:
Al
CE S=IR x 100
S
For CO2 and 02: CE = IR — Al
where: CE = Calibration Error(%of span) A = Actual CEMS Response
R = Reference Gas Value S = CEMS Span Value
Page A-]2 Part 75 Field Audit Manual—July 16,2003
APPENDIX 1
Part 75 CEMS Field Audit Information
UNI 1 7
Pollutants . _.__ __
Zero — — _ _ -- Span
------- ----
Value Target Drift (%) Value Target Drift °fo
e g CO2 (%) 0.130.00 0.1 10. 0 10.81 -0.21
0.2 0.0m 0.08
NOx (PPM)
231.4� Y20.0 3 0.34
Stack Pressure at Initial Cal: �30-37
r vnuat�� ........__: ... _,.. .v ......._ _...... . ......r
-�-- Zero — - -T _. Span
x �` t Value Tar et Drift / Value Tame q Drift % Interf.
Flow (DP) 0.00o OAoo -0.04 0.699 0.700 -0.04 PASS
s, VIIttLQl It,`!. _ _ ._. .W ._ __ N_ .. . .. .. -..: ...._. ._ .....:.� .__.: .,
Zero --- Span... -
� Value Target Drift %) Value Target' Drift
Opacity (%°) 0.5 0.00 0.66 40.06 k 40,10
Copyright(C) 1993-200T VIM Technologies, Inc.
_ _. _._-------
MODE
Mt UNIT1 .� Ce �II�IrfYt � � '� Fffi'
�o���sf�oosl�:�0_�3
_,a ,...�... . .,...�.__..__
UINIIL
Pollutants _
\ - - — Zero -- - --- — - - Span -
� # � Value Target Drift % Value Target Drift
\ h
CO2 (a/O) 0.09 0.00 0.09 F 1.27 '10.81 0.46
Ox (PPNI) 0.0
0.0 0.00 2'I�'.3 �.. 230.0 .1f
0 0
Stack Pressure at Initial Cal: 29.75
r-uHULCIIIL .: � .. .. _....
Zero Span ---
h �t k\ Value Tar et Drift % Value Tar et Drift % Interf.
� i
Flow (DP) -0.001 0.000 �- --0.95 0.700 0.?00 -0.96 ASS
...4;�;c..a�N✓�;�� c''.'v "'.;nn.,..w,�<��sa.X,Hx,^3�.xS :
r IJIIUL4211L*
Zero — — — Span
Value. .Target Drift. /° Value Target Drift /°
p tY ( °) O.iS 0.00 0.55 30.55 3'1.50 -0.95 a-
�Y
Copyright(C) 1993-2007.VIM Technologies, Inc.
MODEM 02/26/2008 11=40.33
9� t� "5 UNIT 2 - Alarm 0� '� � �
Cogentrix, SouthPort, NC
Unit 1 Status Unit 2 Status
Maintenances Normal
Process Code Unit 1 8 Process Code Unit 2 8
CO2 Unit 1 NOx Raw Unit 1 CO2 Unit 2 NOx Raw Unit 2
3.04 % _ ��� 2.2 ppm 15 9
�� � 132.3 ppm 0 �
NOx Ib/Mbtu Unit 1 _ NOx Ib/hr Unit 1_ NOx lb/Mbtu Unit 2 NOx Ib/hr Unit 2
0.263IbslMbtu 15 214.0Ibslhr 15 0.230Ibs/Mbtu I 172.8Ibslhr
NOx 24 Hr Avg NOx 30 Day Avg NOx 24 Hr Avg NOx 30 Day Avg _
0.368 61 6t6 0.405 I' MBtu 0.293 IbIMBtu 0.373 IbtMBtu
Steam Flow 1 A Steam Flow 1 B Steam Flow 1 C Steam Flow 2A Steam Flow 2B Steam Flow 2C
[--176.7 klbslhr 177.0 klbslhr 179.7 klbslhr 183.9 klbslhr 177.2 klbslhr 175.6 klbslhr
Opacity Process Cody 8 Opacity Process Cade 8
Opacity Opacity.6 min Opacity Opacity 6 min
0.00 °fQ 1 i 12.41 °f8 5.16°fo 5.65 °l0
..I
Stack Flow Unit 1 Delta P' _ _Stack Flow Unit 2 Delta P
198.65 kscfm 0.886 inH24 182.43 kscfm 0.923 inH2O
Stk Press Unit 1 Stk Temp U1 Stk Press Unit 2 Stk Temp U2
�--------------�=------�-� 1 inHg �W 301.37 i n H g
_ 31.39 inHg 11 301.04 DegF > �,� y _. .�6.73._
Copyright(C) 1993 -2007. VIM Technologies, Inc.
MODEM
008 114
i
i
NOx RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 60 RATA
PLANT:Primary Energy-Soutliport DATE: 2/29/08
UNIT NAME: UNIT 1 SAMPLING LOCATION: CS001
MONITOR: NOx MONITOR SERIAL NO.: 42C-71812-369
COMPARISON: lb/inmBlu OPERATING LOAD,klb/lir: 533.0
1=used START START END END LOAD lb/mmStu
0-not used RUN DATE TIME DATE TIME Idb/hr RM CEMS DIFF
1 1 02/29/08 0735 02/29/08 0756 533.0 0.259 0.250 -0,009
1 2 02/29/08 0804 02/29/08 0825 533.0 0.268 0.260 -0.008
1 3 02/29/08 0832 02/29/08 0853 533.0 0.253 0.240 -0.013
1 4 02/29/08 0902 02/29/08 0923 533.0 0.260 0.250 -0,01
0 5 02/29/08 0932 02/29/08 0953 533.0 0,274 0.260 -0,014
1 6 02/29/08 1002 02/29/08 1023 533.0 0.265 0.250 -0.015
1 7 02/29/08 1033 02/29/08 1054 533.0 0,268 0.260 -0.008
1 8 02/29/08 1103 02/29/08 1124 533.0 0.251 0.240 -0.011
1 9 02/29/08 1132 02/29/08 1153 533.0 0,259 0.250 -0.009
1 10 02/29/08 1202 02/29/08 1223 533 0 0.260 0.250 -0,010
9 OF RUNS: 9 MEANS: 533.0 0.260 0.254 -0.010
T-VALUE: 2.306
STANDARD DEVIATION: 0.002
95%CONFIDENCE COEFFICIENT: 0.002
RELATIVE ACCURACY 20%of RM?): 4.7%
if
DRAFTf
r
t
C
i
f
1
1'.
southport-gas RATA-EDR.xls
1
f
5
NOx RELATIVE ACCURACY CALCULATION SUMMARY
i
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy-Soutliport DATE: 2/29/08
UNIT NAME: UNIT I UNIT ID/COMMON STACK ID: CS001
MONITOR: NOx MONITORING SYSTEM ID: M10
COMPARISON: ppm wet TEST NUMBER: 1
OPERATING LEVEL: H AVERAGE GROSS LOAD,.klb/hT: 533.0
1=uscd . START START END END LOAD PRM wet
D=not uso� RUN DATE TIME DATE TIME k1b1hr RM CEMS DI.FF
1 1 02/29/08 0735 02/29/08 0756 533.0 138.7 140,5 -1.8
1 2 02/29/08 0804 02/29/08 0825 533,0 146.8 148.0 -1.2
t) 3 02/29/08 0832 02/29/08 0853 533.0 136.4 138.7 -2.3
1 4 02/29/08 0902 02/29/08 0923 533.0 140.2 142.4 -2.2
1 5 02/29/08 0932 02/29/08 0953 533.0 148.4 150.3 -1.9
1 6 02/29/08 1002 02/29/08 1023 533.0 142.9 143.3 -0.4
1 7 02/29/08 1033 02/29/08 1054 533.0 144.4 145.2 -0.8
1 8 02/29/08 1103 02/29/08 1124 533.0 136.1 136.7 -0.6
1 9 02/29/08 1132 02/29/08 1153 533.0 140.2 141.1 -0.9
1 10 02/29/08 1202 02/29/08 1223 533.0 140.2 142.1 -1.9
#OF RUNS: 9 MEANS: 533.0 142.0 143.3 -1.300
T-VALUE: 2.306
STANDARD DE IATION: 0.661
BIAS TEST: PASSED 95%CONFIDENCE ICIENT: 0.508 f1
BIAS FACTOR: 1.000 RELATIVE A ({10%of RM7): 1.3%
:
r
r-
l
t
F
c:.
L
f
r
southport-gas RATA-EDR.xls r
1
CO2 RELATIVE ACCURACY CALCULATION SUMMARY
i
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy-Southport DATE: 2/29/08
UNIT NAME: UNIT 1 UNIT ID/COMMON STACK ID: CSOOI
MONITOR: CO2 MONITORING SYSTEM ID: CIO
COMPARISON: %wet TEST NUMBER: I
OPERATING LEVEL: H AVERAGE GROSS LOAD,klblhr: 533.0
1=used START START END END LOAD %wet
0-not used RUN DATE TIME DATE TIME klh/hr RM CEMS DIFF
0 1 02/29/08 0735 02/29/08 0756 533.0 11,51 12.30 -0.8
1 2 02/29/08 0804 02/29/08 0825 533.0 11.77 12.30 -0.5
1 3 02/29/08 0832 02/29/08 0853 533.0 11.60 12.30 -0.7
1 4 02/29/08 0902 02/29/08 0923 533.0 11.60 12.30 -0.7
1 5 02/29/08 0932 02/29/08 0953 53 3.0 11.64 12.30 -0.7
1 6 02/29/08 1002 02/29/08 1023 533.0 11.61 12.10 -0.5
1 7 02/29/08 1033 02/29/08 1054 533.0 11,60 12.30 -0.7
i 8 02/29/08 1103 02/29/08 1124 533.0 11,67 12.30 -0.6
l 9 02/29/08 1132 02/29/08 1153 533.0 11.65 12.30 -0.7
t 10 02/29/08 1202 02/29/08 1223 533.0 11.59 12.1.0 -0.5
#OF RUNS: 9 MEANS: 533.0 11.64 12.26 -0,619
T-VALUE: 2.306
STAND DEVIATION: 0.086
BIAS TEST: NA 95%CONFIDE oEFFICIENT: 0.066
BIAS FACTOR: LOOO RELAT v%L CY(<10%of RM?), 5.9%
i
r
F-
r
i:.
j.
E_
southport-gas RATA-EDR.xls
i
3
i
FLOW RATE RELATIVE ACCURACY CALCULATION SUMMARY
i
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy-Southport DATE: 2/14/06
UNIT NAME: UNIT 1 UNIT ID/COMMON STACK ID: CS001
MONITOR: FLOW MONITORING SYSTEM ID: F10
COMPARISON-. SCFH,wet TEST NUMBER: 1
OPERATING LEVEL: H AVERAGE GROSS LOAD,klb/hr: 533.8
1-USED
0--NOT START START END END WAD SCFH,wet
USED RUT DATE TIME DATE TIME klk4ir RAI CEMS DIFF
1 1 02/08/0 0732 02/08/07 0753 533.0 10,483,535 10,439,714 43,821
1 2 , ( /08/ 0838 02/08/07 0859 533.0 10,438,533 10,381,263 :i7,270
U 3 0 !0 07 0832 02l08/07 0853 533.0 10,577,047 10,300,857 276,190
1 4 0 0 /07 0902 02/08/07 0923 533.0 10,374,493 10,318,421 56,072
1 5 02 8/07 0932 02/08/07 0953 533.0 10,447,174 10,352,000 95,674
1 6 02 /07 1002 02/08/07 1023 533.0 10,427,354 10,340,526 86,828
1 7 0 /0 07 1033 02/08/07 1055 533.0 10,449,691 10,363,714 85,977
1 8 /08 7 1103 02/08/07 1124 533.0 10,461,813 10,296,632 165,181
1 9 2/08/ 7 1132 02/08/07 1153 537.0 105451,931 10,355,143 96,788
1 10 02/08/ 1202 02/08/07 1223 536.0 10,435,960 10,382,842 53,118
I
#OF RUNS: 9 MEANS: 533.8 10,441,221 10,358,917 82,303
T-VALUE: 2.306
STANDARD—DEVIATION: 36,978
BIAS TEST: NOT PASSED 95%CONFID FFICIENT: 28,423
BIAS FACTOR: 1.008 RELATIV CY(<7.5%of RM?): 1.1%
r.
i
t-
1_
F
4-
I'
k>
I'
k_
Ul-Ilow-lulll.xls
FLOW RATE RELATIVE ACCURACY CALCULATION S-UMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy,Southport DATE: 12/0/07
UNIT NAME: Unit 1 UNIT ID/COMMON STACK ID: CS001
MONITOR: Flow MONITORING SYSTEM ID: FIO
COMPARISON: SCFH Wet TEST NUNMER: I
OPERATING LEVEL: M AVERAGE GROSS LOAD,klb/hr: 386.6
1=USED
I><NOT START START END END LOAD SCFH Wet
USED RUN DATE TIME DATE TIME k1b/hr RNI CENIS DIFF
0 1 2/28/08 1441 02/28/08 1451 386.0 8,081,629 8,446,200 -364,571
1 2 02/29/08 1451 02/28/08 150I 385.0 8,285,912 8,466,000 -180,088
0 3 02/28/08 2025 02/28/08 2035 390.0 8,087,729 8,386,800 -299,071
1 4 02/28/08 1524 02/28/08 1534 392.0 8,368,468 8,492,400 -123,932
1 5 02/28/08 1534 02/28/08 1544 389.0 8,267,809 8,387,400 -119.591
I 6 02/28/08 1544 02/28/08 1554 398.0 8,304,759 8,421,000 -116,241
1 7 02/28/08 1606 02/28/08 1616 395.0 8,420,421 8,630,000 -209,579
0 8 02/28/08 1616 02/28/08 1626 398.0 8,346,038 8,602,667 -256,629
1 9 02/28/08 1626 02/28/08 1636 380.0 8,338,901 8,434,200 -95,299
1 10 02/28/08 1653 02/28/08 1703 380.0 8,343,272 8,284,200 59,072
1 11 02/28/08 1703 02/28/08 1713 381 8,398,641 8,353,200 45,441
1 12 02/28/08 1713 02/28/08 1723 379 8,481,878 8,368,500 113,378
4 OF RUNS: 9 MEANS: 386.6 8,356,673 8,426,322 -69,649
T-VALUE: 2.306
STANDARD DEVIATION: 113,666
BIAS TEST: PASSED 95% CONFIDENCE COEFFICIENT: 87,372
BIAS FACTOR: 1.000 RELA Y(<7.5%,@f'RM?): 1.88% I
t
r
r
F
E.
t
kF
f.
Ul flow-mid.xls
FLOW RATE RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy, Southport DATE: 12/6/07
UNIT NAME: Unit 1 UNIT ID/COMMON STACK ID: CS001
MONITOR: Flow MONITORING SYSTEM ID: F10
COMPARISON: SCFH Wet TEST NUMBER: I
OPERATING LEVEL: L AVERAGE GROSS LOAD,klb/hr: 99A
1=USED
0=NOT START START END END LOAD SCFH Wet
USED RIJN DATE TIME DATE TIME Idb/lor RM CEMB DIFF
0 1 2/29/08 1328 02/29/08 1338 103.0 3,592,165 3,916,200 -324,035
0 2 02/29/08 1338 02/29/08 1348 106,0 3,322,432 3,818,400 -495,968
1 3 02/29/08 1348 02/29/08 1358 104.0 3,527,222 3,703,200 -175,978
1 4 02/29/08 1406 02/29/08 1416 102.0 3,408,807 3,611,333 -202,526
1 5 02/29/08 1416 02/29/08 1426 97.0 3,243,456 3,448,667 -205,211
0 6 02/29/08 1426 02/29/08 1436 96.0 3,083,485 3,358,200 -274,715
1 7 02/29/08 1450 02/29/08 1500 96.0 3,097,015 3,363,600 -266,585
1 8 02/29/08 1500 02/29/08 1510 100.0 3,238,547 3,343,200 -104,653
1 9 02/29/08 1510 02/29/08 1520 99,0 3,245,552 3,358,500 -112,948
1 10 02/29/08 1.532 02/29/08 1542 98.0 3,170,127 3,345,000 -174,873
1 11 02/29/08 1542 02/29/08 1552 99 3,198,145 3,304,200 -106,055
1 12 02/29/08 1552 02/29/08 1602 100 3,195,930 3,335,400 -139,470
#OF RUNS: 9 NEANS: 99A 3,258,311 3,423,678 -165,366
T-VALUE: 2,306
,ST DEVIATION: 54,816
BIAS TEST: PASSED 95%CONF E OEFFICIENT: 42,136
BIAS FACTOR: 1.000 I2ELAT Tcy
(<7.5%of RNL?): 6.37%
t
t
V
f.
EEFFF
4:
U1 flow-low.xls
s
NOx RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 60 RATA
PLAIN: Primary Energy-Southport DATE: 2/28/08
UNIT NAME: UNIT 2 SAMPLING LOCATION: CS002
MONITOR: NOx MONITOR SERIAL NO.: 42C-71812-369
COMPARISON: lb/mmBtu OPERATING LOAD,klb/br: 530,8
i=used START START END END LOAD Ib/mointu _
D=not used RUN DATE TIME DATE TIME ld"r RM CEMS RIFF
1 1 02/28/08 0802 02/28/08 0823 531.0 0.281 0,260 -0.021
1 2 02/28/08 0832 02/28/08 0853 531.0 0.291 0.270 -0.021
1 3 02/28/08 0948 02/28/08 1009 531.0 0.291 0.270 -4.021
1 4 02/28/08 1028 02/28/08 1049 531.0 0.285 0.270 -0.015
1 5 02/28/08 1100 02/28/08 1121 531.0 0.275 0,260 -0,015
0 6 02/28/08 1130 02/28/08 1151 530.0 0.285 0.260 -0.025
t 7 02/28/08 1200 02/28/08 1221 530.0 0.269 0.250 -0.019
1 8 02/28/08 1229 •2/28/08 1250 530.0 0.262 0.240 -0.022
1 9 02/28/08 1308 02/29/08 1329 531.0 0.272 0.250 -0.022
1 10 02/28/08 1340 02/28/08 1401 531.0 0.273 0.250 -0,023
#OF RUNS: 9 MEANS: 530.8 0.278 0.258 -0,020
T-VALUE: 2.306
STANDARD DE ON: 0.003
95%CONFIDENCE O T: 0.002
RELATIVE ACCUR a 20%ofRM7): 8.0%
F
t
f
4-
E.
f:
j.
soutliport-gas RATA-EDR.xls
i
NOx RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy-Southport DATE: 2/28/08
UNIT NAME: UNIT 2 UNIT ID/COMMON STACK ID: CS102
MONITOR: NOx MONITORING SYSTEM ID: M10
COMPARISON: ppm wet TEST NUMBER: I
OPERATING LEVEL: H AVERAGE GROSS LOAD,klb/lir: 530.7
Ssused START START END END LOAD ppm wet
0-not used RUN DATE TIME DATE TIME ldb/hr RM CEMS D1FF
1 1 02/28/08 0802 02/28/08 0823 531.0 147.2 147.1 0.1
1 2 02/28/08 0832 02/28/08 0853 531.0 152.2 151.8 0.4
0 3 02/28/08 0948 02/28/08 1009 531.0 149.0 152.2 -3.2
1 4 02/28/08 1028 02/28/08 1049 531.0 146.0 149.0 -3
1 5 02/28/08 1100 02/28/08 1121 531.0 143.0 144.9 -1.9
1 6 02/28/08 1130 02/28/08 1151 530.0 1479 I46.0 1.9
1 7 02/28/08 1200 02/28/08 1221 530.0 138.7 140.6 -1.9
1 8 02/28/08 1229 02/28/08 1250 530,0 134.8 136.4 -1.6
1 9 02/28/08 1308 02/28/08 1329 531.0 142.5 142.5 0
1 10 02/28/08 1340 02/28/08 1401 531.0 142.1 142.7 -0.6
#OF RUNS: 9 MEANS: 530.7 143.8 144.6 -0.733
T-VALUE: 2.306
STAND TION: 1.503
BIAS TEST: PASSED 95%m CONFIDE C FFICIENT: 1.156
I
BIAS FACTOR: 1,000 RELATIVE AC Y(<10%of Rhl?): 1.3%
t
k
t
k
c
kkt
r.
southport-gas RATA-EDR.xIs
CO2 RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Enerp-Southport DATE: 2/28/08
UNIT NAINIE: UNIT 2 UNIT ID/COMMON STACK ID: CS002
MONITOR: CO2 MONITORING SYSTEM ID: C10
COMPARISON: %wet TEST NUMBER: 1
OPERATING LEVEL: H AVERAGE GROSS LOAD,klb/hr: 530.7
t=used START START END END LOAD %wet
0=not used RUN DATE TIME DATE TIME Idb/hr RM CEMS DIFF
1 1 02/28/08 0802 02/28/08 0823 531.0 11.26 12.10 -0.840
1 2 02/28/08 0832 02/28/08 0853 531.0 11.25 12.10 -0.850
1 3 02/28/08 0948 02/28/08 1009 531.0 11.02 12.10 -1.080
I 4 02/28/08 1028 02/28/08 1049 531.0 11,01 12.10 -1.090
1 5 02/28/08 1100 02/28/08 1121 531.0 11.19 12.20 -1.010
1 6 02/28/08 1130 02/28/08 1.1.51 530.0 11.16 12.10 -0.940
1 7 02/28/08 1200 02/28/08 1221 530.0 11.08 12.20 -1.120
0 8 02/28/08 1229 02/28/08 1250 530.0 11.07 12.20 -1.130
1 9 02/28/08 1308 02/28/08 1329 531.0 11.26 12.20 -0.940
1 10 02/28/08 1340 02/28/08 1401 531.0 1.1.21 12.20 -0.990
�#OF RUNS. 9 MEANS: 510,8 11.16 12.14 -0,984
T-VALUE: 2.306
STAND IATION: 0.101
BIAS TEST: NA 95%CONnf CENT: 0.078
ICBIAS FACTOR: 1.000 RELATIVE A EY(<ltl°lo of I2M?); 9.5%
I
i
i
t:
1:
k:.
southport-gas RATA-EDR.xls
l
I
CO2 RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy-Southport DATE: 2/29/08
UNIT NAME: UNIT 2 UNIT ID/COMMON STACK ID: CS002
MONITOR: CO2 MONITORING SYSTEM ID: C20
COMPARISON: %wet TEST NUMBER: I
OPERATING LEVEL: H AVERAGE GROSS LOAD,k1b/hr: 536.2
1=used START START END - END LOAD %wet
9=not used RUN DATE TIME DATE TIME k1b/iir RM CEMS RIFF
1 1 02/29/08 0735 02/29/08 0756 537.0 .11.26 11.90 -0,640
1 2 02/29/08 0804 02/29/08 0825 537.0 11.25 11.90 -0.650
1 3 02/29/08 0932 02/29/08 0853 538.0 11.08 11,80 -0.720
0 4 02/29/08 0902 02/29/08 0923 537.0 11.13 11.90 -0.770
1 5 02/29/08 0932 02/29/08 0953 536.0 11.1E 1I90 -1,720
1 6 02/29/08 1002 02/29/08 1023 536.0 11.31 12.00 -0.690
1. 7 02/29/08 1033 02/29/08 1054 535.0 1 IA 1 12.10 -0.690
1 8 02/29/08 1103 02/29/08 .1124 534.0 11.36 12.00 -0.640
9 02/29/08 1132 02/29/08 1153 536.0 11.33 11.90 -0.570
10 02/29/08 1202 02/29/08 1223 536.0 1.1.31 12.00 4690
#Or RUNS: 9 MEANS: 536.1 11.28 11.94 -0.668
T-VALUE: 2.306
STANDARD DEVIATION: 0.048
BIAS TEST: 'NA 95%CONFIDENCE COEFFICIENT: 0.037
BIAS FACTOR: 1.000 RELATIVE ACCURACY(<1.00 of RM?): 6.2%
I
i
1
I
F
1,
E:
6
h
is
k=
E
southport-gas RATA-EDR.xls
Er
FLOW RATE RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Prii]]aly Energy-Southport DATE: 2/28/08
UNIT NAME: UNIT 2 UNIT ID/COMMON STACK ID: CS002
MONITOR: FLOW MONITORING SYSTEM ID: F20
COMPARISON: SCFH,wet TEST NUMBER: 1
OPERATING LEVEL: H AVERAGE GROSS LOAD,k1b/hr: 530,7
]—USED
O=NOT START START END END LOAD SCFH,wet
USED RUN DATE TIME DATE TIME klh/hr RM CEMS DIFF
1 1X27,7 0802 02/08/07 0823 531.0 11,334,923 10,998,857 336,066
1 2 0832 02/08/07 0853 531.0 11,671,351 11,141,714 529.637
1 3 7 0948 02/08/07 1009 531.0 11,605,734 11,042,571 563,163
1 4 7 1028 02/08/07 1049 531.0 11,368,540 11,150,211 218,329
1 5 7 1100 02/08/07 1121 531.0 11,362,723 11,043,429 319,294
1 6 7 1130 02/08/07 1151 530.0 11,303,649 11,033,400 270,249
1 7 7 1200 02/08/07 1221 530.0 11,268,083 11,015,429 252,654
1 87 1229 02/08/07 1250 530.0 11,405,902 11,019,158 386,744
0 9 1308 02/08/07 1329 531.0 11,591,314 11,004,571 586,743
1 10 1340 02/08/07 1401 531.0 11,521,883 11,012,857 509,026
#OFRL'NS: 9 MIEANS: 530.7 11,426,976 11,050,847 376,129
T-VALUE: 2.306
STANDAItDDEV2ATIiN: I28,702
BIAS TEST: NOT PASSED 95%CONFIDENCE CQJWFICIENT: 98,929
.00
BIAS FACTOR 1.034 RELATIVE ACC 5%of RM?): 4.2%
{
rE
6
F
i
f:
E
t
E'
U2-flow-high.xls
r.:
F:
0
i
I
1
FLOW RATE RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy,Southport DATE: 12/6/07
UNIT NAME-. unit 2 UNIT ID/COMMON STACK ID: CS002
MONITOR: Flow MONITORING SYSTEM ID: F20
COMPARISON: SCFH Wet TEST NUMBER: 1
OPERATING LEVEL: M AVERAGE GROSS LOAD,klb/hr: 390.6
1—USED
0=NOT START START END END LOAD SCI+H Wet
USED RUN DATE TIAIE DATE TIME k1h/hr RM GEMS DIFF
1 1 2/28/08 1441 02/28/08 1451 395.0 9,588,429 9,179,400 409,029
1 2 02/28/08 1451 02/28/08 1501 398.0 9,668,492 8,967,600 700,892
1 3 02/28/08 1501 02/28/08 1511 396.0 9,564,394 9,399,600 164,794
0 4 02/28/08 1524 02/28108 1534 385.0 8,633,550 9,782,250 -1,148,700
0 5 02/28/08 1534 02/28/08 1544 391.0 8,665,954 9,921,600 -1,255,646
0 6 02/28/08 1544 02/28/08 1554 391.0 8,198,593 10,219,800 -2,021,207
1 7 02/28/08 1606 02/28/08 1616 381.0 9,379,501 10,038,000 -658,499
I 8 02/28/08 1616 02/28/08 1626 382.0 9,322,299 9,762,000 -439,701
1 9 02/28/08 1626 02/28/08 1636 389.0 9,271,592 9,391,500 -119,908
1 10 02/28/08 1.653 02/28/08 1703 392.0 9,729,196 9,328,200 400,996
1 11 02/28/08 1703 02/28/08 1713 389 9,719,951 9,412,800 307,151
1 12 02/28/08 1713 02/28/08 1723 393 9,740,513 9,500,400 240,113
#OF RUNS: 9 MEANS: 390.6 9,553,819 9,442,167 111,652
T-VALUE: 2.306
STANDARD DEVIATION: 436,985 j
BIAS TEST: PASSED 95%CONFIDENCE COEFFICIENT: 335,896
BIAS FACTOR: 1.000 RELATIVE A'*j4Fr
7 %of RM?): 4.68%
f
i,
G
r.
U2 flaw-mid.xls
`I
i
FLOW RATE RELATIVE ACCURACY CALCULATION SUMMARY
TYPE OF TEST: 40 CFR 75 RATA
PLANT: Primary Energy, Southport DATE: 12/6/07
UNIT NAME: Unit 2 UNIT ID/COMMON STACK ID: CS002
MONITOR: Flow MONITORING SYSTEM ID: F20
COMPARISON: SCFH Wet TEST NUMBER: 1
OPERATING LEVEL; L AVERAGE GROSS LOAD,k1b/hr: 111.6
1—USED
O—NOT START START END END LOAD SC1F H Wet
USED RUN DATE TIME DATE TIME klb/hr RM CEMS DIFF
1 1 2/29/08 1328 02/29/08 1338 108 3,087,722 3,352,500 -2647778
I 2 02/29/08 1338 02/29/08 1348 109 3,178,228 3,315,600 -137,372
1 3 02/29/08 1348 02/29/08 1358 111 3,247,383 3,348,600 -101,217
1 4 02/29/08 1406 02/29/08 1416 110 3,166,257 3,314,400 -148,143
1 5 02/29/08 1416 02/29/08 1426 108 3,205,003 3,325,200 -120,197
1 6 02/29l08 1426 02/29/08 1436 112 3,210,138 3,284,250 -74,112
1 7 02/29/08 1450 02/29/08 1500 115 3,161,037 3,334,200 -173,163
I 8 02/29/08 1500 02/29/08 1510 116 3,144,359 3,308,400 -164,041
0 9 02/29/08 1510 02/29/08 1520 116 3,086,389 3,448,200 -361,811
1 10 02/29/08 1532 02/29/08 1542 115 3,138,967 3,446,400 -307,433
0 11 02/29/08 1542 02/29/08 1552 116 3,104,622 3,440,400 -335,778
0 12 02/29/08 1552 02/29/08 1602 109 3,094,100 3,504,000 -409,900
#OF RUNS: 9 MEANS. 111.6 3,171,010 3,336,617 -165,606
T-VALUE: 2.306
STANDARD DEVIATION: 75.574
BIAS TEST: PASSED 95%C ENCE COEFFICIENT: 58,091
BIAS FACTOR: 1.000 RELATIVE ACC {7.5%ofRM?): 7.05%
i
i
f
4
it
F
t
F
k
E
U2 flow-iow.xis t: