Loading...
HomeMy WebLinkAboutAQ_F_1000067_20030807_CEM_RptRvwLtr (3) NCDENR North Carolina Department of Environment and Natural Resources DIVISION OF AIR QUALITY Michael F. Easley, Governor William G. Ross,Jr., Secretary B. Keith Overcash, P.E., Director August 7, 2003 Mr. Gary Willer The Plant Manager Cogentrix of North Carolina, Inc. P.O. Box 10836 Southport, North Carolina 28461-0836 Subject: Excess Emissions Report(EER)for the 1st Quarter, 2003 Relative Accuracy Test Audit(RATA)report for NOX and CO2 CEMS Analyzers on Units 1 and 2, 2003 Facility I.D. No. 1000067 Dear Mr. Willer: The Division of Air Quality(DAQ)has reviewed the subject reports dated April 24 and March 17, 2003 and submitted by Cogentrix of Southport, Inc. for Units No. 1 and 2. The reports were reviewed for compliance with the applicable emission standards set forth in 40 CFR Part 60 Subpart Db, the general provisions of 40 CFR 60.11(d) and 40 CFR 60.13. For Units 1 and 2, compliance with the nitrogen oxide emission standard is determined through the use of a 30-day rolling average emission rate in accordance with 40 CFR 60.46b. There were no violations of the NO,,emission standard for Units 1 and 2. Also, Units 1 and 2 are subject to the opacity standards set forth in 40 CFR 60 Subpart Db. Thus,when reviewed for compliance with the standards, the report indicated 228 minutes (38 periods) of opacity excursions for Unit 1 and 60 minutes (10 periods) of opacity excursions for Unit 2. The six-minute opacity excess emission incidents for Unit 1 occurred due to startup,baghouse bypass on low air and opacity monitor out of alignment. The six-minute opacity excess emission incidents for Unit 2 occurred due to baghouse bypass on low air and blown fuse in baghouse controller card. DAQ's review of the Continuous Emissions Monitoring Compliance Report(CEMCR)for NO,,,the Excess Emissions Report(EER) for opacity, and Continuous Monitoring System(CMS)downtime (DT)for Units 1 and 2 during the quarter ending March 31, 2003 confirmed the reported results as follows: Units: No. 1 No. 2 NO,Excess Emission: 0.00% 0.00% NO X CMS Downtime: 0.10% 0.11% Opacity Excess Emission: 0.2% 0.05% Opacity CMS Downtime: 0.02% 0.01% Technical Services Section 1641 Mail Service Center, Raleigh,North Carolina 27699-1641 - 2728 Capital Boulevard,Raleigh,North Carolina 27604 Phone: 919-733-1728 • FAX: 919-733-1812 - Internet: http://daq.state.nc.us An Equal Opportunity/Affirmative Action Employer • 30% Post-Consumer Recycled Paper Mr. Gary E.Willer August 7, 2003 Page Two For the purpose of assessing good operation and maintenance(O&M)practices for particulate emission control devices and all continuous monitoring systems,the DAQ uses, among other things,the EPA Region IV CEM Enforcement Plan (CEP). Based on this plan, excess emissions (opacity only) and/or monitor downtime(all CMS) greater than 2%, 5% for two consecutive quarters or 10% for any one quarter is followed by appropriate agency response and for enforcement purposes only. All data in your first quarter report indicated you were below the CEP threshold levels for all of your Units 1 and 2. The CEM RATA report was reviewed and the NOx and CO2 CEMs monitors on Units 1 and 2 appear to have been tested in accordance with 40 CFR 60, Appendix B,Performance Specifications 2 and 3 and therefore acceptable. The model/serial numbers and relative accuracy values are as follows: Source Parameter Monitored Model and Serial No. % Relative Accuracy Unit 1 NOx TEI 42C-70208-369 6.08% of RM Unit 1 NOx TEI 42C-71812-369 4.41% of RM The next relative accuracy test for Unit 1 is due by March 31, 2004. Finally, unless the permit or any applicable rule states otherwise,your future quarterly Continuous Emission Monitoring Complian,:-e Report and Excess Emission Reports will be reviewed consistent with the compliance of the emission control standards set forth in 40 CFR 60, Subpart Db, and the CEP will be used to assess excess opacity emissions and CMS downtime. All violations of the NOX emission standard may result in enforcement actions. If you have any questions regarding the issues discussed in this letter,please contact me at (919)715-0726. Sincerely, Richard R. Simpson Environmental Engineer cc: '-Mike Aldridge Wayne Cook-WIRO Central File-Brunswick Co. Tracy Patterson—Cogentrix IMPAQ—Documents— 1000067 (Filename : SimpsonRR\Cogentrix\2003\cgEER1Q03sp.doc)