Loading...
HomeMy WebLinkAboutAQ_F_0900067_20131204_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY S T Wooten Corporation-Elizabethtown NC Facility ID 0900067 Inspection Report County/FIPS:Bladen/017 Date: 12/05/2013 Facility Data Permit Data S T Wooten Corporation-Elizabethtown Permit 08344/R04 3931 Cromartie Road Issued 3/7/2011 Elizabethtown,NC 28337 Expires 2/29/2016 Lat: 34d 38.4860m Long: 78d 40.6530m Classification Synthetic Minor SIC: 2951 /Paving Mixtures And Blocks Permit Status Active NAICS: 324121/Asphalt Paving Mixture and Block Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP MACT Part 63: Subpart ZZZZ James Washburn Richard Vick James Washburn NSPS: Subpart I Environmental Vice President Environmental Compliance Manager (252)291-5165 Compliance Manager (252)290-5912 (252)290-5912 Compliance Data Comments: Inspection Date 12/04/2013 Inspector's Name Heather Hawkins Inspector's Signature: �, � /_L� Operating Status Operating Compliance Code Compliance-inspection Action Code FCE Date of Signature: ��� i 3 On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: No emissions reported because the facility has never operated at this site. Five Year Violation History: None Performed Stack Tests since last FCE: None 1) MACT/GACT APPLICABILITY: S T Wooten Corporation—Elizabethtown facility is permitted to construct one(1)of three(3)plants on this site. Each plant is permitted to include a generator. Therefore, at the time in which a plant is constructed on this site and does include a generator,then the facility will be subject to the RICE NESHAP(GACT 4Z). 2) DIRECTIONS: S.T. Wooten Corporation—Elizabethtown is located off of Hwy 87 near Elizabethtown,NC,Bladen County. From FRO,take Hwy 87 South approx 35 miles to State Rd 1155 (Cromartie Rd),turn left onto Cromartie Road. The facility property is the right corner lot. 3) SAFETY CONCERNS: Hard hat and safety shoes are required. 4) SOURCE/FACILITY DESCRIPTION: S.T. Wooten Corporation—Elizabethtown facility is permitted as a hot mix asphalt plant with a recycled asphalt product(RAP) system. One of three different plants is permitted to operate on this site at any given time. Aggregates of various sizes are added to a drum dryer/mixer via conveyor belt from a surge hopper, which is fed by front-end loaders from large stockpiles on the property. RAP is fed to through a screen,where larger material is diverted to a crusher that reduces the size to approximately'/a inches or less, and then the material is conveyed to the dryer/mixer. RAP is combined with the aggregate in the dryer/mixer, where it is heated and mixed with liquid asphalt, as a binding agent. The dryer/mixer is direct fired with natural gas/42 fuel oil/Recycled 42 fuel oil/#4 fuel oil/Recycled#4 fuel oil. The particulate emissions from the dryer/mixer are controlled by a bagfilter. The hot asphalt product discharged from the dryer/mixer is conveyed to an overhead surge bin, where it then drops into a weigh hopper/truck loadout bin below. Asphalt is discharged from the bottom of the weigh hopper into dump trucks that take the asphalt to the location of the paving operation. 5) ENIISSION SOURCES: Permitted Sources: Fm�ssron Em�ss�on'Saurce Control l Control System ,Sourcg_ID bescrigUon .. _ (System ID l DeScrtpt1op Plant 5, 285 ton per hour HMA plant and 65 ton per hour RAP system, OR Plant not on site SES 1 No.2 fuel oil/recycled No.2 fuel oil/No.4 fuel oil/ Baofilter(7,421 square (NSPS) recycled No.4 fuel oil/natural gas-fired rotary drum dryer/ SCDl feet of filter area) mixer(74 rnmBtu maximum heat input rate) _ _ .._ SES3 HMA surge bin(100 ton capacity) 5F1 HMA truck loadout SF2 _ Portable RAP crusher(65 tons per hour capacity) N/A N/A 5F3 Portable RAP conveyor 5174 Portable RAP screen SESGI Diesel generator(1 000 kW) S Control 515 5 Emassron Emtssron Source Control System System source III Description Aesertptloa �. .ID Plant 6,365 ton per hour HMA plant and 65 ton per hour RAP system, OR Plant not on site 6ES1 No.2 fuel oil/recycled No.2 fuel oil/No.4 fuel oil/No.4 Bagfilter(9,542 square (NSPS) recycled fuel oil/natural gas-fired rotary drum dryer/mixer 6CD 1 feet of filter area) (94.4 million Btu maximum heat nput rate) _ __ ___— 6ES3 HMA surge bin(60 ton capac ty) 6F1 F HMA truck loadout 6F2 ( Portable RAP crusher(65 tons per hour capacity) N/A N/A — 6F3 Portable RAP conveyor 6174 _ _ Portable RAP screen 6ESGl Diesel generator(1,000 kW) j missh°n Emisston,Source Control Control System rtSourelA,(." .ra" ". .. Dgsgriphon SysfemlD Description Plant 15, 400 ton per hour HMA plant and 65 ton per hour RAP system Plant not on site 15ES 1 No.2 fuel oil/No.2 recycled fuel oil/No 4 fuel oil/No.4 15CD2, Cyclone,9 foot (NSPS) recycled fuel oil/natural gas-fired rotary drum dryer/mixer P15CD1 (diameter,and Baghouse (120 mml3m maximum heat input rate) 111,598 square feet 15ES3 #HMA surge bin(146 ton capacity) _ __..___.___ ____� 15F1 HMA truck loadout _ __m__m_. -_ _mm_____ __. 15F2 Portable RAP crusher(65 tons per hour capacity) N/A N/A ' 15F3 JPortable RAP conveyor ----------------- 15F4 Portable RAP screen 15ESG1 Diesel generator(1,000 kW) Insignificant Sources: Source None of these sources are on site I5ES11 -Hot oil heater(1.5 mmBtu/hr) I5ES12-Asphalt cement tank(30,000 gallons) I5ES13 -Fuel oil tank(15,000 gallons) I6ES11 -Hot oil heater(0.6 mmBtu hr) I6ES12-Asphalt cement tank(30,000 gallons) 16ES13 -Fuel oil tank(15,000 gallons) —__ � ___________ _._, IISESI 1 -Hot oil heater(1.5 mmBtu/hr) I15ES12-Asphalt cement tank(30,000 gallons) _._m___ ._--__-__ ._m_.m_._ I15ES13-Fuel oil tank(15,000 gallons) 6) INSPECTION SUMMARY: On 4 December 2013,1,Heather Hawkins, arrived at the facility site. The site was empty. There has never been a plant constructed at this site. 7) REPORTING: Annual reports received on time. 8) 112R APPLICABILITY: This facility is subject to the general duty clause of the CAA section 112r. 9) CONCLUSION/RECOMMENDATION: Next permit modification/renewal needs to include addition of GACT 4Z stipulation in permit. Based on the observations made during the 4 December 2013 inspection, S T Wooten Corporation- Elizabethtown appeared to be operating in compliance with their current air permit by being shut down. /hsh