Loading...
HomeMy WebLinkAboutAQ_F_1000067_20130930_CMPL_AltTMRR NCDENR North Carolina Department of Environment and Natural Resources Division of Air Quality Pat McCrory Sheila C. Holman John E. Skvarla, III Governor Director Secretary September 30, 2013 Mr. David Groves Facility Manager CPI USA North Carolina Southport Plant 1281 Powerhouse Dr. SE Southport, NC 28461 SUBJECT: Clean Air Act Section I I2j Monitoring Approval Air Quality Permit No. 05 884T 13 CPI USA North Carolina Southport Plant Facility ID: 1000067, Southport, Brunswick County Facility Classification: Title V Dear Mr. Groves: The Division of Air Quality (DAQ)has reviewed and approves your request for using a CO2 monitor and equations from 40 CFR Part 60 Appendix A, Method 19, in order to calculate an emission rate corrected to 7% 02. In your August 6, 2013 letter to Don van der Vaart, Permitting Chief, DAQ, you requested that the DAQ approve the use of CO and CO2 analyzers measuring a diluted, wet emissions stream in conjunction with equations 19-1 and 19-7 from Method 19. Your reasoning was that the installation of dry CO and dry 02 monitors, associated sampling equipment and treatment systems would be cost prohibitive when the alternative monitoring you proposed would yield data that can be used to demonstrate compliance. The DAQ has the authority to approve this monitoring for our state Clean Air Act (CAA) section 1120) boiler standard that will be in effect for eight years from the 1120) permit issuance. However, when your facility demonstrates compliance with the CAA Section I I2(d) Boiler MACT on May 23, 2019, you will need to either install monitoring specifically required in the Boiler MACT or petition the EPA for approval of alternative monitoring. Either of these actions should be taken well in advance of May 2019 so that you will be able to demonstrate compliance by May 23, 2019. Technical Services Section 1641 Mail Service Center,Raleigh,North Carolina 27699-1641 217 West Jones Street,Raleigh,North Carolina 27603 Phone:919-707-8407/Fax:919-715-0718 Internet:www,ncair.org An Equal Opportunity 1 Affirmative Action Employer—Made in part by Recycled Paper Mr. David Groves September 30, 2013 Page 2 The approved equation to determine the CO emissions at 7% 02 using a wet CO and CO2 measurement is: Fc 100 (20.9 — %02 correction) Cd = Cw x Fd x %CO2w x 20.9 Where: Cd=pollutant concentration, dry basis Cw=pollutant concentration, wet basis Fc=Method 19 carbon F-factor for wood Fd=Method 19 wet F-factor for wood %02 correction= 7% This approved monitoring and calculations will need to be included in your Title V permit. Please contact Michael Pjetraj (michael.pjetraignedenr. ov) (919-707-8497) if you have any questions. Sincerely J� Lee 7A. Daniel, Chief Technical Services Section I cc: Don van der Vaart, Permitting Section Chief Brad Newland, Supervisor, Wilmington Regional Office Central Files