Loading...
HomeMy WebLinkAboutAQ_F_0400054_20110202_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY NC DOC-Lanesboro Case Goods Plant NC Facility ID 0400054 Inspection Report County/FIPS: Anson/007 Date: 02/09/2011 Facility Data Compliance Data NC DOC-Lanesboro Case Goods Plant Inspection Date 02/02/2011 552 Prison Camp Road Inspector's Name Cindy Grimes Polkton,NC 28135 Operating Status Operating Lat: 34d 59.1000m Long: 80d 11.3202m Compliance Code Compliance- inspection SIC: 2499/Wood Products,Nee Action Code FCE NAICS: 321999/All Other Miscellaneous Wood Product Manufacturing On-Site Inspection Result Compliance Contact Data Permit Data Facility Contact Authorized Contact Technical Contact Permit 09932/R00 David Hawley G.Freeman David Hawley Issued 8/20/2008 Facility Maintenance Director of Engineering Facility Maintenance Expires 7/31/2013 Manager (919)716-3400 Manager Classification Small (704)695-1013 (704) 695-1013 Permit Status Active Inspector's Signature: Comments: Date of Signature: t a J iVIACT/GACT Applicability: None at this time(specific information on the permitted generators is currently not known,since the facility has not begun operations yet. NESHAP GACT 4Z may be applicable at a later date). 1) Location NC Department of Corrections is located at 552 Prison Camp Road, in Polkton,NC, Anson County. Directions From FRO,take Hwy 401 South to Wagram. Turn left at Old Wire Road (Hwy 144)and go approximately 11 V2 miles to Laurel Hill. Turn right onto US 74 West, continue through Rockingham on Bypass US 74 West, cross over the Pee Dee River, and enter Anson County. Go through Wadesboro, drive another 5 miles, and turn left onto Prison Camp Road, which will be about 1 mile after Boggan Cut Road. Continue on Prison Camp Road; it'll make a sharp left after about.6 mile. Facility will be on the right hand side. Safety Considerations: Safety shoes,safety glasses, and earplugs.Hardhat as needed. 2) Facility and Process Description This facility is not yet in operation, but will manufacture and finish case goods (cabinets and counters) within a woodworking operation. It is permitted under Air Permit No. 09932R00, effective from 20 August 2008 until 31 July 2013. Cindy Grimes conducted the last compliance inspection on 19 January 2010, verifying that that the facility remains inactive. This facility will manufacture and finish case goods (cabinets and counters) in a woodworking operation supported by a baghouse and three dry filter spray booths used to apply stains and sealants. The facility also employs two natural gas and propane fired boilers (10.46 mmBTUs) and two diesel fired peak shaving/emergency generators (1,750 kW). Wood waste will be sent to a wood chipper connected to the baghouse. a) Current Throughputs for 2010 Production: 0 (same in 2009) b) Permitted Sources Emission Emission Source Control Control System Source ID Description System ID Description Power Generation ES-2 Diesel-fired emergency/peak shaving generator, 1,750 kW N/A N/A ES-3 Diesel-fired emergency/peak shaving generator, 1.750 kW Case Goods Operation ES-1 Woodworking operation, including a wood chipper CD-1 Baghouse,4,755 square feet filter area ES-4 Paint booth, dry filter type ES-5 Paint booth, dry filter type N/A N/A ES-6 Paint booth,dry filter type c) Insignificant Sources/Exempt Activities Source Exemption Source of Source of Title V Regulation TAPS? Pollutants? IES-7-Natural gas/propane-fired boiler, 10.46 mmBtu 2Q .0102 yes Yes maximum heat input(NSPS Subpart De) (c)(2)(B)(ii) IES-8-Natural gas/propane-fired boiler, 10.46 mmBtu 2Q.0102 yes Yes maximum heat input(NSPS Subpart Dc) (c)(2)(B)(ii) 3) Inspection Summary.(facility is not operating) On 2 February 2011, I (Cindy Grimes, of DAQ FRO), verified with Ken Hart, Central Engineer at the Raleigh headquarters of the NC Dept. of Correction, that this facility is still not in operation. With the economy being as bad as it is,the starting up of the facility will not be occurring for some time.There is no equipment in place, as of this date. 4) . Reporting Requirements This facility is required to submit an annual report by 1 March each year, which includes the emissions ol� VOCs (in lbs), largest single HAP (in lbs), and the total of all HAPs (in lbs). The latest report, show1110 no emissions,was submitted on time (I I January 2010). The 1 March 2011 report had not been submitted yet as of this report date. 5) 112R Status This facility does not use or store chemical compounds requiring a written risk management plan under the Clean Air Act, Section 112R. 6) DAQ Compliance History This facility has not begun operations yet, therefore has no history. 7) Comments and Compliance Statement This facility has not begun operations as of this time; NCDOC Lanesboro Case Goods Plant appeared to be in compliance on 2 February 2011. /clg DAQ Central Files