HomeMy WebLinkAboutAQ_F_0400054_20100119_CMPL_InspRpt NORTH CAROLINA DIVISION OF : Fayetteville,Regional Office.
AIR QUALITY NC DOC-Lanesboro Case Goods Plant
NC Facility ID 0400054
Inspectiow eport County/FIPS:Anson/007
Date: 01/20/2010
Facility.Data Compliance Data
NC DOC-:Lanesboro Case Goods`Plant 4 Inspection Date 01/19/2010
552 Prison Camp Road Inspector's Name Cindy Grimes
Polkton,NC 28135 Operating Status Operating
Lat:34d 59.10,OOm Long: 80d 11.3202in Compliance Code, 'Complian,
ce-inspection `
SIC: 2499/Wood Products,Nec Action Code FCE
NAILS: 321.999/All Other Miscellaneous Wood Product Manufacturing On-Site Inspection Result . Compliance
Contact Data" Permit Data
Facility Contact Authorized Contact Technical Contact permit - 09932/R00
Issued, 8/20/2008
David Hawley . G.Freeman , David Hawley Expires 7/31/2013
Facility Maintenance Director of Engmeenng Facility Maintenance
g (919)716-3400` Manager Classification•Small
Mana er
(704)695=1013 (704)695 1013 Permit Status Active
Inspector's SignaltIr comments:,-
Date of Signature:
MACT/GACT Applicability: None
1) Location
NC Department of Corrections is located at 55.2 Prison-Camp Road,in Polkton,NC,Anson County.
Directions - - :
From FRO,take Hwy 401 South to_Wagram. Turn left at Old Wire Road(Hwy 144) and go
approximately I L5 miles to Laurel Hill.Turn right onto US 74,West and go to Anson County. Go'
through-Wadesboro;go anoth/ 5 miles,and turn left onto Prison Camp;Road,'which will be about'1
mile after Boggan Cut Road. Continue on Prison Camp Road; it'll make a sharp left after-abo I t.6 mile.
Facility will be on the right hand side.
Safety Considerations: Safety shoes,safety glasses,and.earplugs.Hardhat as needed.
2) Description
This facility is not yet in operation,but will manufacture and finish case goods (cabinets and counters)
within a woodworking operation. It is permitted under Air Permit No. 09932R00,`effective from 20
:August 2008 until 31 July 2013.Cindy Grimes conducted the last compliance inspection on l l June
2009,'verifying that that the facility remains inactive.
a) Current Throughputs for 2009
None,as this facility is still not operating.
b) Permitted Sources
-.___ __..-_ ;_-_.�� --__:-., .,
Emission ; Emission Source Control Control System
Source ID Description System ID ( Description
jPower Generation «:
ES-2' Diesel-fired emergency/peak shaving generator;,1,750
Ikw
__. _..____. ..:__. .:.___.._..._.. _ --- ---------- N/A N/A
j ES-3- IDiesel-fired emergency/peak shaving generator, 1.750 i
` JkW j ;
Emission Emission Source Control Control System
Source ID Description System ID Description
Case Goods Operation
ES-1 `Woodworking operation,including a wood chipper CD-1 Baghouse,4,755
;square feet filter area
ES-4 'Paint booth,dry filter type I
ES-5 ;Paint booth,dry filter type N/A N/A
ES-6 ;Paint booth,dry filter type
c) Insignificant Sources/Exempt Activities
Source Exemption Source of Source of Title V
j Regulation TAPS? Pollutants?
IES-7-Natural gas/propane-fired boiler, 10.46 mmBtu 12Q .0102
maximum heat input(NSPS Subpart Dc) (c)(2)(B)(ii) i Yes Yes
JES-8-Natural gas/propane-fired boiler, 10.46 mmBtu 12Q.0102 j yes Yes
.maximum heat input(NSPS Subpart Dc) ,(c)(2)(B)(ii) f
3) Inspection
On 19 January 2010, I, Cindy Grimes (of DAQ FRO),verified with Ken Hart, Central Engineer at the
Raleigh headquarters of the NC Dept. of Correction,that this facility is still not in operation. With the
economy being as bad as it is,the starting up of the facility will not be occurring for some time. There is
no equipment in place, as of this date.
4) Process Description
This facility will manufacture and finish case goods (cabinets and counters) in a woodworking operation
supported by a baghouse and three dry filter spray booths used to apply stains and sealants. The facility
also employs two natural gas and propane fired boilers (10.46 mmBtu) and two diesel fired peak
shaving/emergency generators (1,750 kW). Wood waste will be sent to a wood chipper connected to the
baghouse.
.5) Permit Stipulations
N/A, since the facility is not in current operation.
6) Reporting Requirements
This facility is required to submit an annual report by 1 March each year, which includes the emissions of
VOCs (in lbs), largest single HAP (in lbs), and the total of all HAPs (in lbs). The latest report, showing no
emissions,was submitted on time(11 January 2010).
7) 112R Status
Based on the facility's inventory, it was decided that there are not subject to 112R requirements.
8) Comments and Compliance Statement
This facility is not in operation as of this time;NCDOC Lanesboro Case Goods Plant appeared to be in
compliance on 19 January 2010.
9) 5 year History
This facility has not begun operations yet,therefore has no history.
/clg
cc: DAQ Central Files