Loading...
HomeMy WebLinkAboutAQ_F_0900066_20100416_CMPL_MACT-Corr ern NCDENR North Carolina Department of Environment and Natural Resources Division of Air Quality Beverly Eaves Perdue B.Keith Overcash, P.E. Dee Freeman Governor Director Secretary April 16, 2010 Mr. Richard Willey, President Venture Milling- Ansonville 31149 Old Ocean City Road Salisbury, MD 21804 Subject: National Emission Standards for Hazardous Air Pollutants for Area Sources: Prepared Fee„ds Manufacturing Venture Milling- Ansonville Ansonville,Anson County,North Carolina Facility ID.No. 0400039 Dear Mr. Willey: On January 5, 2010,the US Environmental Protection Agency(EPA)promulgated 40 CFR Part 63,Subpart DDDDDDD -National Emission Standards for Hazardous Air Pollutants for Area Sources: Prepared Feeds Manufacturing final rule(GACT Subpart DDDDDDD, or 7D). You are subject to this subpart if you own or operate a facility which: • Is NAICS 311119 (Animal Feeds,prepared (except dog and cat food)); (NAICS corresponds to SIC codes 2048 and 0723), and • Uses chromium> 0.1 %or manganese> 1.0 % as an ingredient, supplement,pre- mix, concentrate, etc. in the product, and • Is primarily engaged in animal feed production. (primarily engaged means > or= 50 % animal feed production.) Subpart 7D applies to prepared feeds ingredient manufacturers(micronutrient formulators) as well as to prepared feeds manufacturers. Your facility has been identified as being potentially subject to this new rule. To help us determine.if you are indeed subject to this regulation,we are requesting that you complete and submit the enclosed Initial Notification Form. The form should be submitted no later than May 5, 2010. If you feel these regulations do not apply to you,please indicate this on the form and provide an explanation of why the regulations are not applicable to your operations. Existing facilities subject to GACT Subpart 7D are required to be in compliance by January 5, 2012. New facilities subject to GACT Subpart 7D (constructed July 27, 2009 to January 5, 2010) are/were required to be in compliance by January 5,2010. New facilities 1641 Mail Service Center,Raleigh,North Carolina 27699-1641 One 2728 Capital Blvd.,Raleigh,NC 27604 NOl thCarolinc1 Phone:919-733-3340\FAX:919-715-7175\Internet:www.ncair.org An FmA ennM,,Nw\AlGrmd,.Adinn FMO.OVn( o/ V G `�( Mr. Willey April 16,2010 Page No. 2 beginning construction after January 5, 2010 are required to be in compliance upon start-up. A copy of this rule can be found at http•//edocket access gpo.Rov/2010/Rdf/E9-30498.pdf. It is very important that you understand these environmental rules and comply with all requirements. Failure to comply exposes you to potential enforcement action and penalties. If you have questions or desire further information or assistance, please contact Jim Moser with the Fayetteville Regional Office at(910) 433-3367. If you have fewer than one hundred employees, you may qualify for confidential,non-regulatory assistance from the Department's Small Business Environmental Assistance Program (SBEAP). They can be reached toll-free at 1-877 623-6748. Sincerely, K Overcash, P.E. BKO/pk Enclosures cc: Jim Moser,Fayetteville Regional Office GACT Files Prepared Feeds Manufacturing (Subpart DDDDDDD / 7D) National Emission Standard for Hazardous Air Pollution State of North Carolina INITIAL NOTIFICATION FORM FACILITY INFORMATION: Facility Name: Venture Milling- Ansonville Facility ID: 0400039 Facility Owner/Operator: Mr. Richard Willey Environmental Manager Facility Physical Address: North State Road 1627 and US 52 Ansonville, NC 28007 Applicable Standard: National Emission Standards for Hazardous Air Pollutants for Area Sources: Prepared Feeds Manufacturing (GACT Subpart 713) Facility Compliance Date: January 5, 2012 (for existing sources) January 5, 2010 (sources built July 27, 2009 to Jan. 5, 2010) Upon startup (for new sources built after January 5, 2010) Is your facility a major source of HAPs? (check one) NOTE:A major source is a facility that emits or has the potential to emit greater than 10 tons per year of any one hazardous air pollutant (HAP) or 25 tons per year of multiple HAPs. All other sources are area sources. ❑ Yes. My facility is a major source of HAPs. ❑ No. My facility is an area source of HAPs Is your facility subject to Subpart 7D ? (check one) ❑ Yes (Notification of Compliance Status is due May 4, 2012; => Final compliance date.) ❑ No (my facility is not an area source of HAPs.) ❑ No (my facility does not perform > 50% of prepared feeds manufacturing.) No (myfacility does perform Prepared Feetls Manufacturing; but daes ngYprocess, or generate materials containing HAP (chromium > 0.1% by weight or manganese 1.0% by weight.)) 0 No (other, please explain) Initial Notification Form for Prepared Feeds Manufacturing Page 2 SIGNATURE Signature of Responsible Person or Company Official: X Date: (Print):__... . Title: Please return this form by May 5, 2010 to BOTH the NC Division of Air Quality and the US Environmental Protection Agency at the following addresses: Mr. Patrick Knowlson Mr. R. Douglas Neeley NC Division of Air Quality Chief Air Toxics Monitoring Branch 1641 Mail Service Center U.S. EPA, Region 4 Raleigh, NC 27699-1641 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Atlanta, GA 30303-3104