Loading...
HomeMy WebLinkAboutAQ_F_0400005_20090820_CMPL_InspRpt i `I NORTWCARO1,INA DIVISION OF Fayott�villeRegional Office T , i AIR QUAIdTY Bonsal Aineriean, NC facility Ill 640om ; I- Inspection Report CounryTIRS: Anson/007 Date:; I0/26/2009. _ facility Aata Cmuphauce""Data i Bonsal American Inspectiow)), " 08/20/2099 " 351 11atl6y s ferry Road Inspector's Name Cindy Orimes " LilcsviUc NC " 29001 operatin�Stttas Operating Lat: 34d 57.5360m . "Lung;99d 57.4490m Compliance Code Compliance; mSj)YC06u . SIC: 3272/Concrete produets,Nec Aelinn Gode , ' "; hC"li " N"AICS:"32734/Othci;Conactc 1'roducti Manufacturing On-Sift Insliectibn I;esnit "Compliance Contact Data" Permit Data Facility Contact - Authorized Contact Tcclnucal Contact, Permit 01759/I,Z19 Issud-;e 10/3/2007 Fjank Ketchum, Frank Ketchun Ken Brown . Fxpues 3/31/2012 Regional PlanrManager" Regional Plant Manager" EllS Director, Cl4ssificatioii Syrflhctia Minor ' (704),848-4141 (704) 848-4441 (704) $21=1915 Permit Status`Active " Jaspcclot'S"Signatuic Conuneots: ; Date of fthatme: BonsalAmerican is located a0S[ Ilailuy's Ferry Road, outside of Lilcsville,NC, Ansofi County, " I Directions From FRO, take Ilwy 401"South to Wagrahi. Tu6i right onto Old Wire Road (Ilwy,144), and go approximately I I.5 miles to Laurel Hill-Pura right onto US 74(poet and cttutitnte for abbut 25"roles, 3tntil"you enter Anson County,just after crossing the Pce"Dee River. Go app oximatcly 5"more.tnilesto Pit Roa (S"12 180I);wliere,th"ere are crossroads acid a 14rgc antique cart in a`yard ou the I-ight'Tl)rn left; go almost.2 mile, and tlicn just Before the railroad tracks,take a leftonto facility's dirt,drive. Ntaiyt office is on thciight: Safety Coosideritions:�"Safety shoes,safety y glasses,"ancl hardhat.Elirpiugs tiro optioilaty" 2) General) acuity Description " W R. Bonsal,Inc,is a mineral mikingaild packaging facility that primarily manuf tctures bagged' concrete:It also produces play sand, all-purpose sand;;androortar. Thoprocessing plant is on contiguous property with the W;"1Z. Bonsal'lnitle. This facility is permitted un er Air Permit No. I" 175*19;effective From 3 etober 2007'until 31 March 2012. Cindy Orirnes"conduc(gd the last compliance inspection'.on 25 Sep tember200$. i " a) Current Tlu'onghptit, for 2008 " Entployecs 21 (ipcluding"drtvers) Hours: 7AM-4PM,Mon Fri, 40hys/wk;52wks/yr Material"recei4ed; " Portland Cement 24615,89,01bs (I1,0007.95 tons) Masonry 3,566,652lbs (1,783.33 tolls) Fly Ash 3,634;2514b5 (1,81M13 tons), i nits Produced: ' 1,360,222'13', U 1 I f I I Y i b) Eermitted"Sou rces ;►,mission "mission Source Control . � Cwttrol Sysleni Source"10 Description System ID i Descriptiop jDrying Operation,consistingrif: T S30 'Natw'al gas/No.2 fuel oil-f red(15 BIH A Bagfrltgr(3,825 squ are-feet o1'filter area irimBty nrax heat input)sand and ,gravel dryer{50 to;Impor hour xuaximunrcapacity)' Prodtic6on i,ine I;consisting(if. Sl?22 . Portlau eernent silo,Line 1 = 1311,2 ,Bagfiltei`(156 square feet of filter area) Sf23 :Recycled Cement silo,Line 1 BII23 ,Bat3filtei'(,156 square feet of filter area), Sr24 iFly ash silo,Lino 1 137124 !,'BagMter(156 square foot of filter area) - i SF25 Noniix camcittsilo, Line 1 61125 ;Bagfilter(I56 square feet of filtor area L803 =Rock,an<i sand bucketeonveyor BIIIA Bagfilter(3,$2S square feet of,'iiltor aroa) ,, operation inefudin 'a rock silo and a sand silo - �," US()I ,Cement Handling operation(bagging ,- BHO1 II3agfiher(3,840 square feetof litterarea) wclghing,mixing), Line I proilaCtion Line 2,consisting of: ` SP4o portlaitd'oomentsilo,Lino 2' BH46 Magfiltor(156 square-foot of fit terarca) - Sr41 Rock silo, Line 2 Bfic Bagfilter(156 square foot of filter.arc# S[42, .San6silo split,Line 2 B1142 78agfiltar(I56 square feet of filter'area) S1r43 rly ash"silo,Lino 2., -- 131443 Bagfifter(156 square feet*frlfei area) i Sr44 'Type S Cement silo,Line-2 8II44' `B r1 Jilker(156 square feetof liltei u6a) r SP52 =Recycled cement silo Line 2 B[152 Baghltor(156 square foot of Mier area) BSIB1Zock soroerrfrom sa d;Line 2 BH13 , , . :73agrlter(I 200 sgriare rector title r uc a) „ I , ES02 Ccmcut handtingoperatinn(haggin{, BII02 l3agiilter(1,900 square sect oFlilttr arc) weighing mixing),Lire 2 r r 3) .Opelihig Conference . Oti 20 Aagust 2009,,I, Cindy Ciriines,met with rrarlk Ketchum;new racility Contact anti Plant j Manager at Bonsai American. We'discussed the following: - r a) Verified the,FACFiNDE9 inforination.Mr. Ketelium is now ihc-Encility and Authorized Contact, ' replacing Bradflartsell and herb Wiggins, Who were both laid off iiue lo,the'slow.econ6my. r b}-'There have been no changes in equipment since n new btighouse was installed to rej>lace tile existing -. one bade in 2007. Mr. Kotehum told-me there have been''-no problems. " Ieel- c) l inspected the logbooks,of which separate ories are kept for each bagfilter.;The lead roam chance - teelwician usaally performs the inspe6tions,which,includes inspeetions'orthe bags, Mower; duetivni'le, and observing Tiny visible canissions all,. The results are noted in the logbooks.`Phese.insjlections used to be done weekly but are now done evcly 3 weeks'. There is also an annuai inspection done on the system, usually toward the beginning of each year..' i I t I I I 4) 111,ocess"pescription Raw materials al delivered on site,processed and hied throe"gh the sand and gravel dryer and stored in designated"si1gs.They are there"blended and paokagcd/bagged aGcortling to the specified concrete nnx and' " customer. 'r 5)` 'Inspection Summary, i Mr. lZetclium"andl walked around the facility, as it was operating at the"tithe. We noticed a Portland cement, tr uck unloading at C31I-40, asked the driver-what Nis"truck line pressmre nornally was, and ire told us 10-I'5 psi " I " at"ticinaxinntm."i observed l09/g VE as he wlls nilloading,Uuf when he finished;he"blow excess VI; from his biickwhen lie opened a relief valve underneath to release pressure.T"hedriver told us his truck is sotto tic maxiinum"piessure of 15 psi; and when the unloading"is finished,,he releases the truck valve.,ilc said that he usyally doesn't seedust rhtring this procedure, Mr, Ketchum stated that he has never seen dust during unloading either:e waited a while for another truck to eome:to u b tdoad,� u n t one arrived. Mr."KeIAntii told " me that'Bonsal has a procedural;policy for'cernenf and 1Ty asiiilnloa lug for tie company and tonal[ vendors; and that every vendor_is given acopy of the policy and required to sign it I his particular driver was from Souther I"Ink, located"hr;llolly'Ilill, S0, they are a"re,gular hauhr of ccmenl for I3onsal." , l.observed no other"probtoms during niy inspectioi: I observed no oXccss buildup of materials on any of-the" silos, whielr Wonld indicate any,comprornises:i also saw nJ excess dust from any tr cks cheering or"leaving ' tieCacility. " b) "Pei&it$tlpuiations " E a) "A.3 21) ,0515 P IRIICULATC C6NTR61 REQUIREMCN'F-Particulate matter eaiissioits from sources . " shall not exceed the allowable rates. In Cornplianee-Latesupermit review indicates compliance. " b) A.4 20 :0516,SOLP R DIOXIDE CONTRQL"RT0-11MAIlzNT S02 crliissin s tiorn"the combustion " sources shall not exceed 2J lbs/nun BTU: Ter CornlSlimrcc Facilitq is only burning natural gas; i i c} A.5 2D .0521 ►ISIBLE.TMISSIONS CONTROL RGQUIREMENr—Visible emissions from the i" emission sourcessthallnot exceed 2q% opacity. Sir Compliance- hdid see"one slight burst of excess VE when the driver unloading cement opened the I relief vat"ve when he f nished.Since Boos"al has-their own policy for all vendors to adlig c_by wlicn unloading products;I"foci c4r9tdent llwt this was an"isolated incident, I asked Mr, Ketchum to inTkc sro�e a(I of the:v end ors follow di4 ir,,pOIicy by reiterating it,to them., �I) A 2D:0540 FUGITIVE CONT 01,REQUII2I;MRN'I`-The Permiltec shall novallow logitive, non-process dust(emissions to'contribute to substantive complaints:." In"Compliance I saw no cxCessfugitiuo dust emissions"during lily inspection. The hud roads are gravcllsand;and Mr;7Cetchum said that he Iias n6trcceived any complaints 13c.evill"use water"front a " I watering puckif dustb"econres"aproblemduringadryspc " " o) A.8 2D .0611" BA6)?ILTEIt RTQUIItEMENTS Particulate niattei'emissions shalLbe conn•olled by the porniittcdequipmciii list;with periodichunival itispoctions perf6rmed and records kept in a " � 14gbook."" � .. . . I In CourpliAlice—separate logbooks are kept for cach baglitter, and regular"and amwa(inspcction records kept current: " 7) " Reporting Requiremeirts 'There are no reporting requirements for this facility in their currentpernlit. i I I 8) , 11212 Status Based on the facili(y's eufregtlnventofy, it was decidedthat they are not subject l0 1 I2I2 fequircartents. I I 9) Cmnarierrts and Compliance Statement " Even though I did observe' a slight bmstof excess VE during the unloading of cement, 1 believe this was_ . I an isolated"incident. Pvaill cheep during,noxt year's 1,11spectioi5 to see that Mr. l<etc rum advise011s vendots.to assure,till's does not reoccur. I saw-no oAhei,problmi ,,v,, any of the em ssronsoiu�ces, Bonsai Arrterieari appeared to be in compliance on 20 August 2009. 10) 5 YearConipliaince rlistory a) . 9 Novenil5er 2005—NOV/NRE'efor C36,laiproper Operatiojj and;Maintenance and 2D,Q535,Failuic to I ReportNlalfunetion, - b) 30 August 2003 NRE for 2D OS. 21,Excessive Visible Emissions. NOV/ " I i - cc: DAQ Central Files I I I I I 1 1 i I I i I I I i I i