Loading...
HomeMy WebLinkAboutAQ_F_0400037_20090916_CMPL_InspRpt i i N012TII CAROLINA DIVISION OF Fayettevilfe Regional Office - AIRQUALITY! The Quiktlete'Compa ics-Pcaclitand Pit NC Facility 11) 0400037 Tnspcctimt Report Coursty/171PS: Anson/007 Date:' 09/17/2009 Tacilitypata — Compliance Data i The Quikrete Conopanics- Pcachland Pit Inspection Date 0911 6/2 0 0 9 1 highway 74'Wcst Uispector's Nance Cindy Grimcs` Pcaclitand,NC +' 28133 Operating Status operating. Lat.- 34d 59.3110m Long: 80d 17.8790m' Compliance Code' Compliance-inspection- SIC: 3212/Concrete Products,Nee ': Action.Code F C E t NAICS: -327391 Other Cotjmctc Product Manufacturing 0t7Site Inspection Result Coinphancc Contact Data Permit Data [aci0ty Contact ' Authorized Coutaot� 7'eclmical Contact ' Penult ' 06)Q7/R07 Matify Goodloe Maury Goodloe Maury Goodloe Issttetl- 3I21I2005 PlantlVlanagcr i P1anLManTgcr Plant Manager hspires 212812010 ' (704)272-7677 (704)272-7677 (704)272-7677' Classiticatiott Sypthctic Minor, i Permit St1tos Active i Inspectors Signature;', Cmnmcnts: Data ofSt�tature: �` 1��. iUUq,, t) Location I Quikrete C6tnpany-'Peachland is located on llwy 74 West,right on the Anson/Union County,Trines, in Peachland,NC,Anson County: Pireetions i Frtun FRO,-talceflwy 401'8outh to Wagram.Turn`lef,at'Old Wire Road (Tlwy 144), and go approximately ]d.5 notes to Laurel hill. `turn right onto US'74 West and go through"Richmond County to Alison County. Wthrough Wadesboi'o and to the West side nfAnson County until you gctto the Union Cotury lira P4111t is just before county linenn left, Safely Consula'atimisi'Safety shoes,safety glasses,and hardhat.Earplugs are optional,as needed. t. . 2), lleseriptioit The Quilcretc Cotrjpatiy-Peaclilaitd is a concrete products faeility that produces play sand, concrete, { mortar and mason mix, and grout. Tbis'facility is pertnitfed under,Air Permit No. 06907RO7, effective from 21 Mitreh 2005,--until 28 February 2010:Cindy Grimes eonductgd the last " ' otnupliarfee iuspectioti on 28 August 2008. h) Curieot'l'brougliputs I Cement; Portland ]4,2175.43 tons Masonry 4 583.99-tour , l Total 18,859.42 tons I Sancl: Red 57,404.53 tons' May 8,075.30 tons Total 65,479.83, tons i Gravel: 34,58118 tons I t t Employees: Production 26 Total w/drivers 37, j flours: Two shifts (6AM-I I I'M) 5days/week, 52 weel<s/year i h). Permitted Sources Emission Tnussion Source Control, Control System I' Source ID 1)escriptlmi system 11) Description „ ES-1 i0ne LP gas'-fired barrier(20 nauBtrOul , , NIA „ N/A rnaXlmuin beat in(ut) } S IA Ortcrotaryit (140lotsper hour, - CD-8 One(1)bagfiltcrQ,240sgnarcfcetof`filter I Illaximara throughput) area) ES-4 cement packaging operation - CD-2 One(1)bagflter(2,403 squarefeet of filter ,area) IiS-6 One Sand silo CD-14 .One(1),bagliher (125 square feet of filter 'area) E9-9S I - ; One compartment of split aggregate silo,, CD 9 . 1011e(1)bagfiltcr(125 square feet of Filter, ; ES-9S2 Ore compartment of splitaggrcgate silo i CD-9 One(l)"bagfiltcr(125 square feet of filter j TS-IIS one eonrparhneritof split site - CD-II ".Oue(1)bagfrlter(125 square teetof.filtei area) FS-12S , `One cotnparinient of split silo CD-12 , .One(I)bagfiltcr(125 square feet of filter ES 13S Two aggregate o ate silos CD-13 Onc(1) bagflter(250 square feet of filler 'area) I ` 3) 111•cluspeetion Conference" On 16 Sept6mber 1009;I, Cindy Grimes(DAQ/PRO),met,with Maury Goodloc;plant manager and, facility contact of Q ikrete-Peachland.This iris(lecfion was pre-arraugdd,since it was the pe tuil renewal compliance-inspections"Mr. Goodloe and f iliseussed the following: i a) I verilicd that lie is the contact for all data regarding Air Quality issues. t b) There have been 11 no ne W sources added since the last complianeeinspection it) 2008, c) ;Mr. Huntley showed rile the maintenance logbooks, in which he maintains a scpaiaw one for ) adeh source;Eithar Bill Davis ox,T irn Iluntley, who hotbAo the-mainfenarice, records the bagfihcr inspections, and magna helix manometer readings weekly; they vsually,check them l daily, l told,Mr, Goodloc that b@ was doing a goo(ljob,on the recordkeepi ig. j d) I asked W'Goodloe if he had received any complaints regarding"dust, and he bagf ne,brrd not. This facility's haul driveways are atuixture of grravel and sa HJ in the back and.asphalt on the sides and in front. I did'not notice any,exccssive dust during;my inspect on. lie said that lie would concoct ainal(eshiftwater truck, if„it ever became a problem during gi dry spell. c) Mr. Good loc does not,have online:access at this time, due to,ill facility's location',so l had brought trim the AFRO forms to fill out. 1 W tit over each formiwitli.him:Ile said Ile might be gefting l[mernet service within the next month, so lie,would,rather wait and complete the j emissions jnveriEoiry vaaAERO when he finds out about the online service:I told Marto call t rile if he ball any ducstious�arid reminded him of the November-30 deadline. I I f i 4) Process Description, Raw materials such as'sand,cement,and grawt are delivered on site.They are then processed and dried khrouglr.the rotarydrum dryer;thensorted in designated silos. Thee are 4 separate filling fines at this'facility,and include 1) Sand life,2) Quikrete cement line, 3)Bulk line for 3,000 lb totes of grout.or mortar,-and 4)Rock line for'Iz inch marble or gravot bags.After bags are filled,,they are, tompora'rily storod in,tbe tacrtrty's warehouse and/or delivered to the customer, Lowe,$is,a major ,'client of Quikiete:,. '5) iuspectipn Summary a) Bag-filters. The facility was notoporµting-during rriyinspection it has been down Cor several (lays,dnc to the elevator system being cotnpromiscd by the load weight because of its age,'Wet Ling repairs and belt replacemepts were being done,'as I verified the time i was there. lV[r. Goodloe said,that last-.nronth,the ctectil'tc nit dryer within the sand�ttansfeir conveyor belts went tlq yn,causiirg moisl0re to get into the systcna. Two bags and one I c gauge had'to be replaced, I;did not notice any:outward problems with any of the - bag-filters. The maintenance craw peifoims a vizilite test on thcbag f/leis Biannually,' which shows any compromises irz the filters, b) Bagging lines: Gach bagging operationhas its own ling filter associated with it. f1r6'e.are multiple product lines,but they are essentially tyre same in regard to emissions, The eauipmeni appeared to be lit good working:order, Some of the piping has been replaced over " the years in this 6rea duc to normal wear and tear. e) LP'Gas-fired,Rotary Dryer: This dryer Handles sand or gravel: The input temperaturo range for the sand is between 300-325 degrees F,and'for the gravel,225-250 degrees E The d yer;was not operating-during roy,inspection,since the facilitywas down.,There is a-magna helix mauometm connected to tlic bad filter for this system, arrd as noted I)revioOsly, I Ina bit eriance checimthe readings daily atrdilogs,the readings,brtotheir books weekly. t 6) `Pci'mitStipulatiolts a) A.3 `2D ;0515�P iRTLCULATE CONTROL'REQlJI12EMENT-As reganodby lSANCAC 2D ,0515. 'Particutajes from Miscellaneous Industrial Processes'; particulate missions front the emission sources shall nofe coed allowablc.cmission rates. In Compliance—Latest permit review shows compliance. t - 1 b) A.4 2D .0521 VlSZBLE L+'Mi.SUONS 6 EQ(JIREA1ENT- As required by 15A NCAC 2D .0521 "Control of Visible finiissions';visible emissions fiom the emission sources I "manufactured after July,t; 1971, shall not be more than 20%,opacity. - I In Compliance—This facility was not operating arthe,time of my inspection, therefore,`I sa'N no visible emissions.There have,beert no issues in the past regarding excessive c) -A.6 2D .0540 PARTICULATE CONTROL,REQUIREMENT--As required by I SA NCAC . 2D";0540 "particulates fruit Fugitive Non-process Dust) missions Sources",the fermiltec' shau not c2usc or,all6w fugitive non-process dust emissiot1, to'cause orcontributc to complaints, ' In Compliance-There was no_excessive dust born the haul roads during r»y inspection: -d)r,A 7 2D,.061,1 BAGFILTER REQUIREMENTS-As required by 1 SA NGAC 2D .0611, particulate'-matter emissions shall be con rofied as dcscr ibcd in the permitted cquipnicnt list. In Compliance-All filters appeared to be in good working condition,with logbook records compl'ete.and updated for each. I e) 'A:8 "2Q .0315 LIMITATION TO AVOID MA NGAC 2Q.0501 —To avoid the applicability Of 15A NCAC 2Q.0501;facility wide emssions shall beless.than 100 tons per ycar. I 10 Compliance,—All records,inventories, and permit reviews indicate'compliance. I i i I 7) Reporting Redstrements The enrrent permit requires"no reporting stipulations. 8) ;112R Status 'Based on the facility's inventory, it was decided that they,are noYsubjeef to 1 12R reduiremeins, A j 9)" Cormnents"and Compliance Statement The Quikrete Company-Peachland apbears to maintain their equipment andl c6tp suf icicin I mannenaliee l'ccoms. The Quikrote Conipany-reaclil4tid appealed to be in compliance on 16 Septenibor 2009," I 10) 5 Yeap Cmnpliance History " I a} 24 Sp for opeli burning. I . I I i Iclg cc:,DAQ Central hiles" 1 I i I i I I I I I t I k i i ! I ! I I I I I I I