HomeMy WebLinkAboutAQ_F_0400044_20111018_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Piedmont Cotton Inc - NC Facility ID 0400044 Inspection Report County/FIPS: Anson/007 Date: 10/19/2011 Facility Data Compliance Data Piedmont Cotton Inc Inspection Date 10/18/2011 195 Cotton Street Inspector's Name Cindy Grimes Polkton,NC 28135 Operating Status Operating Lat: 34d 59.7360m Long: 80d 12.4970m Compliance Code Compliance- inspection SIC: 0724/Cotton Ginning Action Code FCE NAICS: 115111 /Cotton Ginning On-Site Inspection Result Compliance Contact Data Permit Data Facility Contact Antho•ized Contact Technical Contact permit 08152/G03 Issued 8/15/2007 Robert Williamson, Jr. Robert Williamson,1r, Robert Williamson,Jr. Expires 7/31/2012 Gin Manager President Gin Manager Classification Small (704)272-7580 (704)272-7580 (704)272-7580 Permit Status Active Inspector's Signature, Co n cents: l/ `fi Date of Signature: t o( 4 MACT/GACT Applicability: None. 1) Location Piedmont Cotton is located at 195 Cotton Street, in Polkton,NC, Anson County. Directions From FRO,take Hwy 401 South to Wagram.Turn right onto Old Wire Road (Hwy144)and go— 11 '/2 miles to Laurel Hill.Turn right at Hwy 74, go—35-miles west through Wadesboro,and continue—5 miles until Iroplar Hill Church Road (BJ's Diner will be on the left hand corner).Turn left and go-'/2 mile until Cotton Street. Turn right,and facility entrance will be on left hand side in— .2 of a mile.Turn left onto dirt drive and warehouse office entrance will be— 100 yards to the left. Safety Considerations: Standard DAQ safety equipment.Watch for trucks entering and leaving, as well as cotton module trucks coning into and out of warehouse. Be aware of all operating gin equipment. 2) Facility and Process Description Piedmont Cotton,Inc. is a cotton ginning operation that produces raw cotton for industrial use.This facility is permitted tinder Air Permit No. 08152G03, effective fi•om 15 August 2007 until 31 July 2012. Cindy Grimes conducted the last compliance inspection on 20 October 2010. Module trucks and trailers transport cotton from the field to the gin.A pneumatic system removes the cotton from the trailers, and either a pneumatic system or a module feeder removes the cotton from modules. A combination conveyer and pneumatic system conveys the cotton to a separator and feed control unit. Prior to this first separator point,some gins use a stone and green boll trap for preliminary trash removal. The screen assembly in the separator allows air to escape but collects the cotton and allows it to fall into the feed control unit. The conveying air flows from the separator to a cyclone system, where it is cleaned and discharged to the atmosphere. are 4 main systems included in theof mina of sotto i• al Chad eotton elea vino-involves n 60,ing to vrl Lice lint cotton moisture content to 5 to 8%, one cleaning to remove fine dirt particles and a second cleaning to extract larger debris b)Overflow- if the flow of cotton exceeds the limit of the extractor/feeder systems,the excess cotton flows into the overflow hopper and is returned back to the conveyor distributor c) Ginning and lint handling-the cotton enters the gin stand, goes thru a set of"saws"that strip off hulls and sticks, and then enters a roll box,where fibers are separated from the seeds(which fall to the bottom of the gin stand for subsequent pneumatic removal to a storage area). Cotton lint is then conveyed pneumatically to the lint cleaning system(normally consisting of 2 cleaners)for final cleaning and combing d) Battery condenser and baling- the lint cotton is pneumatically transported to a battery condenser, which separates it from the conveying air. Cotton is then formed into batts and fed into a baling press, which finally compresses the cotton into uniform bales,which are either sent directly to the customer or to storage. a) Throughputs for 2010 Employees: 9 (same in 2009) Hours: 8:OOAM—8:00 PM,Mon —Fridays Only on weekends in 2009) Bale Production in 2010: 8,916 (1,946 in 2009) Projected Bales for 2011: 16-18,000(8,000 for 2010) b) Permitted Sources Emission Emission Source Control Control System Source ID Description System Ill Description CG-1 Emission sources and air filtration system(s) CS-1 Cyclones(ID-3D and 2D-2D utilized in the cotton ginning process,(Standard cyclones typical per 2D.0542) Industrial Classification Code(SIC)0724) [maximum rated gin stand capacity greater than or equal to 20 bales per hour regardless of the number of gin stands and/or modified or new facilities constructed after July 1,2002] 3) Checklist Surnmary a) Entry: I observed a clean appearance throughout the facility property in general. There was no excess dust accumulation on surrounding property or vegetation upon entry. The haul roads were sufficiently damp because the facility's water truck had been used earlier in the AM. b) Inspection Conference: On 18 October 2011, I (Cindy Grimes) met with Robert Williamson, Jr., the Facility and Authorized Contact, and we discussed the following: 1) Piedmont Cotton began ginning on 19 September 2011.They plan to end the season —30 November 2011. There have been no equipment changes since the last compliance inspection. 2) This gin is rated at 35 bales/hr(3 gin stands, each @ slightly more than 11 bales/fir). 3) I examined the walk-around logbook and found entries for each day of operation so far. AI I entries appeared complete,with ductwork, cyclone,trash stacker, yard and other notations. The most recent entry was on 18 October 2011,with a duct tape repair of a small pinhole in one of the cyclones. 4) Rafe Dixon performed their baseline study on 15 September 2011. All static pressure readings were within the defined operating range. A second monthly static pressure test was clone on 12 October 2011 by Mr. Dixon, and again, all were within acceptable range. 5) Production usually averages—221 bales per 12 hour shift,though in the last 8 clays, production has been—350 bales per day. 7) This was the facility's permit renewal compliance inspection.Mr. Williamson will be getting the renewal letter-31 January 2012, and the letter will give instructions on how FRO DAQ will want the gin to complete its application forms and emissions inventory. I told him to call me if lie had any questions. c) Inspection Walk-around (facility was operating) 1) All cyclones appeared to be less than 20%VE(actual VE was b/t 10-15% for each cyclone). At the time of inspection,the weather was mostly sunny(the trash cyclone was 15%and all of the others were 10%). 2) All cyclones are either ID-313 or 2D-2D in size. 3) All rain caps have been removed. 4) The trash collection area is composed of 3-sided enclosed trash house that dumps from the bottom into atrailer.Water is added along the opening at the bottom of the dump bins. I observed the water being sprayed in this area, and it seemed to be doing a good job; VE here was 5%. 5) The gin's overall appearance was good.In the past, there have been problems with wash build-up behind the gin,but I did not observe a problem during this inspection. At the current ginning rate,they are switching out a trash truck 3-4 times/day,which will eventual ly slow down to every 2-3 days. This depends on the quality of the cotton and/or the amount of cotton being ginned. 6) Iobserved three haul trucks, and all were covered. d) Exit Conference 1) Mr. Williamson and I discussed the baseline study, and I reminded him to make sure that the monthly static pressure checks are done within 30 days of each other.They have had 2 static monthly pressure checks done so far(15 September and 12 October). 2) I reminded him that their annual report is due by March 1, 2011; FRO DAQ received this year's report on 10 March 2011 (not considered late since it was postmarked 25 February). 3) For the last couple of years,Mr. Williamson has had plans to add a larger cyclone fan for air handl ing, but due to the economy and small amount of cotton ginned the last few years,that has not happened yet. 4) Permit Stipulations (also, see attached inspection checklist) a) A.3 2D .0521 VISIBLE EMISSIONS CONTROL REQUIREMENTS- Visible emission fi-om emission sources manufactured after July 1, 1971 shall be no more than 20% opacity. Compliance Indicated—The facility was operating during my inspection; I observed no visible emissions greater than 20%VE from any of the emission sources. b) AA 2D .0521 VISIBLE EMISSIONS CONTROL REQUIREMENTS—Visible emissions from emission sources manufactured as of July 1, 1971,shall be no more than 40% opacity; verification of manufacture date with ID numbers for subject equipment shall be kept on site,or facility can opt for the 20% opacity standard. Compliance Lrdicated—All equipment at this facility has been manufactured since July 1, 1971, thus is subject to the 20% opacity standard. not allow odorous emissions beyond the facility's boundary. Compliance Indicated-I detected no objectionable odors oil site during my inspection or atthe facility's boundary. d) A.7 2D .0542 CONTROL OFPARTICULATE EMISSIONS FROM COTTON GINNING OPERATIONS-For gins rated at> 20 bales/hour, the Permittee shall comply with permitted conditions, including emission control requirement, rain caps, operation and maintenance, fugitive emissions(fioni trash composter, gin yard,traffic areas, and transport of trash material), monitoring (includes baseline studies, static pressure checks, and daily inspections), recordkeeping, reporting, record retention, and alternative control measures(see permit for details). Compliance Indicated-Facility uses ID-3D cyclones, rain caps are removed, logbook contains daily inspections/maintenance,trash composter/stacker has wet suppression, gin yard is cleaned daily, wet suppression is used in traffic areas and there are 10 mph signs, haul trucks are covered, facility has monitoring devices that measure static pressure and flow rates, initial baseline study was done on 15 September 2011, static pressure checks are performed within every 30 days, initial flow range measurements were performed, daily inspections are performed by Robert Williamson, Jr. (gin manager), all observations and inspections are recorded in one logbook, latest annual report was compliant and submitted on time, and past records are retained in main office. e) A.8 2D .0310 COTTON GINREQUIREMENT-Facility will not operate any emission sources other than those that are permitted. Compliance Indicated-Facility is only operating permitted emission sources. f) A.92Q .Q806 LIMITATION TO AVOID I5ANCAC2Q.0501(PROIIII3ITORY SMALL)— Facility-wide potential PMIO shall be less than 100 tons per consecutive 12 month period and gin production less than 167,000 bales of cotton per consecutive 12 month period; annual report shall contain number of bales produced,with records to be maintained documenting such. - Compliance Indicated-Inspection showed that the facility and all observed equipment appeared to be compliant and only operating permitted emission sources. Latest permit review shows compliance in PMI O emissions; latest annual production (2010)was 8,916 bales;latest annual report showed bale production; facility office keeps records that maintain production and gin reports. 5) Reporting Requirements Annual report is due by March 1 of each year. See permit for specifics. 6) Compliance History a) 21 November 2001 -NOV for"Failure to Operate and Maintain the Facility". b) 6 March 2001 -NOV/NRB for"Open Burning Cotton rash". c) 16 November 1998-NOB for"Open Burning Cotton Trasb". 7) Comments and Compliance Statement This facility has had problems in the past with cotton trash build-up on the property. During last year and this year's inspections, it appeared that Mr. Williamson has done a much betterjob of cleaning up the trash on the gin's grounds. During the next compliance inspection in 2012, the inspector should ensure that the facility has not replaced any of the current cyclones with larger capacity ones.Also,the facility will have received its new permit before the next inspection; therefore, any new information/stipulations should be discussed with facility. Piedmont Cotton,Inc. appeared to be in compliance on 18 October 2011. /clg cc: DAQ Central Files DAQ 2011 Cotton Gin Insp Form Final Page 1 DAQ Cotton Gin Inspection Plan for 2011 _ _ 1011OZA11 Inspector Prep and Checklist: (1)Copy of Current Permit (2)Copy of Reg* (3)Copy of DAQ Reg Summary* (4)Copy of DAQ Suggested Logform* (5)Copy of DAQ Airflow Measure Guides, including the Method 1-2 form fi•om website (6)Copy of compliance certif.letter submitted to regional office (7)Copy of Repair Schedule from last annual report (8)Tape Measure *may want to have extra copies to be able to leave with gin operator Name of Cotton Gin County Premise oL4 c�4f I. Entry Make the following observation on the surveillance drive around and upon your initial entry. 1. Observe general yard appearance: a) Are good housekeeping practices being done in Non-storage areas? ucs Overall yard? V Are cyclone banks caked with dust? i<v Do nearby trees/vegetation have dust9 V b) Are speed limit signs posted on unpaved roadways? Un S Z (indicat—r e speed and#of signs) [15 mph for wet suppression or 0 mph r chemical suppression] c) Are transport (trash or non-module trucks) vehicles covered before leaving facility? %� C II. Inspection Conference New rule effective date: 1 August 2002 1. Plant Contact and Title olac,-l'1 f I Lia-. ot...l + - 2. Date cotton ginning began 9 111 1Z_z)[ I 3. What is Gin's Maximum Rated Capacity :3 3. How determined? Number of gin stands 3 Rated capacity of each �1 b 1-v Have any changes been made to gin stand(s) that increased the bale/hr capacity? (Only for gins that are rated under 20 bales/hr) Production: Bales last year: ?, 9 t(e f DAQ 2011 Cotton Gin Insp Form Final Page 2 Expected Bales this season ],(,�i$i uvO Hours of operation (days, Ins) M>t6- g Atl- e e M &-6 > S�� Estimated end of season o,-J't S'e\r- Z-Z1 k 4. Are all cyclones installed to meet the final requirements of 2D.0542? }es ro IF no, what else is required [see summary or rule for detail] What type of control do you have on? Lint Cleaners 1 '�, -3-D clot or mesh, if mesh then size Battery Condensers k D�3�II clop or mesh, if mesh then size 5. Do you have sources that were manufactured as of July 1, 1971 yes/® If yes, is your facility opting to have these sources subject to the 20%opacity standard yes/no If no does your facility have the following monitoring and recordkeeping requirements for all subject equipment i. verification of the date of manufacture yes/no ii. labels on Subject equipment and all associated control equipment yes/no 6. Examine logbook. And discuss all aspects of what is in logbook. Who is responsible for book? Where is it kept? Vy�z.w 1, ld]��a ° _ Note do this prior to walking around. The logbook(s)shall be maintainer/on site and Hanle available to Division representatives upon request Records not on-site should be violation. i. Results of the New Season baseline study. Date conducted Who conducted study Do you have monitoring equipment on site? u e_r Was EPA Method 1 and 2 used for any measurements? LIM- Were all required items measured for each control device Inlet velocity �4 R f Static pressure c Pressure drop Appear baseline conducted properly?j,-.f [will need to evaluate ports and locations during inspection] Examine air flow design ranges; are any out of range y ,) [air flow design ranges:213-213(2700 to 3600 fpm), ID-3D(2800 to 3600 fin)] Request copy of this baseline study (copy on site if possible) (if no copy, have a copy sent asap) ii. Has any part of collection system been changed or redesigned since baseline study? (such as new control devices, new fans, etc.) YO C-La4- er Results of new baseline study(conducted if there is a design change) iii. Results of monthly static pressure checks and any corrective action taken How will company conduct these monthly measurements: _\ �0 11 5 e ✓c n ZJ DAQ 2011 Cotton Gin Insp Form Final Page 3 Examine static pressures. Any out of range? --yJ Corrective Actions - Appear to be in compliance with rule uaf Note: change ofstatic pressure of>20016, then initiate corective action. (a)corrective action shall be recorded in logbook (b) if> 48 hrs to complete, notify RAQS asap, no later than end of day such pressure was measured. iv. Observations from daily inspections of the facility and any resulting corrective actions taken (inspect structural integrity of the control devices and other emissions processing systems) Who does the walk around? i Il.w.-S How is form signed? What time each day - to -t1 ic�M Is Logbook entry complete? �4 p,J (see DAQ recommended form for necc. items) v. A copy of the manufacturer's specifications for each type of control device installed. 1.Copy of the inspection and maintenance schedule for the control devices, other emission processing equipment,and monitoring devic . This was to be established and based on manufacturer's recommendations. AND 2.Results of the inspections and any maintenance performed Ae.� *3. Repair Schedule from previous Season (if applicable). Verify that problems and repair identified have been resolved per schedule The following three items are recommended to be placed in the logbook vi. copy of regulation 2D.0542, �tS vii. copy of current permit viii. copy of annual reports submitted to DENR y tj *Inspector: Where is logbook kept? Evaluate how convenient the logbook is for every day use. III. Inspection Walk around In addition to your normal observations,note the following areas and issues 1. Normal evaluation includes: a) VE at all sources. b) holes (and patches) in ductwork. Are they reflected in the daily log? kt.ts 2. Cyclones. Are all cyclone 1D-3D r 2D-2D? I a> if no, then identi y How is each in compliance with reg DAQ 2011 Cotton Gin Insp Form Final Page 4 3. Mesh Screen. - If used on exhaustfrom lint cleaning and/or battery condensers, what size Try to examine to get a better understanding. 4. Rain cap Removal Examine exhausts. Is any type of`lid' still present? Yw Is air deflected downward or outward 5. Baseline Study Evaluate the baseline study by examining the ports. Know which method(s) they used. Use tape measure to calculate/estimate whether the ports met the requirements; measure duct size and distances (cotton gin handbook method requires 1.5 duct diameters and 8.5 d.d.) V1_4_4 aCNI� 6. Trash Collection and Stacker What type of trash stacker system is present? Three types in rule: — --> Observations: ( 3 sided with roof g w ct- Ua+N I's (2) Wet suppression at auger and dump area (3) Trash stacker/composter- water in auger box, water at dump area, pile kept wet at all times (4) Other ? if so specify. 7. Trash Collection Area: a) is overspill removed from truck before transporting? 4e-,r b) Examine how trucks are covered? Do all trucks have covers? If not, question how it is covered prior to transport? 4e_5 c) Is trash collection a�ea cleaned daily? W at time nil by who? d"`i pyp��2 8. Unpaved Road Dust Suppression. Are unpaved roads being adequately controlled with we r chemical suppression? How is wet or them. suppression applied d-P wo What schedule and by who Mv.wd 1 „ sr -h� ? Pr (< f 4L�) iDAQ 2011 Cotton Gin Lisp Form Final Page 5 IV. Exit Conference In addition to your normal observations,note the following areas and issues _ t 1. Discuss Discrepancies 2. Restate any required information you requested, and/or any actions to be performed on or before agreed date. 3. Reminders: Zo w b) Annual report due on 1 March.200K-