Loading...
HomeMy WebLinkAboutAQ_F_0400033_20120612_CMPL_InspRpt (4) NORTH CAROLINA DIVISION OF Fayetteville Regional Office AIR QUALITY Martin Marietta Aggr Pee Dee Quarry NC Facility ID 0400033 Inspection Report County/FIPS: Anson/007 Date: 06/13/2012 Facility Data Compliance Data Martin Marietta Aggr Pee Dee Quarry Inspection Date 06/12/2012 2710 Wycliff Road Inspector's Name Cindy Grimes Pee Dee,NC 28091 Operating Status Operating Lat: 34d 56.2500m Long: 79d 53.0000m Compliance Code Compliance- inspection SIC: 1423/Crushed And Broken Granite Action Code FCE NAICS: 212313/Crushed and Broken Granite Mining and Quarrying On-Site Inspection Result Compliance Contact Data Permit Data Facility Contact Authorized Contact Technical Contact Permit 06334/R05 Richard Broughton Paxton Badham Richard Broughton Issued 10/19/2007 Expires 9/30/2012 Environmental Services VP Land/Environmental Enviromnental Services Classification Small Manager Services Manager Permit Status Active (803)978-6275 (919)784-4550 (803)978-6275 Inspector's Signature: Comments: Date of Signature: MACT/GACT Applicability: None(Facility has not broken ground on site yet,thus is not operating; with the permit information DAQ FRO has been given thus far,facility should not be subject to any MACTs). 1) Location Martin Marietta Aggregate-Pee Dee Quarry is located at 2710 Wycliff Road in Pee Dee(just west of the Pee Dee River),NC,Anson County. Directions From FRO,take Hwy 401 South to Wagram.Turn right at Old Wire Road(Hwyl44)and go— 11 %2 miles to Laurel Hill.Turn right at Hwy 74,and go west—24 miles until Hwy 145 (— 1 mile after crossing the Pee Dee River).Turn left onto Hwy 145 South and drive about'/4 mile. Planned site is on the right hand side. Safety Considerations: Standard DAQ safety equipment required.When facility starts operating, be alert to large equipment on site. 2) Facility and Process Description Martin Marietta Aggregate Pee Dee Quarry is a rock quarry that is permitted to produce gravel and aggregate used in construction. This facility is permitted under Air Permit No. 63341105,effective from 19 October 2007 until 30 September 2012. Cindy Grimes conducted the last compliance inspection on 20 April 2011.Note: This facility has not broken ground or been constructed yet. This facility is(will be)a quarry which extracts mainly granite from the earth.The granite and crushed stone products are loosened by drilling and blasting,and then are loaded by power shovel or front-end loader into large haul trucks that transport the material to the processing operations. Primary operations include a jaw, which is used for initial crusher reduction, and a series of conveyors.This crusher product is next fed through a grizzly feeder for undersize material,and then is discharged onto a conveyor,where it goes through more screening processes, until it is conveyed to a surge pile for temporary storage or sold as coarse aggregate. N+ a) Throughputs for 2011 Employees: 0(same in 2010) Hours: 0 (same in 2010) Production: 0 (same in 2010) b) Permitted Sources Emission Emission Source Control Control System Source ID I Description System ID Description Non-Metallic Mineral Processing Plant,800 tons per hour rating,utilizing water suppression with no other control devices,including: Crushers(NSPS) lCrushing Operations Conveyors(NSPS) lConveying Operations WS Wet suppression water spray system Screens(NSPS) Iscreening Operations 3) Inspection Summary This facility has not begun operations at its proposed site. I drove by the site on 12 June 2012 and did not observe any equipment or evidence of ground-breaking. Note: On 29 May 2012,FRO DAQ received the permit application and emissions inventory certification form from Paxton Badham,the Authorized Contact and Vice President of Land/Environmental Services for this facility. Even though this facility has never started operations since it,was originally issued a permit in 1988, corporate offices of Martin Marietta wish to continue the renewal of its permit. 4) Permit Stipulations Per permit. 5) Reporting Requirements Within 15 days after start-up of the rock crushing operation,the Permittee shall notify, in writing, the Regional Supervisor of the start-up. 6) 112R Status Unknown at this time. Facility has not been constructed to date. 7) DAQ Compliance History This facility has not started operations since its initial permit; it has had no prior DAQ violations. 8) Comments and Compliance Statement This facility has not been established on site as of the date of this inspection.FRO has been informed that the company still plans on developing the site sometime in the future. Martin Marietta Aggregate Pee Dee Quarry appeared to be in compliance on 12 June 2012. /clg