Loading...
HomeMy WebLinkAboutAQ_F_0400047_20130110_CMPL_MACT-Corr NCDENR .North Carolina Department of Environment and Natural Resources Division of Air Quality Pat McCrory Sheila C. Holman John E. Skvarla, III Governor Director Secretary January 10, 2013 Mr. Jeffry Goodman President B. V. Hedrick Gravel and Sand Company 15 Yorkshire Street, Suite 302 Asheville,NC 28803 SUBJECT: 40 CFR 63 Subpart ZZZZ RICE MACT Extension Approval Air Quality Permit No. 09572 B. V. Hedrick Gravel and Sand Company Facility ID: 0400047, Lilesville,Anson County Facility Classification: Synthetic Minor Dear Mr. Goodman: The Division of Air Quality(DAQ)received your December 21, 2012 request for a one year extension of your 40 CFR 63 Subpart ZZZZ Reciprocating Internal Combustion Engine Maximum Achievable Compliance Technology(RICE MACT) compliance date. 40 CFR 63.6(i)(6) lists the information that is required for the DAQ to act on your request. Specifically: (i) The request for a compliance extension under paragraph (i)(4) of this section shall include the following information.- (-4)-4 description of the controls to be installed to comply with the standard; (B)-4 compliance schedule, including the date by which each step toward compliance will be reached. -4t a minimum, the list of dates shall include.- (I) The date by which on-site construction, installation of emission control equipment, or a process change is planned to be initiated; and (2) The date by which final compliance is to be achieved. (3) The date by which on-site construction, installation of emission control equipment, or a process change is to be completed; and (4) The date by which final compliance is to be achieved; The NC DAQ has been delegated the implementation of the MACT standards and is therefore considered the "Administrator." 1641 Mail Service Center, Raleigh,North Carolina 27699-1641 217 West Jones Street,Raleigh,North Carolina 27603 Phone:919-707-8401/Fax;919-715-0718 Internet:www.ncair.org An Equal opportunity 1 Affirmative Action Employer—Made in part by Recycled Paper Mr. Jeffrey Goodman January 10, 2013 Page 2 Your request described the controls as: "Oxidation Catalyst" for the T-G10 CAT engine, manufacture date of 2002 and rated at 310 horsepower. Your request included the following compliance schedule: date of on-site construction, installation of emission control equipment, or initiation of a process change would occur by August 2013. Your schedule indicated a final compliance date of mid-November 2013. This letter serves as approval of your request for a one year extension. Your compliance date will be May 3, 2014. Sincerely, Lee A. Daniel, Chief Technical Services Section cc: Steven Vozzo FRO Supervisor Central Files IBEAM