HomeMy WebLinkAboutAQ_F_0400047_20130110_CMPL_MACT-Corr NCDENR
.North Carolina Department of Environment and Natural Resources
Division of Air Quality
Pat McCrory Sheila C. Holman John E. Skvarla, III
Governor Director Secretary
January 10, 2013
Mr. Jeffry Goodman
President
B. V. Hedrick Gravel and Sand Company
15 Yorkshire Street, Suite 302
Asheville,NC 28803
SUBJECT:
40 CFR 63 Subpart ZZZZ RICE MACT Extension Approval
Air Quality Permit No. 09572
B. V. Hedrick Gravel and Sand Company
Facility ID: 0400047, Lilesville,Anson County
Facility Classification: Synthetic Minor
Dear Mr. Goodman:
The Division of Air Quality(DAQ)received your December 21, 2012 request for a one year
extension of your 40 CFR 63 Subpart ZZZZ Reciprocating Internal Combustion Engine Maximum
Achievable Compliance Technology(RICE MACT) compliance date. 40 CFR 63.6(i)(6) lists the
information that is required for the DAQ to act on your request. Specifically:
(i) The request for a compliance extension under paragraph (i)(4) of this section shall
include the following information.-
(-4)-4 description of the controls to be installed to comply with the standard;
(B)-4 compliance schedule, including the date by which each step toward
compliance will be reached. -4t a minimum, the list of dates shall include.-
(I) The date by which on-site construction, installation of emission
control equipment, or a process change is planned to be initiated;
and
(2) The date by which final compliance is to be achieved.
(3) The date by which on-site construction, installation of emission
control equipment, or a process change is to be completed; and
(4) The date by which final compliance is to be achieved;
The NC DAQ has been delegated the implementation of the MACT standards and is therefore
considered the "Administrator."
1641 Mail Service Center, Raleigh,North Carolina 27699-1641
217 West Jones Street,Raleigh,North Carolina 27603
Phone:919-707-8401/Fax;919-715-0718
Internet:www.ncair.org
An Equal opportunity 1 Affirmative Action Employer—Made in part by Recycled Paper
Mr. Jeffrey Goodman
January 10, 2013
Page 2
Your request described the controls as: "Oxidation Catalyst" for the T-G10 CAT engine,
manufacture date of 2002 and rated at 310 horsepower.
Your request included the following compliance schedule: date of on-site construction,
installation of emission control equipment, or initiation of a process change would occur by August
2013.
Your schedule indicated a final compliance date of mid-November 2013.
This letter serves as approval of your request for a one year extension. Your compliance date
will be May 3, 2014.
Sincerely,
Lee A. Daniel, Chief
Technical Services Section
cc: Steven Vozzo FRO Supervisor
Central Files
IBEAM