HomeMy WebLinkAboutAQ_F_1400188_20130401_PRMT_Permit NCDEN
North Carolina Department of Environment and Natural Resources
Division of Air Quality
Pat McCrory Sheila C. Holman John E. Skvarla, III
Governor Director Secretary
April 1, 2013
Mr. B. K. Mount
President
Maymead Materials, Inc.
Post Office Box 911
1995 Roan Creek Road
Mountain City, TN 37683
Subject: Air Permit No. 08589R04
Maymead Materials, Inc. -North 321 Stone Yard
Lenoir, Caldwell County, North Carolina
Permit Class: Small
Facility ID# 1400188
Dear Mr. Mount:
In accordance with your completed application received January 30, 2013, we are
forwarding herewith Permit No. 08589R04 to Maymead Materials, Inc. -North 321 Stone Yard,
Lenoir, Caldwell County,North Carolina for the construction and operation of air emissions sources
or air cleaning devices and appurtenances. Please note the records retention requirements are
contained in General Condition 2 of the General Conditions and Limitations.
If any parts, requirements, or limitations contained in this permit are unacceptable to you,
you have the right to request a formal adjudicatory hearing within 30 days following receipt of this
permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of
the entire permit. This hearing request must be in the form of a written petition, conforming to G.S.
150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal
adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings.
Unless a request for a hearing is made pursuant to G.S. 15013-23, this air permit shall be final and
binding.
You may request modification of your air permit through informal means pursuant to G.S.
15013-22. This request must be submitted in writing to the Director and must identify the specific
provisions or issues for which the modification is sought. Please note that the permit will become
Asheville Regional Office-Division of Air Quality
2090 U.S.Highway 70,Swannanoa,North Carolina 28778
Phone:828-296-4500/FAX:828-299-7043
Internet:www.ncair.org
An Equal Opportunity 1 Affirmative Action Employer-Made in part by Recycled Paper
Mr. B. K. Mount
April 1, 2013
Page 2
final and binding regardless of a request for informal modification unless a request for a hearing is
- also made under G.S. 150B-23.
- Unless exempted by a condition of this permit or the regulations, construction of new
air pollution sources or air cleaning devices, or modifications to the sources or air cleaning
devices described in this permit must be covered under a permit issued by the Division of Air
Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may
subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143-
215.114B.
This permit shall be effective from April 1, 2013 until March 31, 2018, is nontransferable to
future owners and operators, and shall be subject to the conditions and limitations as specified
therein.
Changes have been made to the permit stipulations. The Permittee is responsible for
carefully reading the entire permit and evaluating the requirements of each permit
stipulation.The Permittee shall comply with all terms, conditions, requirements, limitations
and restrictions set forth in this permit. Noncompliance with any permit condition is grounds
for enforcement action, for permit termination, revocation and reissuance, or modification, or
for denial of a permit renewal application. Specific changes and additions are summarized
below (note: this list may not include all changes and additions):
• This Permit contains an emission inventory requirement for the 2016 calendar year as
part of the next renewal in 2018.
Should you have any questions concerning this matter,please contact Christopher Scott at(828)
296-4500.
Sincerely,
Paul K. Muller, P.E.
Regional Air Quality Supervisor
PKM:ces
Enclosures
c: Asheville Regional Office
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF AIR QUALITY
AIR PERMIT NO. 08589R04
Issue Date: April 1, 2013 Effective Date: April 1, 2013
Expiration Date: March 31, 2018 Replaces Permit: 08589R03
To construct and operate air emission source(s) and/or air cleaning device(s), and for the
discharge of the associated air contaminants into the atmosphere in accordance with the provisions
of Article 21 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other
applicable Laws, Rules and Regulations,
Maymead Materials, Inc. -North 321 Stone Yard
3540 Blowing Rock Road
Lenoir, Caldwell County,North Carolina
Permit Class: Small
Facility ID# 1400188
(the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air
cleaning devices and appurtenances described below:
........... -... ........------_._....u.._._. _____._........_._._......................___..._..._ _.._.._
Emission Emission Source Control Control System j
Source ID Description System ID Description i
{Non-Metallic Mineral Processing Plant,200 tons per hour rating, equipped with water
suppression,with no other control devices, including:
ES Crush(NSPS) Crushing Operations , N/A N/A '
�ES-Screen(NSPS) Screening Operations , N/A N/A
_.............................. ......... ..... _. _.............. ._.........._........ ....._._.._.
ES-Convey(NSPS)~Conveying^Operations j N/A N/A
_,._........ ........ .. ._..... _.
in accordance with the completed application 1400188.13A received January 30, 2013 including
any plans, specifications,previous applications, and other supporting data, all of which are filed
with the Department of Environment and Natural Resources, Division of Air Quality(DAQ) and are
incorporated as part of this permit.
This permit is subject to the following specified conditions and limitations including any
TESTING, REPORTING, OR MONITORING REQUIREMENTS:
Permit No. 08589R04
Page 2
A. SPECIFIC CONDITIONS AND LIMITATIONS
1. Any air emission sources or control devices authorized to construct and operate above must
be operated and maintained in accordance with the provisions contained herein. The
- Permittee shall comply with applicable Environmental Management Commission
Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter
2D .0202, 2D .0501, 2D .0510, 2D .0521, 2D .0524 (40 CFR 60, Subpart 000), 2D .0535
and 2D .0540.
2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT - The Permittee,
at least 90 days prior to the expiration date of this permit, shall request permit renewal by
letter in accordance with 15A NCAC 2Q .0304(d) and(f). Pursuant to 15A NCAC 2Q
.0203(i), no permit application fee is required for renewal of an existing air permit (without
a modification request). The renewal request(with AA application form) should be
submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration
date of this permit,the Permittee shall submit the air pollution emission inventory report
(with Certification Sheet) in accordance with 15A NCAC 2D .0202,pursuant to N.C.
General Statute 143 215.65. The report shall be submitted to the Regional Supervisor,DAQ
and shall document air pollutants emitted for the 2016 calendar year.
3. EQUIPMENT REPORTING - To demonstrate compliance with 15A NCAC 2D .0501(c),
the Permittee shall maintain on-site an equipment list and a plant(or flow) diagram of all
equipment covered under this permit.
a. The equipment list shall include the total rated crushing capacity of all primary
crushers at the facility and the following information for each piece of equipment:
i. A description of equipment including applicability of New Source
Performance Standards, and:
A. Width of belt conveyors,
B. Dimensions and configuration(e.g., triple deck) of screens,
C. Rated capacity (tons/hr) of each crusher, and
D. Rated capacity(tons or tons/hr) of all equipment not exempt from
permit requirements under 15 A NCAC 2Q.0IO2(c),
ii. A unique ID number.
iii. The date the equipment was manufactured, and
iv. The dates any required performance testing was conducted and submitted to
the Regional Supervisor, Division of Air Quality.
b. The equipment list and plant diagram shall bear the date when the current list and
diagrams were revised.
Permit No. 08589R04
Page 3
c. The Permittee shall provide documentation to the Regional Supervisor, Division of
Air Quality, for any required performance testing within seven days of a written
request.
d. Notwithstanding General Condition and Limitation titled 'Equipment Relocation,"
the Permittee may install new non-primary crushing nonmetallic mineral processing
equipment so long as such equipment does not change the primary crushing rated
capacity of the facility and the equipment does not utilize any mechanical collection
device(s). The Permittee shall provide written notification to the Regional
Supervisor, Division of Air Quality, including a revised equipment list and a plant
layout or flow diagram, each time non-primary crushing nonmetallic mineral
processing equipment is installed at a facility. This notification shall be submitted at
least 15 days before the equipment is installed at the facility unless otherwise
approved by the Director. Non-primary crushing nonmetallic mineral processing
equipment includes all non-primary crushers, screen, conveyors and loadout bins.
e. Notwithstanding General Condition and Limitation titled 'Equipment Relocation,"
the Permittee may relocate existing non-primary crushing nonmetallic mineral
processing equipment so long as such equipment does not change the primary
crushing rated capacity of the facility. The Permittee shall provide written
notification to the Regional Supervisor, Division of Air Quality, including a revised
equipment list and a plant layout or flow diagram, each time non-primary crushing
nonmetallic mineral processing equipment is relocated at a facility. This notification
shall be submitted within 15 days of the relocation made at the facility, unless
otherwise approved by the Director.
4. PARTICULATE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0510
"Particulates from Sand, Gravel, or Crushed Stone Operations,"the following requirements
apply:
a. The Permittee of a sand, gravel, recycled asphalt pavement(RAP), or crushed stone
operation shall not cause, allow, or permit any material to be produced, handled,
transported, or stockpiled without taking measures to reduce to a minimum any
particulate matter from becoming airborne to prevent exceeding the ambient air
quality standards beyond the property line for particulate matter, both PM10 and total
suspended particulates.
b. Fugitive dust emissions from sand, gravel, RAP, or crushed stone operations shall be
controlled by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission
Sources."
c. The Permittee of any sand, gravel, RAP, or crushed stone operation shall control
process-generated emissions:
i. From crushers with wet suppression(excluding RAP crushers); and
I From conveyors, screens, and transfer points
Permit No. 08589R04
Page 4
such that the applicable opacity standards in 15A NCAC 2D .0521 Control of Visible
Emissions," or 15A NCAC 2D .0524 "New Source Performance standards" are not
exceeded.
5. This primary crusher is a 42-inch x 48-inch jaw crusher rated at 200 tons per hour at a jaw
setting of 6 inches, with no grizzly by-pass,per the manufacturer's specifications as
submitted. Any change from this crusher definition, other than like-for-like, will require a
- permit application to be submitted. The purpose of this stipulation is to characterize the
primary crusher and not limit production.
6. VISIBLE EMISSIONS CONTROL REQUIREMENT -As required by 15A NCAC 2D
.0521 "Control of Visible Emissions," visible emissions from the emission sources,
manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged
over a six-minute period, except that six-minute periods averaging not more than 87 percent
opacity may occur not more than once in any hour nor more than four times in any 24-hour
period. However, sources which must comply with 15A NCAC 2D .0524 "New Source
Performance Standards" or .1110 "National Emission Standards for Hazardous Air
Pollutants" must comply with applicable visible emissions requirements contained therein.
7. VISIBLE EMISSIONS CONTROL REQUIREMENT - As required by 15A NCAC 2D
.0521 "Control of Visible Emissions," visible emissions from the emission sources,
manufactured as of July 1, 1971, shall not be more than 40 percent opacity when averaged
over a six-minute period, except that six-minute periods averaging not more than 90 percent
opacity may occur not more than once in any hour nor more than four times in any 24-hour
period. However, sources which must comply with 15A NCAC 2D .0524 "New Source
Performance Standards" or .1110 "National Emission Standards for Hazardous Air
Pollutants" must comply with applicable visible emissions requirements contained therein.
8. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" - For the
nonmetallic mineral processing equipment (wet material processing operations, as defined in
60.671, are not subject to this Subpart) including Conveying Operations (ID No. ES-
Convey), Crushing Operations (ID No. ES-Crush) and Screening Operations (ID No. ES-
Screen), the Permittee shall comply with all applicable provisions, including the notification,
testing, reporting, recordkeeping, and monitoring requirements contained in Environmental
Management Commission Standard 15A NCAC 2D .0524 "New Source Performance
Standards" (NSPS)as promulgated in 40 CFR 60, Subpart 000, including Subpart A
"General Provisions."
a. NSPS Reporting Requirements - In addition to any other notification requirements to
the Environmental Protection Agency(EPA), the Permittee is required to NOTIFY
the Regional Supervisor, DAQ, in WRITING, of the following:
i. The date construction(40 CFR 60.7) or reconstruction(40 CFR 60.15) of an
affected source(s) is commenced,postmarked no later than 30 days after such
date. This requirement shall not apply in the case of mass-produced facilities
which are purchased in completed form; and
ii. The actual date of initial start-up of an affected facility,postmarked within 15
days after such date.
Permit No. 08589R04
Page 5
b. NSPS Emissions Limitations - As required by 15A NCAC 2D .0524,the following
permit limits shall not be exceeded:
i. For affected facilities that commenced construction, modification, or
reconstruction after August 31, 1983 but before April 22, 2008 (wet material
processing operations, as defined in 60.671, are not subject to this Subpart):
Affected Facility Pollutant Emission 1
Limit
V�sle
Crushers j Emissions ons 15% opacity I
a
Fugitive emissions from conveyor belts, Visible
{Fscreenin erations and other affected facilities€ Emissionsg op 10% opacity
_
ii. For affected facilities that commenced construction, modification, or
reconstruction on or after April 22, 2008 (wet material processing operations,
as defined in 60.671, are not subject to this Subpart):
Affected Facility ' Pollutant a Emission
Limit
Visible 12% opacity
Crushers Emissions
................
Fugitive emissions from conveyor belts, Visible o j
! screening operations, and other affected facilities ` Emissions 7/o opacity
_ _g p �
c. NSPS Monitoring Requirements - As required by 15A NCAC 2D .0524, for any
affected facility that commenced construction, modification, or reconstruction on or
after April 22, 2008 that uses wet suppression to control emissions, the Permittee
shall:
i. Perform monthly periodic inspections to check that water is flowing to
discharge spray nozzles in the wet suppression systems.
ii. Initiate corrective action within 24 hours and complete corrective action as
expediently as practical if the Permittee finds that water is not flowing
properly during an inspection of the water spray nozzles.
d. NSPS Recordkeeping Requirements - As required by 15A NCAC 2D .0524, the
following recordkeeping requirements shall be conducted:
i. Each inspection of the water spray nozzles,including the date of each -
inspection and any corrective actions taken, shall be recorded in a logbook(in
written or electronic form).
ii. The logbooks (in written or electronic form) shall be maintained on-site and
made available to DAQ personnel upon request.
Permit No. 08589R04
Page 6
e. NSPS Performance Testing- As required by 15A NCAC 2D .0524, the following
performance tests shall be conducted:
Affected Facility Pollutant ' Test
Method
......................................
Visible
Crushers ` Method 9
Emissions
Fugitive emissions from conveyor belts, screening Visible Method g Y g d9
I operations, and other affected facilities : Emissions
i. All performance tests shall be conducted in accordance with EPA Reference
Methods, contained in 40 CFR 60, Appendix A;
ii. The EPA Administrator retains the exclusive right to approve equivalent and
alternative test methods, continuous monitoring procedures, and reporting
requirements;
iii. Within 60 days after achieving the maximum production rate at which the
affected facility(s) will be operated, but not later than 180 days after the
initial start-up of the affected facility(s), the Permittee shall conduct the
required performance test(s) and submit two copies of a written report of the
test(s)to the Regional Supervisor, DAQ;
iv. The Permittee shall be responsible for ensuring, within the limits of
practicality, that the equipment or process being tested is operated at or near
its maximum normal production rate or at a lesser rate if specified by the
Director or his delegate;
V. All associated testing costs are the responsibility of the Permittee;
vi. At least 45 days prior to performing any required emissions testing, the
Permittee must submit two copies of a testing protocol to the Regional
Supervisor, DAQ for review and approval. All testing protocols must be
approved by the DAQ prior to performing such tests; and
vii. To afford the Regional Supervisor, DAQ, opportunity to have an observer
present,the Permittee shall PROVIDE the Regional Office, in WRITING, at
least 7 days notice of any required performance test(s) that involve only
Method 9. All other tests require a 15 day notice.
viii. When determining compliance with the visible emissions limit from fugitive
emissions from crushers, conveyor belts, screening operations, and other
affected facilities (as described in 60.672(b) or 60.672(e)(1)), the duration of
the Method 9 test must be 30 minutes (five 6-minute averages). Compliance
with the fugitive visible emissions limits must be based on the average of the
five 6-minute averages.
Permit No. 08589R04
Page 7
ix. For any affected facility that commenced construction, modification, or
reconstruction on or after April 22, 2008 that does not use wet suppression to
control emissions,the Permittee shall repeat the performance tests within five
(5) years of the previous test. If an affected facility relies on water carryover
from upstream wet suppression to control fugitive emissions, then that
affected facility is exempt from the 5-year repeat testing requirement
provided that the Permittee conducts periodic inspections of the upstream wet
suppression that is responsible for controlling fugitive emissions from the
affected facility and designates which upstream wet suppression systems will
be periodically inspected at the time of the initial performance test.
f. Like-For-Like-Replacement- As provided in 40 CFR 60.670(d), when an existing
facility is replaced by a piece of equipment of equal or smaller size, as defined in 40
CFR 60.671, having the same function as the existing facility, and there is no
increase in the amount of emissions,the new facility is exempt from the provisions
of 40 CFR 60.672, 60.674, and 60.675 except as provided for in 60.670(d)(3). The
Permittee shall comply with the reporting requirements of 40 CFR 60.676(a).
Equipment covered under 40 CFR 60.670 shall comply with the requirements of 15A
NCAC 2D .0521.
9. NOTIFICATION REQUIREMENT - As required by 15A NCAC 2D .0535,the Permittee of
a source of excess emissions that last for more than four hours and that results from a
malfunction, a breakdown of process or control equipment or any other abnormal
conditions, shall:
a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time
of the Division's next business day of becoming aware of the occurrence and
describe:
i. the name and location of the facility,
ii. the nature and cause of the malfunction or breakdown,
iii. the time when the malfunction or breakdown is first observed,
iv. the expected duration, and
V. an estimated rate of emissions.
b. Notify the Director or his designee immediately when the corrective measures have
been accomplished.
This reporting requirement does not allow the operation of the facility in excess of
Environmental Management Commission Regulations.
10. FUGITIVE DUST CONTROL REQUIREMENT -As required by 15A NCAC 2D .0540
"Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow
fugitive dust emissions to cause or contribute to substantive complaints or excess visible
emissions beyond the property boundary. If substantive complaints or excessive fugitive
dust emissions from the facility are observed beyond the property boundaries for six minutes
in any one hour(using Reference Method 22 in 40 CFR, Appendix A), the owner or
operator may be required to submit a fugitive dust plan as described in 2D .0540(f).
Permit No. 08589R04
Page 8
"Fugitive dust emissions" means particulate matter that does not pass through a process
stack or vent and that is generated within plant property boundaries from activities such as:
unloading and loading areas, process areas stockpiles, stock pile working, plant parking lots,
and plant roads (including access roads and haul roads).
B. GENERAL CONDITIONS AND LIMITATIONS
1. TWO COPIES OF ALL DOCUMENTS, REPORTS, TEST DATA,MONITORING DATA,
NOTIFICATIONS; REQUESTS FOR RENEWAL, AND ANY OTHER INFORMATION
REQUIRED BY THIS PERMIT shall be submitted to the:
Regional Air Quality Supervisor
North Carolina Division of Air Quality
Asheville Regional Office
2090 U.S. Highway 70
Swannanoa,NC 28778
828-296-4500
For identification purposes, each submittal should include the facility name as listed on the
permit, the facility identification number, and the permit number.
2. RECORDS RETENTION REQUIREMENT -Any records required by the conditions of this
permit shall be kept on site and made available to DAQ personnel for inspection upon
request. These records shall be maintained in a form suitable and readily available for
expeditious inspection and review. These records must be kept on site for a minimum of 2
years, unless another time period is otherwise specified.
3. ANNUAL FEE PAYMENT- Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay
the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a
timely manner will cause the DAQ to initiate action to revoke the permit.
4. EQUIPMENT RELOCATION -A new air permit shall be obtained by the Permittee prior to
establishing, building, erecting, using, or operating the emission sources or air cleaning
equipment at a site or location not specified in this permit.
5. REPORTING REQUIREMENT -Any of the following that would result in previously
unpermitted, new, or increased emissions must be reported to the Regional Supervisor,
DAQ:
a. changes in the information submitted in the application regarding facility emissions;
b. changes that modify equipment or processes of existing permitted facilities; or
c. changes in the quantity or quality of materials processed.
If appropriate,modifications to the permit may then be made by the DAQ to reflect any
necessary changes in the permit conditions. In no case are any new or increased emissions
allowed that will cause a violation of the emission limitations specified herein.
Permit No. 08589R04
Page 9
6. This permit is subject to revocation or modification by the DAQ upon a determination that
information contained in the application or presented in the support thereof is incorrect,
conditions under which this permit was granted have changed, or violations of conditions
contained in this permit have occurred. The facility shall be properly operated and
maintained at all times in a manner that will effect an overall reduction in air pollution.
Unless otherwise specified by this permit, no emission source may be operated without the
concurrent operation of its associated air cleaning device(s) and appurtenances.
7. This permit is nontransferable by the Permittee. Future owners and operators must obtain a
new air permit from the DAQ.
8. This issuance of this permit in no way absolves the Permittee of liability for any potential
civil penalties which may be assessed for violations of State law which have occurred prior
to the effective date of this permit.
9. This permit does not relieve the Permittee of the responsibility of complying with all
applicable requirements of any Federal, State, or Local water quality or land quality control
authority.
10. Reports on the operation and maintenance of the facility shall be submitted by the Permittee
to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be
required by the DAQ. Information required in such reports may include, but is not limited
to, process weight rates, firing rates, hours of operation, and preventive maintenance
schedules.
11. A violation of any term or condition of this permit shall subject the Permittee to enforcement
pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of
civil and/or criminal penalties.
12. Pursuant to North Carolina General Statute 143-215.3(a)(2), no person shall refuse entry or
access to any authorized representative of the DAQ who requests entry or access for
purposes of inspection, and who presents appropriate credentials, nor shall any person
obstruct, hamper, or interfere with any such representative while in the process of carrying
out his official duties. Refusal of entry or access may constitute grounds for permit
revocation and assessment of civil penalties.
13. The Permittee must comply with any applicable Federal, State, or Local requirements
governing the handling, disposal, or incineration of hazardous, solid, or medical wastes,
including the Resource Conservation and Recovery Act(RCRA) administered by the
Division of Waste Management.
14. PERMIT RETENTION REQUIREMENT- The Permittee shall retain a current copy of the
air permit at the site. The Permittee must make available to personnel of the DAQ, upon
request,the current copy of the air permit for the site.
15. CLEAN AIR ACT SECTION 112(r)REQUIREMENTS -Pursuant to 15A NCAC 2D .2100
"Risk Management Program," if the Permittee is required to develop and register a risk
management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the =
Permit No. 08589R04
Page 10
Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part
68.
16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I
Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of
Accidental Releases - Purpose and General Duty," although a risk management plan may not
be required, if the Permittee produces, processes, handles, or stores any amount of a listed
hazardous substance, the Permittee has a general duty to take such steps as are necessary to
prevent the accidental release of such substance and to minimize the consequences of any
release. This condition is federally-enforceable only.
17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS - If emissions
testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing
to the DAQ in support of a permit application or to demonstrate compliance, the Permittee
shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ
procedures including protocol approval, regional notification,report submittal, and test
results approval.
Permit issued this the 1 sc of April, 2013.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Paul K. Muller,
Regional Air Quality Supervisor
By Authority of the Environmental Management Commission
Air Permit No. 08589R04