HomeMy WebLinkAboutAQ_F_1300101_20130319_PRMT_Permit w.rr �
RCDENR
North Carolina Department of Environment and Natural Resources
Division of Air Quality
Pat McCrory Sheila C. Holman John E. Skvarla, III
Governor Director Secretary
March 19, 2013
Mr. Frank Blythe
Member Manager
Blythe Brothers Asphalt Co., LLC - Concord Plant
1415 East Westinghouse Boulevard
Charlotte,NC 28273
Subject: Air Permit No. 07449R09
Blythe Brothers Asphalt Co., LLC - Concord Plant
Concord, Cabarrus County,North Carolina
Permit Class: Synthetic Minor
Facility ID# 1300101
Dear Mr. Blythe:
In accordance with your completed application received February 27, 2013, we are
forwarding herewith Permit No. 07449R09 to Blythe Brothers Asphalt Co., LLC -Concord Plant,
Concord, Cabarrus County,North Carolina for the construction and operation of air emissions
sources or air cleaning devices and appurtenances. Additionally, any emissions activities
determined from your air permit application as meeting the exemption requirements contained in
15A NCAC 2Q .0102 have been listed for information purposes as an "ATTACHMENT" to the
enclosed air permit. Please note the records retention requirements are contained in General
Condition 2 of the General Conditions and Limitations.
If any parts, requirements, or limitations contained in this permit are unacceptable to you,
you have the right to request a formal adjudicatory hearing within 30 days following receipt of this
permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of
the entire permit. This hearing request must be in the form of a written petition, conforming to G.S.
150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal
adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings.
Unless a request for a hearing is made pursuant'to G.S. 15013-23, this air permit shall be final and
binding.
You may request modification of your air permit through informal means pursuant to G.S.
15013-22. This request must be,submitted in writing to the Director and must identify the specific
Mooresville Regional Office-Division of Air Quality
610 East Center Avenue,Suite 301,Mooresville,North Carolina 28116
Phone:704-663-1699/FAX:704-663-7679
Internet:wwwmairmg
An Equal Opportunity 1 Affirmative Action Employer-Made in part by Recycled Paper
Frank Blythe
March 19, 2013
Page 2
provisions or issues for which the modification is sought. Please note that the permit will become
final and binding regardless of a request for informal modification unless a request for a hearing is
also made under G.S. 150B-23.
Unless exempted by a condition of this permit or the regulations, construction of new
air pollution sources or air cleaning devices, or modifications to the sources or air cleaning
devices described in this permit must be covered under a permit issued by the Division of Air
Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may
subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143-
215.114B.
This permit shall be effective from March 19, 2013 until February 28, 2018, is
nontransferable to future owners and operators, and shall be subject to the conditions and limitations
as specified therein.
Changes have been made to the permit stipulations. The Permittee is responsible for
carefully reading the entire permit and evaluating the requirements of each permit
stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations
and restrictions set forth in this permit. Noncompliance with any,permit condition is grounds
for enforcement action, for permit termination, revocation and reissuance, or modification, or
for denial of a permit renewal application. Specific changes and additions are summarized
below (note: this list may not include all changes and additions):
The testing requirement was removed. The facility will not be required to retest until ten years from
the previous passed stack test(July 23,2009), and the condition requiring a stack test will be added
during the next permit renewal.
A PSD avoidance condition was added to the permit. It was inadvertently not included in the
previous revision.
Should you have any questions concerning this matter,please contact Jennifer Womick at(704)
663-1699.
Sincerely,
Ronald E. Slack
Regional Air Quality Supervisor
JAW
Enclosures
c:
Mooresville Regional Office
G:\DAQ\WPDATA\COUNTIES\CABARRUS\00101\RO9—PERMIT.docx
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF AIR QUALITY
AIR PERMIT NO. 074491109
Issue Date: March 19, 2013 Effective Date: March 19, 2013
Expiration Date: February 28, 2018 Replaces Permit: 07449R08
To construct and operate air emission source(s) and/or air cleaning device(s), and for the
discharge of the associated air contaminants into the atmosphere in accordance with the provisions
of Article 21 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other
applicable Laws, Rules and Regulations,
Blythe Brothers Asphalt Co., LLC - Concord Plant
660 Goodman Road
Concord, Cabarrus County, North Carolina
Permit Class: Synthetic Minor
Facility ID# 1300101
(the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air
cleaning devices and appurtenances described below:
Emission Emission Source Control Control System
Source ID Description System ID Description
,........:.„ :::::::. ..., ...... .. .............. .......F .. .... ...........
ES-1 (NSPS) drum mix type,natural gas/No.2 CD-1,CD-2 cyclone(ID No. CD-1;8 feet£
E fuel oil/recycled No.2 in diameter)installed in
fuel/recycled No.4 fuel oil-fired series with bagfilter(ID No
hot mix asphalt plant(350 tons CD-2;9,672 square feet of
per hour maximum rated filter area)
capacity; 116 million Btu per
hour maximum heat input rate)
ES 2 ES 3 ES 4 three 00 t tons
stora a silo_,_.
( capacity,each) s 1777��77]
N/A
g7 ..............
ES-17,ES-18,ES-19,ES =RAP crushing equipment
20,ES-5,ES-6 including a hammermill(ID No.
ES-5; 12 tph maximum rated
capacity),a single deck screen N/A N/A
(ES-6;25 tph maximum rated
capacity), and four(4) {
conveyors(ES-17 through ES-
20)
.._......__. ...... ............ ..._..........
P__..._'... ._._.._...............___.__...........__a.._...._S-8 aggregate deck screen(400 tons
per hour maximum process rate N/A N/A
_P
Permit No. 07449R09
Page 2
.......... . .
Emission Emission Source Control Control System '
Source ID .. ,.. Descri tion System ID Description
.... ........... .P,.
ES-10,ES-11,ES-12,ES- eight(8)aggregate conveyor _
13,ES-14,ES-15,ES-16, belts(400 tons per hour N/A N/A
ES-9 maximum process rate,each)
in accordance with the completed application 1300101.13A received February 27, 2013 including
any plans, specifications,previous applications, and other supporting data, all of which are filed
with the Department of Environment and Natural Resources, Division of Air Quality (DAQ) and are
incorporated as part of this permit.
This permit is subject to the following specified conditions and limitations including any
TESTING, REPORTING, OR MONITORING REQUIREMENTS:
A. SPECIFIC CONDITIONS AND LIMITATIONS
1. Any air emission sources or control devices authorized to construct and operate above must
be operated and maintained in accordance with the provisions contained herein. The
Permittee shall comply with applicable Environmental Management Commission
Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter
2D .0202, 2D .0506, 2D .0516, 2D .0521, 2D .0524 (40 CFR 60, Subpart I), 2D .0535, 2D
.0540, 2D .0611, 2D .1806, 2Q .0315'and 2Q .0317 (Avoidance).
2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT - The Permittee,
at least 90 days prior to the expiration date of this permit, shall request permit renewal by
letter in accordance with 15A NCAC 2Q .0304(d) and (f). Pursuant to 15A NCAC 2Q
.0203(i), no permit application fee is required for renewal of an existing air permit (without
a modification request). The renewal request (with AA application form) should be
submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration
date of this permit,the Permittee shall submit the air pollution emission inventory report
(with Certification Sheet) in accordance with 15A NCAC 2D .0202,pursuant to N.C.
General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ
and shall document air pollutants emitted for the 2016 calendar year.
3. PARTICULATE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0506
"Particulates from Hot Mix Asphalt Plants,"
a. Particulate matter emissions resulting from the operation of a hot mix asphalt plant
shall not exceed allowable emission rates. The allowable emission rates are, as
defined in 15A NCAC 2D .0506, a function of the process weight rate and shall be
determined by the following equation(calculated to three significant figures), where
P is the process throughput rate in tons per hour(tons/hr) and E is the allowable
emission rate in pounds per hour(lbs/hr).
E=4.9445 * (r( ) 1.4376 for P< 300 tons/hr, or
E= 60 lbs/hr for P>=300 tons/hr
Permit No. 07449R09
Page 3
b. Visible emissions from stacks or vents at a hot mix asphalt plant shall be less than 20
percent opacity when averaged over a six-minute period.
c. Fugitive dust emissions shall be controlled as required by 15A NCAC 2D .0540
"Particulates From Fugitive Dust Emission Sources."
d. Fugitive emissions for sources at a hot mix asphalt plant not covered elsewhere
under this Rule shall not exceed 20 percent opacity averaged over six minutes.
4. SULFUR DIOXIDE CONTROL REQUIREMENT -As required by 15A NCAC 2D .0516
"Sulfur Dioxide Emissions from Combustion Sources," sulfur dioxide emissions from the
combustion sources shall not exceed 2.3 pounds per million Btu heat input.
5. VISIBLE EMISSIONS CONTROL REQUIREMENT -As required by 15A NCAC 2D
.0521 "Control of Visible Emissions," visible emissions from the emission sources,
manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged
over a six-minute period, except that six-minute periods averaging not more than 87 percent
opacity may occur not more than once in any hour nor more than four times in any 24-hour
period. However, sources which must comply with 15A NCAC 2D .0524 "New Source
Performance Standards" or .1110 "National Emission Standards for Hazardous Air
Pollutants" must comply with applicable visible emissions requirements contained therein.
6. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" - For asphalt
plant(ID No. ES-1),the Permittee shall comply with all applicable provisions, including the
notification, testing, reporting, recordkeeping, and monitoring requirements contained in
Environmental Management Commission Standard 15A NCAC 2D .0524 "New Source
Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart I, including Subpart
A "General Provisions."
a. NSPS Emissions Limitations -As required by 15A NCAC 2D .0524, the Permittee
shall not discharge or cause the discharge into the atmosphere from any affected
source any gases which:
i. Contain particulate matter in excess of 90 mg/dscm(0.04 gr/dscf); or
I Exhibit 20 percent opacity, or greater.
7. NOTIFICATION REQUIREMENT -As required by 15A NCAC 2D .0535, the Permittee of
a source of excess emissions that last for more than four hours and that results from a
malfunction, a breakdown of process or control equipment or any other abnormal
conditions, shall:
a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time
of the Division's next business day of becoming aware of the occurrence and
describe:
i. the name and location of the facility,
ii. the nature and cause of the malfunction or breakdown,
Permit No. 07449R09
Page 4
iii. the time when the malfunction or breakdown is first observed,
iv. the expected duration, and
V. an estimated rate of emissions.
b. Notify the Director or his designee immediately when the corrective measures have
been accomplished.
This reporting requirement does not allow the operation of the facility in excess of
Environmental Management Commission Regulations.
8. FUGITIVE DUST CONTROL REQUIREMENT - As required by 15A NCAC 2D .0540
"Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow
fugitive dust emissions to cause or contribute to substantive complaints or excess visible
emissions beyond the property boundary. If substantive complaints or excessive fugitive
dust emissions from the facility are observed beyond the property boundaries for six minutes
in any one hour(using Reference Method 22 in 40 CFR, Appendix A), the owner or
operator may be required to submit a fugitive dust plan as described in 2D .0540(f).
"Fugitive dust emissions" means particulate matter that does not pass through a process
_ stack or vent and that is generated within plant property boundaries from activities such as:
unloading and loading areas,process areas stockpiles, stock pile working,plant parking lots,
and plant roads (including access roads and haul roads).
9. FABRIC FILTER REQUIREMENTS including cartridge filters, baghouses, and other dry
filter particulate collection devices -As required by 15A NCAC 2D .0611, particulate matter
emissions shall be controlled as described in the permitted equipment list.
a. Inspection and Maintenance Requirements - To comply with the provisions of this
permit and ensure that emissions do not exceed the regulatory limits, the Permittee
shall perform, at a minimum, an annual (for each 12 month period following the
initial inspection) internal inspection of each bagfilter system. In addition,the
Permittee shall perform periodic inspections and maintenance as recommended by
the equipment manufacturer.
b. Recordkeeping Requirements - The results of all inspections and any variance from
manufacturer's recommendations or from those given in this permit(when
applicable) shall be investigated with corrections made and dates of actions recorded
in a logbook. Records of all maintenance activities shall be recorded in the logbook.
The logbook(in written or electronic format) shall be kept on-site and made
available to DAQ personnel upon request.
10. CYCLONE REQUIREMENTS -As required by 15A NCAC 2D .0611,particulate matter
emissions shall be controlled as described in the permitted equipment list.
a. Inspection and Maintenance Requirements - To comply with the provisions of this
permit and ensure that emissions do not exceed the regulatory limits, the Permittee
shall perform an annual (for each 12 month period following the initial inspection)
Permit No. 07449R09
Page 5
inspection of the cyclone system. In addition,the Permittee shall perform periodic
inspections and maintenance (I&M) as recommended by the manufacturer.
b. Recordkeeping Requirements - The results of all inspections and any variance from
the manufacturer's recommendations or from those given in this permit(when
applicable) shall be investigated with corrections made and dates of actions recorded
in a cyclone logbook. Records of all maintenance activities shall be recorded in the
logbook. The cyclone logbook(in written or electronic format) shall be kept on-site
and made available to DAQ personnel upon request.
11. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS -As required by 15A
NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not
operate the facility without implementing management practices or installing and operating
odor control equipment sufficient to prevent odorous emissions from the facility from
causing or contributing to objectionable odors beyond the facility's boundary.
12. LIMITATION TO AVOID 15A NCAC 2Q .0501 - Pursuant to 15A NCAC 2Q .0315
"Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of
Section and Requirement for a Permit," as requested by the Permittee, facility-wide
emissions shall be less than the following:
Pollutant Emission Limit
ons per consecutive 12 month period)
SO2 ^N 100
CO 100__ _.
a. Operations Restrictions -To ensure emissions do not exceed the limitations above,
the following restrictions shall apply:
i. The asphalt produced shall be less than 1,488,817 tons per consecutive 12-
month period when combusting No. 2 fuel oil and recycled No. 2 fuel oil that
is 0.5 percent by weight sulfur.
ii. The production of asphalt shall be less than 316,991 tons per consecutive 12-
month period when combusting recycled No. 4 fuel oil that is 2.0 percent by
weight sulfur.
iii. The asphalt produced shall be less than 1,488,817 tons per consecutive 12
month period when combusting natural gas.
iv. If multiple fuels are used, emissions should be determined using the sum of
the individual emissions rates.
b. Recordkeeping Requirements
i. The Permittee shall record monthly and total annually the following:
A. The amount of asphalt produced and the associated fuel combusted to
produce the asphalt.
Permit No. 07449R09
Page 6
B. The facility-wide S02 and CO emissions.
ii. Fuel supplier certification shall be kept on-site and made available to DAQ
personnel upon request.
c. Reporting Requirements - Within 30 days after each calendar year,regardless of the
actual emissions, the Permittee shall submit the following:
i. emissions and/or operational data listed below. The data should include
monthly and 12 month totals for the previous 12 month period.
A. The amount of asphalt produced and the associated fuel combusted to
produce the asphalt.
B. The facility-wide S02 and CO emissions.
13. LIMITATION TO AVOID 15A NCAC 2D .0530 "PREVENTION OF SIGNIFICANT
DETERIORATION" - In accordance with 15A NCAC 2Q .0317, to comply with this permit
and avoid the applicability of 15A NCAC 2D .0530 "Prevention of Significant
Deterioration," as requested by the Permittee, emissions shall be limited as-follows:
Affected Source( Pollutant:Emission Limit Tons Per Consecutive 12 month Period
C ( . . ..
Facility Wide S02 250
14. VENDOR SUPPLIED RECYCLED No(s). 2 and 4 FUEL OIL REQUIREMENTS - In
accordance with Rule 2Q .0317, the Permittee is avoiding the applicability of Rule 2Q .0700
by using recycled fuels which are equivalent to their virgin counterparts. The Permittee is
allowed to use the recycled fuel oil(s) supplied by a DAQ-approved vendor as follows:
a. Specifications - The recycled fuel oil(s) shall be equivalent to unadulterated fossil
fuel by meeting the following criteria:
Constituent/Property lAllowable Level
1 0 ppm maximum Arsenic
Cadmium . .12.0 ppm maximum
.. _ .
Chromium . 0 ppm maximum
....._ . .....,.. _ _.............
Lead 100 ppm maximum
__.. ..
Total Halogens 1000 ppm maximum
Flash Point
No. 2 100°F minimum
No. 4 130°F minimum
Sulfur
No. 2 0.5%maximum (by weight)
No. 4 2.0%maximum(by weight).
Ash 1 0%maximum
Permit No. 07449R09
Page 7
b. The Permittee is responsible for ensuring that the recycled fuel oil(s), as received at
the site, meet(s)the approved criteria for unadulterated fuel. The Permittee is held
responsible for any discrepancies discovered by DAQ as a result of any sampling and
analysis of the fuel oil(s).
c. Recordkeeping Requirements - The Permittee shall maintain at the facility for a
minimum of three years, and shall make available to representatives of the DAQ
upon request, accurate records of the following:
i. The actual amount of recycled fuel oil(s) delivered to, and combusted at the
facility on an annual basis.
ii. Each load of recycled fuel oil received shall include the following:
A. A delivery manifest document clearly showing the shipment content
and amount, its place and date of loading, and place and date of
destination.
B. A batch specific analytical report that contains an analysis for all
constituents/properties listed above. Analytical results of the samples
representative of the recycled oil shipment from the vendor shall be
no more than one year old when received.
C. Batch signature information consisting of the following: a batch
number,tank identification with batch volume of recycled oil, date
and time the batch completed treatment, and volume(s) delivered.
D. A certification indicating that the recycled fuel oil does not contain
detectable PCBs (<2ppm).
d. Reporting Requirements - Within 30 days after each calendar year, regardless of the
amount received or combusted,the Permittee shall submit in writing to the Regional
Supervisor, DAQ,the following:
i. A summary of the results of the analytical testing for the previous 12 months.
ii. The total gallons of recycled fuel oil(s) from each approved vendor
combusted at the facility for the previous 12 months.
e. The DAQ reserves the right to require additional testing and/or monitoring of the
recycled fuel oil(s) on an annual basis or without notice.
B. GENERAL CONDITIONS AND LIMITATIONS
1. TWO COPIES OF ALL DOCUMENTS REPORTS TEST DATA MONITORING DATA
NOTIFICATIONS, REQUESTS FOR RENEWAL, AND ANY OTHER INFORMATION
REQUIRED BY THIS PERMIT shall be submitted to the:
Permit No. 07449R09
Page 8
Regional Air Quality Supervisor
North Carolina Division of Air Quality
Mooresville Regional Office
610 East Center Avenue, Suite 301
Mooresville,NC 28115
704-663-1699
For identification purposes, each submittal should include the facility name as listed on the
permit,the facility identification number, and the permit number.
2. RECORDS RETENTION REQUIREMENT- Any records required by the conditions of this
permit shall be kept on site and made available to DAQ personnel for inspection upon
request. These records shall be maintained in a form suitable and readily available for
expeditious inspection and review. These records must be kept on site for a minimum of 2
years,unless another,time period is otherwise specified.
3. ANNUAL FEE PAYMENT -Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay
the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a
timely manner will cause the DAQ to initiate action to revoke the permit.
4. EQUIPMENT RELOCATION - A new air permit shall be obtained by the Permittee prior to
establishing, building, erecting, using, or operating the emission sources or air cleaning
equipment at a site or location not specified in this permit.
5. REPORTING REQUIREMENT -Any of the following that would result in previously
unpermitted, new, or increased emissions must be reported to the Regional Supervisor,
DAQ:
a. changes in the information submitted in the application regarding facility emissions;
b. changes that modify equipment or processes of existing permitted facilities; or
c. changes in the quantity or quality of materials processed.
If appropriate, modifications to the permit may then be made by the DAQ to reflect any
necessary changes in the permit conditions. In no case are any new or increased.emissions
allowed that will cause a violation of the emission limitations specified herein.
6. This permit is subject to revocation or modification by the DAQ upon a determination that
information contained in the application or presented in the support thereof is incorrect,
conditions under which this permit was granted have changed, or violations of conditions
contained in this permit have occurred. The facility shall be properly operated and
maintained at all times in a manner that will effect an overall reduction in air pollution.
Unless otherwise specified by this permit, no emission source may be operated without the
concurrent operation of its associated air cleaning device(s) and appurtenances.
7. This permit is nontransferable by the Permittee. Future owners and operators must obtain a
new air permit from the DAQ.
Permit No. 07449R09
Page 9
8. This issuance of this permit in no way absolves the Permittee of liability for any potential
civil penalties which may be assessed for violations of State law which have occurred prior
to the effective date of this permit.
9. This permit does not relieve the Permittee of the responsibility of complying with all
applicable requirements of any Federal, State, or Local water quality or land quality control
authority.
10. Reports on the operation and maintenance of the facility shall be submitted by the Permittee
to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be
required by the DAQ. Information required in such reports may include, but is not limited
to, process weight rates, firing rates, hours of operation, and preventive maintenance
schedules.
11. A violation of any term or condition of this permit shall subject the Permittee to enforcement
pursuant to G.S. 143-215.114.A, 143-215.114B, and 143-215.114C, including assessment of
civil and/or criminal penalties.
12. Pursuant to North Carolina General Statute 143-215.3(a)(2),no person shall refuse entry or
access to any authorized representative of the DAQ who requests entry or access for
purposes of inspection, and who presents appropriate credentials,nor shall any person
obstruct, hamper, or interfere with any such representative while in the process of carrying
out his official duties. Refusal of entry or access may constitute grounds for permit
revocation and assessment of civil penalties.
13. The Permittee must comply with any applicable Federal, State, or Local requirements
governing the handling, disposal, or incineration of hazardous, solid, or medical wastes,
including the Resource Conservation and Recovery Act(RCRA) administered by the
Division of Waste Management.
14. PERMIT RETENTION REQUIREMENT- The Permittee shall retain a current copy of the
air permit at the site. The Permittee must make available to personnel of the DAQ,upon
request, the current copy of the air permit for the site.
15. CLEAN AIR ACT SECTION 112(r) REQUIREMENTS - Pursuant to 15A NCAC 2D .2100
"Risk Management Program," if the Permittee is required to develop and register a risk
management plan pursuant to Section 112(r) of the Federal Clean Air Act,then the
Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part
68.
16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I
Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of
Accidental Releases -Purpose and General Duty," although a risk management plan may not
be required,if the Permittee produces, processes, handles, or stores any amount of a listed
hazardous substance,the Permittee has a general duty to take such steps as are necessary to
prevent the accidental release of such substance and to minimize the consequences of any
release. This condition is federally-enforceable only.
Permit No. 07449R09
Page 10
17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS - If emissions
testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing
to the DAQ in support of a permit application or to demonstrate compliance,the Permittee
shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ
procedures including protocol approval, regional notification,report submittal, and test
results approval.
Permit issued this the 19th of March, 2013.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
4j� z—
Ronald E. Slack
Regional Air Quality Supervisor
By Authority of the Environmental Management Commission
Air Permit No. 07449R09
ATTACHMENT to Permit No. 07449R09, March 19, 2013
Insignificant/Exempt Activities
_ .... .................... ......................... _,_............ ......m. ..... _ _ _._.....
_
Source
Exemption ;[Siourcei of Source of Title V,�
Regulation APs9 Pollutants?
... ...._.�.._......,.. _w.._ _....,... . __.........
IES-2 -natural gas/No. 2 fuel oil-fired hot oil 2Q 0102 I
heater(2.2 million Btu per hour maximum F
Yes
2 B i I
heat input rate
(c)( )( )O( )
P. ....................)
IES-3 -two compartment liquid asphalt 2Q .0102
storage tank(capacities of 20,000 and 10,000
No No
gallons per compartment) €(c)(1)(L)(xii)
IES-4 -recycled No. 4 fuel oil storage tank 2Q .0102
(20,000 gallon capacity) c 1 D i yes Yes
IES-5 -recycled No. 4 fuel storage tank 112Q .0102 1
(12 gallon capacity)P Y)000 ca c 1 D i yF......es Yes
O( )� )O
.............
IES-6 -No. 2 fuel oil storage tank(20,000 2Q .0102 yes Yes
gallon capacity) (c)(1)(D)(i)
:.._.................................................................................................:........................._.............._........................................................................ .._......_.._........._............................................_.......... ..........................................._...... ...._................_..................................................................
IES-7 - anti-stripping storage tank(2,000 jF2Q .0102� No No
g on capacity) _ _ _ d. `(�)(1)(L)(xii)
all
1. Because an activity is exempted from being required to have a permit or permit modification
does not mean that the activity is exempted from an applicable requirement or that the owner
or operator of the source is exempted from demonstrating compliance with any applicable
requirement.
2. When applicable, emissions from stationary source activities identified above shall be
included in determining compliance with the permit requirements for toxic air pollutants
under 15A NCAC 2D .1100 "Control of Toxic Air Pollutants" or 2Q .0711 "Emission Rates
Requiring a Permit."