Loading...
HomeMy WebLinkAboutAQ_F_0400032_20120224_PRMT_Permit NCDENR North Carolina Department of Environment and Natural Resources Division of Air Quality Beverly Eaves Perdue Sheila C. Holman Dee freeman Governor Director Secretary February 24, 2012 Mr. Ken Kennedy Plant Manager - Hydro CP&L - Blewett Hydroelectric Plant 179 Tillery Dam Road Mt. Gilead,NC 27616 Subject: Air Permit No. 06093R05 CP&L - Blewett Hydroelectric Plant Lilesville,Anson County,North Carolina Permit Class: Synthetic Minor Facility ID# 0400032 Dear Mr. Kennedy: In accordance with your completed application received January 25, 2012, we are forwarding herewith Permit No. 06093R05 to CP&L - Blewett Hydroelectric Plant, Lilesville, Anson County,North Carolina for the construction and operation of air emissions sources or air cleaning devices and appurtenances. Additionally, any emissions activities determined from your air permit application as meeting the exemption requirements contained in 15A NCAC 2Q .0102 have been listed for information purposes as an "ATTACHMENT" to the enclosed air permit. Please note the records retention requirements are contained in General Condition 2 of the General Conditions and Limitations. If any parts,requirements, or limitations contained in this permit are unacceptable to you, you have the right to request a formal adjudicatory hearing within 30 days following receipt of this permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of the entire permit. This hearing request must be in the form of a written petition, conforming to G.S. 150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27699-6714. The form for requesting a formal adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings. Unless a request for a hearing is made pursuant to G.S. 15013-23,this air permit shall be final and binding. You may request modification of your air permit through informal means pursuant to G.S. 15013-22. This request must be submitted in writing to the Director and must identify the specific Fayetteville Regional Office-Division of Air Quality lie Systel Building,225 Green Street,Suite 714,Fayetteville,North Carolina 28301-5094 i hQ� Phone:(910)433-33001 FAX:(910)485-74671 Internet:www.ncair.org/ JP kJ74art c ( iyKL/L � An Equal Opportunity 1 ARrmalive Action Employer Ken Kennedy February 24, 2012 Page 2 provisions or issues for which the modification is sought. Please note that the permit will become final and binding regardless of a request for informal modification unless a request for a hearing is also made under G.S. 15013-23. Unless exempted by a condition of this permit or the regulations, construction of new air pollution sources or air cleaning devices, or modifications to the sources or air cleaning devices described in this permit must be covered under a permit issued by the Division of Air Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143- 215.114B. This permit shall be effective from February 24, 2012 until January 31, 2017, is nontransferable to future owners and operators, and shall be subject to the conditions and limitations as specified therein. Changes have been made to the permit stipulations. The Permittee is responsible for carefully reading the entire permit and evaluating the requirements of each permit stipulation. Please note Stipulation 7a, 7b and 7c for CAIR requirements newly added to this permit. Also note that Stipulation No. 6 FUGITIVE DUST CONTROL REQUIREMENT-As required by 15A NCAC 2D .0540 " is new to this permit revision. The Permittee shall comply with all terms, conditions, requirements, limitations and restrictions set forth in this permit. Noncompliance with any permit condition is grounds for enforcement action, for permit termination, revocation and reissuance, or modification,or for denial of a permit renewal application. Should you have any questions concerning this matter, please contact Jim Moser at (910) 433-3300. Sincerely, Steven F. Vozzo Regional Air Quality Supervisor jem Enclosures c: Fayetteville Regional Office NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF AIR QUALITY AIR PERMIT NO. 06093R05 Issue Date: February 24, 2012 Effective Date: February 24, 2012 Expiration Date: January 31, 2017 Replaces Permit: 06093R04 To construct and operate air emission source(s) and/or air cleaning device(s), and for the discharge of the associated air contaminants into the atmosphere in accordance with the provisions of Article 21 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other applicable Laws, Rules and Regulations, CP&L - Blewett Hydroelectric Plant Power Plant Road SR 1748 Lilesville, Anson County,North Carolina Permit Class: Synthetic Minor Facility ID# 0400032 (the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air cleaning devices and appurtenances described below: lei 1 ..P .,......._._...__.___._.. ,......, ,. >_........... .. .. No.2 fuel oil-fired combustion turbine ES ICl (288 million Btu per hour maximum heat input) No.2 fuel ml-fired combustion.turbme ES IC2 ( N/A (288 million Btu per hour maximum heat input) N/A ES IC3 No 2 fuel oil-fired combustion turbine N/A N/A (288 million Btu per hour maximum heat input) 1 No 2 fuel oil-fired combustion turbine ESIC4 N/A N/A (288 million Btu per hour maximum heat input) in accordance with the completed application 0400032.12A received January 25, 2012 including any plans, specifications,previous applications, and other supporting data, all of which are filed with the Department of Environment and Natural Resources, Division of Air Quality(DAQ) and are incorporated as part of this permit. Permit No. 06093R05 Page 2 This permit is subject to the following specified conditions and limitations including any TESTING, REPORTING, OR MONITORING REQUIREMENTS: A. SPECIFIC CONDITIONS AND LIMITATIONS 1. Any air emission sources or control devices authorized to construct and operate above must be operated and maintained in accordance with the provisions contained herein. The Permittee shall comply with applicable Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter 2D .0200, 2D .0202, 2D .0516, 2D .0521, 2D .0535, 2D .0540, 2D .2400, 2Q .0315 and 2Q .0317 (Avoidance). 2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT- The Permittee, at least 90 days prior to the expiration date of this permit, shall.request permit renewal by letter in accordance with 15A NCAC 2Q .0304(d) and(f). Pursuant to 15A NCAC 2Q .0203(i),no permit application fee is required for renewal of an existing air permit(without a modification request). The renewal request(with AA application form) should be submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration date of this permit,the Permittee shall submit the air pollution emission inventory report (with Certification Sheet) in accordance with 15A NCAC 2D .0202, pursuant to N.C. General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ and shall document air pollutants emitted for the 2015 calendar year. 3. SULFUR DIOXIDE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0516 "Sulfur Dioxide Emissions from Combustion Sources," sulfur dioxide emissions from the combustion sources shall not exceed 2.3 pounds per million Btu heat input. 4. VISIBLE EMISSIONS CONTROL REQUIREMENT- As required by 15A NCAC 2D .0521 "Control of Visible Emissions," visible emissions from the emission sources, manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged over a six-minute period, except that six-minute periods averaging not more than 87 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. However, sources which must comply with 15A NCAC 2D .0524 "New Source Performance Standards" or .1110 "National Emission Standards for Hazardous Air Pollutants" must comply with applicable visible emissions requirements contained therein. 5. NOTIFICATION REQUIREMENT -As required by 15A NCAC 2D .0535, the Permittee of a source of excess emissions that last for more than four hours and that results from a malfunction, a breakdown of process or control equipment or any other abnormal conditions, shall: a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time of the Division's next business day of becoming aware of the occurrence and describe: i. the name and location of the facility, ii. the nature and cause of the malfunction or breakdown, Permit No. 06093R05 Page 3 iii. the time when the malfunction or breakdown is first observed, iv. the expected duration, and V. an estimated rate of emissions. b. Notify the Director or his designee immediately when the corrective measures have been accomplished. This reporting requirement.does not allow the operation of the facility in excess of Environmental Management Commission Regulations. 6. FUGITIVE DUST CONTROL REQUIREMENT -As required by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow I ugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. If substantive complaints or excessive fugitive dust emissions from the facility are observed beyond the property boundaries for six minutes in any one hour (using Reference Method 22 in 40 CFR,Appendix A), the owner or operator may be required to submit a fugitive dust plan as described in 2D .0540(f). "Fugitive dust emissions" means particulate matter from process operations that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas,process areas stockpiles, stock pile working,plant parking lots, and plant roads (including access roads and haul roads). 7. CLEAN AIR INTERSTATE RULE (CAIR) PERMIT REQUIREMENTS—As required by 15A NCAC 2D .2400. The following sources are affected CAIR units: ES IC1 I 1 I ES IC2 I 2 IC3 . ,...... 3 ES IC4 4 , a. 15A NCAC 2D .2403: NITROGEN OXIDE EMISSIONS i. The total nitrogen oxide(NOx) emissions from the affected CAIR units listed above at the Blewett Hydroelectric Plant shall not exceed,except as provided in 15A NCAC 2D .2408: [15A NCAC 2D .2403] A. 8 tons annually for 2009-2014. B. 7 tons annually for 2015 and later. Permit No. 06093R05 Page 4 If any of the CAIR sources listed above is a new source for which allocations have not been included in the table in 15A NCAC 2D .2403, the CAIR designated representative may submit a request to be allocated CAIR NOx allowances for those sources using the procedures in 40 CFR 96.142(c)(2)and(3). ii. The affected CAIR NOx sources shall comply with the requirements of 15A NCAC 2D .2400 using the trading program and banking set out in 40 CFR Part 96. [15A NCAC 2D .2408] iii. The owner or operator of any unit or source covered under 15A NCAC 2D .2403 shall be subject to the provisions of 40 CFR 96.106(f). [15A NCAC 2D .2403] iv. The Permittee shall comply with the monitoring,recordkeeping,and reporting requirements in 40 CFR 96.106(b) and(e),and 40 CFR 96 Subpart HH for each CAIR NOx unit. v. The emissions of nitrogen oxides of a CAIR NOx source shall not exceed the number of allowances that it has in its compliance account established and administered under 15A NCAC 2D .2408. vi. The emissions measurements recorded and reported according to 40 CFR Part 96 Subpart HH shall be used to determine compliance by each CAIR NOx source with its emissions limitation according to 40 CFR 96.106(c) including 96.106(c)(5)and (6). vii. The provisions of 40 CFR 96.106(d) shall be used for excess emissions. b. 15A NCAC 2D .2405: NITROGEN OXIDE EMISSIONS DURING OZONE SEASON i. Ozone season NOx emissions from the affected CAIR units listed above at the Blewett Hydroelectric Plant shall not exceed, except as provided in 15A NCAC 2D .2408: [15A NCAC 2D .2405(a)(1) and(b)] A. 7 tons during the ozone season for 2009-2014. B. 6 tons during the ozone season for 2015 and later. The ozone season shall be defined as the period of time extending from May 15`to September 301h of each calendar year. If any of the CAIR sources listed above is a new source for which allocations have not been included in the table in 15A NCAC 2D .2405,the CAIR designated representative may submit a request to be allocated CAIR NOx ozone season allowances for those sources using the procedures in 40 CFR 96.342(c)(2)and(3). ii. The affected CAIR NOx Ozone Season sources shall comply with the requirements of 15A NCAC 2D .2400 using the trading program and banking set out in 40 CFR Part 96. [15A NCAC 2D .2408] iii. The owner or operator of any unit or source covered under 15A NCAC 2D .2405 shall be subject to the provisions of 40 CFR 96.306(f). [15A NCAC 2D .2405] iv. The Permittee shall comply with the monitoring,recordkeeping,and reporting requirements in 40 CFR 96.306(b) and(e),and 40 CFR 96 Subpart HHHH for each CAIR Ozone Season NOx unit. Permit No. 06093R05 Page 5 v. The nitrogen oxide ozone season emissions of a CAIR NOx Ozone Season source shall not exceed the number of allowances that it has in its compliance account established and administered under 15A NCAC 2D .2408. vi. The emissions measurements recorded and reported according to 40 CFR Part 96 Subpart HHHH shall be used to determine compliance by each CAIR NOx Ozone Season source with its emissions limitation according to 40 CFR 96.306(c)including 96.306(c)(5) and (6). vi. The provisions of 40 CFR 96.306(d) shall be used for excess emissions. c. 15A NCAC 2D .2404: SULFUR DIOXIDE EMISSIONS i. The affected CAIR SO2 sources shall comply with the requirements of 15A NCAC 21) .2400 using the trading program and banking set out in 40 CFR Part 96. [15A NCAC 2D .2408] ii. The owner or operator of any unit or source covered under 15A NCAC 2D .2404 shall be subject to the provisions of 40 CFR 96.206(f). [15A NCAC 2D .2404] iii. The Permittee shall comply with the monitoring, recordkeeping, and reporting requirements in 40 CFR 96.206(b) and (e), and 40 CFR 96 Subpart HHH for each CAIR SO2 unit. iv. The emissions of sulfur dioxides of a CAIR SO2 source shall not exceed the number of allowances that it has in its compliance account established and administered under Rule 15A NCAC 2D .2408. v. The emissions measurements recorded and reported according to 40 CFR Part 96 Subpart HHH shall be used to determine compliance by each CAIR SO2 source with its emissions limitation according to 40 CFR 96.206(c) including 96.206(c)(5)and(6). vi. The provisions of 40 CFR 96.206(d) shall be used for excess emissions. d. CAIR PERMIT APPLICATION - The CAIR Permit Application, dated June 26, 2007, submitted for this facility, as approved by the Department of Environment and Natural Resources, Division of Air Quality, is part of this permit. The owner and operator of these CAIR NOx and SO2 sources must comply with the standard requirements and special provisions set forth in the attached application. 8. LIMITATION TO AVOID 15A NCAC 2Q .0501 - Pursuant to 15A NCAC 2Q .0315 "Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of Section and Requirement for a Permit," as requested by the Permittee, facility-wide emissions shall be less than the following: NOx I 100a Permit No. 06093R05 Page 6 a. Operations Restrictions - To ensure emissions do not exceed the limitations above, the following restrictions shall apply: i. The amount of No. 2 fuel oil combusted shall be less than 1,602,175 gallons per consecutive 12-month period when burning fuel that is 0.5 percent by weight sulfur. b. Recordkee iinng Requirements i. The Permittee shall record monthly and total annually the following: A. The amount of No. 2 fuel oil combusted B. The facility-wide nitrogen oxide emissions. ii. Fuel supplier certification shall be kept on-site and made available to DAQ personnel upon request. c. Reporting Requirements - Within 30 days after each calendar year,regardless of the actual emissions,the Permittee shall submit the following: i. emissions and/or operational data listed below. The data should include monthly and 12 month totals for the previous 12 month period. A. nitrogen oxide emissions ii. copies of the fuel certification records for the previous 12 months 9. LIMITATION TO AVOID 15A NCAC 2D .0530 "PREVENTION OF SIGNIFICANT DETERIORATION' - In accordance with 15A NCAC 2Q .0317, to comply with this permit and avoid the applicability of 15A NCAC 2D .0530 "Prevention of Significant Deterioration," as requested by the Permittee, emissions shall be limited as follows: Facility Wide NOx 250 tons per year Facility Wide n. .5O2... � 250 tons per year m a. Reporting Requirements - Within 30 days after each calendar year quarter, regardless of the actual emissions,the following shall be reported to the Regional Supervisor, DAQ: i. The reporting requirement for this stipulation shall be met when the Permittee submits the report for the synthetic minor stipulation above. Permit No. 06093R05 Page 7 B. GENERAL CONDITIONS AND LIMITATIONS 1. TWO COPIES OF ALL DOCUMENTS REPORTS TEST DATA, MONITORING DATA, NOTIFICATIONS REQUESTS FOR RENEWAL AND ANY OTHER INFORMATION REQUIRED BY THIS PERMIT shall be submitted to the: Regional Air Quality Supervisor North Carolina Division of Air Quality Fayetteville Regional Office Systel Building 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 (910)433-3300 For identification purposes, each submittal should include the facility name as listed on the permit,the facility identification number, and the permit number. 2. RECORDS RETENTION REQUIREMENT - Any records required by the conditions of this permit shall be kept on site and made available to DAQ personnel for inspection upon request. These records shall be maintained in a form suitable and readily available for expeditious inspection and review. These records must be kept on site for a minimum of 2 years, unless another time period is otherwise specified. 3. ANNUAL FEE PAYMENT- Pursuant to 15A NCAC 2Q .0203(a),the Permittee shall pay the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a timely manner will cause the DAQ to initiate action to revoke the permit. 4. EQUIPMENT RELOCATION - A new air permit shall be obtained by the Permittee prior to establishing, building, erecting,using, or operating the emission sources or air cleaning equipment at a site or location not specified in this permit. 5. REPORTING REQUIREMENT-Any of the following that would result in previously unpermitted, new, or increased emissions must be reported to the Regional Supervisor, DAQ: a. changes in the information submitted in the application regarding facility emissions; b. changes that modify equipment or processes of existing permitted facilities; or c. changes in the quantity or quality of materials processed. If appropriate, modifications to the permit may then be made by the DAQ to reflect any necessary changes in the permit conditions. In no case are any new or increased emissions allowed that will cause a violation of the emission limitations specified herein. 6. This permit is subject to revocation or modification by the DAQ upon a determination that information contained in the application or presented in the support thereof is incorrect, conditions under which this permit was granted have changed, or violations of conditions contained in this permit have occurred. The facility shall be properly operated and Permit No. 06093R05 Page 8 maintained at all times in a manner that will effect an overall reduction in air pollution. Unless otherwise specified by this permit,no emission source may be operated without the concurrent operation of its associated air cleaning device(s) and appurtenances. 7. This permit is nontransferable by the Permittee. Future owners and operators must obtain a new air permit from the DAQ. 8. This issuance of this permit in no way absolves the Permittee of liability for any potential civil penalties which may be assessed for violations of State law which have occurred prior to the effective date of this permit. 9. This permit does not relieve the Permittee of the responsibility of complying with all applicable requirements of any Federal, State, or Local water quality or land quality control authority. 10. Reports on the operation and maintenance of the facility shall be submitted by the Permittee to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be required by the DAQ. Information required in such reports may include, but is not limited to, process weight rates, firing rates, hours of operation, and preventive maintenance schedules. 11. A violation of any term or condition of this permit shall subject the Permittee to enforcement pursuant to G.S. 143-215.114A, 143-215.11413, and 143-215.114C, including assessment of civil and/or criminal penalties. 12. Pursuant to North Carolina General Statute 143-215.3(a)(2), no person shall refuse entry or access to any authorized representative of the DAQ who requests entry or access for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his official duties. Refusal of entry or access may constitute grounds for permit revocation and assessment of civil penalties. 13. The Permittee must comply with any applicable Federal, State, or Local requirements governing the handling, disposal, or incineration of hazardous, solid, or medical wastes, including the Resource Conservation and Recovery Act (RCRA) administered by the Division of Waste Management. 14. PERMIT RETENTION REQUIREMENT- The Permittee shall retain a current copy of the air permit at the site. The Permittee must make available to personnel of the DAQ, upon request,the current copy of the air permit for the site. 15. CLEAN AIR ACT SECTION 112(r) REQUIREMENTS -Pursuant to 40 CFR Part 68 "Accidental Release Prevention Requirements: Risk Management Programs Under the Clean Air Act, Section 112(r)," if the Permittee is required to develop and register a risk management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the Permittee is required to register this plan in accordance with 40 CFR Part 68. 16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of Permit No. 06093R05 Page 9 Accidental Releases -Purpose and General Duty," although a risk management plan may not be required, if the Permittee produces, processes,handles, or stores any amount of a listed hazardous substance,the Permittee has a general duty to take such steps as are necessary to prevent the accidental release of such substance and to minimize the consequences of any release. This condition is federally-enforceable only. 17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS - If emissions testing is required by this permit, or the DAQ,or if the Permittee submits emissions testing to the DAQ in support of a permit application or to demonstrate compliance,the Permittee shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ procedures including protocol approval,regional notification, report submittal, and test results approval. Permit issued this the 24`h of February, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Steven F. Vozzo Regional Air Quality Supervisor By Authority of the Environmental Management Commission Air Permit No. 06093R05 ATTACHMENT No. I to Permit No. 06093R05, February 24, 2012 Insignificant/Exempt Activities v IOILTANKI No. 2 fuel oil storage tank 2Q .0102 (c)(1)(D)(i) Yes Yes f (850,000 gallon capacity) I _ � _�_J ILUBETANKI - Lube Oil Storage Tank 2Q .0102 (c)(1)(D)(i) Yes Yes (550 gallon capacity) ,n._.. --a ILUBETANK2 - Lube Oil Storage Tank (1800 gallon capacity) 2Q .0102 (c)(1)(D)(i) IL—Yes Yes' _I ILUBETANK3 - Lube Oil Storage Tank 2Q .0102 (c)(1)(D)(i) ! Yes Yes (1800 gallon capacity) s ILUBETANK4 - Lube Oil Storage Tank 2Q.0102 (c)(1)(D)(i) Yes (1800 gallon capacity) Yes ILUBETANK5 - Lube Oil Storage Tank I (1800 gallon capacity) LLQ .0102 (c)(1)(D)(i) YesYes ...a.. , . . 1. Because an activity is exempted from being required to have a permit or permit modification does not mean that the activity is exempted from an applicable requirement or that the owner or operator of the source is exempted from demonstrating compliance with any applicable requirement. 2. When applicable, emissions from stationary source activities identified above shall be included in determining compliance with the permit requirements for toxic air pollutants under 15A NCAC 2D .1100 "Control of Toxic Air Pollutants" or 2Q .0711 "Emission Rates Requiring a Permit." ATTACHMENT No. 2 to Permit No. 06093RO5, February 24, 2012 CAIR Application Page 1 Clean Air Interstate Rule (CAIR) Permit Application . For Administrallft Amendment to Title V Permit to Add CAIR Budget Trading Part For mom Intormalion,see instructions and refer to 40 CFR 96.121,96.122,68.221.96.222j 96:321 and 96 322:and Rele 15 NCAQ 2O 24U6, This,subroMisn 10 [A Now Q Revised p Renewal STEP I Carolina Power S Light dwe Progress Energy Carolinas,trip.: - Idanil "scarce by. Site. ddresa. 'i79 T91ary Dam Road Gry `Mt.Gllead 21P Code 27308 tilling in.lhe:requested Slowed ttydroolecffic Plant. County Amon ORIS/Plant Coda 2707 cats PiAnINPrae!a Penif M093 1NC Facility D 1 2§w"32 Permit Techni0OICont5& Stottlane Facillyinspeoban Cdntac't I Malt Oortlner <.-Address P.O.Sox 1551 R01010h,NC 27602 Address>, sama as above - Phone No 919448:5536 Phone No. 91g 4395211' Fax No. 919546-4409 Pax Nil .. !�iigranell cdm Hail: Seotl:Lane@ABnmalEcom Email .M6x Gardns a b c :d a f- - Unit ID# -.Unit"I' unit WI] 'UnAwill New units New Unit& STHP2 WdA ogee hold sulfur hold NOx Ozone oxltles(NOx) O wde(sq) Saatchi Expacted Expected. allowances allowances- atlowanbos Comnionoo Monitor In accordance In acoordanoe in accordance Commercial Certification. With 40 CFR: with 40 CPR: w)th 40 CKR Operation Date Deadline. 6,1ge(e)CA s 96,266(u)(1). 96.306(c)(1) 1 x. x I x .: 2 - _ x x_ . x .. In column s'"enterthe 3 x' X uhltl4gfPrevery CAIR ._.4. $ x X .... unit at the CAIR source. In colfamhe"b","c^; and"d"In'onto to 'which CNR - Progmm(s)eadb unit Is sublectby placing - an'W'In the.-.. .. column(s):- For new unite,enter therequested Tnforrnati@n in, - 0olumnB'a"Olio"'V. JUN 2 a'2007 Farm for 15A NCAC2D.2406 F.CN� Effectve!January 1,2009 Uk FA`lE1TEVILLE REGIONAL OFFICE PIahl NaMe(fr0r1 sT1tP 1) Blewett Hydroelectric Plant Page 2 CAIR NOX ANNUAL.TRADING PROGRAM STEP 3. CA(R Part:Rearrlr4merila. Read the (1)The CAIR designated mpmeeart abye of eaeh CAIR NOxauurne required to hive a Title V operating permit or Sir construction permit,and re Standard eabh CAIR NOxunlrrequired to have a T-e Voperating permit or Sir 0onsinle6on permit atthe Source shall _ requirements. to Submit to the Department a OmPlats anccaNfied CAIR part form under 40 CPR pan tie.129:and Ruls 15 NCAC 20;02406.,.In ;ao-.ordancewith the deadlines apeciled in 40 CFR parke8,121;and (H Owner (2)11ppwnel¢-amlopwi i TI of actin CAIR NOkSOUrair construction on tructonave's Tat tVApemNlgpadmfor aft IRPatd In and papa CAIR NOx pUnit ermit or air b'haveaTI1tar operating permit orate QAndodeontsthe atiheandthaunty haveaGAIRPad included quoter In Part Nopereting permit or COnalmcedn;peund kSued by lheNCDA4end,Aparate tills Sautcepnd the unit ln,wmPuao"R with apoh CAlRPart. Mo'1t nha.'Reaordna and Rerordkeeoirn ftillydmahte - - (1)Tfk g14p"and opemtgra;and the CAIR designated representative,of each CAIR NOx scum and eaoh CAIR NOxunR at the sogrfb sheN- O'onpry v4di'fhe monhedng,repottirp,andredoalkeetling requirements of AO CFR part Sa Subpart NH and Rule 15NCAC 2D 02406, (2)The eac emissionsAIA NOx sp4laewfth liteo #aCA7Irived gauxuagia-Ra AhA��pedgS wboad.HH shall bewepk determine compliance by. NOR Emisslijtl Reuulrnanl6� (1)As or."alloowwpanos tranafer deadlne far a conto{period tha ti mom and operators of each CAM NOxabu(oe and each CAIR NICK unit at the source sha)I.hUd,in the source's oomplanue aacWnt„CAIR Ngx alµyWaAcbs a 4atxb Wcompilarce deduothms for the control period under 40 COR 0054(010 m amou cm(Wes then tna tens offOkl NOx emissidne forlha rrontrol period from all CAIR NOx•unils at the source,as deiermined 1n accunhutH with 40 CFRd g Pa0sub`part HH (2)A CAIIN NDgunh Shall be stQW to the requirements underparegra (1)of the NOx Requirements staamg on the later of Janupry 1,Rom or tlh§deShclrie br IrieeNng Nis units rmnllor cer(Klpabpn requkefnama undat 40 CPR 90.170(b)(1)or(2)and toot Such bomnel period thereafter. (3)A CAIR NOx a itamnice shall not be ded%ted,farcappileneeWM the regWfe mints uiderpafagreph(1)of the NOR Requirements,for a. come)p,ioQm a caIgn htr yaar betoYe Ma ydaf for w"the CAIR NOx allowahux was allocated; (4)OAIRNOxallimutfvxhS Sltaii Da Hato In,doduoted trm,a or transferred Into or among CAIR NOx Allowance Tmcking$ysteM Accounts In acooMancea with 40 CFR pad Se subparts FF and GO. (5}A OAIR NOxagawarab la aNMlted aU(llolt2aton,k aMltoRe tonof NOx M accordance vM thO CAIR NOxAnnual TmdRD Program;No provision of the CAIR NoxA0n0al T ",radina P ram.the CAIR Godjoran sxempLon under 40 CFR a0105 and no'prowsjon orlawshallpe canstnredtoFmit rheaugiwdybt N1e SmkofMe UfiRad Sktesto'temsnala orlanit each auMoaaaton. (0)ACAIRNOxaHOWvrce&&not amaMute afro r1y;4hl. (7)Upon,iecpdetgn by the Admtnisbatoe under 40 Rpad 90 subpart EE.FF,arGO,every allocation,trahaler,or deduction of CAIR NOx AtuwdOcb to or eom a.CA(R NDxunlrs compllsee,As countie Inoorpcmted autdmatioaliy In any CAIR Part of the source that Inoludes the CAIR NOu unit. - C ss rmis_eanaRpOuiremmb. Its CAIR NOx aoui'ae Smile NOX d1fdng any coebal period In excess W the CAIR NOx emissionaamitagon,than: (i)iha'tiuinem and UIred for deduction under 40 CFR 08:184(d)(1)and P Yators of the any MIS,P9Ralry,ort the soVne,assessment orobraphy tl th an other re CAR emedy Imposed,Impoossed,ffor the same violations;urldorthe Clean At Atli or appac2ble Sells iaMand cMNRY Y (2)Eactrton of avdh exdass amisewna and each day of siW control period shall constitute a separate violation of 40 CFR pail 90 subPsnAA,the Clean AlrAe(;and'app12abIa Stele law. Recuadkeadna apd Reaaidn Rewlrem 11 (1)Unless otherwise proy d6d the Owners and 0erstots of the CAIR NOx source and each CAIR NOx unit at{he source shall keep'orl Site at the Souroa each of the following dowAlonts for a period of 5 years from the date the dowment is created This period may be extended forcause, at ally None befara tog and of 5 yaa%In Willing by the Dins&rortheAdminis0a[or. Q The dartificstai of representation under 40 CFR 96.113 for the C{!R designated ieprasantalive forma source and ouch CAIR NOx unit at the SOume and.all documents thetdemonauate Uie oath 61tIq shu, fonts In the cardloebaW mpreontition,proYidedthal 010 Sertlfitatt and douimentsatlall be mkihed on Steel the s'obrod begond sudi 5-yeatpadediInUl iuch dmomente amsupemeded hepuse of the suOMiasipn of"new caltiffrate of mpmentOph under 40 CFR tia,11E obi nging the CAIR distrusted representative, Sip Alr,mission,morftolltlg iAtorrllaton m accordancewilb 40 GFR Part g05ubpert HH oltlis part,Provided that to the extent that 40.CFR pat:g6 $gbpart HH pjavidas ter a a.ydvrperiod for recordkeeli ng,the.1-1e41 ParMls sheti,.ePPIS (W)Coples of anrepom,oomplisno,aaMcations,.and other submlS§IMS and ell records made Or required under the CAIR NOx Annoal Trediag Program (N)Copies of all documents ui`edto edrriplow a CAIR Part form end any other suibmisslon under the CAIR NOx Annual Teding Program or to domorlelmte Compliance v4tlithe requiremeal4:of the CAIR NOxgnnual Ymdi�Program. (2)The CAIR,deilgnakdrepresentat1w of a CAIR NOx source and eat CAIRN x unit at the source shall Submit the reports regvled under the CAIR NOx Annual Trading program Including those under 40 CFR part$O subpart HH. Form for 15A NCAC 2b,2406 EffectPva:January 1,2009 i I Plant Name(from s7Er 1) 13.1ewett Hydroelectric Plant. _ _.... Page 3' . .UedliN; STEP3;. ,(2);g()Each CAIR.NOxsouroeand 000 OAIRNOk unit shall meet tha.feommaots blNgCA1RNQXAMKQ1 Trading Program. Commink! Any provlalon ofNa CAIRNOxAnnoel Trading Program that apphrtstgIs W NQRsoume or the CAIR-des10noted representative Of a.CAIR Wit soureeshaa alsCCoAApappplY to.lna owaeH any opefators'df such source and of M CAfR NOX unit$at lyre souma, (a)ANOxMunl6 eleoeppy Wtile otutL Pnraridngppe s�Da t attd piles(usCAIR NOX unitoriheCAlRdeslBna[ed repr06ahlatlYe gta CAIR Effbol onOnwANlwr(tiea. RP KO*Ioh offhb LAIR Ntlx ApnwlTTedin Pro'am a LAIR pad,wan exempbon under 40 CFR OQADII shall bo wshued es exempdn0 or excluding Neon ners and appn dord,and 1ho�IR:daslgnsted raprewb4ve,of a PAIR Nbx Ownge 61 CAIR N62 unit from compliance With any =Other Provision of.Ne'appllcable,.approved State im MOrTtailon'pION atadefalh 611*eable permit,or the Clean Akld. 0AIR S%,YK (RG PROgRAM 'CAIR Pad Rrftlo"'-ants_ (1)The CAIR deaigoaterJ rePreserhaOve of each LAIR$02 aouree'?equlred to have a Title V operating permit or air constmction Permit,and each C/qR St,,4nflr. 0)fad tohave s Tips V grending penult or Air donsbvctloh pemJt al the source shall; 0Sultan to the NCDAO a complete and ceknad CAIR part form under40CFR pad 9a222 and Rule 1SNCA0.2D,02406,inaeWrdance Va the deadltdess(fedW In 4 CFR part 6021;and dd(Reserved); -(2)The"sera and operators Otago CAIR$0,spur,,required 16 have a Title Voperetlrg pemffidrlelr oonsWcgon permit aM each CAtR.Sb1 unit required to,havile*pV operatlng p011,k0 alroonsbuctsipermit at the source shall have a CAIR Pad Included In the Title Voperabng 0,unit of air construction pa tnii1660"bythe014ob rundar''0 CFR Pan 05 SUbpad CCG for the source and Oparste bw source and each CAM tmitincomplaneawlih sUcli:CAIR ParC nbdn RaZn ,rid RewrdNeeolna Reodremdtil5 (1)The owners and operators,antl:Ne CAIR designated representative,of each CAIR So,source and each$02 CAR unhatlfre sOurga§hell comply ydih the mbnlinhnb,repomng,and mcpdkeeplrg requlremems of40 CFR pan 06 suboWHHH and Rule 15:NCAC 2D.02406 "(2)The aeDh CAIR S(jz aource'Akh lla fpNanfng CAIR 50i Emlasl gwvlrarrie_r4i10sCFR,pad 98 subpart NHH Snell be used tode1annlrre compliance by cud . Mlsae'sn RI,tlrmft a ,(1)As of Ne sUgpance bpnafBf deadline for a Dordml perigd,Ore¢"IA and opgretors of each CAIR S%source arld seen CAIR S02 brit at Ira Bounce shall hdd,indte sources wmplance a�at a NDnege 9g01vA1ent in GAIR SO,allowen�available for mrpaance dedupyons for,the eontrd perbd;,as detFrmleea sf onlatKd s9ly'40 CPR 06'. I(a)and(b),not leas Nan the tons of totalsutnurdlavida emissions for the oohbal period(rpinall CAIR Sba unitaTtNe aohe urd§,as'detemdrled In aDObrdahcewOh 4g OR part 90 subpart HHH :(2)J CAIR lrSg0 01tNtlre deaOSnefpt(nleetA�igUl tl7abenlYe mgMiof: Rn reequiremenia�undde ap CFR gii;k u(b)(1)at(2)and for e ch whbd Peyod 111e1xager (8)A CAR,S02 allmwco vithtffe roullermnte WderPMatiMph(1)ofthe SCi EmledoD Rag06emems,for a pxrMol pui0rl h a FBfs)tdar drbekra Ne yredr forwidoh the CAIR SO,0110"IM6 was allocated. .(4)CAIR SO}atlawarke6 dhall qb held In,dadmiad from,ortrehsfened IMOW.among.CAto to,MowerosTrackin9 System acwunta In 6cyord o6 ViMn4o CFRped A6labpsM PPP and GGG. rt5) ,C(J(2�Oealbwaroa Is a limped agholtwilon to wit sulfur dbxlde In accordance With the CAIR Sox Trading Program.No provision of fie AAg256x7rad�rg Program.iheCNR Part or 06 ex,4WtiDn l odei4D CPR 06 2bSand no pmylsibA Of taW shah beConehued to IWMO {O authority CA SO wallp$vreht0 tldosaa t 60miftulea prope,rt rightates 16 terminate or mit eucn authorization. (7 upon re{Wdalon bythe Admialstmtor must 0 CPR pad 06 subpart FEE or OGC;ovary allocation,7ansfar,or tlaductlohdaCAIR:$O: allowance toot f m'a CAIRS02 ardl'sOompl(eafe accouaf IS IndorpQmtad ardoma8cally In ahq CAIR Padof Na acurce that Includes the CAIR SOi uh)4 ,0,,.be gm•.lbn'Rerf lrmrf®hte if a CAIR 802 Source suits 6C2during any control pe)lod in excess of too QAIR$02 aMsalons hm istION than: (1)7he'ewAMArid operators of the pourga end each CAIR$'sseC2 prdtat the fdoree Shell sbmehderthe CAIR So,auw/ances required for deduction under4o 2 CFR9 y"4(d)(I'And pay anYgne,penalty,d'asarrierd or 66n*wffh any(Mar remedy Imposed,for the same violations,under the Clean NtAct or UpplUleSthU favY,and "(2)Each ton ui subh ekb tons Oand sea day of such mntrol period shall constitute a"Separate vlaatlon of 40 CFR pad 06 subpart AAA,the Clean AlrAd._arld app Form 1,5 for A..NCAC 2D.'2406. Effective:January 1 2009. Plant Name(from STEP t) Blewott Hydroeie0tric Plant Page 4 ;Rec dkqoolna'and ligoO inRede'rell STEP#, (1),Unless osteMtae provlddd:tireowners pnd operators ofthaOAIA SOz.aopme and each CAIR$0e dnIt atthe Source Shall kbap coin#"atdte Continued Source each ofths(oi7rying ddwmente fora padbd areyearfomthgdaldthe document is created this period maybe extended for cause.at. anylinebekfat Of end s6years, ndar'4g M'Ufa Ol0fororthe designated - q)Tpe UnuedcarOU its s repmsentabpn cu e1 is that 4mona rarma CAIR dealgnataamountsi tithe pert-eAbsof rd'e tacA CAIR Sq unit et CorNnuedale source and alPdecuments that dgmonsimte the;6Wh of the s(alemenb in the eer66cata of repeaeriWtidn;pmvidetlthattlia ceNflcate:and documents Shall be retained on Shp at the source bay"such dyasrpedodurill Such dacomentk arel- m6dod because of the submaslon of Anew ceMkota OtreprePahtadon uhder40 CFR 66.213 changing the CAIRdasslnatad microsentaltvo. Q)All arassions monitoring Informedon,Jd scoudiance With 40 CFRpart96 subpart HHHof this:P4 Multi #orWith extant that 4b CFR part. 96 adbp in HHH provides(Ora 3:yesr pedoE for mobtQkeePNO the 3-yearpeflod shall apply. 04)Coplasof oil reports,compliance CetN6cedo0s,andoiber submissions and at i6ords made Or required u d"a'CAIR SOz Trading Program. (w)Copies of all documents used to cdnplele a CAIR Pad Amn'Ard any Other Submission undertheCAIR SOzTrading Program or to demonstrate canipliancevtth the rkgahe"bits olthe MR.SOj Trading Program. (2)The CAIR desgnated repfeaBrlladva ofa CAIR.SOz source and each LAIR 801 unit at thp.aource shall submit Ole reports regared Mdarthe CAIR$0a Trading Program,Including those under 40 CFR part gS subpart HHH: Lialift ,(1)Each CARR=sburc6 and each CAIR SCy unitshall meet the faqulrameoffinf the CAIR SOt Trading Program 1(2)Any pruvffilon of the CAIR 50iTrading Program Sir applies to#,,CAIR$%source,or the CAIR designated rpprespnWliva of a CAIR50z source ehsil also apply ta the ovmere end opeatoa of p @aurae and of the CAIR uNte et(he source. (a)AhY provision ol Ole OAIR SDx YradlnB Progrem,thal appliepbaaioeGAIR SOgu'nlibfdne drone CAIR tlealgngtsa Capfesenlativ0 Na0AIR Sos unitsh@I1. aloapph to fhe owners Ono operators or such unit Ebect on QgierAuAggles No provision ajtha CAIRSO2T(ading PrOgmm,a CAIR Pad,of an exemption undergo CFR 96.206 shall beoonshuad 4s exemptng or exciudfng the owners and Operators,and(hp CAgidesigngfad representative,Of a CAIR SOzscume or CAIR SOz unit from oc nglance with any other provision of dreappikaWa,approved State Implementatimplan,a toderaly enforceable pom-A or the Clean ARA& CAIR NOR OZONE SEASON TRADING PROGRAM CW:Pan ReaUlrements (])The CAIR designated neprpaentadve of Oaoh.CAIR NOR Ozone Season soaca required to,have sTdle V opeeadhg pprmll or air construction permit,and peon CAIR NOR Owns Season unit requiredto have aTlire VOperating Pemnd orairconslNCdoif Permnat the sorace shell: - (i)SdulGml�,the sOCDAQdlgUCFRpart rdfie 1- AIR Poo form ymdar 4a OPIk of06.322 and RutaA6 NGAC2D.02406,in Accordance with nd (1)Resorved _[z)The ownerianp oparalpra OFoach CAIRNORO7bnb Season source required to pewee Title V operating pSmill orap cheSdugtion permit,and each CAIR NOR Ozone Season unit required to have aTasV opemtlrg permit oratroonabuisjod permliAt thd source sholthave a CAIR Part Included in the Idle V operating permit or aireonstrucpon permlt Issued by the NCIPA0,61or 46 CFR part 96euepart CCCC forthe source.and - operate theaource and the unit In comp0anw.yith such CAIR part .Mppgafmo Reoonina and RaWrokeealna Reaulmanlente (1)The amble and eperetore,and the-CAIR despo0ted vepresentool of each CAIR NOX Ozone Saasoh sour"and each CAIR NOR Ozone Season unit at the source$hail'com*vNth the:monHoling reporting and rboordkeOlIV 1`0111 mmenit Of 41)OFRpad 66 subpart HNHH end Rule 16 NCAO 20 Q466 (2)The emfsslonsmeasuremenU reporded and reported In szoordanoe with 40 CFR Part 06 subpart HHHH than be used to determine compliance by each CAIR NOXOzope SeAsodSource With the following CAR NOx Ozone SpasoaEmisalbnapequirentadia: NOR Ozone Season -isslonRegg1tROMIs: (1)As of Me allowance transfer deadline for a control pgdod.the ovmeRand operators Of"Oh QAIR NOR Ozone Season soome and each CAIR NOR Ozone Seaspd unit at hssource shall hold,In dry sources cmrpsence account CAIR NOR Owns Season illo wanr4s evallable'for compliance deduct ons fortghre contmfpenOd udder40 CFRA6.364(0)in an Amount pot)asaWen thef ms 4ftbiat NOR emissions tarthe condol. pelfod fminallCAIR HOx II ZOM Bea ldn units At the source as determined in accordance with 40,CFR part se subpart HHHH. (2)A CAIR NOx.Ozona Season unit'$ha]be aubjeotto the requirements under paragraph(1)of Ste NOR Ozone Season amiss)on Requlrements starting on the laterofMay 1,2000 or the dead"for meeting the units mar)torceMhcadorr regNiemanta under 40,CFR a6.370(b)(1)(2),:or(3). and roreach eoRtrol podod thereafter, (1)AOAIR,'NORrOZ,on6 Season alkWplpp shallda be daduGed:for compliance whh.'the,T uiremmts Under pa%taph(1)of the NOR Ozone Season Emission Requlmtnenls;.ror a wntrgl ppnad In a calenper year Gafare Ina ygaF which tpe.CAIR NOx Ozone Seasoneliowanee was allocated. (4)CAIR NOR Ozone Season allowances shall AS heldm„dadaCted from,a transferred into"among:CAIR NOR Ozone Season AXOwande T,raaking b`Yslem aecounq in AScord$nee with 4D.6FR pad 06 subparts FFFF and rOGG, (SA CARN15 0,wneSeasonellowaoo¢isalinOtedauttMHtationSitemitonetonoffliNInaccordancewithInaCAIRNCxOzoneSeason Trading Program.No plovAlon ofthe CAIR NOR Ozone Sesson trading Program.the CAIR Part.oean exelnpdonunder 40 CFR 96,306and no provision of law shall be construed to limit the authority of tho State or the Vnited Sides toterminate or limp such authorization. 16)A CAIR NOR Ozone Season ailowsiee does not conatitut6 a property tight (7)Upon ragortisljon by the Admdnistrolor under 40 CFR part 06 subpart ESEE,FFFF or GGOG,ovary atioceaon,transfer,of deduction or a.CAIR NOR Ozone Season allowance tour from a CAIR NOR Ozone Season units compliance account Is Incorporeta automatically In any CAIR Part of the source that mClades the CAIR NOR Ozone,teason unit. Form for 1 SA NCAC.20.2406. Effective;January 1,2009 Plant Name(rrnm;sTEP I) glewett Hydroelectric Plant Pages ufe a ml Qn�Raovirementa STEP 3, Its PAIR NOX Ozone Season source a(nits NO during say wntrol period In w bass of the PAIR NOX Ozona5eason emwmns)imbadpn,then: Continued. (1)The ownem,and pmAidrs ottee sothoe and eachAIR NW01bna Season Wilt at the source shall sumanderihe PAIR NGx Ozone STEP Seowlh allowances required l6rdaduttloh under 40 CPR ee.354(d)(1)and pay any fine penalty,or:assassmem of o7mPly Wth anyothar mpaidy 6npos8d,fgfN9 same Noladone,uPderthe t:leanAlrAct orapplioable Staletaw.end (2)l=ach ton al such exoasa emissl0na afxl eagh,daY W aucd cMrird period shall ti?nstl6rta a se"TOW violation of 40 CFR part 96 Bubpen AAAA. the Cleari Act and appticbWe State Idw, RefordKODI a and R600*13 ROQUIMI21W, (1yurdoft ofinowlse Provktad,the oWreN end operatorsofthe PAIR NOx Ozone Season aouroe and each PAIR NOz Ozone Season unit At the amace shailkaep on Meal the a9u,"each of the fdllowlog 00' 'hhl6 for period ors years front that date'DW doWment Is created.This lodrn peray beeXlanded Iacaaee,at Any time Word the Bad of 5leers,In vWtUng by the Uirecbr ,or,the AdNMabator. (1)The ceNrrate of momsenutfoh under 40 CFR 90.311316f the CAIR dd$I0s%d mpresematve for ihe soume addeatdt LAIR NO)(Orone Season unitatthe mums arid all donumama dealdemonstrate theadth otthe stalaair alp In iha benid4ais hapresenf ition:pmvgied that the pelli8cete:and doWmenla spell De,refalnaden site attire abufpe Lgyond Bitch S-yaar p(tlidd urA(suds dopXnanls are superseded'bacaUse.of tie subrdiatgon ore new Cenlfipatp of roprearta&m 6nder4o CFR e8,118 cha�ipB fhD CAtRd e9ldnated rePrepanteibd {Iq A@ dmteeigl"7a monitoring In(emlatondn adcdrdarMewgh 40 CFR pan 00 subpar HHHH ofthtapan,provided that lathe extent that 40 CFR pad06 aubpAd HHHH providesforr a 3-year Period tortacordXeBpinq ih93-year p9tl4d chefa . (tii)O6pfesof All re",compliance certlesatkns,And other submissions And A@:ra4ords m pply ade 4rfagulrodLndar the(:AIRNOx Ozone.Seasan Trading a mgmm.- (N)Copies of all doam4res used to oompime a PAIR Pon too and any other aubmhsston undartie MR NOx Ozone Season Trading Program or to demorstato wraharm v4lh the mguI arasals of the CAIR NOX Ozone Beason Trading Program (2)The Wort' IRdqS�ly� hat, repiaieutativeda CA.IRNOx Ozond reason sounds and each PAIR NOx Ozorm$996an unk at the source shall submit the rePo6lequlrgd hhnd9f the LAIR NOx Okdm Season Trading Program,inplud ng those,cndw 40 PFR part et tubpert HNHN, 'ab1 (1)Edoh PAIR NPx Ozone SdeAon sappre andeadh PAIR NOx Ozone Seasonunitshad meet the requlremente Of UM CAIR NOXO;one Season Trodhopmoram. (2)Arty provlalonialthe PAIR NOX Ozone Season Tradng Program tat appeBs to g PAIR NOX Ozone Season sourde or the PAIR designated. mpresentetive of a PAIR NOx Ozone Season sourceshot also apply to tie owners and oyarators of such Bouma'and of the PAIR NOxOzone Season units at the aourgo, (3)Any ptoV*66 q(the CAIR NOX Ozone SmAsoh Trading Program that epPdes to a 0AIR NOX Ozone Season unitor the PAIR deslgn&led repreAantaWa'of a PAIR NOX Ozone Season unt shelf also Apply to the ownem andopera0a,of such unk act on Authorities. No Wvl§ion or the CAIR NOX Ozone Season Trading Program,a PAIR Part,or an exemption under40 CFR o8,305 shall be Odnstrued as eXemperyg or excluding the Oman end dperatura;and ere CAIRdasigrreted representa@ve of a PAIR.004 OZOne Season Source WPAIR NOX Ozone Season unh tom cdmpjohW With Any other provie)on of theapplioablo,approved We Implementation plan.ehderallyenfofseallh mend, orthe Oloan AirAct, STEP CERMeAton.(fnrdealgnsted repredantatvo Or alternate designated mpresentative only) Redd the oehdgoation I am authorized to make this submission on behalfclim owners and operators oft"PAIR source or PAIR units WWhidr the submisslon is made. slate)nan't Previde name, fmaily,under penalty of law that]-ha le parsanalfye In9 xanined,and anifemillarwith,' stet€manis and information submitted in this document and We.owner company,name. o@Its etlsch"Ats,Based onmylnqusy of those ImIlhAdUals with primary MAponsWlily for obtaining theinformaticn,I:oerdry that the sttlements and phone,small address;Ggn. Information ore 16the bail ofmy Rnowtodgebad belieftne,scoarele and Complete,lam aware that there are slgnigcant penalizes for:IlUbmittinp :and date. false statements and dlntotm ilon:otametng r9gWred statements endinfpmanter inoiuoing the possitillty,of flas or imprisonment. 'Nam 4,Michael H9Aoedy' - - - MW Principle Envlrohmenfal Spe ellst - Gompany Carolina Pover&Llght dlWa PMUmsm Energy Carolinas Inc. Owner Name Carolina Power B Llght411019Progr"o Energy Carolinas.Inc. Phone 727.820-8887' rangh Addross bMiebael KeenneWRoo aliggm- a Signature Date form for f6A NCAC 2D.2406 :Effective;January 1,2009