Loading...
HomeMy WebLinkAboutAQ_F_1300038_20130822_PRMT_Permit A*A L-E- North Carolina Department of Environment and Natural Resources Division of Air Quality Pat McCrory Sheila C. Holman - John E,Skvarla, III Governor Director Secretary August 22, 2013 Mr. John J. Tiberi Division President Martin Marietta Materials, Inc. - Rocky River Quarry 2710 Wycliff Road Raleigh,NC 27622-0013 Subject: Air Permit No. 05615R12 Martin Marietta Materials, Inc. -Rocky River Quarry Midland, Cabarrus County, North Carolina Permit Class: Small Facility ID# 1300038 Dear Mr. Tiberi: In accordance with your completed application received August 16, 2013, we are forwarding herewith Permit No. 05615R12 to Martin Marietta Materials, Inc. - Rocky River Quarry,Midland, Cabarrus County,North Carolina for the construction and operation of air emissions sources or air cleaning devices and appurtenances. Please note the records retention requirements are contained in General Condition 2 of the General Conditions and Limitations. If any parts,requirements,or limitations contained in this permit are unacceptable to you, you have the right to request a formal adjudicatory hearing within 30 days following receipt of this permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of the entire.permit. This hearing request must be in the form of a written petition, conforming to G.S. 150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings. Unless a request for a hearing is made pursuant to G.S. 15013-23,this air permit shall be final and binding. You may request modification of your air permit through informal means pursuant to G.S. 15013-22. This request must be submitted in writing to the Director and must identify the specific provisions or issues for which the modification is sought. Please note that the permit will become final and binding regardless of a request for informal modification unless a request for a hearing is also made under G.S. 15013-23. Mooresville Regional Office-Division of Air Quality 610 East Center Avenue,Suite 301,Mooresville,North Carolina 28115 Phone:704-663-16991 FAX:704-663-7579 Internet:www.ncair.org An Equal Opportunity\Affirmative Action Employer-Made in part by Recycled Paper Johns Tiberl. , August 22,2013' 11 Page 2- Unless exempted by a condition of this permit or the regulations, construction of new. air pollution sources or air cleaning devices,or modifications to the sources or air cleaning devices described in this permit must be covered under a permit issued by the Division of Air Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143- 215.114B. This permit shall be effective from August 22,2013 until July 31, 2018, is nontransferable to future owners and operators, and shall be subject to the conditions and limitations as specified therein. Changes have been made to the permit stipulations. The Permittee is responsible for carefully reading the entire permit and evaluating the requirements of each permit stipulation.The Permittee shall comply with all terms, conditions,requirements, limitations and restrictions set forth in this permit. Noncompliance with any permit condition is grounds for enforcement action,for permit termination,revocation and reissuance,or modification,or for denial of a permit renewal application. Should you have any questions concerning this matter, please contact Bob Caudle at(704) 663-1699. Sincerely, Ronald E. Slack Regional Air Quality Supervisor JRC Enclosures` c: Mooresville Regional Office G:\AQ\SHARED\WPDATA\COUNTIES\CABARRUS\00038\R12_PERMIT.DOCX NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF AIR QUALITY AIR PERMIT NO. 05615R12 Issue Date:August 22, 2013 Effective Date: August 22, 2013 Expiration Date: July 31, 2018 Replaces Permit: 05615RI I To construct and operate air emission source(s) and/or air cleaning device(s),and for the discharge of the.associated air contaminants into the atmosphere in accordance with the provisions of Article 21 B of Chapter 143,General Statutes of North Carolina(NCGS)as amended, and other applicable Laws,Rules and Regulations, Martin Marietta Materials, Inc. Rocky River Quarry 430 Running Brook Road Midland, Cabarrus County,North Carolina Permit Class: Small Facility ID# 1300038 (the Permittee) is hereby authorized.to-construct and operate the air emissions sources and/or air cleaning devices and appurtenances described below: Emission Emission Source Control Control System Source ID Description System ID Description Non-metallic Mineral Processing Plant with 1100 tons per hour rating,utilizing water suppression with no other control devices,including LES Crush(NSPS) crushing operations. N/A N/A µ ..._ vW _.� ES-Screen(NSPS)~J screening operations��� N'A N/A ES-Convey(NSPS) c�o`nv—ey—ing operations N/A µ N/A in accordance with the completed application 1300038.13A received August 16,2013 including any plans, specifications,previous.applications,and other supporting data, all of which are filed with the Department of Environment and Natural Resources,Division of Air Quality(DAQ)and are incorporated as part of this permit. This permit is subject to the following-specified conditions and limitations including any TESTING,REPORTING, OR MONITORING REQUIREMENTS: Permit.No. 05615R12 Page 2 A. SPECIFIC CONDITIONS AND LIMITATIONS 1. Any air emission sources or control devices authorized to construct and operate above must be operated and maintained in accordance with the provisions contained herein. The Permittee shall comply with applicable Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code(NCAC), Subchapter 2D .0202,2D .0510,2D .0521, 2D .0524 (40 CFR 60, Subpart 000), 2D .0535 and 2D .0540. 2. EQUIPMENT REPORTING- The Permittee shall maintain on-site an equipment list and a plant(or flow) diagram of all equipment covered under this permit. a. The equipment list shall include the total rated crushing capacity for all primary crushers at the facility and the following information for each piece of equipment: i. A description of the equipment including applicability of New Source Performance Standards,and: A. Widths of belt conveyors, B. Dimensions and configuration(e.g. triple deck) of screens, C. Rated capacity (ton/hr)of each crusher, and D. Rated capacity(ton or ton/hr) of all other equipment not exempt from permit requirements under 15 A NCAC 2Q .0102(c), ii. A unique ID number, iii. The date the,equipment was manufactured,and iv. The dates any required performance testing was conducted and submitted to the Regional Supervisor, Division of Air Quality. b. The equipment list and plant diagram shall bear the date when the current list and diagram were revised. c. The Permittee shall provide documentation to the Regional Supervisor, Division of Air Quality, for any required performance testing within seven days of a written request. d. Notwithstanding General Condition and Limitation No. 5 (Equipment Relocation) the permitted may install new non-primary crushing nonmetallic mineral,processing equipment so long as such equipment does not change the primary crushing rated capacity of the facility. The Permittee shall provide written notification to the Regional Supervisor, Division of Air Quality, including a revised equipment list and a plant layout or flow diagram, each time non-primary crushing nonmetallic mineral processing equipment is installed at a facility. This notification shall be submitted at MARTIN MARIETTA MATERIALS, INC. ROCKY RIVER QUARRY Last Revised 08/05/2013 ID Rated Manufacture NSPS VE Test VE Test No. DESCRIPTION C/N Capacity Date Status Date Submittal 1 42"X 48" Jaw Crusher(Primary) CJ-13 1100 1994 Yes 9/17/1996 10/4/1996 2 52" x22'Vib. Grizzl Feeder VGF-14 1100 1994 No Exempt Exempt 3 48"Conveyor#1 P-13 1000 * Yes 9/17/1996 10/4/1996 4 36"Conveyor#2 66-36-100 800 1989 Yes 9/18/1996 10/4/1996 5 6'x 16'-2D Screen#1 LJS-20 750 1994 Yes 9/17/1996 10/4/1996 6 66" Std. Crusher LJ-4 550 1985 Yes 9/17/1996 10/4/1996 7 48"Conveyor#3 JBUC-103 1000 1996 Yes 9/17/1996 10/4/1996 8 36"Conveyor#4 110-36-80 800 1992 Yes '9/17/1996 10/4/1996 9 36"Conveyor#5 JB-49 800 * Yes 9/18/1996 10/4/1996 10 36"Conveyor#6 US-20 800 * Yes 9/18/1996 10/4/1996 11 36"Conveyor#7 JB-47 800 * Yes 9/18/1996 10/4/1996 12 24"Conveyor#8 ** 800 * Yes No Install No Install 13 6'x 20'-3D Screen#2 LJS-16 750 1993 Yes 9/18/1996 10/4/1996 14 36" Conveyor#9 91-36-60 800 1991 Yes 9/17/1996 10/4/1996 : 15 66"F.H. Crusher LJ-7 500 1986 Yes 9/18/1996 10/4/1996 16 48"Conveyor#10 JBUC-105 1000 1996 Yes 9/18/1996 10/4/1996 17 36"Conveyor#11 114-36-100 800 1993 Yes 9/18/1996 10/4/1996 18 60"Conveyor#12 US-16 800 * Yes 9/23/1996 10/4/1996 1.9 36"Conveyor#13' ** 800 * Yes No Install No Install 20 36"Conveyor#14 21-36-100 800 1983 Yes 9/18/1996 9/18/1996 21 36" Conveyor#15 ** 800 * Yes No Install No Install 22 36"Conveyor#16 JB-100 800 * Yes 9/18/1996 10/4/1996 23 36"Conveyor#17 95-36-80 800 , 1991 Yes 09/17/96 10/4/1996 24 48"Conveyor#18 JBUC-104 800 1996 Yes 09/18/96 10/4/1996 -25 HP-300 Crusher NHP-2 500 1994 Yes 09/18/96 10/4/1996 *=Information not available nor provided by Mellott. ** -These items were not installed or operated in 1996 Exempt--No VE testing required,Conveyor#14 was a stacker conveyor. Rated Capacities are in Tons Per Hour(TPH) 17 CONVEYOR Olt ` _ 36•x100' 24 CONVEYOR re 23F" OCONVEYOR p7 2 3r w 0 0 ////--4Y:46•JAW CRUSHER 73 { - 6'IQD'-3D SCREEN/2 1Y . `�(JJ/ \ CONVEYOR 13 O36'x1CO 52.722'M&F=. �6'x24 O O O O23 4O HP-IODt CONVEYOR 2 36•ow O _ 5 8:70'-2D SCrEE7i/I _ V E e O 7p 66•M.O CRUSHER 36•A20 14 CONVEYOR (, 3a•>nDa Oo 0 1S 51OCKPR,E 66•FINE HEAD O CRU SHER USHER 03 4B'a20' - O O O 76 CONVEYOR O - O6 40'X20 36'�BO' 1B CONVEYOR 012 80•x26' 12 d CONVEYOR JS � 0 24'x1s' z7 it CONVEYOR rye CONVEYOR#7 36•:40' CHARLOTTE DI57RICT MARK H MAMMA ACORMIES RAIEION,N.Q LAST REVISED 08/05/2013 FLOW DIAGRAM FlLE NAPE:FI) STOCKPILE PLANT NO. 663 T DUARROROCRY RIVER.CONTRACT PCRTABIE PLAN ' �yy AM6 LAST REVISED 08/05/2013 ROCKY RIVER QUARRY ITEM DESCRIPTION C/N RATED CAPACITY 1. CEDARRAPIDS 42" X 48" JAW CRUSHER * 1100 2. 52"x22' VIBRATING GRIZZLY FEEDER * 1100 3. 48"x24' CONVEYOR #1 * 1000 4. 36%100' CONVEYOR #2 * 800 5. 6'x16'-2D SCREEN #1 * 750 6. 66" STD. ELJAY CONE CRUSHER * 550 7. 48"x20' CONVEYOR #3 * 1000 8. 36"x80' CONVEYOR #4 * 800 9. 36%20' CONVEYOR #5 * 800 10. 36"x21' CONVEYOR #6 * 800 11. 36"x40' CONVEYOR #7 * 800 12. 24"xi5' CONVEYOR #8 * 800 13. 6'x20'-3D SCREEN #2 * 750 14. 36"x20' CONVEYOR #9 * 800 15. 66" FINE HEAD CONE CRUSHER * 500 16. 48"x20' CONVEYOR #10 * 1000 17. 36%100' CONVEYOR #11 * 800 18. 60"x26' CONVEYOR #12 * 800 19. 36"x1OO' CONVEYOR #13 * 800 20. 36"x100' CONVEYOR #14 * 800 21. 36%100' CONVEYOR #15 * 800 22. 36"x26' CONVEYOR #16 * 800 23. 36"x80' CONVEYOR #17 * 800 24. 48"x20' CONVEYOR #18 * 800 25. HP-300 CRUSHER * 500 NOTE: (*) INDICATES NEEDING COMPANY NUMBER CHARLOTTE DMWJCT MARTIN YARIETTA AGCRERAIM RALFICK N.C. FLOW DIAGRAM FA.E NAPE:FD PLANT NO. 663 OUAWrRMY RIVER CDUM=PORTABLE PLANT uu.u�e�i"Rq�ism s ,oa w Permit No. 05615R12 Page 3 least 15 days before.the equipment is installed at the facility unless otherwise approved by the Director. Non-primary crushing nonmetallic mineral processing equipment includes all non-primary crushers, screens, conveyors and loadout bins e. Notwithstanding General Condition and Limitation No. 5 (Equipment Relocation) the permitted may relocate existing non-primary crushing nonmetallic mineral processing equipment.so long as such equipment does not change the primary crushing rated capacity of the facility. The Permittee shall provide written notification to the Regional Supervisor,Division.of Air Quality,including a revised equipment list and a plant layout or flow diagram; each time equipment.is relocated within the facility.1 This notification shall be submitted within 15 days of the date of the relocation made at the facility;unless otherwise approved by the Director. 3. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT The Permittee, at least 90 days prior to the expiration.date of this permit, shall request permit renewal by letter in accordance with 15A NCAC,2Q .0304(d) and (f . Pursuant to 15A NCAC 2Q .0203(i);no permit application.fee is required for renewal of an existing air,permit(without :a modification request).The renewal request(with AA application form) should be submitted to the Regional Supervisor,DAQ. Also, at least 90 days prior to the expiration -date of this permit,the Permittee shall submit the air pollution emission inventory report (with Certification Sheet)in accordance with 15A NCAC 2D .0202,pursuant to N.C. General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ and'shall document air pollutants emitted for the 2017 calendar year. 4.- PARTICULATE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0510 "Particulates from Sand, Gravel, or Crushed Stone Operations," the following requirements apply, a. The Permittee of a sand, gravel,recycled asphalt pavement(RAP), or crushed stone operation shall not cause, allow, or permit any material to be produced,-handled, transported, or stockpiled without taking measures to reduce to a minimum any particulate matter from becoming airborne to prevent exceeding the ambient air quality standards beyond the property line for particulate matter, both PM10 and total suspended particulates. b. Fugitive dust emissions from sand,gravel,RAP, or crushed stone operations shall be controlled by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources." c. The Permittee of any sand, gravel, RAP, or crushed stone operation shall control process-generated emissions: i. From crushers with wet suppression(excluding RAP crushers); and I From conveyors,screens, and transfer points such that the applicable opacity standards in 15A NCAC 2D .0521 Control of Visible Emissions," or 15A NCAC 2D .0524 "New Source Performance standards" are not exceeded. Permit No. 05615R12 Page 4 5. The primary crusher is a jaw crusher rated at 550 tons per hour at 5 to 6 inch crusher setting per the manufacturer's specifications as submitted. Any change from this crusher definition, other than like-for-like, will require a permit applications to be submitted. The purpose of this stipulation is to characterize the primary crusher and not limit production. 6. VISIBLE EMISSIONS CONTROL REQUIREMENT-As required by 15A NCAC 2D 0521 "Control of Visible Emissions,"visible emissions from the emission sources, manufactured after July 1 1971, shall not be more than 20 percent opacity when averaged over a six-minute period, except that six-minute periods averaging not more than 87 percent opacity may occur-not more than once in any hour nor more than four times in any 24-hour period. However,sources which must comply with 15A NCAC 2D .0524"New Source Performance Standards" or .1110 "National Emission Standards for Hazardous Air Pollutants" must comply with applicable visible emissions requirements contained therein. 7. .VISIBLE EMISSIONS CONTROL REQUIREMENT-As required by 15A NCAC 2D .0521 "Control of Visible Emissions,"visible emissions from the emission sources, manufactured as of July 1, 1971, shall not be more than 40 percent opacity when averaged over a six-minute period, except that six-minute periods averaging not more than 90 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. However,sources which must comply with 15A NCAC 2D 0524 "New Source Performance Standards" or .1110 "National Emission Standards for Hazardous Air Pollutants"must comply with applicable visible emissions requirements contained therein. 8. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" - For the nonmetallic mineral processing equipment(wet material processing operations, as defined in 60.671,are not subject to this Subpart)including conveying operations(ID No.ES-Convey), crushing operations (ID No. ES-Crush) and screening operations (ID No. ES-Screen),the Permittee shall comply with all applicable provisions,including the notification,testing, reporting, recordkeeping; and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 2D .0524'"New Source Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart 000, including Subpart A "General Provisions. a. NSPS Reporting Requirements - In addition to any other notification requirements to the Environmental Protection Agency(EPA),the Permittee is required to NOTIFY the Regional Supervisor,DAQ, in WRITING, of the following: L The actual date of initial start-up of an affected facility,postmarked within 15 days after such date; b. NSPS Emissions Limitations -As required by 15A NCAC 2D .0524,.the following permit limits shall not be exceeded: L For affected facilities that commenced construction,modification, or reconstruction after August 31, 1983 but before April 22,2008 (wet material processing operations, as defined in 60.671, are not subject to this Subpart): Permit No. 05615R12 Page 5 Affected Facility Pollutant Emission Limit__... ._ Affected facilities with dry capture systems(i.e., bagfilters) except for.a system that controls only PM 0.022 gr/dscf an individual enclosed storage bin Affected facilities with dry capture systems (i.e., FVisible 7% opacity bagfilters) Emissions Visible Crushers vF { w 15%opacity .! Emissions Fugitive emissions from.conveyor belts, Visible 10%opacity screening operations, and other affected facilities I Emissions A. If an affected facility is enclosed in a building,the affected facility must comply with the limits listed above OR the building enclosing the affected facilities must comply with a visible emissions limit of seven(7)percent opacity from the building openings (except for vents as defined in 60.671) and a particulate emission limit of 0.022 grains per dry standard cubic foot from the vents. ii. For affected facilities that commenced construction, modification, or reconstruction on or after April 22, 2008 (wet material processing operations, as defined in 60.671, are not subject to this Subpart): Affected Facility =Pollutant Emission __.._... � Limit Affected facilities_with dry capture systems (i.e., bagfilters) except for a system that controls only PM 0.014 gr/dscf an individual enclosed storage bin Dry'capture system installed only on an Visible 7/o° opacity individual enclosed storage bin 1 Emissions Crushers Visible12% opacity Emissions Fugitive emissions from conveyor belts, Visible 7%opacity screening operations, and other affected facilities Emissions A. If an affected facility is enclosed in a building, the affected facility must comply with the limits listed above OR the building enclosing the affected facilities must comply with a visible emissions limit of _ seven(7)percent opacity from the building openings (except for vents as defined in 60.671) and a particulate emission limit of 0.014 grains per dry standard cubic foot from the vents. c. NSPS Monitoring Requirements -As required by 15A NCAC 2d .0524,the following monitoring shall be conducted: Permit No. 05615R12 - Page 6 i. For any affected facility that commenced construction, modification, or reconstruction on or after April 22,2008 that uses wet suppression to control emissions,the Permittee shall: A. Perform monthly periodic inspections to check that water is flowing to discharge spray nozzles in the wet suppression systems. B. Initiate corrective action within 24 hours and complete corrective action as expediently as practical if the Permittee finds that water is not flowing properly during an inspection of the water spray nozzles. ii. For any affected facility that commenced construction, modification, or reconstruction on or after April 22, 2008 that is controlled with a bagfilter. system,the Permittee shall: A. Conduct quarterly.visible emissions inspections using.EPA Method _ 22 while the bagfilter system is in operation. If any visible emissions are observed, the Permittee must initiate corrective action within 24 hours to return the bagfilter system to normal operation. OR B. Install, operate, and maintain a bag leak detection system according to specifications and requirements listed in 40 CFR 60.674(d)(1). The Permittee must develop and submit for approval a site-specific monitoring plan for each bag leak detection system. The Permittee must operate and maintain the bag leak detection system according to the approved site-specific monitoring plan at all times. The Permittee must initiate procedures to determine the cause of an alarm within 1 hour of the alarm. The cause of the alarm must be alleviated within 3 hours of the alarm by taking any corrective action necessary. d. NSPS Recordkeeping Requirements -As required by 15A NCAC 2d .0524,the following recordkeeping requirements shall be conducted: i. Each inspection of the water spray nozzles, including the date of each inspection and any corrective actions taken, shall be recorded in a logbook (in written or electronic form). ii. Each quarterly Method 22, including the date,results of the observation, and any corrective actions taken, shall be recorded in a logbook(in written or electronic form). iii. For each bag leak detection system,records of the system output, any system adjustments (including the date and time of the adjustment,the initial system settings, and the final system settings), and information pertaining to all system alarms(including the date and time of the alarm,the time that procedures to determine the causes of the alarm were initiated,the cause of the alarm, an explanation of the actions taken,the date and time the cause of the alarm was alleviated, and whether the cause of the alarm was alleviated Permit No. 05615R12 Page 7 within 3 hours of the alarm) shall be recorded in a logbook(in written or electronic form). iv. The logbooks (in written or electronic form) shall be maintained on-site and made available to DAQ personnel upon request. e. NSPS Performance Testing- As required by 15A NCAC 2D .0524, the following performance tests shall be conducted: Affected Facility i Pollutant Tet =Method-i Affected facilities with dry capture systems (i.e., bagfilter) and vents from a building that encloses affected PM Method 5 I facilities (except for a system that controls an individual enclosed storage bin) Affected facilities with dry capture systems (i.e., Visible Method 9 bagfilter) and a building that encloses affected facilities Emissions Crushers VisibleMethod 9 Emissions FFugitive emissions from conveyor belts, screening Visible Method 9 operations, and other affected facilities Emissions i. All performance tests shall be conducted in accordance with EPA Reference Methods, contained in 40 CFR 60, Appendix A; ii. The EPA Administrator retains the exclusive right to approve equivalent and alternative test methods, continuous monitoring procedures, and reporting - requirements; iii. Within 60 days after achieving the maximum production rate at which the affected facility(s)will be operated,but not later than 180 days after the initial start-up of the affected facility(s),the Permittee shall conduct the required performance test(s) and submit two copies of a written report of the test(s)to the Regional Supervisor, DAQ; iv. The Permittee shall be responsible for ensuring,within the limits of practicality,that the equipment or process being tested is operated at or near its maximum normal production rate or at a lesser rate if specified by the Director or his delegate; V. All associated testing costs are the responsibility of the Permittee; vi. The Permittee shall arrange for air emission testing protocols to be provided to the DAQ prior to testing.Testing protocols are not required to be pre- approved by the DAQ prior to testing. The DAQ shall review testing Permit No. 05615R12 Page 8 protocols for pre-approval prior to testing if requested by the Permittee at least 45 days before conducting the test; and vii. To afford the Regional Supervisor,DAQ,the opportunity to have an observer present,the Permittee shall PROVIDE.the Regional Office, in WRITING, at least 7 days notice of any required performance test(s)that involve only Method 9. All other tests require a 15 day notice. viii. When determining compliance with the visible emissions limit for a dry capture system(i.e., bagfilter)that controls an individual enclosed storage bin,the duration of the Method 9 test shall be one (1)hour(ten 6-minute averages). ix. When determining compliance with the visible emissions limit from fugitive emissions from crushers, conveyor belts, screening operations, and other affected facilities (as described in 60.672(b) or 60.672(e)(1));the duration of the Method 9 test must be 30 minutes (five 6-minute averages). Compliance with the fugitive'visible emissions limits must be based on the average of the five 6-minute averages. X. For any affected facility that commenced construction,modification, or reconstruction on or after April 22,2008 that does not use wet suppression to control emissions,the Permittee shall repeat the performance tests within five (5)years of the previous test. . A. If an affected facility relies on water carryover from upstream wet suppression to control fugitive emissions, then that affected facility is exempt from the 5-year repeat testing requirement provided that the Permittee.conducts periodic inspections of the upstream wet suppression that is responsible for controlling fugitive emissions from the affected facility and designates which upstream wet suppression systems will be periodically inspected at the time of the initial performance testa xi. If a-building encloses affected facilities that commenced construction modification, or reconstruction on.or after April 22,2008, the Permittee must conduct an initial Method 9 performance test. xii. If a building encloses only affected facilities that commenced construction, modification, or reconstruction before April 22, 2008, and the Permittee has not previously conducted an initial visible emissions performance test,then the Permittee must conduct an initial Method 9 performance test to show compliance with the above limits. f_ Like-For-Like-Replacement -As provided in 40 CFR 60.670(d), when an existing facility,is replaced by a piece of equipment of equal or smaller size, as defined in 40 CFR,60,671,having the same function as the existing facility, and there is no increase in the amount of emissions,the new facility is exempt from the provisions of 40 CFR 60.672, 60.674, and 60.675 except as provided for in 60.670(d)(3). The Permit No. 05615R12 Page 9 Permittee shall comply with the reporting requirements of 40 CFR 60.676(a). Equipment covered under 40 CFR 60.670 shall comply the requirements of 15A NCAC 2D .0521. 9. NOTIFICATION REQUIREMENT - As required by 15A NCAC 2D .0535,the Permittee of a source of excess emissions that last for more than four hours and that results from a malfunction, a breakdown of process or control equipment or any other abnormal conditions, shall: a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time. of the Division's next business day of becoming aware of the occurrence and describe: i. the name and location of the facility, ii. the nature and cause of the malfunction or breakdown, iii. the time when the malfunction or breakdown is first observed, iv. the expected duration, and v an estimated rate of emissions. b. Notify the Director or his designee immediately when the corrective measures have been accomplished. This reporting requirement does not allow the operation of the facility in excess of Environmental Management Commission Regulations. 10.FUGITIVE DUST CONTROL REQUIREMENT - As required by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. If substantive complaints or excessive fugitive dust emissions from the facility are observed beyond the property boundaries for six minutes in any one hour(using Reference Method 22 in 40 CFR,Appendix A),the owner or operator may be required to submit a fugitive dust plan as described in 2D .0540(f). "Fugitive dust emissions" means particulate matter that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas,process areas stockpiles, stock pile working, plant parking lots, and plant roads(including access roads and haul roads). B. GENERAL CONDITIONS AND LIMITATIONS 1. TWO COPIES OF ALL DOCUMENTS REPORTS TEST DATA MONITORING DATA NOTIFICATIONS, REQUESTS FOR RENEWAL,AND ANY OTHER INFORMATION REQUIRED BY THIS PERMIT shall be submitted to the: Permit No. 05615R12 Page 10 Regional Air Quality Supervisor North Carolina Division of Air Quality Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville,NC 28115 704-663-1699 For identification purposes, each submittal should include the facility name as listed on the permit,the facility identification number, and the permit number. 2. RECORDS RETENTION REQUIREMENT -Any records required by the conditions of this permit shall be kept on site and made available to DAQ personnel for inspection upon request. These records shall be maintained in a form suitable and readily available for expeditious inspection and review.These records must be kept on site for a minimum of 2 years,unless another time period is otherwise specified. 3.' ANNUAL FEE PAYMENT-Pursuant to 15A NCAC 2Q .0203(a),the Permittee shall pay the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a timely manner will cause the DAQ to initiate action to revoke the permit. 4. EQUIPMENT RELOCATION-A new air permit shall be obtained by the Permittee prior to establishing,building, erecting, using, or operating the emission sources or air cleaning equipment at a site or location not specified in this permit. 5. REPORTING REQUIREMENT-Any of the following that would result in previously unpermitted, new, or increased emissions must be reported to the Regional Supervisor, DAQ: a. changes in the information submitted in the application regarding facility emissions; b. changes that modify equipment or processes of existing permitted facilities; or c. changes in the quantity or quality of materials processed. If appropriate,modifications to the permit may then be made by the DAQ to reflect any necessary changes in the permit conditions. In no case are any new or increased emissions allowed that will cause a violation of the emission limitations specified herein. 6. This permit is subj Oct to revocation or modification by the DAQ upon a determination that information contained in the'application or presented in the support thereof is incorrect, conditions under which this permit was granted have changed, or violations of conditions contained in this permit have occurred. The facility shall be properly operated and maintained at all times in a manner that will effect an overall reduction in air pollution. Unless otherwise specified by,this permit,no emission source may be operated without the concurrent operation.of its associated air cleaning device(s) and appurtenances. 7. This permit is nontransferable by the Permittee. Future owners and operators must obtain a new air permit from the DAQ. Permit No. 05615R12 Page 11 8. This issuance of this permit in no way absolves the Permittee of liability for any potential civil penalties which may be assessed for violations of State law which have occurred prior to the effective date of this permit. 9. This permit does not relieve the Permittee of the responsibility of complying with all applicable requirements of any Federal, State, or Local water quality.or land quality control authority. 10.Reports on the operation and maintenance of the facility shall be submitted by the Permittee to.the Regional Supervisor, DAQ at such intervals and in such form and detail as may be required by the DAQ. Information required in such reports may include,but is not limited to,process weight rates, firing rates, hours of operation, and preventive maintenance schedules. 11.A violation of any term or condition of this permit shall subject the Permittee to enforcement pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of civil and/or criminal penalties. 12. Pursuant to North Carolina General Statute 143-215.3(a)(2),no person shall refuse entry or access to any authorized representative of the DAQ who requests entry or access for purposes of inspection, and who presents appropriate credentials,nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his official duties. Refusal of entry or access may constitute grounds for permit revocation and assessment of civil penalties. 13. The Permittee must comply with any applicable Federal, State, or Local requirements governing the handling, disposal, or incineration of hazardous,solid, or medical wastes, including the Resource Conservation and Recovery Act(RCRA) administered by the Division of Waste Management. 14. PERMIT RETENTION REQUIREMENT- The Permittee shall retain a current copy of the air permit at the site. The Permittee must make available to personnel of the DAQ,upon request,the current copy of the air permit for the site. 15. CLEAN AIR ACT SECTION 112(r)REQUIREMENTS -Pursuant to 15A NCAC 2D .2100 "Risk Management Program," if the Permittee is required to develop and register a risk management plan pursuant to Section I I2(r)of the Federal Clean Air Act, then the Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part 68. 16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of Accidental Releases -Purpose and General Duty," although a risk management plan may not be required, if the Permittee produces, processes, handles, or stores any amount of a listed hazardous substance,the Permittee has a general duty to take such steps as are necessary to prevent the accidental release of such substance and to minimize the consequences of any release. This condition is federally-enforceable only. Permit No. 05615R12 Page 12 17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS If emissions testing is required by this permit,or the DAQ, or if the Permittee submits emissions testing to the DAQ in support of a permit application or to.demonstrate compliance, the Permittee shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ procedures including protocol approval, regional notification,report submittal, and test results approval. Permit issued this the 22°d of August,2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Ronald'E.--Slick Regional Air Quality Supervisor By Authority of the Environmental.Management Commission Air Permit No. 05615R12