Loading...
HomeMy WebLinkAboutAQ_F_1900009_20140502_CMPL_Ext-Rqst NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary May 2, 2014 Mr. Kevin Ham Vice President General Shale Brick, Inc. Moncure Facility PO Box 3547 3015 Bristol Highway Johnson City, TN 37602 SUBJECT: Case-By-Case Clean Air Act Section 1120) Extension Approval Air Quality Permit No. 04384T36 General Shale Brick, Inc. Moncure Facility Facility ID: 1900009, Moncure, Chatham County Facility Classification: Title V Dear Mr. Ham: The Division of Air Quality (DAQ)received your request for a one year extension of your compliance date for the "15A NCAC 21) .1109: CAA § 1120); Case-by-Case MACT for Brick Manufacturers" (Permit 4384T36 Section 2.1.A(4)). The extension request is for two brick kilns, ES-K3K and ES-K4K, each controlled individually by dry limestone adsorbers CD-K3DLA and CD- K4DLA, respectively. The kilns are each described as: "One coal/natural gas/propane-fired brick tunnel kiln (25.9 million Btu per hour heat input and 20.55 tons per hour maximum fired brick production rate)" 40 CFR 63.6(i)(6)lists the information that is required for the DAQ to act on your request. Specifically: (i) The request for a compliance extension under paragraph (i)(4) of this section shall include the following information: (A)A description of the controls to be installed to comply with the standard; (B)A compliance schedule, including the date by which each step toward compliance will be reached. At a minimum, the list of dates shall include: (I) The date by which on-site construction, installation of emission control equipment, or a process change is planned to be initiated; and (2) The date by which final compliance is to be achieved. (3) The date by which on-site construction, installation of emission control equipment, or a process change is to be completed; and (4) The date by which final compliance is to be achieved; The NC DAQ has been delegated the implementation of the MACT standards and is therefore considered the "Administrator." 1641 Mail Service Center,Raleigh,North Carolina 27699-1641 Phone:919-707-84001 Internet:www.ncdenr.gov An Equal Opportunity 1 Affirmative Action Employer—Made in part by recycled paper Mr. Kevin Ham May 2, 2014 Page 2 The original request was submitted on March 25, 2014, which was greater than the required 120 days prior to the July 29, 2014 compliance date. The DAQ requested additional information on April 4, 2014. General Shale responded with additional information dated April 8, 2014, which the DAQ received on April 30, 2014. Your request stated: "Description of the controls to be installed to comply with the standard: Conversion from coal to natural gas. " You stated that General Shale will initiate conversion to natural gas by January 2015. Your requested final compliance date would be July 29, 2015. This letter serves as approval of your request for a one year extension. Your compliance date will be July 29, 2015. Please note that per 63.6(i)(4)(i)(A): "The owner or operator of an affected source who has requested an extension of compliance under this paragraph and who is otherwise required to obtain a title V permit shall apply for such permit or apply to have the source's title V permit revised to incorporate the conditions of the extension of compliance. The conditions of an extension of compliance granted under this paragraph will be incorporated into the affected source's title V permit according to the provisions of part 70 or Federal title V regulations in this chapter (12 U.S.C. 7661), whichever are applicable. " If you choose to use the extension, you shall apply for a modification to your permit. Sincerely, ee A. Daniel, Chief Technical Services Section Division of Air Quality, NCDENR cc: Patrick Butler, Raleigh Regional Office Supervisor Mark Cuilla, Acting Permitting Section Chief Central Files IBEAM