Loading...
HomeMy WebLinkAboutAQ_F_1900009_20140408_CMPL_Fac-Ltr 0010 General Shale Building The American Dreamt April 8, 2014 Michael Pjetraj, PE, Supervisor Stationary Source Compliance Branch - Technical Services Section d NC DENR, Division of Air Quality APR 3 0 201 Green Square Office Complex 1641 Mail Service Center Raleigh, NC 27699-1641 s Re: Air Quality Permit No. 04384T36 Request for extension of compliance date for case-by-case MACT standard (Special Condition 2.1.A(4)) Dear Mr. Pjetraj: On behalf of General Shale Brick, Inc. ("General Shale"), I am writing to request a one-year extension of the compliance date for Special Condition 2.1.A(4) in the above-referenced operating permit pertaining General Shale's facility in Moncure, North Carolina. Special Condition 2.1.A(4) is the case-by-case MACT requirement for brick manufacturers required by Clean Air Act Section 112(j). The initial compliance date for this permit condition is July 29, 2014 with testing to demonstrate compliance within 180 days. As required by 40 CFR 63.6(i)(6), General Shale provides the following information in support of its request: Description of the controls to be installed to comply with the standard: Conversion from coal to natural gas. Compliance schedule: Milestone Date Initiation of on-site construction, installation of January 2015 emission control equipment, or process change The date by which on-site construction, installation July 29, 2015 of emission control equipment, or a process change is to be completed The date by which final compliance is to be July 29, 2015 achieved; P.O. Box 3547 3015 Bristol Highway Johnson City,Tennessee 37602 TEL 1-800-414-4661 FAX 423-952-4104 www.GeneralShale.corn Michael Pjetraj, PE, Supervisor April 8, 2014 Page 2 Please contact me if you have any questions or need any additional information. Sincerely, z Kevin Ham Vice President cc: Warren Paschal, General Shale