Loading...
HomeMy WebLinkAboutAQ_F_1900091_20140410_PRMT_Permit -xr-*W'A NCDE North Carolina Department'of Environment and Natural Resources Pat McCrory John E. Skvada, III Governor Secretary April 10,2014 Mr. Clay Van Culberson Jr. President Carolina Wood Enterprises, Inc. P.O. Box 902 Siler City,NC 27344 Subject: Air Permit No. 08714R05 Carolina Wood Enterprises, Inc. Siler City, Chatham County,North Carolina Permit Class: Synthetic Minor Facility ID# 1900091 Dear Mr. Van Culberson Jr.: In accordance with your completed application received February 3, 2014, we are forwarding herewith Permit No. 08714R05 to Carolina Wood Enterprises,Inc., Siler City, Chatham County,North Carolina for the construction and operation of air emissions sources or air cleaning devices and appurtenances. Please note the records retention requirements are contained in General Condition 2 of the General Conditions and Limitations. If any parts, requirements, or limitations contained in this permit are unacceptable to you, you have the right to request a formal adjudicatory hearing within 30 days following receipt of this. permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of the entire permit. This hearing request must be in the form of a written petition, conforming to G.S. 150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings. Unless a request for a hearing is made pursuant to G.S. 15013-23, this air permit shall be final and binding. You may request modification of your air permit through informal means pursuant to G.S. 15013-22. This request must be submitted in writing to the Director and must identify the specific provisions or issues for which the modification is sought. Please note that the permit will become final and binding regardless of a request for informal modification unless a request for a hearing is also made under G.S. 15013-23. Unless exempted by a condition of this permit or the regulations, construction of new Raleigh Regional Office-Division of Air Quality 3800 Barrett Drive,Raleigh,North Carolina 27609 Phone:919-791-4200/FAX:919-881-2261 Internet:www.ncdenr.gov An Equal Opportunity 1 Affirmative Action Employer-Made in part by recycled paper Clay Van CulbersonJr. April 10, 2014 Page 2 air pollution sources or air cleaning devices, or modifications to the sources or air cleaning devices described in this permit must be covered under a permit issued by the Division of Air Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143- 215.114B. This permit shall be effective from April 10, 2014 until March 31, 2022, is nontransferable to future owners and operators, and shall be subject to the conditions and limitations as specified therein. Changes have been made to the permit stipulations. The Permittee is responsible for carefully reading the entire permit and evaluating the requirements of each permit stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations and restrictions set forth in this permit. Noncompliance with any permit condition is grounds for enforcement action, for permit termination, revocation and reissuance, or modification, or for denial of a permit renewal application. Specific changes and additions are summarized below (note: this list may not include all changes and additions): • The boiler description has been adjusted to better reflect the equipment. • Added a condition for NESHAPS Subparts JJJJJJ(6J), Industrial, Commercial, and Institutional Boilers Area Sources. • The Synthetic Minor condition was changed to include a limit, record keeping, and reporting on the amount of saw dust the boiler combusts. Should you have any questions concerning this matter, please contact David Miller at(919) 791- 4200. Sincerely, ?JA �4 Patrick Butler, P.E., Regional Supervisor Division of Air Quality, NCDENR ddm Enclosures c: Raleigh Regional Office NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF AIR QUALITY AIR PERMIT NO. 08714R05 Issue Date: April 10, 2014 Effective Date: April 10, 2014 Expiration Date: March 31, 2022 Replaces Permit: 08714R04 To construct and operate air emission source(s) and/or air cleaning device(s), and for the discharge of the associated air contaminants into the atmosphere in accordance with the provisions of Article 21 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other applicable Laws, Rules and Regulations, Carolina Wood Enterprises, Inc. 902 South Chatham Avenue Siler City, Chatham County,North Carolina Permit Class: Synthetic Minor Facility ID# 1900091 (the Pen- ittee) is hereby authorized to construct and operate the air emissions sources and/or air cleaning devices and appurtenances described below: Emission Emission Source Control ' Control System 3 Source ID_. ..--- .._..Description __._...._._.___ � System IDl _w.___._..._.__...Description ES-B 1 (NSPS, `wood-fired boiler(28.7 million Btu per hour I IMC-1,MC-2 primary multicyclone((16) NESHAP) I maximum heat input)utilizing fly ash reinjection j tubes)in series with a secondary from the primary multicyclone _ — multicyclone((44)6-inch tubes) ES-3 wood planing operation 1 cyclone(96 inches in diameter) ES-5 steam heated wood kiln N/A N/A ES-2 chipper - _._..___. _ ._. .__.s C-2^ cyclone(48 inches-in diameter) ES-4 sawdust transfer point C-4 c clone 48 inches in diameter in accordance with the completed application 1900091.14A received February 3, 2014 including any plans, specifications,previous applications, and other supporting data, all of which are filed with the Department of Environment and Natural Resources, Division of Air Quality(DAQ) and are incorporated as part of this permit. This permit is subject to the following specified conditions and limitations including any TESTING, REPORTING, OR MONITORING REQUIREMENTS: Permit No. 08714R05 Page 2 A. SPECIFIC CONDITIONS AND LIMITATIONS 1. Any air emission sources or control devices authorized to construct and operate above must be operated and maintained in accordance with the provisions contained herein. The Permittee shall comply with applicable Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter 2D .0202, 2D .0504, 2D .0512, 2D .0516, 2D .0521, 2D .0524 (40 CFR 60, Subpart Dc), 2D .0535, 2D .0540, 2D .1111 (40 CFR 63, Subpart JJJJJJ), 2D .1806 and 2Q .0315. 2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT-The Permittee, at least 90 days prior to the expiration date of this permit, shall request permit renewal by letter in accordance with 15A NCAC 2Q .0304(d) and (f). Pursuant to 15A NCAC 2Q .0203(i), no permit application fee is required for renewal of an existing air permit(without a modification request). The renewal request(with AA application form) should be submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration date of this permit,the Permittee shall submit the air pollution emission inventory report (with Certification Sheet) in accordance with 15A NCAC 2D .0202, pursuant to N.C. General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ and shall document air pollutants emitted for the 2020 calendar year. 3. PARTICULATE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0504 "Particulates from Wood Burning Indirect Heat Exchangers," particulate matter emissions from the wood burning indirect heat exchangers shall not exceed the allowable emission rates listed below: Emission Limit Source (lbs/million Btu) wood-fired boiler(28.7 million Btu per hour maximum heat input) 0.55 lb/million Btu utilizing fly ash reinjection from the primary multicyclone (ES-B 1) 4. PARTICULATE CONTROL REQUIREMENT -As required by 15A NCAC 2D .0512 "Particulates from Wood Products Finishing Plants," the Permittee shall not discharge particulate matter caused by the working, sanding, or finishing of wood without providing, as a minimum for its collection, adequate duct work and properly designed collectors, or other such devices as approved by the Commission. 5. SULFUR DIOXIDE CONTROL REQUIREMENT - As required by 15A NCAC 2D .0516 "Sulfur Dioxide Emissions from Combustion Sources," sulfur dioxide emissions from the combustion sources shall not exceed 2.3 pounds per million Btu heat input. 6. VISIBLE EMISSIONS CONTROL REQUIREMENT-As required by 15A NCAC 2D .0521 "Control of Visible Emissions," visible emissions from chipper (ID No. ES-2), wood planing operation(ID No. ES-3), sawdust transfer point(ID No. ES-4), steam heated wood kiln(ID No. ES-5) and wood-fired boiler(28.7 million Btu per hour maximum heat input) utilizing fly ash reinjection from the primary multicyclone (ID No. ES-131), manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged over a six- minute period, except that six-minute periods averaging not more than 87 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. Permit No. 08714R05 Page 3 However, sources which must comply with 15A NCAC 2D .0524 "New Source Performance Standards" or .1110 "National Emission Standards for Hazardous Air Pollutants" must comply with applicable visible emissions requirements contained therein. 7. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" -For wood-fired boiler(28.7 million Btu per hour maximum heat input) utilizing fly ash reinjection from the primary multicyclone (ID No. ES-B 1),the Permittee shall comply with all applicable provisions, including the notification,testing, reporting,recordkeeping, and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 2D .0524 "New Source Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart Dc, including Subpart A "General Provisions." a. NSPS Recordkeeping Requirements - In addition to any other recordkeeping requirements of the EPA,the Permittee is required to maintain records as follows: i. The amounts of each fuel combusted during each month; and ii. All records required under this section shall be maintained for a period of two years following the date of such record. 8. NOTIFICATION REQUIREMENT-As required by 15A NCAC 2D .0535, the Permittee of a source of excess emissions that last for more than four hours and that results from a malfunction, a breakdown of process or control equipment or any other abnormal conditions, shall: a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time of the Division's next business day of becoming aware of the occurrence and describe: i. the name and location of the facility, ii. the nature and cause of the malfunction or breakdown, iii. the time when the malfunction or breakdown is first observed, iv. the expected duration, and V. an estimated rate of emissions. b. Notify the Director or his designee immediately when the corrective measures have been accomplished. This reporting requirement does not allow the operation of the facility in excess of Environmental Management Commission Regulations. 9. FUGITIVE DUST CONTROL REQUIREMENT -As required by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. If substantive complaints or excessive fugitive Permit No. 08714R05 Page 4 dust emissions from the facility are observed beyond the property boundaries for six minutes in any one hour(using Reference Method 22 in 40 CFR, Appendix A), the owner or operator may be required to submit a fugitive dust plan as described in 2D .0540(f). "Fugitive dust emissions" means particulate matter that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas, process areas stockpiles, stock pile working, plant parking lots, and plant roads (including access roads and haul roads). 10. GENERALLY AVAILABLE CONTROL TECHNOLOGY- For the wood-fired boiler (28.7 million Btu per hour maximum heat input) utilizing fly ash reinjection from the primary multicyclone (ID No. ES-B1), the Permittee shall comply with all applicable provisions, including the notification,testing, and monitoring requirements contained in Environmental Management Commission Standard 15A NCAC 2D .I 111, as promulgated in 40 CFR 63, Subpart JJJJJJ, " National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers", including Subpart A "General Provisions." a. Compliance Dates (40 CFR 63.11196) -The owner or operator of an existing source is required to comply with the tune-up and the energy assessment requirements no later than March 21, 2014. b. Compliance Requirements -As required by 15A NCAC 2D .1111, the Permittee shall comply with the following requirements: i. General Duty Clause (40 CFR 63.11205(a)) -At all times the Permittee shall operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. ii. Boiler Tune-up (40 CFR 63.11223) - An initial boiler tune-up is required by March 21, 2014. If the unit is not operating on the required date for a tune-up, the tune-up must be conducted within thirty days of startup. The Permittee shall comply with the following with respect to the tune-up: A. Periodic tune-ups: A biennial tune-up is required and shall be conducted no more than 25 months after the previous tune-up. The following units are only required to conduct a tune-up every five years: seasonal boilers (shutdown for 7 consecutive months or 210 consecutive days each 12-month period due to seasonal conditions; only biomass or oil), limited-use boilers, and units with oxygen trim systems, as defined in 40 CFR 63.11237. Each five-year tune-up must be conducted within 61 months of the previous tune-up. B. Fuel required for the tune-up: The permittee shall conduct the tune-up while burning the type of fuel (or fuels in the case of boilers that routinely burn two types of fuels at the same time)that provided the majority of the heat input to the boiler over the 12 months prior to the tune-up. Permit No. 08714R05 Page 5 C. As applicable, inspect the burner, and clean or replace any components of the burner as necessary. The Permittee may delay the burner inspection until the next scheduled unit shutdown, but must inspect each burner at least once every 36 months (72 months for 5- year tune-ups). D. Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. E. Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. The Permittee may delay the air to fuel ratio inspection until the next scheduled unit shutdown,but must conduct the inspection at least once every 36 months (72 months for 5-year tune-ups). F. Optimize total emissions of carbon monoxide. This optimization should be consistent with the manufacturer's specifications, if available, and with any nitrogen oxide requirement to which the unit is subject. G. Measure the concentrations in the effluent stream of carbon monoxide in parts per million,by volume, and oxygen in volume percent,before and after the adjustments are made (measurements may be either on a dry or wet basis, as long as it is the same basis before and after the adjustments are made). Measurements may be taken with a portable CO analyzer. iii. Energy Assessment(40 CFR 63.11214(c)) - A one-time initial energy assessment is required by March 21, 2014. The energy assessment must be performed by a qualified energy assessor. An energy assessment completed on or after January 1, 2008,that meets or is amended to meet the energy assessment requirements in this section satisfies the energy assessment requirement. This energy assessment requirement does not apply to limited use boilers as defined in 40 CFR 63.11237. A facility that operates under an energy management program compatible with ISO 50001 that includes the affected units satisfies the energy assessment requirement. The energy assessment must include: A. A visual inspection of the boiler system. B. An evaluation of operating characteristics of the facility, specifications of energy using systems, operating and maintenance procedures, and unusual operating constraints. C. Inventory of major systems consuming energy from affected boilers and which are under control of the boiler owner or operator . Permit No. 08714R05 Page 6 D. A review of available architectural and engineering plans, facility operation and maintenance procedures and logs, and fuel usage. E. A list of major energy conservation measures that are within the facility's control. F. A list of the energy savings potential of the energy conservation measures identified. G. A comprehensive report detailing the ways to improve efficiency, the cost of specific improvements,benefits, and the time frame for recouping those investments. c. Notification and Reporting Requirements - In addition to the notification and reporting requirements of the Environmental Protection Agency (EPA),the Permittee is required to NOTIFY the Regional Supervisor, DAQ, in WRITING, of the following: i. Initial Notification(per 40 CFR 63.9(b) and 40 CFR 63.11225(a)(2)) is required by January 20, 2014. ii. Notification of Compliance Status (40 CFR 63.11225(a)(4)) is required by July 19, 2014. iii. Compliance Report must be prepared by March 1 of every other year(or every five years depending on the frequency of the tune-up requirements) starting March 1 the year following the first periodic tune-up, and submitted upon request. If the source experiences any deviations from the applicable requirements then the report must be submitted by March 15. The report must meet the requirements of 40 CFR 63.11225(b)(1-4). d. Recordkeeping_Requirements - In addition to any other recordkeeping requirements of the EPA, the Permittee shall maintain the following records as defined under 40 CFR 63.11225(c): i. Copies of all required notifications. ii. Maintain the following records to document conformance with the work practices, emission reduction measures, and management practices: A. Tune-up records - records must identify each boiler, the date of tune- up, the procedures followed for tune-up, the manufacturer's specifications to which the boiler was tuned, and the following: I. The concentrations of CO in the effluent stream in parts per million, by volume, and oxygen in volume percent, measured at high fire or typical operating load, before and after the tune- up of the boiler. Permit No. 08714R05 Page 7 II. A description of any corrective actions taken as a part of the tune-up of the boiler. III. The type and amount of fuel used over the 12 months prior to the tune-up of the boiler but only if the unit was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel use by each unit. B. A copy the Energy Assessment required by 40 CFR 63.11214(c). C. Seasonal boilers - For each boiler that meets the definition of seasonal boiler, you must keep records of days of operation per year. D. Records of non-Waste determinations per 40 CFR 63.11225(c)(2)(ii). iii. Malfunction Records -Records of the occurrence and duration of each malfunction of the boiler, or of the associated air pollution control and monitoring equipment. Records of actions taken during periods of malfunction to minimize emissions in accordance with the general duty to minimize emissions in 40 CFR 63.11205(a), including corrective actions to restore the malfunctioning boiler, air pollution control, or monitoring equipment to its normal or usual manner of operation. iv. Record Retention - You must keep each record for 5 years following the date of each recorded action. 11. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS -As required by 15A NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not operate the facility without implementing management practices or installing and operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the facility's boundary. 12. LIMITATION TO AVOID 15A NCAC 2Q.0501 - Pursuant to 15A NCAC 2Q .0315 "Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of Section and Requirement for a Permit," as requested by the Permittee, facility-wide emissions shall be less than the following: ollutan Emission Limit (Tons per consecutive 12-monthperiod) PM10 1 100 a. Operations Restrictions - To ensure emissions do not exceed the limitations above, the following restrictions shall apply: i. The sawdust combusted in the wood-fired boiler(ES-B1) shall not exceed 8,100 tons per consecutive 12-month period. Permit No. 08714R05 Page 8 b. Inspection and Maintenance Requirements - i. Cyclone Requirements - Particulate matter emissions shall be controlled as described in the permitted equipment list. To comply with the provisions of this permit and ensure that emissions do not exceed the regulatory limits, the Permittee shall perform an annual (for each 12 month period following the initial inspection) inspection of the cyclone system. In addition, the Permittee shall perform periodic inspections and maintenance (I&M) as recommended by the manufacturer. ii. Multi-Cyclone Requirements -Particulate matter emissions shall be controlled as described in the permitted equipment list. To comply with the provisions of this permit and ensure that emissions do not exceed the regulatory limits,the Permittee shall perform an annual (for each 12 month period following the initial inspection) internal inspection of the multi- cyclone system. In addition, the Permittee shall perform periodic inspections and maintenance (I&M) as recommended by the manufacturer. c. Recordkeeping Requirements i. The Permittee shall record monthly and total annually the following: A. Tons of sawdust combusted. ii. A log book shall be kept on site for cyclone (48 inches in diameter) (C-2), cyclone (96 inches in diameter) (C-3), cyclone (48 inches in diameter) (C-4), primary multicyclone ((16) 9-inch tubes) (MC-1), and secondary multicyclone ((44) 6-inch tubes) (MC-2) and made available to Division of Air Quality personnel upon request. The Permittee shall record all inspection, maintenance and monitoring requirements listed above in the log book. Any variance from the manufacturer's recommendations shall be investigated with corrections made and date of actions recorded in the log book. d. Reporting Requirements - Within 30 days after each calendar year, regardless of the actual emissions,the Permittee shall submit the following: i. emissions and/or operational data listed below. The data should include monthly and 12 month totals for the previous 12 month period. A. Tons of sawdust combusted. Permit No. 08714R05 Page 9 B. GENERAL CONDITIONS AND LIMITATIONS 1. TWO COPIES OF ALL DOCUMENTS REPORTS TEST DATA MONITORING DATA NOTIFICATIONS, REQUESTS FOR RENEWAL, AND ANY OTHER INFORMATION REQUIRED BY THIS PERMIT shall be submitted to the: Regional Supervisor North Carolina Division of Air Quality Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 919-791-4200 For identification purposes, each submittal should include the facility name as listed on the permit,the facility identification number, and the permit number. 2. RECORDS RETENTION REQUIREMENT- Any records required by the conditions of this permit shall be kept on site and made available to DAQ personnel for inspection upon request. These records shall be maintained in a form suitable and readily available for expeditious inspection and review. These records must be kept on site for a minimum of 2 years, unless another time period is otherwise specified. 3. ANNUAL FEE PAYMENT-Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a timely manner will cause the DAQ to initiate action to revoke the permit. 4. EQUIPMENT RELOCATION - A new air permit shall be obtained by the Permittee prior to establishing, building, erecting, using, or operating the emission sources or air cleaning equipment at a site or location not specified in this permit. 5. REPORTING REQUIREMENT-Any of the following that would result in previously unpermitted, new, or increased emissions must be reported to the Regional Supervisor, DAQ: a. changes in the information submitted in the application regarding facility emissions; b. changes that modify equipment or processes of existing permitted facilities; or c. changes in the quantity or quality of materials processed. If appropriate,modifications to the permit may then be made by the DAQ to reflect any necessary changes in the permit conditions. In no case are any new or increased emissions allowed that will cause a violation of the emission limitations specified herein. 6. This permit is subject to revocation or modification by the DAQ upon a determination that information contained in the application or presented in the support thereof is incorrect, conditions under which this permit was granted have changed, or violations of conditions contained in this permit have occurred. The facility shall be properly operated and maintained at all times in a manner that will effect an overall reduction in air pollution. Permit No. 08714R05 Page 10 Unless otherwise specified by this permit, no emission source may be operated without the concurrent operation of its associated air cleaning device(s) and appurtenances. 7. This permit is nontransferable by the Permittee. Future owners and operators must obtain a new air permit from the DAQ. 8. This issuance of this permit in no way absolves the Permittee of liability for any potential civil penalties which may be assessed for violations of State law which have occurred prior to the effective date of this permit. 9. This permit does not relieve the Permittee of the responsibility of complying with all applicable requirements of any Federal, State, or Local water quality or land quality control authority. 10. Reports on the operation and maintenance of the facility shall be submitted by the Permittee to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be required by the DAQ. Information required in such reports may include,but is not limited to,process weight rates, firing rates, hours of operation, and preventive maintenance schedules. 11. A violation of any term or condition of this permit shall subject the Permittee to enforcement pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of civil and/or criminal penalties. 12. Pursuant to North Carolina General Statute 143-215.3(a)(2),no person shall refuse entry or access to any authorized representative of the DAQ who requests entry or access for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct,hamper, or interfere with any such representative while in the process of carrying out his official duties. Refusal of entry or access may constitute grounds for permit revocation and assessment of civil penalties. 13. The Permittee must comply with any applicable Federal, State, or Local requirements governing the handling, disposal, or incineration of hazardous, solid, or medical wastes, including the Resource Conservation and Recovery Act(RCRA) administered by the Division of Waste Management. 14. PERMIT RETENTION REQUIREMENT - The Permittee shall retain a current copy of the air permit at the site. The Permittee must make available to personnel of the DAQ,upon request, the current copy of the air permit for the site. 15. CLEAN AIR ACT SECTION 112(r)REQUIREMENTS - Pursuant to 15A NCAC 2D .2100 "Risk Management Program," if the Permittee is required to develop and register a risk management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part 68. Permit No. 08714R05 Page 11 16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I Part A Section I I2(r)(1) of the Clean Air Act "Hazardous Air Pollutants -Prevention of Accidental Releases ,Purpose and General Duty," although a risk management plan may not be required, if the Permittee produces, processes, handles, or stores any amount of a listed hazardous substance,the Permittee has a general duty to take such steps as are necessary to prevent the accidental release of such substance and to minimize the consequences of any release. This condition is federally-enforceable only. 17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS -If emissions testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing to the DAQ in support of a permit application or to demonstrate compliance,the Permittee shall perform such testing in accordance with 15A NCAC 21) .2600 and follow all DAQ procedures including protocol approval, regional notification, report submittal, and test results approval. Permit issued this the 10'' of April, 2014. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ej� ai— Patrick Butler, P.E. Regional Supervisor By Authority of the Environmental Management Commission Air Permit No. 08714R05