April 10,2014
Mr. Clay Van Culberson Jr.
President
Carolina Wood Enterprises, Inc.
P.O. Box 902
Siler City,NC 27344
Subject: Air Permit No. 08714R05
Carolina Wood Enterprises, Inc.
Siler City, Chatham County,North Carolina
Permit Class: Synthetic Minor
Facility ID# 1900091
Dear Mr. Van Culberson Jr.:
In accordance with your completed application received February 3, 2014, we are
forwarding herewith Permit No. 08714R05 to Carolina Wood Enterprises,Inc., Siler City, Chatham
County,North Carolina for the construction and operation of air emissions sources or air cleaning
devices and appurtenances. Please note the records retention requirements are contained in General
Condition 2 of the General Conditions and Limitations.
If any parts, requirements, or limitations contained in this permit are unacceptable to you,
you have the right to request a formal adjudicatory hearing within 30 days following receipt of this.
permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of
the entire permit. This hearing request must be in the form of a written petition, conforming to G.S.
150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal
adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings.
Unless a request for a hearing is made pursuant to G.S. 15013-23, this air permit shall be final and
binding.
You may request modification of your air permit through informal means pursuant to G.S.
15013-22. This request must be submitted in writing to the Director and must identify the specific
provisions or issues for which the modification is sought. Please note that the permit will become
final and binding regardless of a request for informal modification unless a request for a hearing is
also made under G.S. 15013-23.
Unless exempted by a condition of this permit or the regulations, construction of new
Raleigh Regional Office-Division of Air Quality
3800 Barrett Drive,Raleigh,North Carolina 27609
Phone:919-791-4200/FAX:919-881-2261
Internet:www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer-Made in part by recycled paper
Clay Van CulbersonJr.
April 10, 2014
Page 2
air pollution sources or air cleaning devices, or modifications to the sources or air cleaning
devices described in this permit must be covered under a permit issued by the Division of Air
Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may
subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143-
215.114B.
This permit shall be effective from April 10, 2014 until March 31, 2022, is nontransferable
to future owners and operators, and shall be subject to the conditions and limitations as specified
therein.
Changes have been made to the permit stipulations. The Permittee is responsible for
carefully reading the entire permit and evaluating the requirements of each permit
stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations
and restrictions set forth in this permit. Noncompliance with any permit condition is grounds
for enforcement action, for permit termination, revocation and reissuance, or modification, or
for denial of a permit renewal application. Specific changes and additions are summarized
below (note: this list may not include all changes and additions):
• The boiler description has been adjusted to better reflect the equipment.
• Added a condition for NESHAPS Subparts JJJJJJ(6J), Industrial, Commercial, and
Institutional Boilers Area Sources.
• The Synthetic Minor condition was changed to include a limit, record keeping, and reporting
on the amount of saw dust the boiler combusts.
Should you have any questions concerning this matter, please contact David Miller at(919) 791-
4200.
Sincerely,
?JA �4
Patrick Butler, P.E., Regional Supervisor
Division of Air Quality, NCDENR
ddm
Enclosures
c: Raleigh Regional Office
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF AIR QUALITY
AIR PERMIT NO. 08714R05
Issue Date: April 10, 2014 Effective Date: April 10, 2014
Expiration Date: March 31, 2022 Replaces Permit: 08714R04
To construct and operate air emission source(s) and/or air cleaning device(s), and for the
discharge of the associated air contaminants into the atmosphere in accordance with the provisions
of Article 21 B of Chapter 143, General Statutes of North Carolina(NCGS) as amended, and other
applicable Laws, Rules and Regulations,
Carolina Wood Enterprises, Inc.
902 South Chatham Avenue
Siler City, Chatham County,North Carolina
Permit Class: Synthetic Minor
Facility ID# 1900091
(the Pen- ittee) is hereby authorized to construct and operate the air emissions sources and/or air
cleaning devices and appurtenances described below:
Emission Emission Source Control ' Control System
3
Source ID_. ..--- .._..Description __._...._._.___ � System IDl _w.___._..._.__...Description
ES-B 1 (NSPS, `wood-fired boiler(28.7 million Btu per hour I IMC-1,MC-2 primary multicyclone((16)
NESHAP) I maximum heat input)utilizing fly ash reinjection j tubes)in series with a secondary
from the primary multicyclone _ — multicyclone((44)6-inch tubes)
ES-3 wood planing operation 1 cyclone(96 inches in diameter)
ES-5 steam heated wood kiln N/A N/A
ES-2 chipper - _._..___. _ ._. .__.s C-2^ cyclone(48 inches-in diameter)
ES-4 sawdust transfer point C-4 c clone 48 inches in diameter
in accordance with the completed application 1900091.14A received February 3, 2014 including
any plans, specifications,previous applications, and other supporting data, all of which are filed
with the Department of Environment and Natural Resources, Division of Air Quality(DAQ) and are
incorporated as part of this permit.
This permit is subject to the following specified conditions and limitations including any
TESTING, REPORTING, OR MONITORING REQUIREMENTS:
Permit No. 08714R05
Page 2
A. SPECIFIC CONDITIONS AND LIMITATIONS
1. Any air emission sources or control devices authorized to construct and operate above must
be operated and maintained in accordance with the provisions contained herein. The
Permittee shall comply with applicable Environmental Management Commission
Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter
2D .0202, 2D .0504, 2D .0512, 2D .0516, 2D .0521, 2D .0524 (40 CFR 60, Subpart Dc), 2D
.0535, 2D .0540, 2D .1111 (40 CFR 63, Subpart JJJJJJ), 2D .1806 and 2Q .0315.
2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT-The Permittee,
at least 90 days prior to the expiration date of this permit, shall request permit renewal by
letter in accordance with 15A NCAC 2Q .0304(d) and (f). Pursuant to 15A NCAC 2Q
.0203(i), no permit application fee is required for renewal of an existing air permit(without
a modification request). The renewal request(with AA application form) should be
submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration
date of this permit,the Permittee shall submit the air pollution emission inventory report
(with Certification Sheet) in accordance with 15A NCAC 2D .0202, pursuant to N.C.
General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ
and shall document air pollutants emitted for the 2020 calendar year.
3. PARTICULATE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0504
"Particulates from Wood Burning Indirect Heat Exchangers," particulate matter emissions
from the wood burning indirect heat exchangers shall not exceed the allowable emission
rates listed below:
Emission Limit
Source
(lbs/million Btu)
wood-fired boiler(28.7 million Btu per hour maximum heat input) 0.55 lb/million Btu
utilizing fly ash reinjection from the primary multicyclone (ES-B 1)
4. PARTICULATE CONTROL REQUIREMENT -As required by 15A NCAC 2D .0512
"Particulates from Wood Products Finishing Plants," the Permittee shall not discharge
particulate matter caused by the working, sanding, or finishing of wood without providing,
as a minimum for its collection, adequate duct work and properly designed collectors, or
other such devices as approved by the Commission.
5. SULFUR DIOXIDE CONTROL REQUIREMENT - As required by 15A NCAC 2D .0516
"Sulfur Dioxide Emissions from Combustion Sources," sulfur dioxide emissions from the
combustion sources shall not exceed 2.3 pounds per million Btu heat input.
6. VISIBLE EMISSIONS CONTROL REQUIREMENT-As required by 15A NCAC 2D
.0521 "Control of Visible Emissions," visible emissions from chipper (ID No. ES-2), wood
planing operation(ID No. ES-3), sawdust transfer point(ID No. ES-4), steam heated wood
kiln(ID No. ES-5) and wood-fired boiler(28.7 million Btu per hour maximum heat input)
utilizing fly ash reinjection from the primary multicyclone (ID No. ES-131), manufactured
after July 1, 1971, shall not be more than 20 percent opacity when averaged over a six-
minute period, except that six-minute periods averaging not more than 87 percent opacity
may occur not more than once in any hour nor more than four times in any 24-hour period.
Permit No. 08714R05
Page 3
However, sources which must comply with 15A NCAC 2D .0524 "New Source
Performance Standards" or .1110 "National Emission Standards for Hazardous Air
Pollutants" must comply with applicable visible emissions requirements contained therein.
7. 15A NCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" -For wood-fired
boiler(28.7 million Btu per hour maximum heat input) utilizing fly ash reinjection from the
primary multicyclone (ID No. ES-B 1),the Permittee shall comply with all applicable
provisions, including the notification,testing, reporting,recordkeeping, and monitoring
requirements contained in Environmental Management Commission Standard 15A NCAC
2D .0524 "New Source Performance Standards" (NSPS) as promulgated in 40 CFR 60,
Subpart Dc, including Subpart A "General Provisions."
a. NSPS Recordkeeping Requirements - In addition to any other recordkeeping
requirements of the EPA,the Permittee is required to maintain records as follows:
i. The amounts of each fuel combusted during each month; and
ii. All records required under this section shall be maintained for a period of two
years following the date of such record.
8. NOTIFICATION REQUIREMENT-As required by 15A NCAC 2D .0535, the Permittee of
a source of excess emissions that last for more than four hours and that results from a
malfunction, a breakdown of process or control equipment or any other abnormal
conditions, shall:
a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time
of the Division's next business day of becoming aware of the occurrence and
describe:
i. the name and location of the facility,
ii. the nature and cause of the malfunction or breakdown,
iii. the time when the malfunction or breakdown is first observed,
iv. the expected duration, and
V. an estimated rate of emissions.
b. Notify the Director or his designee immediately when the corrective measures have
been accomplished.
This reporting requirement does not allow the operation of the facility in excess of
Environmental Management Commission Regulations.
9. FUGITIVE DUST CONTROL REQUIREMENT -As required by 15A NCAC 2D .0540
"Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow
fugitive dust emissions to cause or contribute to substantive complaints or excess visible
emissions beyond the property boundary. If substantive complaints or excessive fugitive
Permit No. 08714R05
Page 4
dust emissions from the facility are observed beyond the property boundaries for six minutes
in any one hour(using Reference Method 22 in 40 CFR, Appendix A), the owner or
operator may be required to submit a fugitive dust plan as described in 2D .0540(f).
"Fugitive dust emissions" means particulate matter that does not pass through a process
stack or vent and that is generated within plant property boundaries from activities such as:
unloading and loading areas, process areas stockpiles, stock pile working, plant parking lots,
and plant roads (including access roads and haul roads).
10. GENERALLY AVAILABLE CONTROL TECHNOLOGY- For the wood-fired boiler
(28.7 million Btu per hour maximum heat input) utilizing fly ash reinjection from the
primary multicyclone (ID No. ES-B1), the Permittee shall comply with all applicable
provisions, including the notification,testing, and monitoring requirements contained in
Environmental Management Commission Standard 15A NCAC 2D .I 111, as promulgated in
40 CFR 63, Subpart JJJJJJ, " National Emission Standards for Hazardous Air Pollutants for
Area Sources: Industrial, Commercial, and Institutional Boilers", including Subpart A
"General Provisions."
a. Compliance Dates (40 CFR 63.11196) -The owner or operator of an existing source
is required to comply with the tune-up and the energy assessment requirements no
later than March 21, 2014.
b. Compliance Requirements -As required by 15A NCAC 2D .1111, the Permittee
shall comply with the following requirements:
i. General Duty Clause (40 CFR 63.11205(a)) -At all times the Permittee shall
operate and maintain any affected source, including associated air pollution
control equipment and monitoring equipment, in a manner consistent with
safety and good air pollution control practices for minimizing emissions.
ii. Boiler Tune-up (40 CFR 63.11223) - An initial boiler tune-up is required by
March 21, 2014. If the unit is not operating on the required date for a tune-up,
the tune-up must be conducted within thirty days of startup. The Permittee
shall comply with the following with respect to the tune-up:
A. Periodic tune-ups: A biennial tune-up is required and shall be
conducted no more than 25 months after the previous tune-up. The
following units are only required to conduct a tune-up every five
years: seasonal boilers (shutdown for 7 consecutive months or 210
consecutive days each 12-month period due to seasonal conditions;
only biomass or oil), limited-use boilers, and units with oxygen trim
systems, as defined in 40 CFR 63.11237. Each five-year tune-up must
be conducted within 61 months of the previous tune-up.
B. Fuel required for the tune-up: The permittee shall conduct the tune-up
while burning the type of fuel (or fuels in the case of boilers that
routinely burn two types of fuels at the same time)that provided the
majority of the heat input to the boiler over the 12 months prior to the
tune-up.
Permit No. 08714R05
Page 5
C. As applicable, inspect the burner, and clean or replace any
components of the burner as necessary. The Permittee may delay the
burner inspection until the next scheduled unit shutdown, but must
inspect each burner at least once every 36 months (72 months for 5-
year tune-ups).
D. Inspect the flame pattern, as applicable, and adjust the burner as
necessary to optimize the flame pattern. The adjustment should be
consistent with the manufacturer's specifications, if available.
E. Inspect the system controlling the air-to-fuel ratio, as applicable, and
ensure that it is correctly calibrated and functioning properly. The
Permittee may delay the air to fuel ratio inspection until the next
scheduled unit shutdown,but must conduct the inspection at least
once every 36 months (72 months for 5-year tune-ups).
F. Optimize total emissions of carbon monoxide. This optimization
should be consistent with the manufacturer's specifications, if
available, and with any nitrogen oxide requirement to which the unit
is subject.
G. Measure the concentrations in the effluent stream of carbon monoxide
in parts per million,by volume, and oxygen in volume percent,before
and after the adjustments are made (measurements may be either on a
dry or wet basis, as long as it is the same basis before and after the
adjustments are made). Measurements may be taken with a portable
CO analyzer.
iii. Energy Assessment(40 CFR 63.11214(c)) - A one-time initial energy
assessment is required by March 21, 2014. The energy assessment must be
performed by a qualified energy assessor. An energy assessment completed
on or after January 1, 2008,that meets or is amended to meet the energy
assessment requirements in this section satisfies the energy assessment
requirement. This energy assessment requirement does not apply to limited
use boilers as defined in 40 CFR 63.11237. A facility that operates under an
energy management program compatible with ISO 50001 that includes the
affected units satisfies the energy assessment requirement. The energy
assessment must include:
A. A visual inspection of the boiler system.
B. An evaluation of operating characteristics of the facility,
specifications of energy using systems, operating and maintenance
procedures, and unusual operating constraints.
C. Inventory of major systems consuming energy from affected boilers
and which are under control of the boiler owner or operator .
Permit No. 08714R05
Page 6
D. A review of available architectural and engineering plans, facility
operation and maintenance procedures and logs, and fuel usage.
E. A list of major energy conservation measures that are within the
facility's control.
F. A list of the energy savings potential of the energy conservation
measures identified.
G. A comprehensive report detailing the ways to improve efficiency, the
cost of specific improvements,benefits, and the time frame for
recouping those investments.
c. Notification and Reporting Requirements - In addition to the notification and
reporting requirements of the Environmental Protection Agency (EPA),the
Permittee is required to NOTIFY the Regional Supervisor, DAQ, in WRITING, of
the following:
i. Initial Notification(per 40 CFR 63.9(b) and 40 CFR 63.11225(a)(2)) is
required by January 20, 2014.
ii. Notification of Compliance Status (40 CFR 63.11225(a)(4)) is required by
July 19, 2014.
iii. Compliance Report must be prepared by March 1 of every other year(or
every five years depending on the frequency of the tune-up requirements)
starting March 1 the year following the first periodic tune-up, and submitted
upon request. If the source experiences any deviations from the applicable
requirements then the report must be submitted by March 15. The report must
meet the requirements of 40 CFR 63.11225(b)(1-4).
d. Recordkeeping_Requirements - In addition to any other recordkeeping requirements
of the EPA, the Permittee shall maintain the following records as defined under 40
CFR 63.11225(c):
i. Copies of all required notifications.
ii. Maintain the following records to document conformance with the work
practices, emission reduction measures, and management practices:
A. Tune-up records - records must identify each boiler, the date of tune-
up, the procedures followed for tune-up, the manufacturer's
specifications to which the boiler was tuned, and the following:
I. The concentrations of CO in the effluent stream in parts per
million, by volume, and oxygen in volume percent, measured
at high fire or typical operating load, before and after the tune-
up of the boiler.
Permit No. 08714R05
Page 7
II. A description of any corrective actions taken as a part of the
tune-up of the boiler.
III. The type and amount of fuel used over the 12 months prior to
the tune-up of the boiler but only if the unit was physically
and legally capable of using more than one type of fuel during
that period. Units sharing a fuel meter may estimate the fuel
use by each unit.
B. A copy the Energy Assessment required by 40 CFR 63.11214(c).
C. Seasonal boilers - For each boiler that meets the definition of seasonal
boiler, you must keep records of days of operation per year.
D. Records of non-Waste determinations per 40 CFR 63.11225(c)(2)(ii).
iii. Malfunction Records -Records of the occurrence and duration of each
malfunction of the boiler, or of the associated air pollution control and
monitoring equipment. Records of actions taken during periods of
malfunction to minimize emissions in accordance with the general duty to
minimize emissions in 40 CFR 63.11205(a), including corrective actions to
restore the malfunctioning boiler, air pollution control, or monitoring
equipment to its normal or usual manner of operation.
iv. Record Retention - You must keep each record for 5 years following the date
of each recorded action.
11. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS -As required by 15A
NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not
operate the facility without implementing management practices or installing and operating
odor control equipment sufficient to prevent odorous emissions from the facility from
causing or contributing to objectionable odors beyond the facility's boundary.
12. LIMITATION TO AVOID 15A NCAC 2Q.0501 - Pursuant to 15A NCAC 2Q .0315
"Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of
Section and Requirement for a Permit," as requested by the Permittee, facility-wide
emissions shall be less than the following:
ollutan Emission Limit
(Tons per consecutive 12-monthperiod)
PM10 1 100
a. Operations Restrictions - To ensure emissions do not exceed the limitations above,
the following restrictions shall apply:
i. The sawdust combusted in the wood-fired boiler(ES-B1) shall not exceed
8,100 tons per consecutive 12-month period.
Permit No. 08714R05
Page 8
b. Inspection and Maintenance Requirements -
i. Cyclone Requirements - Particulate matter emissions shall be controlled as
described in the permitted equipment list. To comply with the provisions of
this permit and ensure that emissions do not exceed the regulatory limits, the
Permittee shall perform an annual (for each 12 month period following the
initial inspection) inspection of the cyclone system. In addition, the Permittee
shall perform periodic inspections and maintenance (I&M) as recommended
by the manufacturer.
ii. Multi-Cyclone Requirements -Particulate matter emissions shall be
controlled as described in the permitted equipment list. To comply with the
provisions of this permit and ensure that emissions do not exceed the
regulatory limits,the Permittee shall perform an annual (for each 12 month
period following the initial inspection) internal inspection of the multi-
cyclone system. In addition, the Permittee shall perform periodic inspections
and maintenance (I&M) as recommended by the manufacturer.
c. Recordkeeping Requirements
i. The Permittee shall record monthly and total annually the following:
A. Tons of sawdust combusted.
ii. A log book shall be kept on site for cyclone (48 inches in diameter) (C-2),
cyclone (96 inches in diameter) (C-3), cyclone (48 inches in diameter) (C-4),
primary multicyclone ((16) 9-inch tubes) (MC-1), and secondary
multicyclone ((44) 6-inch tubes) (MC-2) and made available to Division of
Air Quality personnel upon request. The Permittee shall record all inspection,
maintenance and monitoring requirements listed above in the log book. Any
variance from the manufacturer's recommendations shall be investigated with
corrections made and date of actions recorded in the log book.
d. Reporting Requirements - Within 30 days after each calendar year, regardless of the
actual emissions,the Permittee shall submit the following:
i. emissions and/or operational data listed below. The data should include
monthly and 12 month totals for the previous 12 month period.
A. Tons of sawdust combusted.
Permit No. 08714R05
Page 9
B. GENERAL CONDITIONS AND LIMITATIONS
1. TWO COPIES OF ALL DOCUMENTS REPORTS TEST DATA MONITORING DATA
NOTIFICATIONS, REQUESTS FOR RENEWAL, AND ANY OTHER INFORMATION
REQUIRED BY THIS PERMIT shall be submitted to the:
Regional Supervisor
North Carolina Division of Air Quality
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
919-791-4200
For identification purposes, each submittal should include the facility name as listed on the
permit,the facility identification number, and the permit number.
2. RECORDS RETENTION REQUIREMENT- Any records required by the conditions of this
permit shall be kept on site and made available to DAQ personnel for inspection upon
request. These records shall be maintained in a form suitable and readily available for
expeditious inspection and review. These records must be kept on site for a minimum of 2
years, unless another time period is otherwise specified.
3. ANNUAL FEE PAYMENT-Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay
the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a
timely manner will cause the DAQ to initiate action to revoke the permit.
4. EQUIPMENT RELOCATION - A new air permit shall be obtained by the Permittee prior to
establishing, building, erecting, using, or operating the emission sources or air cleaning
equipment at a site or location not specified in this permit.
5. REPORTING REQUIREMENT-Any of the following that would result in previously
unpermitted, new, or increased emissions must be reported to the Regional Supervisor,
DAQ:
a. changes in the information submitted in the application regarding facility emissions;
b. changes that modify equipment or processes of existing permitted facilities; or
c. changes in the quantity or quality of materials processed.
If appropriate,modifications to the permit may then be made by the DAQ to reflect any
necessary changes in the permit conditions. In no case are any new or increased emissions
allowed that will cause a violation of the emission limitations specified herein.
6. This permit is subject to revocation or modification by the DAQ upon a determination that
information contained in the application or presented in the support thereof is incorrect,
conditions under which this permit was granted have changed, or violations of conditions
contained in this permit have occurred. The facility shall be properly operated and
maintained at all times in a manner that will effect an overall reduction in air pollution.
Permit No. 08714R05
Page 10
Unless otherwise specified by this permit, no emission source may be operated without the
concurrent operation of its associated air cleaning device(s) and appurtenances.
7. This permit is nontransferable by the Permittee. Future owners and operators must obtain a
new air permit from the DAQ.
8. This issuance of this permit in no way absolves the Permittee of liability for any potential
civil penalties which may be assessed for violations of State law which have occurred prior
to the effective date of this permit.
9. This permit does not relieve the Permittee of the responsibility of complying with all
applicable requirements of any Federal, State, or Local water quality or land quality control
authority.
10. Reports on the operation and maintenance of the facility shall be submitted by the Permittee
to the Regional Supervisor, DAQ at such intervals and in such form and detail as may be
required by the DAQ. Information required in such reports may include,but is not limited
to,process weight rates, firing rates, hours of operation, and preventive maintenance
schedules.
11. A violation of any term or condition of this permit shall subject the Permittee to enforcement
pursuant to G.S. 143-215.114A, 143-215.114B, and 143-215.114C, including assessment of
civil and/or criminal penalties.
12. Pursuant to North Carolina General Statute 143-215.3(a)(2),no person shall refuse entry or
access to any authorized representative of the DAQ who requests entry or access for
purposes of inspection, and who presents appropriate credentials, nor shall any person
obstruct,hamper, or interfere with any such representative while in the process of carrying
out his official duties. Refusal of entry or access may constitute grounds for permit
revocation and assessment of civil penalties.
13. The Permittee must comply with any applicable Federal, State, or Local requirements
governing the handling, disposal, or incineration of hazardous, solid, or medical wastes,
including the Resource Conservation and Recovery Act(RCRA) administered by the
Division of Waste Management.
14. PERMIT RETENTION REQUIREMENT - The Permittee shall retain a current copy of the
air permit at the site. The Permittee must make available to personnel of the DAQ,upon
request, the current copy of the air permit for the site.
15. CLEAN AIR ACT SECTION 112(r)REQUIREMENTS - Pursuant to 15A NCAC 2D .2100
"Risk Management Program," if the Permittee is required to develop and register a risk
management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the
Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part
68.
Permit No. 08714R05
Page 11
16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I
Part A Section I I2(r)(1) of the Clean Air Act "Hazardous Air Pollutants -Prevention of
Accidental Releases ,Purpose and General Duty," although a risk management plan may not
be required, if the Permittee produces, processes, handles, or stores any amount of a listed
hazardous substance,the Permittee has a general duty to take such steps as are necessary to
prevent the accidental release of such substance and to minimize the consequences of any
release. This condition is federally-enforceable only.
17. GENERAL EMISSIONS TESTING AND REPORTING REQUIREMENTS -If emissions
testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing
to the DAQ in support of a permit application or to demonstrate compliance,the Permittee
shall perform such testing in accordance with 15A NCAC 21) .2600 and follow all DAQ
procedures including protocol approval, regional notification, report submittal, and test
results approval.
Permit issued this the 10'' of April, 2014.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
ej� ai—
Patrick Butler, P.E.
Regional Supervisor
By Authority of the Environmental Management Commission
Air Permit No. 08714R05