HomeMy WebLinkAboutAQ_F_0400033_20140812_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY Martin Marietta Aggregates-Pee Dee Quarry
NC Facility ID 0400033
Inspection Report County/FIPS:Anson/007
Date: 08/19/2014
Facility Data Permit Data
Martin Marietta Aggregates-Pee Dee Quarry Permit 06334/R06
2710 WycliffRoad Issued 6/19/2012
Pee Dee,NC 28091 Expires 5/31/2017
Lat: 34d 56.2500m Long: 79d 53.0000m Classification Small
SIC: 1423/Crushed And Broken Granite Permit Status Active
NAICS: 212313 /Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Richard Broughton John Tiberi Richard Broughton NSPS: Subpart 000
Environmental Services Division President Environmental Services
Manager (919)781-4550 Manager
(803)978-6275 (803)978-6275
Compliance Data
Comments:
Inspection Date 08/12/2014
Inspector's Name Mike Thomas
Inspector's Signature: Operating Status Operating
Compliance Code Compliance-inspection
e Action Code FCE
DOteoignature: On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 *HAP
2011 --- --
2006 --- --- --- --- --
*--Highest HAP Emitted(in pounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
1) Location
Martin Marietta Aggregate-Pee Dee Quarry is located at 2710 Wycliff Road in Pee Dee(just west of the
Pee Dee River),NC,Anson County.
Directions
From Rockingham,take HWY 74 west until you cross over the Pee Dee River,then take HWY 145 on the
_ left. The proposed project site is approximately 0.5 miles down HWY 145 on the right hand side.
Safety Considerations: Standard DAQ safety equipment required.When facility starts operating,be alert to
large equipment on site.
2) Facility and Process Description
_ Martin Marietta Aggregate Pee Dee Quarry is a rock quarry that is permitted to produce gravel and
aggregate used in construction. This facility is permitted under Air Permit No.6334R05, effective from
19 October 2007 until 30 September 2012. Cindy Grimes conducted the last compliance inspection on
12 June 2012.Note: This facility has not broken ground or been constructed yet.
This facility is(will be)a quarry which extracts mainly granite and other stone.The granite and other stone
products are loosened by drilling and blasting, and then are loaded by power shovel or front-end loader into
large haul trucks that transport the material to the processing operations. Primary operations include a jaw,
which is used for initial crusher reduction,and a series of conveyors. This crusher product is next fed through
a grizzly feeder for undersize material, and then is discharged onto a conveyor,where it goes through more
screening processes, until it is conveyed to a surge pile for temporary storage or sold as coarse aggregate.
a) Throughputs for 2013
Employees: 0 (same in 2012)
Hours: 0 (same in 2012)
Production: 0 (same in 2012)
b) Permitted Sources
Emission Emission Source Control Control System
Source ID Description 1System ID Description
Non-Metallic Mineral Processing Plant,800 tons per hour rating,utilizing water suppression with no other
control devices,including:
Crushers(NSPS) JCrushing Operations
_Conveyors(NSPS) Conveying Operations !FWS 1 Wet suppression water spray system
Screens(NSPS) ]IScreening Operations
3) Inspection Summary
This facility has not begun operations at its proposed site.I drove by the site on 12 August 2014 and did not
observe any equipment or evidence of ground-breaking. I spoke to Richard Broughton,Environmental
Services Manager and confirmed that there have been no operations at the site and that Martin Marietta
wants to retain the permit in case a need arises for the plant in the future.
4) Permit Stipulations
No operations,therefore nothing to verify.
5) 112R Status
Unknown at this time. Facility has not been constructed to date.
6) DAQ Compliance History
This facility has not started operations since its initial permit; it has had no prior DAQ violations.
7) Comments and Compliance Statement
Martin Marietta Aggregate Pee Dee Quarry appeared to be in compliance on 12 August 2014.
Pink Sheet: No comments.
/mst