HomeMy WebLinkAboutAQ_F_0200068_20140710_CMPL_NOCS S�JED
United States
A =o= ENVIRONMENTAL PROTECTION AGENCY
r
4L PR6Ki.G
Washington, DC 20460
Compliance and Emissions Data Reporting Interface (CEDRI) Report
Notification required under 40 CFR 63. 11225(a)(4)
Office of Air and Radiation (OAR)
http://www.epa.gov/ttn/chief/ert/index.html
FACILITY INFORMATION
Date and Time of Report 2014-07-10 16:11:31 EDT
Facility Name CARPENTER CO TAYLORSVILLE PLT
Facility Address
2581 HWY 90 EAST
TAYLORSVILLE, ALEXANDER, NC 28681
Mailing Address
I/
Longitude of Facility Latitude of Facility
-81.13337 35.91593
FRS Code 110007117770
State Facility ID Number
THIS FORM WAS GENERATED BY THE CEDRI APPLICATION
1
REQUIRED INFORMATION AND CERTIFICATION
1. The methods that were used to determine compliance:
five year tune-up and preparation
2. The methods that will be used for determining continuing compliance, including a description of reporting
requirements and test methods:
continued five year tune-ups and testing.
3. Has the source complied with the relevant standard or other Yes
requirements?
4. "This facility complies with the requirements in §63.11214 to conduct
an initial tune-up of the boiler." Yes
5. "This facility has had an energy assessment performed according to No
§63.11214(c)."
5.a. Has a past or amended energy assessment been performed on or
after January 1, 2008 and by March 212014 to meet the energy
assessment requirements in 63.11214(c)?
5.b. Does your facility operate under an energy program compatible
with ISO 50001 that includes the affected units to meet the
energy assessment requirements of 63.11214(c)?
6. "This facility complies with the requirements in §63.11224(f)."
Not Applicable
7. "No secondary materials that are solid waste were combusted in any
affected unit." Not Applicable
8. Date of the test showing conformance with the emission standards
and operating limits of this subpart(if applicable). 10/18/2011
THIS FORM WAS GENERATED BY THE CEDRI APPLICATION
2
ADDITIONAL INFORMATION
Please enter any additional information
Please attach any additional information
Taylorsville 2012 Boiler tuneup.pdf
THIS FORM WAS GENERATED BY THE CEDRI APPLICATION
3
SIGNATURE PAGE
Signature of Company Official or Authorized Agent
Thomas Dunston
Mr
8284649470 ext:4442
THIS FORM WAS GENERATED BY THE CEDRI APPLICATION
4