HomeMy WebLinkAboutAQ_F_0400056_20150121_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY Piedmont Natural Gas-Wadesboro Compressor
Station
Inspection Report NC Facility ID 0400056
Date: O1/23/2015 County/FIPS:Anson/007
Facility Data Permit Data
Piedmont Natural Gas-Wadesboro Compressor Station Permit 10097/TO
259 Pleasant Grove Church Road Issued 9/15/2014
Wadesboro,NC 28170 Expires 8/31/2019
Lat: 35d 1.4834m Long: 80d 1.6830m Classification Title V
SIC: 4922/Natural Gas Transmission Permit Status Active
NAICS: 48621/Pipeline Transportation of Natural Gas Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP/Title V
_ Gil Vinzani Martin Petchul Gil Vinzani MACT Part 63: Subpart ZZZZ
Environmental Engineer Managing Dir. of Eng. Environmental Engineer NSPS: Subpart-JJJJ
(919)899-6081 and Tech. Svcs. (919)899-6081
(704)731-4457
Compliance Data
Comments:
Inspection Date 01/21/2015
/ Inspector's Name Gregory Reeves
Inspector's Signature: ( � Operating Status Operating
Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: O✓A,6*11— On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP SO2 NOX VOC CO PM10 *HAP
2013 0.0800 --- 1.0000 0.3900 0.1100 0.0800 985.82
2012 --- --- -- --- ---
2011 --- --- --- ---
* ---
Highest HAP Emitted(in pounds)
Five Year Violation History:None
Date Letter Type. Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
Piedmont Natural Gas—Wadesboro Compressor Station
Compliance Inspection Report
Page 2 of 6 .
1. DIRECTIONS TO SITE:
From FRO,take US Hwy 401 South through Raeford and Wagram. Just past Wagram,turn right onto Old Wire
Road(NC 144). Follow Old Wire Road across US 15/501 and through Laurel Hill to US 74. Turn right onto
US 74. Follow US 74 35 miles to Wadesboro,then turn right onto N.Greene St/NC Hwy 109. Drive 4.9 miles,
then turn left onto Pleasant Grove Church Road. The Piedmont facility is located approximately 0.3 miles on
the left side of the road.
2. SAFETY CONSIDERATIONS:
The usual FRO safety gear is required,including hard hat,safety shoes,safety glasses,and hearing protection.
There may be numerous pieces of equipment operating on site,including forklifts,personnel lifts,trucks,cars,
and others. At the time of this inspection,the facility was not operating.
3. FACILITY DESCRIPTION:
The facility is a large natural gas pipeline compressor station. The facility accepts natural gas from the Trans-
Continental distribution pipeline at 500-800 psig pressure, and compresses this gas to 800-1,000 psig for
injection into the Piedmont pipeline to transport it to its destination. The Piedmont facility consists of four(4)
permitted natural gas-fired 4,735 HP compressors(8 are permitted at the facility),plus a 770 HP natural gas-
fired emergency generator. All the engines are fueled by natural gas from the transmission pipeline. The
facility operates only as needed to supply the gas demand downstream of the compressor station.
4. FACILITY INSPECTION SUMMARY:
On 01/22/2015 I,Greg Reeves,visited the Piedmont Natural Gas—Wadesboro Compressor Station plant site in
Wadesboro. The facility was not in operation,but facility personnel were on site conducting maintenance and a
security inspection. The facility is generally un-manned unless gas demand spikes,generally due to colder
weather
I met with Mr.Alan Henderson,Manager,Compression and Controls(910-419-7207 office, 910-334-9035
cell). I explained that I was at the site to conduct a compliance inspection. Mr.Henderson verified that the
FacFinder information was correct for the facility contacts.
Records for operating hours and operating loads on the engines is kept on the computerized control system.
The operator was able to show me the records on operating hours for each of the permitted engines.
Piedmont Natural Gas—Wadesboro Compressor Station
Compliance Inspection Report
Page 3 of 6
5. PERMITTED EQUIPMENT:
Emission Emission Source Description Control Control Device Description
Source Device
ID No. ID No.
COMPOI One four-stroke lean bum natural gas- COMPOl C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
COMP02 One four-stroke lean burn natural gas- COM002C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
COMP03 One four-stroke lean burn natural gas- COMP03C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
_ rating)powering a compressor
NOT OPERATING
COMP04 One four-stroke lean burn natural gas- COMP04C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
COMP05 One four-stroke lean burn natural gas- COMP05C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
COMP06 One four-stroke lean burn natural gas- COMP06C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
COMP07 One four-stroke lean burn natural gas- COMP07C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
COMP08 One four-stroke lean bum natural gas- COMP08C Catalytic oxidizer(24.0 cubic
NSPS fired reciprocating internal feet of oxidation catalyst)
MACT combustion engine(4,735 horsepower
rating)powering a compressor
NOT OPERATING
EGO I One four-stroke lean burn natural gas-
MACT fired emergency generator(770 hp N/A N/A
maximum rating)
NOT OPERATING
Piedmont Natural Gas—Wadesboro Compressor Station
Compliance Inspection Report
Page 4 of 6
6. SPECIFIC PERMIT CONDITIONS:
A. Eight 4,735 Four Stroke Lean Burn Natural Gas-fired Compressor Engines(ID Nos. COMPOI,through
COMP08)
i. 15A NCAC 2D.0516 SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES—
Emissions of sulfur dioxide from the eight 4,735 HP compressor engines shall not exceed 2.3 pounds
per million Btu heat input.
APPEARS IN COMPLIANCE—The engines use only natural gas,with an EPA AP-42 emission
factor of 0.001 lb/mml3m. As long as the engines only combust natural gas,they should not exceed
the limitation. The engines were not operating during the inspection. Only 4 of the permitted engines
have been installed.
ii. 15A NCAC 2D.0521 CONTROL OF VISIBLE EMISSIONS—Visible emissions from the eight
compressor engines shall not exceed 20 percent opacity when averaged over a 6-minute period. 6-
minute averaging periods may exceed 20 percent opacity no more than once in any hour and not more
than four times in any 24-hour period. In no event shall the 6-minute average exceed 87 percent
opacity.
APPEARS IN COMPLIANCE—The typical opacities for these engine exhausts are zero. The facility
should have no difficulty complying with these limits. The engines were not operating during the
inspection.
iii. 15A NCAC 2D.1423 LARGE INTERNAL COMBUSTION ENGINES—The Permittee shall not
cause to be emitted into the atmosphere nitrogen oxides (NOx)in excess of 125 ppm, corrected to 15
percent by volume stack gas oxygen on a dry basis,averaged over a rolling 30-day period. This limit
may be adjusted basis the engine efficiencies. Compliance with the limits will be demonstrated by
conducting stack testing at the engine exhausts. A report is required by October 31 of each year,
documenting the total nitrogen oxide emissions during the period Mayl through September 30 of each
year,beginning with the year of the first ozone season that the engines operate. Records are required
to be maintained for each engine for ID and location of each engine;number of hours of operation of
each engine each day, including startups,shutdowns,and malfunctions,and the type and duration of
maintenance and repairs;date and results of any emissions corrective maintenance taken;results of
compliance testing. Emission standards do not apply during periods of start-up and shutdown and
periods of malfunctions,not to exceed 36 consecutive hours,or regularly scheduled maintenance
activities.
APPEARS INCOMPLIANCE—The facility will maintain all records electronically through the DCS
control system,which maintains hours of operation and other data. Some paper records may also be
maintained for the maintenance operations. The engines were not operating during the inspection.
The last ozone season report was received at FRO on 10/30/14.
B. 880 HP Four Stroke Lean Burn Natural Gas-fired Emergency Generator(ID No.EGO1)
i. 15A NCAC 2D.0516 SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES—
Emissions of sulfur dioxide from the emergency generator engine shall not exceed 2.3 pounds per
million Btu heat input.
APPEARS INCOMPLLANCE—The engine combusts only natural gas. The EPA AP-42 emission
factor for sulfur dioxide for natural gas combustion is 0.001 lb/mmBtu. As long as this engine only
combusts natural gas,it should easily meet this limitation. The engine was not operating during the
inspection.
Piedmont Natural Gas—Wadesboro Compressor Station
Compliance Inspection Report
Page 5 of 6
ii. 15A NCAC 2D.0521 CONTROL OF VISIBLE EMISSIONS-Visible emissions from the
emergency generator engine shall not exceed 20 percent opacity when averaged over a 6-minute
period. 6-minute averaging periods may exceed 20 percent opacity no more than once in any hour and
not more than four times in any 24-hour period. In no event shall the 6-minute average exceed 87
percent opacity.
APPEARS IN COMPLIANCE—Typical visible emissions for this engine are zero. The facility
should have no difficulty complying with this limitation. The engine was not operating during the
inspection.
C. Compressor Engines(COMPOI through COMP04)and Emergency Generator Engine(EGO1)
i. 40 CFR 63,Subpart ZZZZ STATIONARY RECIPROCATING INTERNAL COMBUSTION
ENGINES—The engines meet the requirements of Subpart ZZZZ by meeting all the requirements of
NSPS Subpart JJJJ"Stationary Spark Ignition Internal Combustion Engines."
APPEARS IN COMPLLANCE—The engines will demonstrate compliance by complying with the
requirements of NSPS Subpart JJJJ. The engines were not operating during the inspection.
ii. 40 CFR 60,Subpart JJJJ STATIONARY SPARK IGNITION INTERNAL COMBUSTION
ENGINES—The compressor engines must meet the following emission limits: NOx—1.0 g/HP-hr
and 82 ppmvd @ 15%oxygen;CO 2.0 gW-hr and 270 ppmvd @ 15%oxygen;VOC 0.7 g/AP-hr and
60 ppmvd @ 15%oxygen. The emergency engine must meet the following emission limits: NOx—
2.0 g/HP-hr and 160 ppmvd @ 15%oxygen;CO 4.0 g/IIP-hr and 540 ppmvd @ 15%oxygen;VOC—
1.0 g/HP-hr and 86 ppmvd @ 15%oxygen. VOCs do not include formaldehyde. The nine engines are
not certified engines,and therefore the facility must conduct initial stack testing to demonstrate initial
compliance on each engine. Records of maintenance plans and records of conducted maintenance
must be maintained,as well as records of the stack testing. Subsequent stack testing must be
conducted every 8,760 hours or 3 years,whichever comes first. Results of stack testing must be
submitted within 60 days after the testing is performed.
APPEARS IN COMPLLANCE—Stack testing was performed on the emergency generator engine on
05/21/13. Results of the test demonstrated compliance with the emission limits. Stack testing for the
four compressor engines was conducted on 02/25—02/27/14. The stack testing results indicated
compliance with the emission limits. The engines were not operating during the inspection. The
operating hours of the four compressor engines were as noted in the table below. The emergency
engine is seldom run except for operational checks,and will be due for stack testing in May 2016. The
facility is preparing for the 1,000 hour maintenance for each of these engines.
zmss, T3a fttaF1s tlxat StE�r t tIougsatflat i
z
l'f � gU�
COMPOI 02/25/14 197 909 712
COMP02 02/26/14 185 920 735
COMP03 02/26/14 179 897 718
COMP04 02/27/14 178 892 714
Piedmont Natural Gas—Wadesboro Compressor Station
Compliance Inspection Report
Page 6 of 6
iii. 15A NCAC 2Q.0317 AVOIDANCE CONDITION FOR 40 CFR 63 SUBPART ZZZZ(HAP
MAJOR CLASSIFICATION AVOIDANCE)—The facility has accepted an emission limit of no
more than 10 tons of formaldehyde per consecutive 12-month period to avoid the Major Source rules
for this Subpart. This requirement is met by conducting the required monitoring,recordkeeping,and
reporting of emissions of CO based on stack testing.
APPEARS INCOMPLIANCE—The review of the potential controlled emissions during the permit
review process showed that this limit should not be exceeded. Proper operation and maintenance of
the catalytic oxidizers on the engines is required to comply with this limit. The stack testing results
indicated compliance with the emission limits. The engines were not operating during the inspection.
iv. 15A NCAC 2D.1100 TOXIC AIR POLLUTANT EMISSIONS LIMITATION AND
REQUIREMENT—Potential emissions of Acrolein,Butadiene,Benzene, and Formaldehyde
exceeded the TPERs. The facility submitted a dispersion modeling analysis for these four pollutants
with the permit application. Limits for the four pollutants were included in the permit for each
emission source. (Note that Benzene was not included in the modeling for the emergency generator
engine.)
APPEARS IN COMPLLANCE—Since the maximum potential emissions were modeled and shown to
not exceed these limits,the facility should meet the limitations as long as the engines are operated as
originally permitted. The engines were not operating during the inspection.
v. CLEAN AIR ACT,SECTION 112(r)REQUIREMENTS
APPEARS IN COMPLLANCE—The facility does not store any of the listed 112(r)chemicals in
amounts that exceed the threshold quantities. Therefore,the facility is not required to maintain a
written Risk Management Plan(RMP).
7. COMPLIANCE HISTORY:
There have been no negative compliance instances since the permit was initially issued in 2011.
S. FACILITY PINK SHEET REVIEW:
There were no pink sheet items to be included in the facility inspection.
9. CONCLUSIONS/RECOMMENDATIONS:
The facility appeared to be INCOMPLLANCE during my visit. The facility was not operating during this visit.