HomeMy WebLinkAboutAQ_F_0100010_20140204_CEM_RptRvwLtr NCDENR
North Carolina Department of Environment and Natural Resources
Division of Air Quality
Pat McCrory Sheila C. Holman John E. Skvarla, III
Governor Director Secretary
February 4, 2014
Mr. Alan Skrzypczak
Facility Manager
Stericycle, Inc.
Post Office Box 310
Haw River,North Carolina 27258
SUBJECT: Review of 2013 CO/02 CEMS Certification Report for HMIWI ESO1 & ES02
Stericycle, Inc.
Haw River, Alamance County,North Carolina
Facility ID# 0100010; Air Permit No. 05896T21
Dear Mr. Skrzypczak:
The Division of Air Quality (DAQ) has reviewed the subject report, received January 9, 2014,
for the following carbon monoxide (CO) and oxygen(02) analyzers operating on hospital,
medical and infectious waste incinerator (HMIWI) ESO1 and HMIWI ES02:
Source Manufacturer/Model Serial No. Parameter
Thermo Scientific 48i CM 09080036 CO
ES01
Ametek Series 2000 C403631 02
Thermo Scientific 48i CM 090800035 CO
ES02
Ametek Series 2000 C403557 02
Stericycle was required to certify both analyzers again since the sampling probes were relocated,
thereby constituting a major modification to the sampling systems. Certification for each CO/02
continuous emissions monitoring system (CEMS) included a relative accuracy test audit
(RATA), calibration error test, response time test, and 7-day calibration drift test. RATA testing
was conducted by TRC Environmental Corp. (TRC) and 7-day drift tests were performed by
Stericycle. Based on our review, we offer the following comments:
1. For ESO 1, a RATA was performed on November 22, 2013 and the 7-day calibration drift test
was conducted from November 16, 2013 to November 23, 2013.
Technical Services Section
1641 Mail Service Center, Raleigh, North Carolina 27699-1641
217 West Jones Street,Raleigh,North Carolina 27603
Phone:919-707-8407/Fax:919-715-0718
Internet:www.ncair.org
An Equal Opportunity 1 Affirmative Action Employer—Made in part by Recycled Paper
Mr. Alan Skrzypczak
February 4, 2014
Page 2
2. For ES02, a RATA was performed on November 21, 2013 and the 7-day calibration drift test
was conducted from November 14, 2013 to November 22, 2013.
3. Test results from the report indicate all CO and 02 analyzers appear to have met the
requirements for relative accuracy, calibration error, and response time as set forth in
Performance Specification 4A (PS 4A), which is found at 40 CFR Part 60, Appendix B.
Since the analyzer met the 7-day drift limit, from November 23, 2013, and ES02 is certified
effective November 22, 2013.
4. For the backup CO CEMS (Mfg/model: Thermo Scientific/48i; Serial#: CM 09080034) to
ESO1 and ES02, test results indicate the backup analyzer met the requirements for relative
accuracy, calibration error, and response time as set forth in PS-4. A RATA was performed
on ESO1 using the backup analyzer on November 22, 2013, and for ES02, on November
21, 2013. A 7-day calibration drift test was conducted from November 20, 2013 to
November 26, 2013. Should the backup CEMS be pressed into service, please refer to our
letter of December 12, 2012, for conditions of its use.
5. 40 CFR Part 60, Appendix F (permit condition 2.1.A.1.h.) requires that quarterly audits
must be conducted, with a RATA being conducted at least once every four calendar
quarters. The next RATA for,ESOI and ES02 should be completed by December 31, 2015.
If you should have any questions, please contact me at (919) 707-8493 or alan.drake@ncdenr.gov.
Sincerely,
Alan Drake
Environmental Engineer
cc: Michael Pjetraj, RCO
Lisa Edwards, WSRO
Central Files, Alamance County
IBEAM (0100010)