Loading...
HomeMy WebLinkAboutAQ_F_0100010_20120203_CEM_RptRvwLtr RCDENR North Carolina Department of Environment and Natural Resources Division of Air Quality Beverly Eaves Purdue Sheila C. Holman Dee Freeman Governor Director Secretary February 3, 2012 Mr. Alan Skrzypczak Facility Manager Stericycle, Inc. Post Office Box 310 Haw River,North Carolina 27258 SUBJECT: Review of 2011 CO/02 CEMS Certification Report for HMIWI ESO1 & ES02 Stericycle, Inc. Haw River, Alamance County, North Carolina Facility ID# 0100010; Air Permit No. 05896T19 Dear Mr. Skrzypczak: The Division of Air Quality (DAQ) has reviewed the subject certification report received January 6, 2012, for the following carbon monoxide (CO) and oxygen (02)analyzers operating on hospital, medical and infectious waste incinerator (HMIWI) ESO1 and HMIWI ES02: Source Manufacturer/Model Serial No. Parameter Thermo Scientific 48i CM 0908000 CO ESO1 Ametek Series 2000 C403631 02 Thermo Scientific 48i CM 090800035 CO ES02 Ametek Series 2000 C403557 02 Certification for each CO/02 continuous emissions monitoring system (CEMS) included a relative accuracy test audit (RATA) and a 7-day calibration drift test. RATA testing was conducted by Custom Stack Analysis, LLC, and 7-day drift tests were performed by Stericycle. Based on our review, we offer the following comments: 1. For ES01, the RATA was performed on November 16, 2012 and the 7-day calibration drift test was conducted from November 2, 2011 to November 8, 2011. Technical Services Section 1641 Mail Service Center,Raleigh,North Carolina 27699-1641 One 217 West Jones Street,Raleigh,NC 27603 NorthCarohna Phone: 919-707-8407/FAX 919-715-0718/Internet: www.ncair.org Natuipally An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Mr. Alan Skrzypczak February 3, 2012 Page 2 2. For ES02, the RATA was performed on November 15, 2012 and the 7-day calibration drift test was conducted from November 2, 2011 to November 8, 2011. 3. Test results from the RATA indicate all CO and 02 analyzers appear to have met the relative accuracy requirements set forth in Performance Specifications 3 & 4, which are found in 40 CFR Part 60, Appendix B. Since each analyzer also met its respective 7-day drift limit, ESO1 is certified effective November 16, 2012, and ES02 is certified effective November 15, 2012. 4. 40 CFR Part 60, Appendix F (permit condition 2.LA.l.h.)requires that quarterly audits must be conducted, with a RATA being conducted at least once every four calendar quarters. The next RATA for ESO1 and ES02 should be completed by December 30, 2012. 5. In order for DAQ to adequately assess the ongoing performance of the CO/02 CEMS operating on ESO1 and ES02, we ask that your facility provide quarterly summaries of percent excess emissions (%EE) and percent monitor downtime (%MD). Please note that each summary should be calculated on a quarterly basis. DAQ considers a facility to have operated with improper operation and maintenance (O&M) practices if the quarterly %EE and/or %MD exceeds 6% for any single calendar quarter or 3% for two consecutive quarters. We request that you provide the quarterly summaries on a semiannual basis in accordance with 15A NCAC 02D .0605 and condition 2.1.A.Ld. of your air permit. If you should have any questions, please contact me at (919) 707-8493 or alan.drake@ncdenr.gov. Sincerely, Alan Drake Environmental Engineer cc: Michael Pjetraj, RCO Margaret Love, WSRO Central Files, Alamance County IBEAM (0 1000 10)