HomeMy WebLinkAboutAQ_F_2100073_20150921_ST_ProtRvw North Carolina Department of Environmental Quality
Pat McCrory Donald R. van der Vaart
Governor Secretary
September 21,2015
Erik R. Wiborg
Facilities Manager
Regulator Marine, Inc.
P. O.Box 49
Edenton,NC 27932
Subject: Regulator Marine,Inc.
Edenton, Chowan County,North Carolina
Facility ID 2100073,Air Permit No. 07132T11
Carbon Monoxide Test Protocol Submitted by Integrity Air Monitoring,Inc.
Proposed Test Date: September 24,2015
Tracking No. 2015-177st
Dear Mr. Wiborg:
The North Carolina Division of Air Quality(DAQ)has reviewed the protocol submittal form(PSF)for
carbon monoxide(CO) emissions testing of Emission Source ES-I4. The proposed testing is acceptable as
discussed in this letter.
Emission Source ID ESOI4 is a diesel-fired peak shaving generator controlled by diesel oxidation catalyst
CD-I4. The maximum permitted capacity is 764 horsepower. 40 CFR 63 Subpart ZZZZ National Emission
Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engine(RICE).
The engine is classified as new under the regulations. 63 Subpart ZZZZ requires a minimum CO reduction
efficiency greater than or equal to 70%.
Integrity proposed inlet and outlet sampling in accordance with EPA Methods 3A and 10 to determine the
CO removal efficiency. The PSF indicates that EPA Method 3A and 10 sampling will be performed
simultaneously at the inlet and outlet. The proposed testing is acceptable.
The PSF states"Inlet and outlet oxidizer pressure or differential pressure and engine temperatures will
electronically collected every minute and engine kW output will collected manually and logged every five
minutes." The proposed process monitoring is acceptable. Please note,the permit requires monitoring of
inlet temperature and oxidizer differential pressure. Since the monitoring is routinely performed using
station instrumentation,DAQ requires this station instrumentation be used to obtain the inlet temperature and
differential pressure during compliance testing. These station instruments should be periodically calibrated
to ensure proper indication. All required process data shall be included in the test report.
Testing must be conducted at full normal load. DAQ grants the request in your August 21,2015 letter to test
within f 10%of"maximum facility demand"load of 250 kW rather than at permitted maximum capacity of 500
kW. Please document the load conditions in the final test report and any additional documentation to
demonstrate that this load was representative. DAQ concurs with your intention to"pursue a permit
modification limiting the engine output power to avoid this issue with future testing.
1641 Mail Service Center,Raleigh, North Carolina 27699-1641
Phone:919-707-84001 Internet:www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer—Made in part by recycled paper
Mr. Eric Wiborg
September 21, 2015
Page 2
Approval of this sampling protocol does not exempt the tester from the minimum requirements of the sampling
methods nor does it exempt the facility from any regulatory or testing requirements. Deviations from this
approved protocol remain subject to approval by DAQ. If you have questions,please contact me at
919-707-8416 or shannon.vogel@ncdenr.gov.
Sincerely,
Ak" �U'7�
Shannon Vogel
Environmental Engineer
Division of Air Quality,NCDEQ
cc: Robert Fisher,Washington Regional Office
Central Files, Chowan County