HomeMy WebLinkAboutAQ_F_1700005_20150601_PRMT_Permit ARTwr,
i{
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R. van der Vaart
{ Governor Secretary
a
ll
June 1, 2015
i
{ Mr. Douglas Dawson
General Manager
Piedmont Asphalt, LLC
P.O. Box 11328
Danville, VA 24543
Subject: Air Permit No. 01902R20
Piedmont Asphalt, LLC
Pelham, Caswell County,North Carolina
Permit Class: Synthetic Minor
Facility ID# 1700005
Dear Mr. Dawson:
In accordance with your completed application received May 14,2015, we are forwarding
herewith Permit No. 01902R20 to Piedmont Asphalt, LLC, Pelham, Caswell County,North
Carolina for the construction and operation of air emissions sources or air cleaning devices and
appurtenances. Additionally, any emissions activities determined from your air permit application
as meeting the exemption requirements contained in 15A NCAC 2Q .0102 have been listed for
information purposes as an"ATTACHMENT" to the enclosed air permit. Please note the records
retention requirements are contained in General Condition 2 of the General Conditions and
Limitations.
If any parts, requirements, or limitations contained in this permit are unacceptable to you,
you have the right to request a formal adjudicatory hearing within 30 days following receipt of this
permit, identifying the specific issues to be contested. Such a request will stay the effectiveness of
the entire permit. This hearing request must be in the form of a written petition, conforming to G.S.
150B-23 of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh,NC 27699-6714. The form for requesting a formal
adjudicatory hearing may be obtained upon request from the Office of Administrative Hearings.
Unless a request for a hearing is made pursuant to G.S. 15013-23, this air permit shall be final and
binding.
You may request modification of your air permit through informal means pursuant to G.S.
15013-22. This request must be submitted in writing to the Director and must identify the specific
provisions or issues for which the modification is sought. Please note that the permit will become
t
t
Winston-Salem Regional Office-Division of Air Quality
450 West Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105
Phone:336-776-9800/FAX:336-776-9797
Internet:www.ncdenr.gov
An Equal Opportunity\Affirmative Action Employer-Made in part by recycled paper
Douglas Dawson
June 1, 2015
Page 2
final and binding regardless of a request for informal modification unless a request for a hearing is
also made under G.S. 15013-23.
Unless exempted by a condition of this permit or the regulations, construction of new
air pollution sources or air cleaning devices, or modifications to the sources or air cleaning
devices described in this permit must be covered under a permit issued by the Division of Air
Quality prior to construction. Failure to do so is a violation of G.S. 143-215.108 and may
subject the Permittee to civil or criminal penalties as described in G.S. 143-215.114A and 143-
1
215.114B.
This permit shall be effective from June 1, 2015 until May 31, 2023, is nontransferable to
future owners and operators, and shall be subject to the conditions and limitations as specified
therein.
Changes have been made to the permit stipulations. The Permittee is responsible for
carefully reading the entire permit and evaluating the requirements of each permit
stipulation. The Permittee shall comply with all terms, conditions, requirements, limitations
and restrictions set forth in this permit. Noncompliance with any permit condition is grounds
for enforcement action, for permit termination, revocation and reissuance, or modification, or
for denial of a permit renewal application.
l
• One hot mix asphalt storage silo (ID No. ES2.4)has been added to the permit and one liquid
asphalt storage tank with 1000 gallons capacity (ID No. I-ES8)has been added to the
a Insignificant/Exempt Activities Attachment to this permit.
S
• The emission test in accordance with 2D .0605 will be required in 2016. The Condition A.9
r pertaining to 21) .0605 has been added in this this permit. Please see Condition A.9 for
detailed testing requirements.
• The SO2 PSD avoidance condition was advertently omitted from the last permit and has
been added to this revision. See Condition A.14 for details.
• The "fugitive dust"definition in Condition A. 8 has been updated in this permit.
i
• The permit expiration date and inventory have been adjusted from a 5 year cycle to an 8 year
cycle in accordance with NC G.S. §143-215.108(d1),which was revised through the
Regulatory Reform Act (Session Law 2013-413) on August 23, 2013.
• The contact information in Condition B.1 has been updated.
9
}
1
Y
ag�
e
Douglas Dawson
June 1, 2015
t
Page 3
Should you have any questions concerning this matter, please contact Caroline (Ying) Sun at
336-776-9649.
Sincerely,
Lisa Edwards P.E. Regional Supervisor
g p
Division of Air Quality,NCDENR
i
YS
Enclosures
c: Winston-Salem Regional Office
i
a
i4
i�
i
L
4
ai
it
{
Y
N
I�
N
F
k
d
J
:a
1
J
j ,
a
a
II
i
7
�I
i
,�
,;
i
';
j
a
1
a
E
i
I
i
P
g
I
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF AIR QUALITY
AIR PERMIT NO. 01902R20
Issue Date: June 1, 2015 Effective Date: June 1, 2015
Expiration Date: May 31, 2023 Replaces Permit: 01902R19
7
i
1
To construct and operate air emission source(s) and/or air cleaning device(s), and for the
discharge of the associated air contaminants into the atmosphere in accordance with the provisions
of Article 21B of Chapter 143, General Statutes of North Carolina (NCGS) as amended, and other
applicable Laws, Rules and Regulations,
Piedmont Asphalt, LLC
1675 Rock Quarry Road
Pelham, Caswell County,North Carolina
Permit Class: Synthetic Minor
Facility ID# 1700005
(the Permittee) is hereby authorized to construct and operate the air emissions sources and/or air
cleaning devices and appurtenances described below:
Emission Emission Source Control Control System
Source ID Description System ID Description
350 tons per hour Hot Mix Asphalt Drum Mix Plant (NSPS),consisting oh.
Natural gas/No.2 fuel oil/used No.2 fuel oil/No.4 fuel Bagfilter
ES 1 oil/used No.4 fuel oil-fired double barrel drum mixer : CDl
(116 million Btu per hour maximum heat input) (10,842 square feet of filter area)'
ES2 1,ES2 2 Three(3)hot mix asphalt storage silos
and ES2 4 (200 ton capacity,each)
u _ ._. _.,._. T:_ ,.,...__. N/A N/A
�mm . ES2.3 I_-- Cold asphalt storage silo(40 ton capacity)
r E93 Truck Loadout Operation
in accordance with the completed application 1700005.15A received May 14, 2015 including any
a
plans, specifications,previous applications, and other supporting data, all of which are filed with the
Department of Environment and Natural Resources, Division of Air Quality (DAQ) and are
incorporated as part of this permit.
4
Permit No. 01902R20
Page 2
This permit is subject to the following specified conditions and limitations including any
TESTING, REPORTING, OR MONITORING REQUIREMENTS:
j A. SPECIFIC CONDITIONS AND LIMITATIONS
l 1. Any air emission sources or control devices authorized to construct and operate above must
be operated and maintained in accordance with the provisions contained herein. The
Permittee shall comply with applicable Environmental Management Commission
Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter
2D .0202, 2D .0506, 2D .0516, 2D .0521, 2D .0524 (40 CFR 60, Subpart I), 2D .0535, 2D
.0540, 2D .0605, 2D .0611, 2D .1806, 2Q .0309, 2Q .0315 and 2Q .0317 (PSD Avoidance
and 2Q. 0711 Avoidance).
2. PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT- The Permittee,
at least 90 days prior to the expiration date of this permit, shall request permit renewal by
letter in accordance with 15A NCAC 2Q .0304(d) and (f). Pursuant to 15A NCAC 2Q
`i .0203(i), no permit application fee is required for renewal of an existing air permit(without
a modification request). The renewal request (with AA application form) should be
submitted to the Regional Supervisor, DAQ. Also, at least 90 days prior to the expiration
date of this permit, the Permittee shall submit the air pollution emission inventory report
(with Certification Sheet) in accordance with 15A NCAC 2D .0202,pursuant to N.C.
General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ
and shall document air pollutants emitted for the 2021 calendar year.
3. PARTICULATE CONTROL REQUIREMENT- As required by 15A NCAC 2D .0506
"Particulates from Hot Mix Asphalt Plants,"
a. Particulate matter emissions resulting from the operation of a hot mix asphalt plant
shall not exceed allowable emission rates. The allowable emission rates are, as
defined in 15A NCAC 2D .0506, a function of the process weight rate and shall be
determined by the following equation(calculated to three significant figures), where
P is the process throughput rate in tons per hour(tons/hr) and E is the allowable
emission rate in pounds per hour(lbs/hr).
E=4.9445 * (P) 0.4376 for P <300 tons/hr, or
E = 60 lbs/hr for P>=300 tons/hr
b. Visible emissions from stacks or vents at a hot mix asphalt plant shall be less than 20
R percent opacity when averaged over a six-minute period.
c. Fugitive dust emissions shall be controlled as required by 15A NCAC 2D .0540
"Particulates From Fugitive Dust Emission Sources."
d. Fugitive emissions for sources at a hot mix asphalt plant not covered elsewhere
under this Rule shall not exceed 20 percent opacity averaged over six minutes.
Permit No. 01902R20
Page 3
4. SULFUR DIOXIDE CONTROL REQUIREMENT - As required by 15A NCAC 2D .0516
"Sulfur Dioxide Emissions from Combustion Sources," sulfur dioxide emissions from the
combustion sources shall not exceed 2.3 pounds per million Btu heat input.
5. VISIBLE EMISSIONS CONTROL REQUIREMENT - As required by 15A NCAC 2D
0521 "Control of Visible Emissions," visible emissions from the emission sources,
manufactured after July 1, 1971, shall not be more than 20 percent opacity when.averaged
over a six-minute period, except that six-minute periods averaging not more than 87 percent
opacity may occur not more than once in any hour nor more than four times in any 24-hour
aperiod. However, sources which must comply with 15A NCAC 2D .0524 "New Source
Performance Standards" or .1110 "National Emission Standards for Hazardous Air
Pollutants" must comply with applicable visible emissions requirements contained therein.
i
r 6. 15ANCAC 2D .0524 "NEW SOURCE PERFORMANCE STANDARDS" - For double
a
� barrel drum mixer(ID No. ES 1),the Permittee shall comply with all applicable provisions,
including the notification,testing, reporting, recordkeeping, and monitoring requirements
contained in Environmental Management Commission Standard 15A NCAC 2D .0524
"New Source Performance Standards" (NSPS) as promulgated in 40 CFR 60, Subpart I,
including Subpart A "General Provisions."
Jj a. NSPS Emissions Limitations -As required by 15A NCAC 2D .0524,the Permittee
shall not discharge or cause the discharge into the atmosphere from any affected
a source any gases which:
i. Contain particulate matter in excess of 90 mg/dscm (0.04 gr/dscf); or
ii. Exhibit 20 percent opacity, or greater.
} 7. NOTIFICATION REQUIREMENT-As required by 15A NCAC 2D .0535,the Permittee of
a source of excess emissions that last for more than four hours and that results from a
malfunction, a breakdown of process or control equipment or any other abnormal
conditions, shall:
a. Notify the Director or his designee of any such occurrence by 9:00 a.m. Eastern time
of the Division's next business day of becoming aware of the occurrence and
describe:
i. the name and location of the facility,
ii. the nature and cause of the malfunction or breakdown,
iii. the time when the malfunction or breakdown is first observed,
iv. the expected duration, and
V. an estimated rate of emissions.
I
Permit No. 01902R20
Page 4
b. Notify the Director or his designee immediate) when the corrective measures have
g Y
been accomplished.
This reporting requirement does not allow the operation of the facility in excess of
Environmental Management Commission Regulations.
8. FUGITIVE DUST CONTROL REQUIREMENT-As required by 15A NCAC 2D .0540
"Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow
fugitive dust emissions to cause or contribute to substantive complaints or excess visible
emissions beyond the property boundary. If substantive complaints or excessive fugitive
dust emissions from the facility are observed beyond the property boundaries for six minutes
in any one hour(using Reference Method 22 in 40 CFR,Appendix A),the owner or
operator may be required to submit a fugitive dust plan as described in 2D .0540(f).
ii
.I
"Fugitive dust emissions" means particulate matter that does not pass through a process
stack or vent and that is generated within plant property boundaries from activities such as:
unloading and loading areas,process areas stockpiles, stock pile working,plant parking lots,
and plant roads (including access roads and haul roads).
I 9. TESTING REQUIREMENT-Under the provisions of North Carolina General Statute 143-
215.108 and in accordance with 15A NCAC 2D .0605,the Permittee shall demonstrate
compliance with the emission limit(s) by testing the emission source(s) for the specified
pollutant(s) as follows:
Emission Limits
Affected Source(s) Pollutant as Per 15A Test Method.
NCAC 2D .0506
Natural gas/No. 2 fuel oil/used No. Visible Emissions 20% Opacity Method 9
" _ _ �_ W
2 fuel oil/No. 4 fuel oil/used No. 4
fuel oil-fired double barrel drum Filterable plus Method 5
mixer (116 million"Btu per hour Condensible 60 lb/hr plus Method
maximum heat input; ID No. ES1)
Particulate Matter 202
a. The Permittee shall arrange for air emission testing protocols to be provided to the
DAQ prior to testing. Testing protocols are not required to be pre-approved by the
DAQ prior to testing. The DAQ shall review testing protocols for pre-approval prior
to testing if requested by the Permittee at least 45 days before conducting the test.
b. To afford the Regional Supervisor, DAQ,the opportunity to have an observer
present,the Permittee shall PROVIDE the Regional Office, in WRITING, at least 15
days notice of any required performance test(s).
c. Two copies of the test results must be submitted to the Regional Supervisor, DAQ, in
accordance with the approved procedures of the Environmental Management
Commission by December 31, 2016.
} Permit No. 01902R20
Page 5
d. This permit may be revoked, with proper notice to the Permittee, or enforcement
procedures initiated, if the results of the test(s) indicate that the facility does not meet
applicable limitations.
e. The source shall be responsible for ensuring, within the limits of practicality, that the
equipment or process being tested is operated at or near its maximum normal
production rate, or at a lesser rate if specified by the Director or his delegate.
f. All associated testing costs are the responsibility of the Permittee.
10. FABRIC FILTER REQUIREMENTS including cartridge filters,baghouses, and other dry
„i filter particulate collection devices - As required by 15A NCAC 2D .0611, particulate matter
emissions shall be controlled as described in the permitted equipment list.
a
a. Inspection and Maintenance Requirements - To comply with the provisions of this
E permit and ensure that emissions do not exceed the regulatory limits,the Permittee
j shall perform, at a minimum, an annual (for each 12 month period following the
initial inspection) internal inspection of the bagfilter system. In addition, the
Permittee shall perform periodic inspections and maintenance as recommended by
1 the equipment manufacturer.
7
b. Recordkeeping Requirements -The results of all inspections and any variance from
manufacturer's recommendations or from those given in this permit(when
applicable) shall be investigated with corrections made and dates of actions recorded
in a logbook. Records of all maintenance activities shall be recorded in the logbook.
The logbook (in written or electronic format) shall be kept on-site and made
available to DAQ personnel upon request.
r
11. CONTROL AND PROHIBITION OF ODOROUS EMISSIONS - As required by 15A
NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not
operate the facility without implementing management practices or installing and operating
odor control equipment sufficient to prevent odorous emissions from the facility from
causing or contributing to objectionable odors beyond the facility's boundary.
t
12. PERMIT REOPENING - In accordance with N.C.G.S. 143-215.108(c), upon the Director
becoming aware of any credible air emissions data not previously considered by the DAQ
during the application review process,the Director may require the Permittee to submit
additional information including, but not limited to, emissions estimates and air dispersion
modeling. Based on this information, the Director may modify and reissue the permit with
additional emission controls and/or additional operational restrictions necessary to
r demonstrate compliance with any applicable regulation.
Permit No. 01902R20
Page 6
E
13. LIMITATION TO AVOID 15A NCAC 2Q .0501 - Pursuant to 15A NCAC 2Q .0315
"Synthetic Minor Facilities," to avoid the applicability of 15A NCAC 2Q .0501 "Purpose of
Section and Requirement for a Permit," as requested by the Permittee, facility-wide
emissions shall be less than the following:
�ollutant�
Emission Limit
(Tons per consecutive 12-month period)
100 SOZ . _.__.._ _ _CO 100
:...._.............:.....:_......................._....._.........._...,............................................_._... _........._.................................._....._.........................
j a. Operations Restrictions - To ensure emissions do not exceed the limitations above,
the following restrictions shall apply:
i. The total amount of asphalt produced shall be less than 720,OOO tons per
consecutive 12-month period.
_ ii. The sulfur content of the No. 4/used No.4 fuel oil shall be limited to 1.05%
sulfur by weight.
ill. If multiple fuels are used, emissions should be determined using the sum of
the individual emissions rates.
7
b. Recordkeeping_Requirements
i. The Permittee shall record monthly and total annually the following:
A. The total amount of asphalt produced(tons)
ii. Fuel supplier certification shall be kept on-site and made available to DAQ
personnel upon request.
c. Reporting Requirements - Within 30 days after each calendar year, regardless of the
actual emissions,the Permittee shall submit the following:
i. Emissions and/or operational data listed below. The data should include
monthly and 12 month totals for the previous 12 month period.
A. The total amount of asphalt produced(tons); and
B. The facility-wide sulfur dioxide and carbon monoxide emission.
14. LIMITATION TO AVOID 15A NCAC 2D .0530 "PREVENTION OF SIGNIFICANT
DETERIORATION" - In accordance with 15A NCAC 2Q .0317,to comply with this permit
and avoid the applicability of 15A NCAC 2D .0530 "Prevention of Significant
Deterioration," as requested by the Permittee, emissions shall be limited as follows:
Affected Sources) Pollutant Emission Limit(Tons Per Consecutive 12-month Period)
Facility Wide SO2 250
Permit No. 01902R20
Page 7
15. VENDOR SUPPLIED RECYCLED No(s). 2 and 4 FUEL OIL REQUIREMENTS - In
accordance with Rule 2Q .0317,the Permittee is avoiding the applicability of Rule 2Q .0700
by using recycled fuels which are equivalent to their virgin counterparts. The Permittee is
allowed to use the recycled fuel oil(s) supplied by a DAQ-approved vendor as follows:
j a. Specifications - The recycled fuel oil(s) shall be equivalent to unadulterated fossil
fuel by meeting the following criteria:
i
Constituent/Property,Allowable Level
Arsenic �11.0 ppm maximum
Cadmium 2.0 ppm maximum
Chromium '5.0 ppm maximum
...._._.....
.__:. .. .......
...........
.__.._._...
(Lead . ._._.._. __.__.-. f 100 ppm maximum
Total Halogens 1000 ppm maximum
Flash Point
'i No. 2 100°F minimum
No. 4 130°F minimum
m.-�:_ .....
._ _.
fur
No. 2 0.5%maximum(by weight)
No. 4 2.0%maximum(by weight),
�,.�_ ,._— _::- .:.� _ _...........
IAsh (1 0%maximum
b. The Permittee is responsible for ensuring that the recycled fuel oil(s), as received at
the site, meet(s)the approved criteria for unadulterated fuel. The Permittee is held
responsible for any discrepancies discovered by DAQ as a result of any sampling and
analysis of the fuel oil(s).
1
c. Recordkeeping Requirements - The Permittee shall maintain at the facility for a
minimum of three years, and shall make available to representatives of the DAQ
upon request, accurate records of the following:
i. The actual amount of recycled fuel oil(s) delivered to, and combusted at the
facility on an annual basis.
ii. Each load of recycled fuel oil received shall include the following:
A. A delivery manifest document clearly showing the shipment content
and amount, its place and date of loading, and place and date of
destination.
B. A batch specific analytical report that contains an analysis for all
constituents/properties listed above. Analytical results of the samples
representative of the recycled oil shipment from the vendor shall be
no more than one year old when received.
Permit No. 01902R20
Page 8
C. Batch signature information consisting of the following: a batch
number,tank identification with batch volume of recycled oil, date
and time the batch completed treatment, and volume(s) delivered.
D. A certification indicating that the recycled fuel oil does not contain
detectable PCBs (<2ppm).
d. Reporting Requirements - Within 30 days after each calendar year, regardless of the
amount received or combusted,the Permittee shall submit in writing to the Regional
{ Supervisor, DAQ, the following:
j i. A summary of the results of the analytical testing for the previous 12 months.
ii. The total gallons of recycled fuel oil(s) from each approved vendor
jcombusted at the facility for the previous 12 months.
e. The DAQ reserves the right to require additional testing and/or monitoring of the
recycled fuel oil(s) on an annual basis or without notice.
B. GENERAL CONDITIONS AND LIMITATIONS
1. In accordance with G.S. 143-215.108(c)(1), TWO COPIES OF ALL DOCUMENTS
REPORTS, TEST DATA, MONITORING DATA,NOTIFICATIONS, REQUESTS FOR
RENEWAL, AND ANY OTHER INFORMATION REQUIRED BY THIS PERMIT shall
be submitted to the:
Regional Supervisor
North Carolina Division of Air Quality
Winston-Salem Regional Office
450 West Hanes Mill Road
Suite 300
Winston-Salem,NC 27105
336-776-9800
L
For identification purposes, each submittal should include the facility name as listed on the
permit, the facility identification number, and the permit number.
2. RECORDS RETENTION REQUIREMENT- In accordance with 15A NCAC 2D .0605,
any records required by the conditions of this permit shall be kept on site and made available
to DAQ personnel for inspection upon request. These records shall be maintained in a form
suitable and readily available for expeditious inspection and review. These records must be
kept on site for a minimum of 2 years, unless another time period is otherwise specified.
S
3. ANNUAL FEE PAYMENT - Pursuant to 15A NCAC 2Q .0203(a), the Permittee shall pay
the annual permit fee within 30 days of being billed by the DAQ. Failure to pay the fee in a
timely manner will cause the DAQ to initiate action to revoke the permit.
Permit No. 01902R20
Page 9
F
4. EQUIPMENT RELOCATION - In accordance with 15A NCAC 2Q .0301, anew air permit
shall be obtained by the Permittee prior to establishing, building, erecting, using, or
operating the emission sources or air cleaning equipment at a site or location not specified in
this permit.
a 5. REPORTING REQUIREMENT- In accordance with 15A NCAC 2Q .0309, any of the
following that would result in previously unpermitted,new, or increased emissions must be
reported to the Regional Supervisor, DAQ:
j a. changes in the information submitted in the application regarding facility emissions;
i
b. changes that modify equipment or processes of existing permitted facilities; or
si
c. changes in the quantity or quality of materials processed.
1
1 If appropriate, modifications to the permit may then be made by the DAQ to reflect any
4 necessary changes in the permit conditions. In no case are any new or increased emissions
allowed that will cause a violation of the emission limitations specified herein.
6. In accordance with 15A NCAC 2Q .0309, this permit is subject to revocation or
modification by the DAQ upon a determination that information contained in the application
or presented in the support thereof is incorrect, conditions under which this permit was
granted have changed, or violations of conditions contained in this permit have occurred. In
' accordance with G.S. 143-215.108(c)(1), the facility shall be properly operated and
maintained at all times in a manner that will effect an overall reduction in air pollution:
Unless otherwise specified by this permit,no emission source may be operated without the
concurrent operation of its associated air cleaning device(s)and appurtenances.
7. In accordance with G.S. 143-215.108(c)(1), this permit is nontransferable by the Permittee.
Future owners and operators must obtain a new air permit from the DAQ.
k8. In accordance with G.S. 143-215.108(c)(1),this issuance of this permit in no way absolves
the Permittee of liability for'any potential civil penalties which may be assessed for
violations of State law which have occurred prior to the effective date of this permit.
9. In accordance with G.S. 143-215.108(c)(1), this permit does not relieve the Permittee of the
responsibility of complying with all applicable requirements of any Federal, State, or Local
water quality or land quality control authority.
10. In accordance with 15A NCAC 2D .0605, reports on the operation and maintenance of the
facility shall be submitted by the Permittee to the Regional Supervisor, DAQ at such
intervals and in such form and detail as may be required by the DAQ. Information required
in such reports may include,but is not limited to, process weight rates, firing rates,hours of
operation, and preventive maintenance schedules.
11. A violation of any term or condition of this permit shall subject the Permittee to enforcement
pursuant to G.S. 143-215.114A, 143-215.11413, and 143-215.114C, including assessment of
civil and/or criminal penalties.
Permit No. 01902R20
Page 10
1
12. Pursuant to North Carolina General Statute 143-215.3(a)(2), no person shall refuse entry or
access to any authorized representative of the DAQ who requests entry or access for
purposes of inspection,and who presents appropriate credentials, nor shall any person
obstruct, hamper, or interfere with any such representative while in the process of carrying
out his official duties. Refusal of entry or access may constitute grounds for permit
revocation and assessment of civil penalties.
i
13. In accordance with G.S. 143-215.108(c)(1),this permit does not relieve the Permittee of the
responsibility of complying with any applicable Federal, State, or Local requirements
governing the handling, disposal, or incineration of hazardous, solid, or medical wastes,
including the Resource Conservation and Recovery Act(RCRA) administered by the
i
Division of Waste Management.
14. PERMIT RETENTION REQUIREMENT- In accordance with 15A NCAC 2Q .0110, the
Permittee shall retain a current copy of the air permit at the site. The Permittee must make
!, available to personnel of the DAQ, upon request,the current copy of the air permit for the
site.
15. CLEAN AIR ACT SECTION 112(r) REQUIREMENTS - Pursuant to 15A NCAC 2D .2100
"Risk Management Program," if the Permittee is required to develop and register a risk
management plan pursuant to Section 112(r) of the Federal Clean Air Act, then the
Permittee is required to register this plan with the USEPA in accordance with 40 CFR Part
68.
16. PREVENTION OF ACCIDENTAL RELEASES - GENERAL DUTY - Pursuant to Title I
Part A Section 112(r)(1) of the Clean Air Act "Hazardous Air Pollutants - Prevention of
Accidental Releases - Purpose and General Duty," although a risk management plan may not
be required, if the Permittee produces, processes, handles, or stores any amount of a listed
hazardous substance, the Permittee has a general duty to take such steps as are necessary to
prevent the accidental release of such substance and to minimize the consequences of any
release. This condition is federally-enforceable only.
17. GENERAL EMISSIONS TESTING AND REPORTING REOUIREMENTS - If emissions
testing is required by this permit, or the DAQ, or if the Permittee submits emissions testing
to the DAQ in support of a permit application or to demonstrate compliance,the Permittee
shall perform such testing in accordance with 15A NCAC 2D .2600 and follow all DAQ
procedures including protocol approval, regional notification, report submittal, and test
results approval.
Permit issued this the 1"of June, 2015.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Lisa Edwards,_P.E.
Regional Supervisor
By Authority of the Environmental Management Commission
Air Permit No. 01902R20
ATTACHMENT to Permit No, 01902R20, June 1, 2015
Insignificant/Exempt Activities
Exemption Source of Source of
Source Regulation ' TAP Title V
s?
Pollutants?
I-1 -Natural gas/No. 2 fuel oil-fired hot oil heater 2Q .0102
(1.6 million Btu per hour maximum heat input) (c)(2)(B)(i)(I)
I-2 -Fuel oil storage tank
(1000 gallon capacity)... .. . . . 2Q .0102
FI-3 - ecycled fuel oil storage tank (c)(1)(D)(i)
0 gallons) Yes Yes
I-ES6 & I-ES7—Two (2) liquid asphalt storage tanks
(30,000 gallons capacity, each) 2Q 0102
rES8 - Liquid asphalt storage tank (c)(1)(L)(xii)
000 gallons capacity)
a
a
1. Because an activity is exempted from being required to have a permit or permit modification
does not mean that the activity is exempted from an applicable requirement or that the owner
or operator of the source is exempted from demonstrating compliance with any applicable
requirement.
z
2. When applicable, emissions from stationary source activities identified above shall be
included in determining compliance with the permit requirements for toxic air pollutants
under 15A NCAC 2D .1100 "Control of Toxic Air Pollutants" or 2Q .0711 "Emission Rates
' Requiring a Permit."