Loading...
HomeMy WebLinkAboutAQ_F_0400043_20160428_CMPL_Fac-Ltr { i C A Triangle Brick 6523 NC Highway 55 Durham, NC 27713 Durham:(919)544-1796. April 28, 2016 Raleigh: (919)828-2070 Toll Free:800-672-8547 Fax:800-849-0612 North Carolina Department of Environmental Quality Fayetteville Regional Office RE Cr E!V E D Division of Air Quality 225 Green Street-Suite 714 : MAY 0 5 2�i6 Fayetteville,North Carolina 28301-5043 I,I . r � . Attention: Steven Vozzo FRG _-., Regional Air Quality Supervisor Re: Request for Approval 1120) Equivalent Initial Compliance Demonstration Triangle Brick Company Wadesboro Brick Manufacturing Plant Dear Mr.Vozzo: This letter is a request for previously conducted performance tests at Triangle Brick Company's brick manufacturing plant in Wadesboro, NC to be approved to satisfy the current permit requirement for an initial compliance test. Triangle Brick's Wadesboro "plant complies with the Case-by-Case MACT for Brick Manufacturers, as described in 15A NCAC 2D.1109: CAA §1120). Wadesboro's Title V Permit 08179T08 contains site-specific 1120) provisions' in Section 2.1.A.4. Wadesboro's initial compliance date for its 1120) permit provisions is September 4, 2016. We have assumed that the requirements under the Case-by-Case MACT will be effective until 8 years after the effective date of the applicable federally promulgated MACT (October 26, 2023). Wadesboro's 1120) permit provisions require initial compliance testing for Particulate Matter (PM), Hydrogen Fluoride (HF), and Hydrogen Chloride (HCl) within 180 days of September 4, 2016, unless NCDAQ-SSCB (Stationary Source Compliance Branch) approves a`previously conducted performance test as an equivalent compliance demonstration. Wadesboro's 1120)permit provisions for initial compliance testing are: • PM testing is required for the tunnel kilns, K-1 and K-2, and must be Method 5 in 40 CFR 60,Appendix A. • HF'and HCl testing is required for the tunnel kilns, K-1 and K-2, and must be either: o Method 26 or 26A in 40 CFR 60, Appendix A.Method 26A may only be used when no acid PM is present, o Method 320 in in 40 CFR 63, Appendix A. • Testing may not be conducted during periods of startup, shutdown, or malfunction. Triangle Brick performed stack testing on K-2 in March 2005 and on K-1 in March 2006. The 1 testing was performed by Trigon Engineering Consultants, Inc. Copies of each report are included as attachments to this letter. Both PM tests used Method 5, and both HF and HCl tests used Method 26A, as outlined in Section 3.2 of both reports. As stated in Section 1.2 of both reports, all tests were performed during normal production and operating conditions. Section 2.1 in both reports states the jproduction rates. Triangle Brick believes that these tests satisfy the requirements of Wadesboro's 1220) permit provisions for initial compliance testing and is requesting that these tests be approved as equivalent compliance demonstrations. Please do not hesitate to contact me at (919) 544-1796 or our consultant, Rachel Kazanski at (919) 855-2293 if you have questions or if you need additional information to complete your review. Sincerely, TRIANGLE BRICK COMPANY / � �) /� t-A Howard P.Brown,Jr. Executive Vice President and Chief Operating Officer cc: Ricky Merritt—Triangle Brick Company