Loading...
HomeMy WebLinkAboutAQ_F_0400043_20161109_CMPL_Ext-Rqst PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Air Quality SHEILA C. HOLMAN ENVIRONMENTAL QUALITY Director November 9, 2016 Mr. Howard Brown, Jr. VP of Production and Engineering Triangle Brick Co Wadesboro 6523 NC Highway 55 Durham, NC 27713 SUBJECT: Extension of 30-day Test Results Reporting Requirement Granted Triangle Brick Co Wadesboro Facility ID: 0400043, Wadesboro, Anson County Air Quality Permit No. 08179T08 Facility Classification: Title V Dear Mr. Brown, Jr.: The North Carolina Division of Air Quality has received the October 31, 2016, request from Beth Barfield, ERM Principal Consultant, on your behalf, for an extension to the 30-day source test reporting requirement as listed in Section 3 General Conditions JJ (4) of your air permit. Air emissions testing was performed on September 13, 2016, at your facility, According to the letter, it was stated that the audit sample results were not received until October 28, 2016. Your request also indicates there was no indication of a violation associated with the emission test. Air permit Section 3 General Conditions—JJ (4) states that "The Director shall approve an extension request if he finds that the request is a result of actions beyond the control of owner or operator." Therefore, the request is approved. Since the extension request was submitted past the 30-day test submittal deadline, you will need to note this as a deviation on your Title V Annual Compliance Certification. If there are questions concerning this matter, please contact me at (919) 707-8497 Sincer ly Michael Pj traj, P.E., Acting Chief Technical Services Section NCDEQ, Division of Air Quality cc: Steven Vozzo, DAQ FRO Supervisor Central Files State of North Carolina I Environmental Quality I Air Quality 1641 Mail Service Center 1 217 W.Jones Street,Suite 4000 1 Raleigh,NC 27699-1641 919 707 8400 T