HomeMy WebLinkAboutAQ_F_0400028_20160907_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY Concrete Supply Co.,LLC-Wadesboro
NC Facility ID 0400028
Inspection Report County/FIPS: Anson/007
Date: 09/09/2016
Facility Data Permit Data
Concrete Supply Co.,LLC-Wadesboro Permit
Rt 4 Box 110 Issued
Wadesboro,NC 28170 Expires
Lat: 34d 58.6320m Long: 80d 5.5620m Classification
SIC: 3273 /Ready-Mixed Concrete Permit Status
NAILS: 32732/Ready-Mix Concrete Manufacturing Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Johnie Alexander Henry Batten Johnie Alexander
Environmental Manager President Environmental Manager
(704)372-2930 (704)372-2930 (704)372-2930
Compliance Data
Comments:
Inspection Date 09/07/2016
Inspector's Name Joshua L.Harris
Inspector's Signature*---y i � ` Operating Status Operating
\ Compliance Code Compliance-inspection
Action Code FCE
Date of Signature: a� On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
i
TSP S02 NOX VOC CO PM10 *HAP
i
2010 --- --- ---
I
2006 2.79 --- --- --- 0.8400 0.2410
*Highest HAP Emitted(inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
I
i
I. DIRECTIONS TO SITE: From From FRO,take Hwy 401 South to Wagram. Turn right at Old Wire
Road(Hwy 144)and continue--11 '/z miles to Laurel Hill. Turn right onto Hwy 74 West and travel—35
miles to Wadesboro. Continue through town,the facility is on the left,—50 yards past the Hwy 52
intersection.
H. SAFETY: Standard FRO safety gear is required.
III. FACILITY DESCRIPTION: Concrete Supply Co.,LLC is a dormant concrete batch plant located in
Wadesboro,Anson County. The facility has not been operational for years,but there are still silos,
conveyors and raw material bunkers on site. The facility's air quality permit was rescinded on 09 August
2016 under the newly adopted 2Q .0102(d)exemption.
IV. INSPECTION SUMMARY: On 07 September 2016,I Joshua Harris,of FRO DAQ conducted a site
visit for a multimedia inspection of the Concrete Supply Co., LLC., -Wadesboro location. This facility
remains dormant, and there are no stockpiles on site,nor is there any evidence of production activity.
According to Mr.Johnie Alexander, Environmental Manager,there are no immediate plans to operate at
this site.
V. NON-COMPLIANCE HISTORY SINCE 2010: The facility does not have a history of non-
compliance.
VI. RISK MANAGEMENT (112r): This facility does not use or store any 112(r) subject materials in excess
of threshold quantities. Therefore,the facility is not required to maintain a written Risk Management
Plan(RMP).
VH. CONCLUSION AND RECOMMENDATIONS:
Concrete Supply Co.,LLC -Wadesboro was non-operational at the time of the visit,and appeared to be
IN COMPLIANCE with applicable air quality regulations.
PINK SHEET ADDITIONS:
- None
/jih