HomeMy WebLinkAboutAQ_F_0400036_20160729_CMPL_InspRpt NORTH CAROLINA DIVISION OF Fayetteville Regional Office
AIR QUALITY B.V.Hedrick Gravel and Sand Co.-Lilesville Plant
NC Facility ID 0400036
Inspection Report County/FIPS: Anson/007
Date: 08/01/2016
Facility Data Permit Data
B.V.Hedrick Gravel and Sand Co. -Lilesville Plant Permit 06725/R05
Ingram Mountain Road-SR 1704 Issued 1/10/2014
Lilesville,NC 28091 Expires 12/31/2021
Lat: 34d 59.9820m Long: 79d 58.5360m Classification Small
SIC: 1423 /Crushed And Broken Granite Permit Status Active
NAICS: 212313/Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Jason Conner Jeffrey Goodman Jason Conner
Environmental Director President Environmental Director
(828)686-3844 (828)277-7030 (828)686-3844
Compliance Data
Comments:
Inspection Date 07/29/2016
Inspector's Name Mike Thomas
Inspector `%/ Operating Status Operating
' Compliance Cade Compliance-inspection
� Action Code FCE
Date of Signature: / /�� On-Site Inspection Result Compliance
Total Actual emissions in TONS/YEAR:
TSP S02 NOX VOC CO PM10 *HAP
2012 --- --- --
2008 --- --- --
*Highest HAP Emitted(inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE:None
Date Test Results Test Method(s) Source(s)Tested
1) Location/Directions
B.V. Hedrick Gravel and Sand Quarry-Lilesville is located on Ingram Mountain Road near Lilesville,NC,
Anson County. From Lilesville,turn right at flashing caution light onto 51 Street(at elementary school).
Follow 5' Street,and bear left to continue on Wall Street,go—%2 mile to Stanback Ferry Road. Turn right
and go %2 mile to Ingram Mountain Road,turn right and go—1 mile.Proposed quarry site is located on the
left past gate.
2) Safety Considerations
Currently there are no mining activities taking place at this facility. Standard DAQ safety gear will
be required if mining operations ever commence.
3) Facility Process and Description
This facility has never been built. The following description is what was proposed for the facility
originally.This facility is a 350 ton per hour throughput capacity crushing/screening operation that
processes granite aggregate products,using a primary jaw crusher with a capacity of 250 tons per
hour.
The granite is mined from the quarry by drilling and blasting the material. Material from the quarry is
loaded into haulage trucks via power shovel or front end loader and conveyed to the primary crusher.
A grizzly feeder is utilized to remove undersize material, and oversize material is fed to the primary
crusher,which is described as a jaw crusher, 250 tons per hour maximum throughput with a 6-inch
crusher setting. Discharged material from the crusher is sent to various secondary screens and a
secondary crusher in order to obtain various sizes of aggregate materials. The materials are stored in
piles on site,and loaded into trucks via front end loader for shipment to the customer. There is no
washing of product at this site. Particulate emissions are controlled by water sprays on the crusher,
screens, and conveyor transfer points.
There are no stationary reciprocating internal combustion engines at this site.
4) Permitted Emission Sources
2
ES Crush Not Crushing g
N Operations N/A N/A
Screening Operations
ES Screen N/A N/A
Not operating
Conveying Operations
ES Convey N/A N/A
Not operating
5) Inspection Summary
On 29 July 2016,I Mike Thomas and Daniel Thoma,both of FRO DAQ conducted a compliance
evaluation inspection of this facility. This facility has not been constructed. I left two messages on
the facility contact,Jason Connor's voicemail. To date, he has not returned my call.
6) Permit Stipulations
a) A.2 2Q .0304 PERMIT RENEWAL AND EMISSIONINYENTORYREQUIREMENT—Entire
facility subject. Submit permit renewal application and EI at least 90 days prior to permit expiration.
Appeared to be in compliance—The facility was due to submit their EI and Permit Renewal by 2
March 2014. Both were received on 12 December 2013.
The other stipulations in this permit could not be evaluated for compliance as the facility has never been
constructed.
7) 112R Status
Undetermined as the facility has not been constructed.
8) Non-compliance History Since 2010
None.
9) Comments and Compliance Statement
B. V. Hedrick Gravel and Sand Co.—Lilesville Plant appeared to be in compliance on 29 July
2016.
Pink Sheet: No comments.
/mst